International Journal of Mathematics and Mathematical Sciences
Volume 2003 (2003), Issue 39, Pages 2475-2486
doi:10.1155/S016117120321019X
Abstract
This paper addresses the two-machine flowshop scheduling problem with separate setup times to minimize makespan or total completion time (TCT). Setup times are relaxed to be random variables rather than deterministic as commonly used in the OR literature. Moreover, distribution-free setup times are used where only the lower and upper bounds are given. Global and local dominance relations are developed for the considered flowshops and an illustrative numerical example is given.