[HN Gopher] Ex-Waymo engineers launch Bedrock Robotics to automa...
       ___________________________________________________________________
        
       Ex-Waymo engineers launch Bedrock Robotics to automate construction
        
       Company announcement: https://bedrockrobotics.com/news/introducing-
       bedrock-robotic...
        
       Author : boulos
       Score  : 490 points
       Date   : 2025-07-16 16:48 UTC (1 days ago)
        
 (HTM) web link (techcrunch.com)
 (TXT) w3m dump (techcrunch.com)
        
       | fidotron wrote:
       | This will prove to be a strange business.
       | 
       | Civil engineering is already a field where the very largest
       | projects are done by humans planning and building the roads and
       | bridges for the robots to move in (such as things rented from
       | Mammoet [1] with extra control systems), but it does require
       | significant human oversight (typically a metaphorical red
       | button).
       | 
       | It's all very one off and specific, and given how big those
       | projects are that seems unlikely to change. The manufacturing of
       | suburbs though would be a whole different ballgame.
       | 
       | [1] Specifically https://en.wikipedia.org/wiki/Self-
       | propelled_modular_transpo...
        
         | ZYbCRq22HbJ2y7 wrote:
         | Do you know anything about the current state of this? I think
         | large construction equipment providers are already doing this?
        
           | fidotron wrote:
           | Apparently the providers recognize that there is significant
           | growth in the complexity of control systems, and so there is
           | a lot of fishing around for R&D funding on that side,
           | however, being classic physical hardware people they severely
           | undervalue the contribution software at that level makes.
           | 
           | Most of the actual planning and execution work is done by the
           | usual big civeng consultant companies in a very globalized
           | manner.
        
       | padjo wrote:
       | "executes work around the clock" of limited value given quite a
       | bit of construction is subject to restrictions on operating
       | hours.
        
         | barbazoo wrote:
         | Think of any construction that's remote though. Especially
         | infrastructure. Wouldn't it be cool if a bunch of excavators
         | could just work all day and night to dig that trench, move that
         | huge amount of dirt from one place to another? I feel like
         | there are lots of situations where automation could be done.
        
         | brudgers wrote:
         | At the scale where automated earth moving equipment makes
         | economic sense, those restrictions often won't apply. Highway
         | construction and other vertically integrated projects are where
         | this potentially makes sense.
         | 
         | Operating hours are the least of logistical hurdles for most
         | projects. Schedule coordination dominates and the critical path
         | can only move as fast as the slowest element on it.
        
       | xnx wrote:
       | Is this a scenario where offshore operators doing remote
       | equipment control would be 90% as good as a US union worker for
       | 15% of the price and could work in shifts 24/7 (e.g. for mining
       | operations)? Sensor + control data would be great training for
       | future AI.
       | 
       | Jumping straight to autonomous operations seems expensive/hard.
        
         | menzoic wrote:
         | Genius transition plan
        
         | beau_g wrote:
         | I was thinking the same thing but the cost of an equipment
         | operator isn't that significant compared to the expense of
         | running and especially maintaining these machines, and if
         | teleop incurs more maintenance cost or efficiency loss due to
         | clumsier operation, it's definitely a step in the wrong
         | direction financially.
        
         | gdbsjjdn wrote:
         | I'm assuming for stuff like mining and oil fields most of the
         | cost is having people on site to service the equipment, not
         | just operating the equipment. You need the robot that can
         | service the other robots, and then the robot that can service
         | itself.
        
         | bluGill wrote:
         | The hard part with remote and automation is you often are in
         | mud. Local humans are still much better able to run the edge of
         | getting stuck. and if you do get stuck local help is needed to
         | get unstuck.
        
         | germinalphrase wrote:
         | There's a startup not far from me working on remotely operated
         | construction machines. They explicitly are targeting
         | terrestrial as well as space operations, but I would be curious
         | if the communication latency to any reasonably close celestial
         | object would require autonomous operation.
        
           | Teever wrote:
           | This is interesting, I've been thinking about similar stuff.
           | Can you share the name of the startup?
        
             | germinalphrase wrote:
             | Carbon Origins.
        
       | AI_beffr wrote:
       | when its construction: jobs will be completely automated away.
       | when its white collar: AI is simply a tool!
        
         | adamredwoods wrote:
         | Only the jobs that get to decide where AI will be used (and pay
         | for the service) are safe from AI.
        
           | AI_beffr wrote:
           | i think the obvious cognitive dissonance is mostly fueled by
           | denial. it's acceptable for them to believe that the dirty
           | blue collar people will fall on hard times. also they don't
           | want to believe that white collar jobs will be lost because
           | you can't use the "teach the coal miners to code" meme-think
           | on it. turns out reality can be a little counter-intuitive
           | sometimes. sometimes it can even be different from what you
           | see on TV! wow!
        
       | jschveibinz wrote:
       | In general, the construction industry doesn't like change. This
       | would be a CHANGE.
        
         | paxys wrote:
         | No industry likes change until it is forced to change.
        
           | bluGill wrote:
           | Most 'changes' are worse than what they are doing already -
           | until they miss the exception. Outsiders are far more likely
           | to propose bad changes.
        
       | moontoast wrote:
       | Automating construction vehicles is not so much about safety
       | (like passenger vehicles) but perhaps about labor cost and
       | efficiency.
        
         | bluGill wrote:
         | It is about safety but you can put up a fence and then only
         | allowed trained people inside. Which means you can say if you
         | get killed it is your fault and the courts will back it (ask a
         | lawyer for the books of fine print)
        
       | taeric wrote:
       | I didn't think open field construction was hampered by the humans
       | in the loop? Quite the contrary, I was under the naive impression
       | that the heavy machinery was already largely doing the vast
       | majority of the work. Even when operated by a human.
       | 
       | Will be neat to see where this goes. But I'm reminded of some
       | Amazon guys that were supposed to revitalize the supply chains.
       | My memory is that that didn't work out so well.
        
         | winrid wrote:
         | It's interesting because the heavy machinery already replaced
         | 20-50 humans. Now somehow that one person that has a job is an
         | issue.
        
           | echelon wrote:
           | Do you know how much California High Speed Rail is over
           | budget?
           | 
           | What if we could bring massive infrastructure projects down
           | from the billions to the millions? Wouldn't that be a great
           | thing for all of society?
           | 
           | What if we could build new power plants, connect all cities
           | with HSR, rebuild all our old bridges, add thousands of new
           | skyscrapers, and do it all under budget?
           | 
           | Think about what steel did for society. Automated
           | construction is the next highest order step function change.
           | It'll be insanely good for society.
        
             | taeric wrote:
             | It is not lack of knowing how to build rail that is keeping
             | HSR over budget and never finished. It is lack of will.
             | Largely driven from lack of direct need.
        
               | bluGill wrote:
               | There is direct need but it isn't obvious until 5 years
               | after it is done.
        
               | taeric wrote:
               | That is indirect, pretty much by definition.
               | 
               | Directly, there are few if any jobs that are not getting
               | done due to lack of HSR today.
               | 
               | Indirectly, people project a ton of benefits to having
               | HSR.
        
               | bluGill wrote:
               | The direct need is all the people dieing on the highways.
        
             | winrid wrote:
             | What a joke. HSR is not over budget because of construction
             | equipment. It's over budget because of bureaucracy and
             | useless middlemen.
        
             | daedrdev wrote:
             | CEQA has added a stupendous amount of cost to California's
             | HSR.
        
           | namibj wrote:
           | If you can automate efficiently enough, you can build far
           | finer structures.
           | 
           | For example look at how detailed the structure and weld
           | arrangement is for modern cars, vs. back when robots only
           | just started to take care of the frame welding on the
           | assembly line.
           | 
           | Or how optical HDMI cables are affordable because they use
           | fully automated UV-cure-resin-glued fiber alignment straight
           | from the cable end into the optoelectronic chips, without
           | needing optical connectors or any other human-labor to get
           | the light path connected up. That's how they manage to do it
           | the conceptually easiest way:
           | amplifier->laser->fiber->photodiode->amplifier, and repeat
           | for the 4 high-speed pairs. Also handing the low speed
           | communication channel separately with just normal wires as
           | signal degradation isn't an issue for that.
           | 
           | Or for example 3d printer infill: that's something no one
           | would do manually in such a way, but if it's just automated
           | it's quite desirable/efficient.
           | 
           | App rental e-scooters: they rely on automation to organize
           | even when parked "pretty much anywhere they're not gonna
           | block traffic", and as such become relevant for even short
           | trips.
           | 
           | If you have an unsupervised robot that lays bricks for you to
           | build up a house, you can get away with smaller bricks (and
           | thus a lighter/cheaper machine needing a smaller crane to
           | lift up/out of higher floors), than if you need a human to
           | supervise it.
           | 
           | Smaller machine if slower means more machines, meaning
           | cheaper production of the machines due to scale.
           | 
           | Auto-feeders for nail guns in construction means more smaller
           | nails as placing 3 in a row takes barely longer than just 2.
           | Especially if the nail gun could, say, run like an optical
           | mouse and automatically trigger at a configured spacing while
           | dragged along a surface with the trigger held down.
        
         | ZYbCRq22HbJ2y7 wrote:
         | CAT and others (hyundai, hitachi, john deere, kubota, komatsu,
         | etc) are already exploring this sort of automation (and have
         | been for at least a decade).
         | 
         | This isn't somehow a new industry because some Waymo engineers
         | decided to make a company.
        
           | echelon wrote:
           | Venture dollars won't back those legacy efforts.
           | 
           | This may be an instance of companies not having enough
           | capital or talent to fend off new entrants.
           | 
           | Talent will flock to the new and exciting. The place where
           | they can get the bigger exit and work with the coolest
           | people.
        
             | taeric wrote:
             | The odds that these companies don't have moats to protect
             | their tech is... very unlikely?
        
               | ZYbCRq22HbJ2y7 wrote:
               | How much of a moat can you have guarding input into
               | controls used by humans?
        
               | taeric wrote:
               | The material sciences involved in building a lot of this
               | machinery is nothing to scoff at.
        
               | someothherguyy wrote:
               | ...steel? You don't need to build machines to implement
               | this technology.
        
               | taeric wrote:
               | Are you serious? Building a good excavator is almost
               | certainly more than just having the material. Similarly,
               | knowing how to deal with the earth will have more than a
               | few curves based on the composition.
        
               | bonestamp2 wrote:
               | I think it's similar to Tesla entering the automotive
               | world. The existing automakers had some moats, but they
               | also had a lot of legacy responsibilities and liabilities
               | that Tesla did not have (existing warranties, lawsuits,
               | recalls, parts stock, maintaining support for old
               | vehicles in various internal software systems, updating
               | software on old vehicles when age related problems arise,
               | retiree pensions/healthcare, etc).
               | 
               | A newcomer in the heavy equipment space will have similar
               | challenges and advantages. Funny enough, a lot of heavy
               | equipment works very similar to cars with their CAN (and
               | other) Buses for control and feedback.
        
               | taeric wrote:
               | I mean... Tesla still makes up a minority of vehicles out
               | there. And without government investment, they almost
               | certainly would not have made it to where they are, now?
               | 
               | Yes, Tesla was valued more for potential growth. But it
               | was also the kind of potential growth that I'm not sure
               | is viable outside of consumer spaces.
        
               | dzhiurgis wrote:
               | They are outselling BMW and Mercedes but that doesn't put
               | them in top10.
        
               | taeric wrote:
               | In total car sells, or just in EVs? Because a quick
               | search online shows each of those still sold considerably
               | more than Tesla. :(
        
             | ikr678 wrote:
             | There have been a handful of residential venture backed
             | bricklaying and extrusion concreting robotics startups that
             | I am aware of but they've had trouble with outputs not
             | meeting builsing standards, interupting other tradespeople
             | workflows on construction sites, being difficult to adapt
             | to new site conditions and ultimately a hard sell to
             | customers - no one wants to be a guinea pig test site for
             | what is likely the biggest purchase of their life.
        
           | JumpCrisscross wrote:
           | Exploring. If these guys bring something to the table, it
           | will become part of one of theirs' exploration.
        
         | whatever1 wrote:
         | It is not easy to find on demand trained operators that are
         | willing to relocate in an instant to whatever forgotten by god
         | construction site you set up for months.
        
           | taeric wrote:
           | I find this hard to believe, to be honest. The capital costs
           | of the machinery is already such that paying a premium to
           | relocate someone for the duration of the construction is
           | almost certainly not the bottle neck for most construction
           | jobs?
           | 
           | If you have numbers on this, I'm game to see them. Just
           | because I find it hard to believe doesn't mean I think it is
           | impossible.
        
             | cycomanic wrote:
             | This report identifies skilled labour shortages as the main
             | risk and factor behind construction cost inflation.
             | 
             | https://publications.turnerandtownsend.com/international-
             | con...
        
               | taeric wrote:
               | This report isn't looking at open field construction,
               | though? It literally highlights the most expensive cities
               | to build in. I'm not surprised that it is expensive to
               | keep skilled labor in places where they will be in very
               | high demand.
        
             | kevinmpeterson wrote:
             | There are companies (like Kiewit) that specifically hire
             | and pay (a lot more) to incentivize their employees to
             | travel. It's a really really hard job and many people burn
             | out. The travel is brutal.
        
               | whatever1 wrote:
               | The worst is that it's not even semi-permanent move. You
               | go to the site, you work for some months then you need to
               | move to the next. If by accident you have a family then
               | guaranteed they cannot follow you and you will be seeing
               | them only sporadically.
        
           | renewiltord wrote:
           | In China they haven't needed that for the better part of a
           | decade https://en.xcmg.com/en-ap/news/news-detail-626577.htm
        
           | AngryData wrote:
           | It is if you aren't adverse to training people and living
           | with lower productivity for a few months as they learn. The
           | biggest obstacle to becoming a heavy equipment operator is
           | finding someone willing to put you in heavy equipment without
           | already being an experienced heavy equipment operator. And
           | the machines cost enough money that someone can't afford to
           | just go buy their own excavator and practice, even really old
           | used equipment that leaks fluids and can't run more than 20
           | minutes without overheating can cost 6 figures, especially if
           | you also need a truck and large equipment trailer to move it.
           | And even if someone likes the job and gets past those
           | obstacles there are other restrictions, like drug usage, that
           | keeps many people out of the business. You went home and
           | smoked a joint last week but this week something broke or
           | went wrong? Well you better hope they don't fear any
           | liability because they will drug test you, fire you, and
           | black list you to shed all liability.
        
             | _zoltan_ wrote:
             | I think that's perfectly OK. If you consume drugs don't
             | operate heavy equipment.
        
               | AngryData wrote:
               | What about caffeine? Tobacco? Refined sugars? Pain
               | killers? Are you going to pay for people to do nothing
               | for 6 months while they wait for an injury to heal and
               | stop taking painkillers? Why are you not regularly drug
               | tested for your job and fired and blackballed from the
               | industry if it comes up positive?
               | 
               | It is completely idiotic to kick people out for smoking
               | weed on their own time. And then you wonder why you have
               | trouble filling these positions. People use drugs and
               | have since before humans were human, get over it.
        
       | ecshafer wrote:
       | I think that more than physics the bottleneck for this is
       | political (at least in the US). All of the local large projects
       | around me are expensive because of massive amounts of red tape
       | (environmental studies, zoning, planning), and political
       | patronage systems. After the kick backs, political donations,
       | promises to only work 8 hours a day, only use union labor, hire x
       | police officers for y hours in overtime security positions a
       | month, use xyz contractor etc. a small cost seems to be the
       | actual labor and materials. Hell these robots if they work will
       | be made illlegal.
        
         | tippytippytango wrote:
         | We need a silver tongued LLM agent that can align all these
         | forces (and a well provisioned MCP paypal tool for greasing
         | palms)
        
         | matthewolfe wrote:
         | I believe SchemeFlow [0] is working on solving some of these
         | problem, particularly with the insane reporting requirements.
         | But of course, that still leaves the unions...
         | 
         | [0] https://www.schemeflow.com/
        
           | esseph wrote:
           | If there are no jobs, you don't need unions!
        
             | dmix wrote:
             | The unions will use their government connections to force
             | the job to exist even if it doesn't need to be. They'll
             | figure out a way to get a union driver sitting in an fully
             | autonomous truck for some invented safety checkbox
             | 
             | I remember Louis CK said he had a hell of a time trying to
             | run his own comedy shows so he could offer lower ticket
             | prices for his fans, but because every bit of the theaters
             | were unionized it got really expensive fast and failed.
             | They couldn't even touch the curtains, they had to pay a
             | union guy to stand around all day and his only job was
             | pulling a curtain cord at the right time. Which was some
             | NYC rule.
        
               | inetknght wrote:
               | > _The unions will use their government connections to
               | force the job to exist even if it doesn 't need to be._
               | 
               | And that's OK. At the end of the day, labor unions exist
               | to help people and not robots.
               | 
               | People were worried robots were going to take their jobs.
               | Then people were seeing their jobs get shipped overseas.
               | Today, robots are finally taking over what jobs are left.
        
               | dmix wrote:
               | > At one of our dinners, Milton recalled traveling to an
               | Asian country in the 1960s and visiting a worksite where
               | a new canal was being built. He was shocked to see that,
               | instead of modern tractors and earth movers, the workers
               | had shovels. He asked why there were so few machines. The
               | government bureaucrat explained: "You don't understand.
               | This is a jobs program." To which Milton replied: "Oh, I
               | thought you were trying to build a canal. If it's jobs
               | you want, then you should give these workers spoons, not
               | shovels."
        
               | darepublic wrote:
               | its okay if you belong to the union. It makes the world
               | worse for everybody else
        
               | amarcheschi wrote:
               | The 5 days work week, the paid holidays (in the country
               | where they exist), and rights on the place of work
               | wouldn't have been obtained without all the struggles of
               | the working class in the past century, by striking and
               | unionizing. They literally made the world better for
               | everyone (except the people owning companies)
        
               | esseph wrote:
               | My FIL spent 30 something years as a union carpenter and
               | for about 15 of that was teaching underprivileged kids
               | carpentry and finding them job placements while
               | rebuilding national parks.
               | 
               | That union did just fine for America, it's better off for
               | it having existed.
        
         | pj_mukh wrote:
         | I think this is true, but even after a construction company
         | works through all the approvals the sheer cost of construction
         | is insurmountable. A big part of this is obviously (sometimes
         | union) labor. This happened recently in NIMBY-HQ Berkeley as
         | interest rates crept up [1]. Pre-approved construction sites
         | are sitting empty.
         | 
         | I am off the (not so controversial) opinion that labor should
         | be paid fair wages, but I think it's also fair to use tech like
         | this to multiply labor productivity.
         | 
         | The last piece is the cost of raw materials, which has also
         | ballooned.
         | 
         | [1]: https://www.berkeleyside.org/2025/04/04/berkeley-housing-
         | dow...
        
           | JumpCrisscross wrote:
           | > _A big part of this is obviously (union) labor_
           | 
           | I live in Wyoming. We don't have many unions. The cost
           | scourge is still there due to red tape and general fuckery.
        
             | taurath wrote:
             | Red or blue, those who own property own the levers of power
             | to determine what gets built.
             | 
             | I've yet to meet anyone who thinks utterly stifling
             | construction restrictions are a good thing, yet they seem
             | to exist everywhere.
        
             | bluGill wrote:
             | Unions don't help but in most casese they are a tiny
             | problem. The real question is which red tape is really
             | there for good reason.
        
               | SequoiaHope wrote:
               | In the best case they certainly would help workers be
               | able to afford the homes they built though. My friend was
               | telling me today that his grandfather came out to
               | California to work as a farm hand, and used that income
               | to buy a home in the area. Imagine doing so now.
        
               | ryandrake wrote:
               | I really wish people would be more specific when they
               | complain about "red tape." I think a lot of people just
               | use red tape as a generalization that means "every
               | government rule and formality that I don't like." Exactly
               | which "red tape" is adding how much cost to projects?
               | Arguers should enumerate them and explain why each cost
               | is unnecessary.
        
               | bluGill wrote:
               | That is a lot of work. It is easy to complain about 'red
               | tape', but ever single line is there for a reason. So the
               | real arguement is what isn't good enough to be worth the
               | cost. I don't want a building to fall, but I also don't
               | want inspectors to insists on additional bracing where
               | the isn't even a stress point (which I have seen)
        
             | bryanlarsen wrote:
             | You wrote this in a separate comment: "There is a well-
             | documented cost premium to building in America that isn't
             | explained by complexity or wages."
             | 
             | I am fairly confident that Europe has a lot more red tape
             | than Wyoming. Yet it's considerably cheaper to build large
             | projects in Europe.
        
               | JumpCrisscross wrote:
               | Correct. My point is this isn't caused by labour unions.
        
               | gottorf wrote:
               | > Europe has a lot more red tape than Wyoming
               | 
               | In general that's true, but perhaps not when it comes to
               | construction, especially for large public projects. In
               | Europe, the goal of such projects appears to be to
               | complete the project and have the thing that they're
               | building. In the US, at least as of late, it seems like
               | the goal is to pay various interest groups in money or
               | patronage, and whether the thing gets built or not is
               | only of a secondary significance.
        
               | rossjudson wrote:
               | How much capability do European governments have to
               | perform/construct or closely monitor these projects?
               | 
               | I have a theory that in-house expertise is cheaper in the
               | long run.
        
               | HeWhoLurksLate wrote:
               | My university has an auto shop for this very reason - at
               | a certain size, it makes more sense to care for your own
               | fleet than it does to contract it out, even though the
               | auto fleet peeps have approximately zero overlap with
               | educational goals.
        
           | esseph wrote:
           | I found this interesting:
           | 
           | https://www.chicagobooth.edu/review/us-construction-has-
           | prod...
        
           | rooppal wrote:
           | More than just red-tape there's whitecollar processes in pre-
           | construction that take months. Just estimating the cost of
           | each subtrade is a process currently done by hand on
           | blueprints (what I work on automating).
           | 
           | `white_collar_automation * robotics_automation = building
           | more, cheaper`
        
           | rswail wrote:
           | > The last piece is the cost of raw materials, which has also
           | ballooned.
           | 
           | Which is about to explode as the tariffs hit the US market.
        
         | sorcerer-mar wrote:
         | Permitting, zoning, etc are all like <3% of a construction
         | project's cost. This is a meme with no basis in reality.
         | 
         | All of the cost is labor and materials.
         | 
         | That said, the _time component_ of the zoning, permitting etc
         | is very costly due to how real estate projects are funded and
         | evaluated.
        
           | pj_mukh wrote:
           | I don't think a construction companies bank account cares
           | about whether money is going to the time component or the
           | _physical_ act of going to city hall to apply.
           | 
           | Also remember there are frivolous lawsuits, CEQA type laws
           | (which was recently overhauled atleast in California), NEPA
           | on the federal level which most people roll into the cost of
           | permitting/zoning. This is no meme, this component is _huge_.
        
             | sorcerer-mar wrote:
             | The time component isn't draining bank accounts...
        
               | JumpCrisscross wrote:
               | > _time component isn't draining bank accounts_
               | 
               | Of course it is, why would you think the land and other
               | capital can be held for free?
        
               | sorcerer-mar wrote:
               | The carrying cost of land is very low compared to any
               | overall project.
               | 
               | The issue is that extended timelines drive down the IRR
               | and add risk which is not the same as being expensive to
               | carry.
               | 
               | > All of the local large projects around me are expensive
               | because of massive amounts of red tape
               | 
               | This just isn't true. There are projects that could be
               | happening _but aren't_ because of red tape, but no, a
               | project that's happening is spending a tiny portion of
               | its capital on red tape.
        
               | pj_mukh wrote:
               | It's not just carrying cost, it could be the full A&D
               | cost, so you're paying the loan on the mortgage without
               | being able to build anything. That's huge and has sunk
               | major projects around me. This happens, literally all the
               | time [1][2][3], all around the country.
               | 
               | What's more, the fear of doing this has basically staved
               | off all but the most brave companies, or giant
               | conglomerates that can buy land cash, which is the most
               | predictable byproduct of excessive regulation at a local
               | level like this.
               | 
               | [1]: https://jerseydigs.com/american-dream-owners-
               | default-on-1-2-...
               | 
               | [2]: https://www.axios.com/local/phoenix/2023/11/08/one-
               | camelback...
               | 
               | [3]:
               | https://www.reddit.com/r/sanfrancisco/comments/y2ein5
               | 
               | "The issue is that extended timelines drive down the IRR
               | and add risk which is not the same as being expensive to
               | carry."
               | 
               | Confusing statement, the IRR is low and the risk is high
               | because the carrying cost is unknown (and _unbounded_ ).
        
               | JumpCrisscross wrote:
               | > _carrying cost of land is very low compared to any
               | overall project_
               | 
               | In New York and San Francisco? And it's not just land,
               | it's keeping all the environmental reviews and
               | neighbourhood associations on board. It's delays in pre-
               | selling, or, if you're pre-sold, customer service to
               | impatient buyers. It's constantly redrawing plans because
               | a community member wants an offset 3/8ths of an inch
               | further so their petunias don't catch shade.
               | 
               | Again, these costs add hundreds of thousands of dollars
               | to each and every apartment built in San Francisco.
               | 
               | > _This just isn't true_
               | 
               | What are you responding to? The quoted text isn't mine.
        
               | sorcerer-mar wrote:
               | Is there a reason you're pointing out San Francisco and
               | New York in particular? Is it because we both know
               | they're by far the most absurd instances of this problem
               | and quite obviously unique in how absurd they are?
        
               | pj_mukh wrote:
               | It all started in San Francisco and New York, but now the
               | disease has spread everywhere. Frankly the disease was
               | always there. Millennials trying to buy houses en-masse
               | over COVID is what exposed it.
               | 
               | Nobody notices it because it's nationwide (and to a
               | certain extent worldwide) and it's a city-by-city policy
               | issue [1][2][3]. But it's the same issue everywhere,
               | over-indexing neighborhood preferences to slow down and
               | kill construction projects behind a permitting process.
               | 
               | [1]: Denver, https://denverite.com/2025/04/14/denver-
               | construction-permitt...
               | 
               | [2]: Toronto/Ontario,
               | https://www.cbc.ca/news/canada/toronto/ontario-housing-
               | const...
               | 
               | [3]: Atlanta, https://www.bizjournals.com/atlanta/news/20
               | 24/06/20/metro-at...
        
               | sorcerer-mar wrote:
               | I don't know what point you think you're arguing against.
               | 
               | I am not denying permitting exists and it slows things
               | down. The original point was that this is a major
               | contributor to cost of construction, which it's not. They
               | specifically said "a small cost seems to be the actual
               | labor and materials [compared to permitting etc]"-- this
               | is absolutely not true. It is not even close to reality
               | in the US.
               | 
               | Here you're just pointing out two facts:
               | 
               | 1) Permitting exists (and slows things down)
               | 
               | 2) We have a housing shortage
               | 
               | No argument there! But what you are failing to do is
               | demonstrate that (1) is the major driver of (2).
               | 
               | The actual drivers are the cost of well-situated land,
               | cost of labor, and cost of materials. This is evident in
               | ANY actual budget from ANY actual construction project.
               | 
               | Add to that the fact that large scale homebuilders are
               | petrified of creating a 2008-style oversupply so they've
               | been chronically underbuilding since then -- and will
               | continue to do so _regardless_ of permitting reform. This
               | is evident in the housing starts compared to population
               | growth since the GFC.
        
               | pj_mukh wrote:
               | There have been 3-4 different comprehensive reports
               | linked in this thread laying out that actually holding
               | costs (please search), legal fees are _one of the main
               | drivers_ of cost along with the 2 others you mentioned.
               | 
               | But specifically, it's the worst one because it's
               | _unbounded_ (labor and materials is really costly now,
               | but its a known cost) especially in states with heavy
               | environment regulations or other zoning regulations. In
               | those states, usually _any one person_ can bring in a
               | lawsuit alleging a lack of environment studies or alleged
               | personal damage to slow down construction, so how much
               | holding costs do you budget for? How much lawyer fees?
               | How many people will bring lawsuits? You have no idea!
               | 
               | Most projects just don't start if they have a bracket for
               | unbounded costs like that. So now you have fewer and
               | fewer parties willing to take on these projects with more
               | and more people (neighbors, bureaucrats etc.) having the
               | bandwidth to pour over each individual project looking
               | for an opening to sue and stop. It's a doom-loop of red-
               | tape.
               | 
               | Do you think the California legislature (not the San
               | Francisco legislature mind you) is wasting its time
               | dealing with this, if it's "not that big of a deal" [1].
               | The governor ransomed the whole state budget to get this
               | passed. Similar things happened in Minnesota. This is a
               | huge deal.
               | 
               | I encourage you to read the various books laying out
               | example after example of these issues and the background
               | data [2], [3].
               | 
               | [1]: https://calmatters.org/housing/2025/06/ceqa-urban-
               | developmen...
               | 
               | [2]: https://www.philipkhoward.com/the-rule-of-nobody
               | 
               | [3]: https://en.wikipedia.org/wiki/Abundance_(Klein_and_T
               | hompson_...
        
               | toast0 wrote:
               | When permitting (etc) delays your project for N years,
               | and materials and labor now cost that much more, that
               | drains your bank account. Sure, maybe you got some return
               | on your money, but many times that won't be enough to
               | cover the increase in cost.
               | 
               | That's not to say _some_ amount of review isn 't
               | appropriate, but excess review (wherever the line is)
               | seems to be just a way to discourage building by process
               | nightmare, when there's no other way to do it.
               | 
               | I've also seen a lot of things where variances go to
               | those who have the patience to play politics, which often
               | ends up being pretty inequitable. And then there's the
               | times where permit issuers aren't consistent; request X
               | get told to do Y, update your permit to request Y, get
               | told to do X, etc. Or my favorite, ask to do A, get told
               | to do expensive thing B to prep, do B, then get told A
               | will not be permitted anyway. Typically, there's no
               | recourse for these things either.
        
               | sorcerer-mar wrote:
               | You're referring to the delta in material and labor
               | between project start and project permission? That's also
               | a fraction of overall costs.
        
             | cycomanic wrote:
             | So it should be easy to find sources to show this "huge"
             | component.
        
               | JumpCrisscross wrote:
               | Yes, it is [1][2].
               | 
               | [1] https://libertylensecon.substack.com/p/unlocking-
               | americas-in...
               | 
               | [2] https://citeseerx.ist.psu.edu/document?repid=rep1&typ
               | e=pdf&d...
        
           | bongodongobob wrote:
           | This is correct.
        
           | JumpCrisscross wrote:
           | > _the time component of the zoning, permitting etc is very
           | costly due to how real estate projects are funded and
           | evaluated_
           | 
           | How is this not part of the cost of permitting and zoning! If
           | you took those processes out, those financing costs wouldn't
           | exist.
           | 
           | Last time I did the math, San Francisco's permitting process
           | financed at going rates meant a price _floor_ of over half a
           | million dollars for an apartment. That's before we've even
           | built anything.
        
             | sorcerer-mar wrote:
             | I am not saying costly in direct "money being spent" terms.
             | I mean costly in "adversely affecting project investment
             | profile."
             | 
             | This is not the same as costing a bunch of money.
        
               | nullc wrote:
               | No, it's _worse_ because the costs are diffuse and so
               | harder to predict and manage.
               | 
               | The delay induced costs are not the only negative impact.
               | During permitting the muni will often make varrious cost
               | adding demands that they have no basis in law or good
               | engineering to make, but unless you're willing and able
               | to take on more years of delay (and potential litigation
               | costs) you have to go along with them to appease them.
               | 
               | And, of course, every opportunity for a subjective call
               | allowing a disruption is a opportunity for corruption.
        
               | sorcerer-mar wrote:
               | Maybe! But it still does not comport with the original
               | post that I replied to which said that permitting etc are
               | the major driver of cost of any construction project. It
               | is not.
        
               | nullc wrote:
               | The point being made is that if you consider permitting
               | holistically by attributing to it all costs that wouldn't
               | exist if permitting didn't exist-- the cost is much
               | greater.
               | 
               | When people complain about the costs of permitting they
               | mean the these total costs, not e.g. some 1% of total
               | project costs filing fee or whatnot.
        
               | sorcerer-mar wrote:
               | Okay then, please demonstrate it and/or provide evidence.
               | 
               | Otherwise you're on a thread where someone is pooh-
               | poohing an effort to improve costs where we _know_ they
               | exist (labor) and suggesting it is meaningless compared
               | to costs that you can 't substantiate.
        
             | blks wrote:
             | Show us the math, please.
        
               | JumpCrisscross wrote:
               | Here you go:
               | https://news.ycombinator.com/item?id=41358952
        
           | 9cb14c1ec0 wrote:
           | I don't know where you live, but I'm familiar with multiple
           | construction projects in the northeast US where permitting
           | was between 10 and 20 percent.
        
           | sidibe wrote:
           | Yeah if it was legal instead of technical hoops buildings
           | would be flying up in unincorporated parts of Mississippi or
           | Alabama. There's a huge difference between states when it
           | comes to codes and enforcement
        
           | ZhiqiangWang wrote:
           | Actually 70% labor and 30% materials, on average. You will
           | never believe that some times contractors propose to do
           | curtain wall as alternative to masonry because pre-fab stuff
           | actually a lot cheaper.
        
         | mschuster91 wrote:
         | > massive amounts of red tape (environmental studies, zoning,
         | planning)
         | 
         | Well, we've seen what happened _without_ the red tape, when
         | people were free to do whatever the fuck they wanted, and the
         | results often aren 't pretty. Sometimes, they were deadly, and
         | occasionally we are reminded of why it might not be a good idea
         | to just let the "free market" do what it wants [1].
         | 
         | Red tape doesn't just appear out of thin air, it appears when
         | politicians are so pissed off about the "free market" that they
         | actually find it worthwhile to do their goddamn jobs for once.
         | 
         | [1]
         | https://en.wikipedia.org/wiki/East_Palestine,_Ohio,_train_de...
        
           | marcosdumay wrote:
           | > Red tape doesn't just appear out of thin air
           | 
           | It mostly appears when politicians force law-enforcement not
           | to punish bad actors for so long that society requires them
           | to punish everybody so that the bad actors will go away.
        
             | mschuster91 wrote:
             | Law enforcement can only act when laws are broken, that's
             | the point. And building codes, zoning codes, that kind of
             | stuff isn't a matter for law enforcement aka police unless
             | someone gets seriously hurt or killed anyway - but if what
             | happened was legal, it's considered an "act of God".
        
               | marcosdumay wrote:
               | Law enforcement isn't the same as police. And laws aren't
               | the same as red-tape.
        
           | pj_mukh wrote:
           | This is a red-herring. No one is suggesting loosening laws on
           | whether a building will stay standing.
           | 
           | The red tape is literally on whether barn owls in Downtown
           | Mountain View will be hurt by an apartment building. This is
           | not a serious consideration and is blatant NIMBY value
           | capture and should be stopped and removed.
           | 
           | What's more, if you don't build that apartment downtown,
           | expect real environmental damage when wild flora and fauna is
           | paved over to build another exurb and highways to connect it
           | all AKA the last 50 years of North American housing policy
        
           | JumpCrisscross wrote:
           | > _we 've seen what happened without the red tape, when
           | people were free to do whatever the fuck they wanted, and the
           | results often aren't pretty_
           | 
           | You mean most of the built environment of New York City?
        
         | khurs wrote:
         | That's not directly related to this topic? This guy isn't
         | starting a construction company. He is intending to sell tech
         | to existing ones.
        
         | CGMthrowaway wrote:
         | That is all changing.
        
           | kQq9oHeAz6wLLS wrote:
           | Not around here. Even the rural cities are starting to
           | emulate the large city bureaucracy with ever increasing
           | regulations and hoops.
           | 
           | Unless you know the loopholes.
        
         | bongodongobob wrote:
         | So tired of this lazy take. The large projects are expensive
         | because they are large, difficult, and require planning between
         | dozens of different companies and contractors. Do you work in
         | the construction industry? Or do you build "apps"? Real
         | building requires literal blood and sweat and affect ecosystems
         | and communities. It's going to be expensive and it should be.
        
           | JumpCrisscross wrote:
           | There is a well-documented cost premium to building in
           | America that isn't explained by complexity or wages.
        
             | sorcerer-mar wrote:
             | Could you link to some analysis on this?
        
               | bluGill wrote:
               | https://transitcosts.com/
        
               | sorcerer-mar wrote:
               | Transit costs are a small fraction of "construction". I
               | agree our transit development costs are insane though
               | this has a lot more to do with America's very strong
               | concept of property rights (and the weaponization of
               | other apparatus to defend property rights) than simply
               | "red tape." I.e. it's more political than bureaucratic.
        
               | bluGill wrote:
               | most of that applies to all construction.
        
               | sorcerer-mar wrote:
               | No it doesn't. Any publicly funded construction is rife
               | with tons of additional regulations designed to limit
               | (but sometimes perpetuating) corrupt contracting, and
               | transit projects in particular have very unique needs
               | around land acquisition.
               | 
               | Even still, the linked website doesn't really seem to say
               | permitting is a major driver. And it certainly doesn't
               | dwarf labor and materials.
        
               | bluGill wrote:
               | Data was asked for not proff that it is permitting.
        
               | realo wrote:
               | There you go.
               | 
               | https://pedestrianobservations.com/2019/03/03/why-
               | american-c...
               | 
               | And if one asks Claude.ai , one gets this:
               | 
               | Bottom Line: US infrastructure costs are dramatically
               | higher than Europe - often 10-30 times more expensive for
               | transit projects, with subway construction in NYC costing
               | $3.2 billion per kilometer compared to just $100 million
               | per kilometer in cities like Madrid.
        
               | herval wrote:
               | Kinda ironic that Europe is seen as the very definition
               | of bureaucracy and red tape by many Americans, when this
               | sort of data shows it's actually quite efficient
        
               | throw7 wrote:
               | Point 9 is funny (although not funny in reality)...
               | Americans have NIH syndrome basically.
               | 
               | I suppose only once the boomers die out will we have a
               | chance of course correcting incuriosity. I actually
               | remember many years ago some of the justices at the
               | supreme court got real uppity when examples were brought
               | up from other countries (forgive me i forget the case
               | name).
        
               | daedrdev wrote:
               | yeah NYC spent a billion a mile on a new subway line.
        
               | sorcerer-mar wrote:
               | That's not analysis
        
         | cycomanic wrote:
         | Do you have any evidence or are you just pulling this out of
         | thin air? All sources I can find estimate pre construction
         | costs between 3 and 10% depending on type of infrastructure and
         | where it is (the US according to [1] is on the lower end with
         | 3-5%). To put this in perspective the profit margins on
         | construction projects is 7% according to [2], which also does
         | attribute skilled labour shortages as the main factor behind
         | increasing construction cost.
         | 
         | [1] https://srgexpert.com/wp-content/uploads/2023/07/The-cost-
         | of... [2]
         | https://publications.turnerandtownsend.com/international-con...
        
           | nickff wrote:
           | Construction costs are not the only costs relating to
           | development and redevelopment. Financing and project risk are
           | also quite significant. Issues that push back the start of
           | construction vastly increase financing costs, and increase
           | construction costs. A delay in getting a permit, or a stop
           | work order because of an environmental lawsuit runs up the
           | interest payments on the loan used to purchase the real
           | estate, as well as increasing the impact of inflation,
           | delaying the revenue, and impacting trades' schedules, all of
           | which reduce the ROI of the project. These are just some of
           | the issues caused by delays.
        
             | jaggederest wrote:
             | But how often do those things actually happen, and is it a
             | substantial enough difference to actually affect the cost
             | of building housing at a fundamental level? Remember that
             | houses have more than tripled in cost this century in most
             | places. A few percent is not going to substantially affect
             | something that has increased in price 340%.
        
               | _alternator_ wrote:
               | That's only a 5% rate of return over the last 25 years,
               | which is pretty lackluster. Won't cover the interest rate
               | on a loan today.
        
           | mogwire wrote:
           | Honestly do you not think what he is saying isn't true?
           | 
           | Do you think they count the items he mentioned in the total
           | costs?
           | 
           | Every major project in America has undocumented costs to go
           | along with the miles of red tape. Just look at California's
           | High Speed Rail.
           | 
           | Where I live they wanted to extend the expressway and it was
           | overwhelmingly supported. So why, 6 years later hasn't it
           | happened? The environmentalist sued to get a survey done that
           | took 2 years to find.... no impact. The county commissioners
           | got voted out and now the new ones want certain promises. The
           | company that got the original no bid contract is owned by a
           | brother of a former commissioner so that led to law suits.
           | People sued because they don't want the new exits to be too
           | close to their house. Others sued because they felt the exits
           | would targets towards higher end homes and didn't equally
           | consider everyone. Then you have the demands that we use ONLY
           | AMERICAN LABOUR!!! and ONLY AMERICAN MATERIALS!!! A state
           | representative said they would boycott the expansion unless a
           | certain percentage of his constitutions were hired to do the
           | work regardless of their qualifications. Another said they
           | would block it due to road noise and complaints from his
           | constitutions unless compensation was made.
           | 
           | It goes on and on and each one costs money they don't count
           | in the official budget.
        
             | slt2021 wrote:
             | this stuff needs to be made illegal. If state gives
             | approval to build stuff according to spec, then nobody
             | should be able to block, unless there is major deviation
             | from spec
        
               | wongarsu wrote:
               | In many countries that's basically how it works. You file
               | for permission, hand in all the paper work, maybe have a
               | hearing or a period where the public can bring concerns,
               | and once the project is approved it can go ahead and is
               | very difficult to stop. But doing it that way means the
               | approval process now has to capture all the nuances,
               | bloating the process. Big projects go a lot smoother, but
               | small projects nobody would care to object to become more
               | expensive
               | 
               | It's an interesting trade off, and getting the right
               | balance is difficult
        
             | bryanlarsen wrote:
             | That's not red tape. That's politics. Europe is notorious
             | for red tape, yet can do large transit projects for an
             | order of magnitude less cost than America can.
             | 
             | America needs more red tape. Red tape is explicit rules and
             | procedures. In Europe you can make sure your project
             | follows all of the explicit rules and procedures and then
             | you can proceed. Nobody can come and try and stop you
             | because you just say "I followed the rules", and continue.
             | 
             | OTOH in America the rules and procedures aren't explicit.
             | They're embodied in court precedent (like the
             | environmentalist who sued) and in gatekeepers like the
             | county commissioners.
        
               | mogwire wrote:
               | > Every major project in America has undocumented costs
               | to go along with the miles of red tape.
               | 
               | Along with would imply that they are not red tape.
        
               | reliabilityguy wrote:
               | > That's not red tape. That's politics.
               | 
               | That's literally the definition of red tape! How do
               | politicians have this kind of power to stop the projects?
               | Because there is a county/city/state law that grants them
               | this power. It's literally part of the procedure! In
               | other words, some part of the process is not defined
               | beyond "the council member has veto power for any
               | construction in their district" (hello NYC!).
               | 
               | As a result, the whole process is not deterministic and
               | ill defined due to red tape.
        
               | SoftTalker wrote:
               | > In Europe you can make sure your project follows all of
               | the explicit rules and procedures and then you can
               | proceed.
               | 
               | You can in America too, if everything you want to do
               | falls within the current zoning you can build "by right"
               | but the problem is that most projects need a variance
               | here or there, even for something like the type of siding
               | used and that is when all the political negotiation kicks
               | in.
        
           | EliasLittle wrote:
           | I'm curious if this is an example of survivorship bias
           | though. I don't have any data, but I can easily imagine lots
           | of projects not getting built at all due to zoning laws or
           | the red tape cost being too high.
        
             | zdragnar wrote:
             | I've worked for two companies who would have done business
             | with governments but ended up refusing to do so because the
             | regulatory burdens exceeded the value of the contract.
             | 
             | The first was intel analysis software (DOD contract), and
             | the second was in mental health (medicare and state
             | medicaid contracts). In the first case, they even
             | considered hiring a company who exists solely to help other
             | companies navigate the government procurement process.
        
               | alexjplant wrote:
               | > The first was intel analysis software (DOD contract),
               | and the second was in mental health (medicare and state
               | medicaid contracts). In the first case, they even
               | considered hiring a company who exists solely to help
               | other companies navigate the government procurement
               | process.
               | 
               | Indeed. You can get a FedRAMP AWS account pretty easily
               | but I've been told that getting a FedRAMP Moderate
               | environment for production use is a year-long, half-
               | million-dollar project. On top of this you have to
               | continuously deal with the Joint Approval Board (JAB) and
               | Third Party Assessment Organization (3PAO) for any non-
               | trivial changes to information flow or infrastructure. As
               | a kicker the Cost Plus Fixed Fee (CPFF) and Time &
               | Materials (T&M) contracts that are so prevalent in the
               | space mean that your upside is limited and you have to do
               | stuff like get your employees' resumes approved by the
               | government before you can bill for their time.
               | 
               | I don't blame anybody for taking a look at this and
               | saying "not for me".
        
           | eagleinparadise wrote:
           | I work in commercial real estate.
           | 
           | There are massive amounts of monopoly/duopoly interests in
           | construction. Want to build affordable housing? Well if you
           | are taking public dollars, you have to work with certain
           | vendors which are approved and meet certain qualifications.
           | Guess what, only 2 electrical vendors are approved! And so
           | they work together and act as a racket to hold your project
           | hostage unless you meet them on their terms.
           | 
           | Actually had a call today with an exec with one of the
           | largest construction general contractors and this topic of
           | "we can't do XYZ project [e.g. compete in that type of
           | project type... driving costs down through competition]
           | because we hire ABC union labor and it would screw us and our
           | relations with the unions we work with."
           | 
           | Every developer has a war story of getting burned exactly in
           | some way by being beholden to political or labor issues.
           | 
           | This results in higher costs... which ultimately is one of
           | the main issues among others.
        
             | andrekandre wrote:
             | > we hire ABC union labor and it would screw us and our
             | relations with the unions we work with
             | 
             | would maybe an industry-wide union fix that issue?
        
               | Eji1700 wrote:
               | Doubtful. People get starry eyed at the idea of unions
               | and I get why. Employees need more protection.
               | 
               | But power patterns are the same everywhere and rather
               | than having corrupt corporate bullshit you get corrupt
               | union bullshit. It just might benefit you if you work in
               | the industry and might very much be at the cost of
               | everyone else.
               | 
               | Police unions are the infamous example alongside the
               | teamsters , but almost everyone who's worked with or for
               | one has stories.
               | 
               | I know someone who works for one and what do you know the
               | people at the top get preferential treatment and there's
               | all sorts of bullshit going on. It's still almost
               | certainly better for him but it's probably not ideal for
               | the projects.
               | 
               | Ignoring cost overruns and hand waving things that fall
               | under "look let's just let people be people not perfect"
               | you still get a lot of problematic behavior. For example
               | my friend is very good at his job because he was taught
               | by someone very good and as a result has high standards
               | for his work.
               | 
               | This has gotten him targeted because he sets expectations
               | too high which sure feels like a crock of shit.
               | 
               | And that's just the work related bullshit. There's still
               | the classics like someone higher up the chain being
               | friends with the right people and throwing others under
               | the bus when they shit the bed.
        
               | idiotsecant wrote:
               | Yes, police unions are corrupt because police are
               | corrupt. This is not generally the case.
        
               | Eji1700 wrote:
               | Meh chicken/egg. Giving people organized power is proven
               | over and over again to lead to problems. It's why we have
               | political science and centuries of "how do we stop
               | everyone from saying fuck it and killing each other"
               | 
               | The police having a state mandated monopoly on violence
               | only adds to the problem but the core issue is still
               | there, and it's hard to do checks and balances that just
               | don't erode to either regulatory capture, rampant
               | bureaucracy, over efficient streamlining, or more often
               | than not some mix of all three
        
               | fc417fc802 wrote:
               | It's worth pointing out that these issues vary by the
               | union. As with any type of organization some will be
               | better than others. I don't think being anti-union is the
               | right answer but rather pushing for systemic changes that
               | would curb various problematic behaviors.
               | 
               | When it comes to construction you don't even need to
               | involve unions to find corruption. There's all sorts of
               | corruption (or borderline corruption) surrounding zoning
               | laws in most of the heavily populated places in the US
               | and that's in addition to the blatant political
               | dysfunction.
        
               | Eji1700 wrote:
               | Sure but I think one of the huge issues is size and the
               | simple fact that the union is by definition NOT pro
               | country/greater good/citizen but pro Union member.
               | 
               | So yea when some CEO golden parachutes out with all the
               | money we're all rightfully pissed, but people weren't
               | thrilled with jimmy hoffa or state mandated monopolies
               | that just don't give a fuck either.
               | 
               | In my city the power company will just tell you to fuck
               | right off no matter what your schedule was for opening
               | your business, no matter how important you are. Hope you
               | can handle your building being built 1+ months behind
               | because "nah fuck you" while the government head makes a
               | million + a year.
               | 
               | Scaling these things so they don't fall to corruption and
               | graft is very very hard.
        
             | torginus wrote:
             | That sounds fishy, yes, electricians do need licensing, but
             | as long as they (as in individuals or small companies) have
             | the correct certs, I don't see why you couldn't substitute
             | one with the other.
        
           | hollywood_court wrote:
           | I work for a home builder. Our single biggest problem is
           | finding and hiring quality contractors that have enough
           | skilled tradesmen.
           | 
           | There are dozens of electrical contractors in my area. But
           | only two that perform work to our standards.
           | 
           | There is only one HVAC company that can meet our standards.
           | Same for all of the other skilled trades.
           | 
           | Our framing crew is the best within a 75 mile radius. Other
           | builders are constantly trying to poach them from us. We keep
           | throwing money at them to prevent them from going to another
           | builder.
           | 
           | Non skilled labor like landscaping and pest control are a
           | dime a dozen. I just fired our main pesticide and herbicide
           | contractor today because they couldn't get it together.
           | 
           | Of course I had them replaced before I fired them but I had
           | almost 20 options to choose from.
           | 
           | Unfortunately I can't say the same about all of the skilled
           | contractors.
        
             | msgodel wrote:
             | Well yeah you've practically done the same thing that's
             | been done with software where juniors need education plus
             | three years of experience for their first job so you have
             | no juniors.
        
               | HeWhoLurksLate wrote:
               | I think the difference is that the pipelines for becoming
               | a junior software developer are well-documented online,
               | where the pipeline for being a "Junior Developer" in the
               | trades is generally accomplished by calling and walking
               | into places and asking for a job still.
        
               | Loughla wrote:
               | Not accurate, even slightly. You might get hired as a
               | gopher and spend 5 years trying to do other work if you
               | just blunder in without training or skills.
               | 
               | Now, there are certificates and other training that most
               | places expect for blue collar workers starting as
               | apprentices.
               | 
               | The days of walking off the street to get an
               | apprenticeship in the trades is over. You'll get one
               | after proving you're not on drugs, can show up, and are
               | willing to do bullshit jobs for minimum wage for a three
               | to five years beforehand.
        
               | spaceguillotine wrote:
               | nah, i went from apprentice to lead installer in under 3
               | years, there is full training programs for the trades,
               | but you will most likely get injured out before
               | retirement so a lot of people won't even go that route.
               | Until the trades are capped at 30 hours a week, you're
               | going to injure out most of your workforce.
               | 
               | It is really hard on bodies.
        
               | idiotsecant wrote:
               | The HN crowd sure has some well informed opinions about
               | people who work for a living.
        
               | nine_k wrote:
               | Many of us do the same. I'd say most. Millionaire
               | founders past exit are not the majority of the HN crowd
               | by a long shot.
        
               | hollywood_court wrote:
               | Uh no. Our culture and society have told folks to go to
               | college for so long like it's their only chance for
               | success.
               | 
               | I put on a tool belt as a kid because I didn't have the
               | opportunity to go to school. It was either learn a trade
               | or fail into the pit of despair that is the hospitality
               | industry.
               | 
               | I'm in the south so we don't have the benefits of union
               | training.
               | 
               | A union carpenter with one year of on the job training
               | will run circles around a veteran carpenter from the
               | south with 15-20 years of experience who never had access
               | to such training.
        
               | jaredhansen wrote:
               | > A union carpenter with one year of on the job training
               | will run circles around a veteran carpenter from the
               | south with 15-20 years of experience who never had access
               | to such training.
               | 
               | Can you elaborate on this point? What is it about the
               | union that makes their on the job training so effective?
               | Veteran carpenters with 15-20 yrs of exp have, in
               | general, a very strong skill set -- what is the union
               | doing that makes people catch up so fast? And if that's
               | true, why do more people not defect from the union?
        
               | Dylan16807 wrote:
               | The contractor is supposed to train their tradesmen.
               | There's no hypocrisy in insisting on good contractors.
        
               | vl wrote:
               | How in the world general contractor can train tradesmen?
               | Contractor organizes and manages, every particular
               | tradesman is better in their respective field than
               | contractor.
        
               | hollywood_court wrote:
               | A good contractor will recognize new employees with
               | potential and try to point them in the right direction
               | and give them guidance.
               | 
               | My first construction job ever was in the Caribbean. I
               | got placed with a group of Haitians, and we were all
               | laborers. We never had a tool in our hands. We simply
               | carried materials, loaded things onto the roof, set up
               | scaffolding, etc.
               | 
               | On my third day on the job, the leader of the Haitians
               | became angry at me and kept telling me to slow down. I
               | kept pushing and the lead carpenter on the job noticed.
               | The next day, the general contractor (my boss) pulled me
               | aside and said "when you come in on Monday, make sure you
               | have a tool belt, a hammer, a pencil, a speed square, a
               | tape measure, and a razor blade."
               | 
               | I showed up that Monday with all of the required tools
               | and the GC let me work alongside the lead carpenter. At
               | the end of that first week, the lead carpenter lent me a
               | book that he used to learned carpentry while he was in a
               | union in Wisconsin. I spent all weekend reading that book
               | and I had tons of questions for him when I returned to
               | work the next week.
               | 
               | I never looked back. I have since worked professionally
               | in every single residential construction related trade. I
               | am confident that I can perform each trade at a
               | professional level with the exception of welding. I can
               | weld. I welded everything on my Land Cruiser and I've
               | welded scores of hip plates over the years. But I'm not
               | confident enough to say that I could perform at the same
               | level as a good professional welder.
               | 
               | But HVAC, electrical, plumbing, roofing, siding, millwork
               | installation, finish carpentry, landscaping, and
               | irrigation are all things that I can perform at a top
               | level.
               | 
               | That lead carpenter ended up being my best friend I have
               | ever had and he taught me about a lot more than
               | carpentry.
        
               | Dylan16807 wrote:
               | They weren't talking about general contractors, but
               | trade-specific contractors with multiple tradesmen
               | working together. A crew can supervise and train newer
               | members, and the more senior tradesmen can make sure the
               | output of the entire crew is high quality even though
               | some of them have a lot to learn.
               | 
               | Even for the explicit goal of getting juniors trained,
               | the crew that does the better job is probably doing
               | _more_ training than the worse crew.
        
             | benreesman wrote:
             | I doubt you meant it this way, but that last bit hits a
             | little rough. It's good that you are able to hire people
             | when you have vacancies, and it's good that you don't have
             | to be at the mercy of some insane rent-seeking because one
             | crew in town has managed to monopolize one of your inputs.
             | 
             | But saying it's unfortunate that you can't just whack
             | anyone at will with 20 people lined up behind them jobless
             | is wishing for a pretty bad situation right? If all your
             | positions were filled by someone with 20 jobless people
             | standing behind them, who would buy the homes you build?
        
               | viraptor wrote:
               | I'm not sure what's it like in the GP's area, but here
               | I'm happy there are landscapers and other contractors who
               | aren't part of the builders teams. There's lack of people
               | available for odd jobs and for example it was hard to
               | find a painter who wasn't busy with new houses. Unless
               | it's a pathological situation on the market, those people
               | are not idle/jobless. There needs to be a good mix of
               | both.
        
               | vrosas wrote:
               | I'm guessing you've never hired a general contractor, or
               | any other kind of home contractor for that matter? I've
               | hired over a dozen at this point in the 1.5 years of
               | owning my home, and I'd say, of those, about 2 have been
               | any good. The construction and contracting landscape is a
               | trash heap - a straight race to the bottom filled with
               | lies, shoddy workmanship, and illegal labor. I'm suing 2
               | of mine for bad workmanship/abandoned projects. I do 100%
               | of my own home renovations now, regardless of the cost of
               | time, tools or materials.
        
               | vlovich123 wrote:
               | If 2 have been good why not stick with them?
        
               | vrosas wrote:
               | Because my stone mason, as good as he is, doesn't do
               | plumbing.
        
               | vlovich123 wrote:
               | His recommendations weren't good? Often good tradespeople
               | know other good tradespeople.
        
               | leoedin wrote:
               | Like the parent, I haven't found that's true at all. Most
               | people doing residential work on houses work either on
               | their own or in very small teams. They spend their time
               | working on houses, not networking with other
               | tradespeople. They might have a few people they work with
               | regularly, but it's not a deep network.
               | 
               | Much better is local whatsapp groups where people who've
               | hired good people can make recommendations. Those are a
               | trove of good information.
        
               | duttish wrote:
               | You could ask what plumber that stone mason uses. "Good
               | people like working with good people" etc.
        
               | lostdog wrote:
               | I have tried exactly this, and it does not work. Nobody
               | who did direct work ever had recommendations for peer
               | workers. They just don't care. Most subs work directly
               | with generals and not each other that much.
               | 
               | The general contractors know which subs are (currently)
               | good and bad, so their recs are good, but you have to be
               | friendly with them for them to share (instead of taking
               | the project on themselves).
        
               | duttish wrote:
               | Ah, that's a shame :/
               | 
               | Worked for me, bathroom guy recommended a carpenter that
               | turned out great. Was hoping it was a general thing one
               | could do.
        
               | potato3732842 wrote:
               | Professionals trade favors for each other. Someone who
               | has done good work for a peer won't necessarily do good
               | work if hired by some rando.
        
               | dwaltrip wrote:
               | The original guy's rep is on the line for making the
               | referral, so if there is already a relationship, he will
               | want to rec someone who will do good work.
        
               | chasd00 wrote:
               | I'll second that finding a good contractor (or even just
               | a "handy man") as a home owner is very hard. When i moved
               | into my house we had two bathrooms and the kitchen
               | renovated. Not a single piece of plumbing the original
               | contractors touched has made it past 3 years, it's all
               | been replaced. About the only thing that was done
               | correctly was bathroom tile. On the other hand, on my
               | street my neighbors and I have a good hvac guy. They are
               | treated like royalty in my neighborhood because they show
               | up, know what they're doing, and fair.
               | 
               | my father in law who has passed away ran a little
               | independent hvac shop. Just him and another guy, they had
               | more work than they could ever handle and he could have
               | grown to at least a 10-15 person shop but chose to work
               | by himself. In southern US climates HVAC is def. a career
               | option, however it's hard physical work that will slowly
               | destroy your body. heh Not unlike how SWE is hard mental
               | work that can slowly destroy your mind.
               | 
               | edit: i miss my father-in-law very much, he could do
               | anything. he replaced the floor in a pier and beam house
               | while living in it. Just think about that for a moment,
               | how do you replace a floor? that's what holds up the
               | walls and the walls hold up the roof...
        
               | sumtechguy wrote:
               | Finding people is easy. Finding good ones is hard. You
               | basically have to interview them. Even then you can end
               | up with a slick salesman and garbage crew.
               | 
               | Needed a moving company. One guy shows up sits in my
               | driveway gives me a quote. The next guy walked thru the
               | house and gave me a quote. The third guy shows up opens
               | every closet every cabinet and has a fairly spot on
               | estimate. The first two were off by nearly 30% on
               | weight/cost.
               | 
               | Needed someone to paint the entire interior of a house.
               | One guy pulls a no show on the walkthru and then 3 months
               | latter says I didnt show on time that day (it was already
               | a done job at that point). Second guy goes 'hmm duno
               | maybe X price'. Next guy measures everything has a
               | itemized estimate. I hired the one with the good
               | estimate.
               | 
               | My sister needed some simple electrical work done. 2 guys
               | just handed her a number and an open ended contract. The
               | 3rd guy had an itemized estimate that was lower than the
               | first two because he did the prework.
               | 
               | Had some AC work done. Again with the 3. 1 just random
               | didnt even come out, 1 driveway guy, and 1 who actually
               | looked around and figured it out correctly. Even then I
               | walk out there and the outside unit is installed
               | backwards. I tell them, they puff out on me. I grab the
               | foreman and walk him over with a 'uh there is a small
               | issue here' didnt tell him what. They had to redo 3 hours
               | of work once the foreman saw it backwards. All because
               | the guys he had were willing to do backwards work. The
               | foreman is usually the key. If they give a crap it will
               | be done right.
               | 
               | Trying to have a covered porch added to my current house.
               | So far 2 no shows and totally ghosted.
               | 
               | I wish this was atypical. But it isn't. I have many more.
        
               | bcrosby95 wrote:
               | I always go back to our real estate agent to find
               | contractors. We've never had any issues with the ones
               | she's recommended.
        
               | mhb wrote:
               | And how did you get your real estate agent???
        
               | ethbr1 wrote:
               | The real answer behind the scenes: commercial pays better
               | for the same work.
               | 
               | Any competent tradesperson is doing majority commercial.
               | 
               | Ergo, if you're looking for residential, you get...
        
               | samth wrote:
               | The post doesn't mean there are 20 unemployed people, but
               | that there are 20 interchangable pest control contractors
               | who all do an adequate job, and so the one they fired was
               | easy to replace.
        
               | hollywood_court wrote:
               | We are at the mercy of one crew. Over 150+ jobs in my
               | company are all at the mercy of that one framing crew
               | that has ~30 people. If we lose them, we'd have to
               | scramble like crazy to find a replacement.
               | 
               | I have guys in Brownsville, TX that I could fly in and
               | put up in hotels to get us through a tough spot, but that
               | would cost a lot of money. And I'd love to encourage them
               | to all move up here to Alabama with their families, but
               | the current political climate has them afraid to do so.
               | 
               | Edit: I'm not saying I wish I could fire anyone I want at
               | any time. I'm saying that it stinks that I literally have
               | no other options for the other trades. So I'm forced to
               | stick with the subpar options.
        
             | toomuchtodo wrote:
             | Appreciate you highlighting the need for unions. Hopefully
             | the skilled trades shortage persists indefinitely,
             | otherwise they'd be treated just as you mentioned:
             | disposable and interchangeable. The scarcity is the only
             | thing protecting these folks at the moment.
             | 
             | https://www.jchs.harvard.edu/blog/rebuilding-construction-
             | tr...
        
               | sobellian wrote:
               | There is so much work for skilled tradesmen that they
               | would rather see more automation so they can take more
               | jobs. Even many unions, e.g. carpenters' unions, think
               | this way.
               | 
               | I mean no large group is a monolith so I'm sure one can
               | find opinions either way among tradesmen. But IMO the
               | problem is so big that it's no longer revenue maximizing
               | for anyone, even the workers. By some measures
               | productivity has actually been declining for
               | construction. If that was good for workers then we should
               | just set them to digging a second Panama Canal with
               | spoons.
        
               | earnestinger wrote:
               | Real men would dig Route 66 canal instead of Panama.
        
               | nine_k wrote:
               | Software engineers have recently had a chance to taste
               | how does it feel to be plentiful and disposable, after
               | decades of shortage.
        
               | seanmcdirmid wrote:
               | Scarcity also creates automation and efficiency pressure.
               | You either get more of that human resource, or you make
               | it so you use less of it, productivity increases also
               | allow for the resources used to make more money without
               | increasing project costs. This is also a very boom/bust
               | industry, so the 2008 bust washed a lot of people out,
               | especially juniors who would be experienced seniors
               | today. A union is not going to protect labor from a
               | building bust, they will stop hiring and the pipeline
               | stalls.
        
               | toomuchtodo wrote:
               | There is a housing shortage of between 3.5M and 12M
               | units; there will be no bust for at least the next
               | decade, as housing production rate dropped substantially
               | after the 2008 global financial crisis and did not
               | recover.
               | 
               | (typically, union workers go on unemployment during slow
               | periods; this includes electrical linemen/journeymen,
               | automotive, pipe fitters, etc based on first hand
               | conversations with union tradespeople in my examples)
               | 
               |  _Housing Supply and Housing Affordability_ -
               | https://www.nber.org/papers/w33694 - April 2025
               | 
               |  _The Housing Industry Never Recovered From the Great
               | Recession_ - https://prospect.org/infrastructure/housing/
               | 2024-12-11-housi... - December 11, 2024
               | 
               |  _APM Marketplace: In an uncertain housing market, home
               | builders face a range of challenges_ -
               | https://www.marketplace.org/story/2024/11/26/in-an-
               | uncertain... - November 26, 2024
               | 
               |  _U.S. Housing Shortage: Everything, Everywhere, All at
               | Once_ - https://www.fanniemae.com/research-and-
               | insights/perspectives... - October 31st, 2022
               | 
               |  _Fannie Mae: The U.S. Housing Shortage from a Local
               | Perspective_ -
               | https://www.fanniemae.com/media/45106/display - October
               | 2022
        
               | zer00eyz wrote:
               | > There is a housing shortage of between 3.5M and 12M
               | units;
               | 
               | The problem with this stat is that the historic data does
               | not support it:
               | 
               | https://fred.stlouisfed.org/series/RSAHORUSQ156S
               | 
               | The supply is just fine, more so with a declining
               | population, how we use housing has changed dramatically.
               | 
               | https://www.census.gov/library/stories/2023/06/more-than-
               | a-q...
               | 
               | U.S. Housing Shortage: Everything, Everywhere, All at
               | Once: that you called out states "While the United States
               | does indeed have a national shortage of affordable
               | housing, every state and city's path to addressing it is
               | relatively unique, and the tools and tactics used to
               | create badly needed new housing supply will have to be
               | tailored."
               | 
               | This is a gross understatement of the issue. The problem
               | is voters. No one will vote in more housing, housing
               | benefits for others or more affordable housing. Because
               | the people who vote own homes and go into the voting
               | booth and protect their own interests and assets:
               | https://www.route-fifty.com/management/2022/08/problem-
               | homeo... . There isnt a law about having to be a
               | landholder to vote but there is a very strong correlation
               | between the two.
               | 
               | Planing and zoning is hyper local, hyper political and
               | very active. This is why mixed use zoning is harder to
               | find, you can't run a garage out of your garage. The is
               | why the "missing middle" is a thing in America. This is
               | why "corporate ownership" of housing wont get fixed (it
               | is a hyper local issue and the people who would show up
               | to vote against it are the same ones whos property prices
               | are being propped up by it).
        
               | kryogen1c wrote:
               | >> people are bad at their jobs so I fire them
               | 
               | > need for unions
               | 
               | What in the world? This is the exact opposite use case
               | for unions.
               | 
               | Unions help protect workers from single, dominant/
               | monopolistic employers where workers have no other
               | options and can get taken advantage of. The construction
               | industry is nearly the polar opposite, where there is
               | almost no barrier for entry and the employment space is
               | very competitive, including the ability to start your own
               | business.
               | 
               | Construction unions would be an absolute nightmare.
        
               | pjmlp wrote:
               | Construction unions do great across European countries.
               | 
               | Any company that can take advantage of workers will do
               | it, no need for "dominant/ monopolistic".
               | 
               | There is a reason why security measures that put the
               | workers life at risk are almost nonexistent on countries
               | where unions hardly have a presence.
               | 
               | No helmets, no eye protection, no masks when dealing with
               | chemicals, bending metal bars with bare hands, no
               | protection shoes, hopping into a ladder alone,....
               | 
               | Some examples of what I have seen in practice.
        
               | rafaelmn wrote:
               | >Construction unions do great across European countries.
               | 
               | Do not know about your country - but over here the
               | construction sites are full of people who couldn't even
               | write the word union (mostly Asian countries like
               | Philippines, Nepal, etc.)
        
               | pjmlp wrote:
               | Germany, and yes if I go to southern countries, Portugal
               | my home country, alongside the other ones, there is a
               | certain flexibility between the law, unions, and what
               | actually happens at the construction site, unless someone
               | does a complaint to the respective goverment authority
               | responsible for checking worker conditions.
               | 
               | I can also add that Scadinavian countries, and UK tend to
               | be similar to Germany.
               | 
               | Naturally all of them have black sheeps that ignore good
               | work conditions if they can manage to, that is why work
               | inspections are also a thing.
               | 
               | Al
        
               | rafaelmn wrote:
               | I mean what happens is skilled workers from poorer
               | countries (Croatia in my case) move to richer EU
               | countries, then we have nobody to perform construction -
               | and now we have issued work Visas for 5% of the
               | population basically. And you see newspaper stories of
               | these people basically being treated like slave labor
               | (crammed in small apartments, completely dependent on the
               | visa provider, often abused). Just a few days ago there
               | was another story about an immigrant worker being raped
               | by her employer - also an immigrant that was just done
               | serving his previous rape sentence. And plenty of stories
               | of these people not being paid for months, documents
               | being held, etc.
               | 
               | The unions have no standing because theres nobody left to
               | be a part of the union - most people already left for
               | Germany/Switzerland/etc. So Germany is just riding on the
               | EU migration for now - but considering population
               | dynamics - that's a short wave.
        
               | rangestransform wrote:
               | I wish NYC could suck out cheaper construction labour
               | from the likes of Missisippi, maybe Second Avenue Subway
               | could actually be built on time and on budget in that
               | case. Right now, expensive local labour has the city by
               | the balls
        
               | kryogen1c wrote:
               | > Any company that can take advantage of workers will do
               | it, no need for "dominant/ monopolistic".
               | 
               | What a nonsense thing to say. This is not an opinion most
               | people, and certainly not most economists, would agree
               | with. It's a foundational pillar of regulated free
               | markets.
               | 
               | Moreover in this instance, construction companies are not
               | some sprawling international megacorps, they're locally
               | oowned and operated.
        
               | rafram wrote:
               | A pillar of free-market _models_ , sure. But economics is
               | built on a stack of spherical-cow assumptions that don't
               | really hold up in the real world.
               | 
               | Of course an employee theoretically has total freedom to
               | leave an abusive employer and go somewhere else. But do
               | they have time to search for jobs while working full-
               | time? What if their employer makes them work mandatory
               | overtime? If they don't have time to search while
               | working, can they afford to be unemployed for a few
               | months? What if their employer threatens them or
               | discourages other employers in the area from hiring them?
               | 
               | It would be great if competition made unions unnecessary,
               | but it doesn't.
        
               | avs733 wrote:
               | > What in the world? This is the exact opposite use case
               | for unions.
               | 
               | Trade unions tend to have a large focus on training and
               | skill building. Yes they make firing people harder but
               | the flip side of unions can be increasing the average
               | quality such that firing due to quality or skill is less
               | often necessary.
               | 
               | If I have need 10 people and I have a choice between two
               | looks. Pool A is harder to fire and costs more but has a
               | 95% competence rate. Pool B is easy to fire and costs
               | less but has a 70% competence rate.
               | 
               | Setting any contractual rules aside I'm going g to find
               | myself firing from pool B more often, and it is easy to
               | attribute all of that to the rules that make A harder to
               | fire. They are easier to fire (component of variance),
               | they are more likely to be bad (component 2), and because
               | they are easier to fire in going to be more likely to
               | fire than coach for quality (component 3).
        
               | chasd00 wrote:
               | as a home owner, i don't want any barrier to demanding
               | someone never step foot in my house again.
        
               | toomuchtodo wrote:
               | > Construction unions would be an absolute nightmare.
               | 
               | They seem to work fine.
               | 
               | https://nabtu.org/
               | 
               | https://www.liuna.org/
               | 
               | https://www.carpenters.org/
               | 
               | https://ibew.org/
        
             | britzkopf wrote:
             | Framing is skilled, but landscaping and pest control are
             | unskilled? Are you living in a well framed house overrun
             | with mice and a terrible yard? I've done some framing. With
             | a communicative foreman and a straightforward building
             | design I did not find it _that_ hard.
        
               | hollywood_court wrote:
               | If performing quality framing was so easy, I imagine I'd
               | have less trouble finding folks who want to earn $125k+
               | per year to do it for me.
               | 
               | Instead I just have a group of ~30 Guatemalans who do it
               | while I listen to my American friends and neighbors
               | complain about immigrants "taking all the jobs."
        
               | epicureanideal wrote:
               | Folks may not know about the jobs, or there might be
               | other details that aren't mentioned here that make them
               | less interested, for example are there occasionally big
               | chunks of being unemployed, is the work dangerous, is the
               | work stable, etc.
               | 
               | 20 years ago, before I started making good money as a
               | software engineer, if someone had offered me a similar
               | opportunity, and training, I would've taken it assuming
               | there were no big gotchas.
        
             | southernplaces7 wrote:
             | >Non skilled labor like landscaping and pest control are a
             | dime a dozen.
             | 
             | As a former landscaper, I can tell you that you either
             | aren't taking the time to understand at least one of these
             | professions at all, or simply have some very low standards
             | for good landscaping. It is not a dime-a-dozen field that
             | requires minimal skill, at all, and given all I've seen of
             | GOOD pest control, the same applies, fully. You might have
             | dozens of small contractors out there claiming to be either
             | of these things but knowing little, sure, but those that
             | actually know the technical balances at work and can apply
             | those to what they're doing so that it creates durable
             | results for your building/land/home, are people who need to
             | know quite a few very fine nuances of their work.
             | 
             | I mean, unless you think that constructing external
             | landscapes that soon collapse, flood or fill with dead
             | plants is irrelevant, or have no problem living in a
             | building riddled with rats, mice, cockroaches and easy
             | domicile to all of these pests and sundry.
        
             | babyshake wrote:
             | I'm a layperson and this touches on my greatest fear about
             | hiring contractors, that I'm not able to quickly enough
             | determine who does meet the quality standard or even what
             | the quality standard should be for a given job. How are
             | average people supposed to navigate these things? I suppose
             | I would just ask Claude/ChatGPT these days but there is
             | surely a lot of tribal knowledge that they don't have.
        
               | bolobo wrote:
               | And chatgpt is going to pull the data from an random UK
               | website when you are in the US and vice-versa, and will
               | augment it with knowledge from its model that come from a
               | reddit thread from 2010 written by an italian plumber.
               | 
               | I saw that on the DIY Uk subreddit where people were
               | confused because ChatGPT was answering question using
               | american standards. It's really hard to answer questions
               | based on regional tribal knowledge.
               | 
               | Apparently a good source are the tradesmens shop? THey
               | might know their customers? Word-of-mouth?
        
               | eecc wrote:
               | poor prompting then. One should narrow down the question
               | to the particular circumstance it should apply.
        
               | bobro wrote:
               | this is exactly what you can't do as an amateur though.
               | You don't know enough context to provide your relevant
               | circumstances.
        
               | vl wrote:
               | The most basic thing you do is hiring by referral, you
               | talk to your friends and neighbors about contractors they
               | used, and then hire the ones that were recommended, being
               | ready to slightly overpay or wait for the slot.
        
             | torginus wrote:
             | This. I live in a very different place from you and I'm
             | just a humble homeowner, but contractors here are less than
             | competent and I as a layperson can often do better after
             | reading up on the thing and watching a couple Youtube
             | videos.
             | 
             | I know it's meme tier and horrible when a guy who watched
             | some videos tells the tradesmen how to do their jobs, but
             | unfortunately I often end up being right and prove them
             | wrong.
             | 
             | For example one of the last things I experienced was one of
             | the electricians needed to get a cable through the concrete
             | upper floor, and just couldn't do the calculations on where
             | to drill and ended up drilling into the middle of the wall
             | instead of right next to it.
             | 
             | These kinds of fuckups are constant and the contractors are
             | pretty good at hiding these unless I stand next to them.
             | 
             | I've yet to meet a roofer that could properly do trig to
             | calculate the sloped roof area.
        
               | Abekkus wrote:
               | ....There's no trigonometry in common roof-slope-area
               | calculations and designations, only pythagoreans. Rise
               | over run, 6ft for every 12ft, etc.
               | 
               | I do feel your pain about vetting "professionals",
               | especially living in a place that tries to prevent me
               | from making my own improvements.
        
               | alt227 wrote:
               | Arent sloped roofs just rectangles?
        
               | ncallaway wrote:
               | The intersections of the joists/beams and the rafters
               | require you to cut angled cuts on the rafters to sit
               | appropriately on the joists/beams.
               | 
               | See: https://www.structuralbasics.com/rafter-roof-design/
               | and imagine how you would get a rectangular piece of wood
               | for the rafter to sit flush against the rectangular
               | joists/beams.
        
               | SoftTalker wrote:
               | OK there might be some confusion here on what's meant by
               | "roofer." Roofers as I have always seen the term used
               | means the crew that puts the shingles on.
               | 
               | The roof structure is built by carpenters or framers. Or
               | more likely just delivered as pre-built trusses which are
               | placed on top of the walls.
               | 
               | For a roof built on-site, a speed-square or framing
               | square will include markings for common roofing cuts,
               | hip/valley cuts, etc. You have to know how to use them
               | but you don't really need to understand the underlying
               | trigonometry.
        
               | bob1029 wrote:
               | > a layperson can often do better
               | 
               | I think it's a mixed bag. I've purchased homes where the
               | previous owner thought they were a wizard at home
               | improvement. One apt example is a dryer outlet that was
               | converted from 14-30R to 10-30R because the homeowner
               | googled the wrong thing and went down a bad rabbit hole.
               | A good electrician would tell you to change the cord on
               | your dryer and that anything else is a code violation.
        
               | potato3732842 wrote:
               | >A good electrician would tell you to change the cord on
               | your dryer and that anything else is a code violation.
               | 
               | It would be a code violation for me to take my exiting
               | 120yo retaining wall and extend it by copying it in exact
               | detail despite the fact that the details of its
               | construction are provably satisfactory.
               | 
               | The code isn't there to ensure results. The code is there
               | to make the subjective quantifiable so it can be bickered
               | over and litigated in a fairly deterministic manner.
        
               | bob1029 wrote:
               | > provably satisfactory.
               | 
               | I don't think the chassis of my dryer becoming energized
               | is a provably satisfactory outcome.
               | 
               | I agree that a lot of code amounts to bureaucratic
               | nonsense, but many rules were changed over time for good
               | reason.
        
               | potato3732842 wrote:
               | Everything sounds like a good reason in a vacuum. I could
               | write an equivalent appeal to emotion justifying why
               | retaining walls ought to be engineered but the fact of
               | the matter is that a bunch of barely literate people
               | working from reference tables managed to do fine and
               | copying them probably will do fine too.
        
               | torginus wrote:
               | How did ground fault protection not kick in when you
               | touched it?
        
               | gedy wrote:
               | Yes agreed. There's skill and experience - and then
               | there's... common sense? And some folks just don't have
               | it.
        
               | potato3732842 wrote:
               | > I as a layperson can often do bette
               | 
               | Except often times you can't because of all the
               | regulations. First there's the code which you can't
               | possibly understand sufficiently if it's not your day
               | job. If you do figure out what you need to do you'll then
               | find plenty of things you can't do without a license that
               | you need to put in years for, not just pay and pass a
               | test.
               | 
               | The only stuff that's not subject to exclusionary
               | regulation is the "average homeowner" type renovation
               | stuff and even then only because there isn't political
               | will to tolerate it, not because the government and
               | trades wouldn't try if they could.
               | 
               | But what do I know, I'm just someone who's been told he
               | has to pay for $50k of engineering studies to assess the
               | runoff impacts of converting forested former pasture back
               | to the latter because a bunch of useful idiots 40yr ago
               | heard some politicians talking points and thought it
               | sounded good.
        
               | jen20 wrote:
               | > First there's the code which you can't possibly
               | understand sufficiently if it's not your day job.
               | 
               | Some of the stuff I found from contractors who worked on
               | my house demonstrate that it turns out people whose day
               | job is understanding the code also don't.
        
               | MisterTea wrote:
               | > I know it's meme tier and horrible when a guy who
               | watched some videos tells the tradesmen how to do their
               | jobs, but unfortunately I often end up being right and
               | prove them wrong.
               | 
               | Normalization of deviance is becoming common place.
               | There's a lot to unpack here but there is a severe lack
               | of professionalism, responsibility, genuine knowledge,
               | and experience. Now its just a bunch of greedy man
               | children who live by "fake it till you make it" and use
               | every dirty trick to intimidate and mislead the client.
               | Once they secure the job they barely show up to the the
               | job site because they ran off to play with their golf
               | clubs, sports cars and yachts or whatever while a crew of
               | cheap unskilled labor shits all over the job site. And if
               | you call out these morons and challenge them they get
               | angry and defensive because they're the experts and
               | you're a dumb client. Infuriating hubris.
        
               | zerkten wrote:
               | >> For example one of the last things I experienced was
               | one of the electricians needed to get a cable through the
               | concrete upper floor, and just couldn't do the
               | calculations on where to drill and ended up drilling into
               | the middle of the wall instead of right next to it.
               | 
               | The exact same problem exists for small manufacturers in
               | the US. There are lot of people who believe they should
               | have jobs in skilled trades and check some boxes but are
               | missing fundamentals.
        
             | simpaticoder wrote:
             | This is a little bit tangential to the conversation but I
             | was wondering how you find the best skilled contractors? Do
             | you use Google maps like everyone else and look at the
             | ratings? Or is it information you glean by trial and error
             | over time? Or do you check in with trade schools to see who
             | their best graduates are? Or perhaps something that I
             | haven't mentioned?
        
               | pjm331 wrote:
               | For me it's personal references from other people via
               | local Facebook/whatsapp groups - since I have kids that's
               | almost always parent groups
        
               | hollywood_court wrote:
               | Mostly from people at supply houses and lumber yards.
               | They know how to tell if a contractor is good or not.
               | 
               | Or if we catch wind of a good contractor doing great work
               | for another builder, we'll go inspect their work and then
               | try to get them to jump ship and work with us.
               | 
               | Trade school information won't help us any because we're
               | hiring contracting companies. We don't hire individuals
               | unless it's for something specific that can be handled by
               | one individual like kitchen installs.
               | 
               | Highly skilled tradesmen are often like really good
               | lawyers. Just because they're good at their craft doesn't
               | mean they'll necessarily be good at running their own
               | contracting business (or law firm).
               | 
               | So being a successful contractor really boils down to
               | being able to properly manage your skilled labor (and
               | keep them content) while also keeping things on budget
               | and following the critical path.
               | 
               | The single most common mistake I see with most
               | contractors (and most all small business owners in
               | general) is the fact that they think "hey, I own this
               | business, therefore I should be the highest paid person
               | here." So they don't take care of their labor and they
               | end up losing them to someone who will take better care
               | of them.
               | 
               | They think that they own the business so they must
               | provide the most value to the company and should earn the
               | most. That's rarely the case in real life though.
               | 
               | When I was a contractor out on my own, there were plenty
               | of times when I was paying some of my employees more than
               | I ever took home. The President of the company I work for
               | now isn't the highest compensated member of our team.
        
             | mclau157 wrote:
             | Is this a symptom of every teacher and parent telling kids
             | to get college degrees?
        
             | AnthonyMouse wrote:
             | A lot of this is a result of how trade licensing works.
             | 
             | In most states it's not about whether you know how to do
             | something -- you can't just take a licensing exam and get a
             | license even if you know the material -- it's about having
             | access to someone who already has a license to sign off on
             | you. From which you get two consequences.
             | 
             | First, if you know someone who already has a license but
             | doesn't know what they're doing or isn't a good teacher,
             | they sign off on other people without actually teaching
             | them how to do a good job, and then you get even more
             | people with a license who don't really know how to do the
             | job.
             | 
             | And second, because the existing license holder has to sign
             | off on several _years_ worth of hours for someone new to
             | get a license, you deter people who would do a good job but
             | -- because of that -- have more opportunities in other
             | industries where you don 't have to spend a large chunk of
             | your adult life beholden to someone else because it's still
             | prohibited by law for you to strike out on your own, in an
             | industry that people would otherwise want to enter because
             | they want to do exactly that. Which both lowers the average
             | quality of the candidate pool and creates shortages by
             | lowering the number of candidates.
        
           | aaron695 wrote:
           | Where I am it's $90,000 - $240,000 to subdivide land from one
           | to two.
           | 
           | Not including costs post-subdividing like selling the empty
           | lot and tax's.
           | 
           | Obviously the new buyer has building costs, but you might
           | have to demolish the existing house to divide, good chance it
           | was in the middle.
           | 
           | On top of all this is the years to divide the property.
           | 
           | On top of all this you can't then build what you want on the
           | new property.
           | 
           | On top of all this is the years to build on the empty lots.
           | 
           | These all have a $$$ cost.
           | 
           | $240,000 to quickly divide and rebuild high density, no one
           | would care about that cost, that's ~$0.
           | 
           | So the houses you can end up with can't be tight practical
           | buildings, it's $$$$$ for permits and land and time. So this
           | robot will help build mega mansions for single families.
        
           | mmmBacon wrote:
           | You need look no further than the poster child of red tape
           | delayed construction projects: California High Speed Rail.
           | 
           | https://www.nytimes.com/2025/05/04/us/high-speed-rail-
           | califo...
        
           | appreciatorBus wrote:
           | That 7% is for the projects that actually happen. This misses
           | all the projects that don't when start because they don't
           | pencil due to the phenomenon that the original poster
           | mentioned.
           | 
           | If you want to see it up close and personal, go to any Public
           | Hearing in your city for any new construction of any kind,
           | and watch 100 of your neighbours who have already benefitted
           | from past construction lineup to oppose the prospect of any
           | additional construction for anyone else. It's not just that
           | it adds a few percent costs, it's that it drastically reduces
           | the number of projects people even try to build.
        
           | reactordev wrote:
           | In the US, it's vastly different. Just look at Ryan Homes.
        
           | jahewson wrote:
           | > promises to only work 8 hours a day, only use union labor,
           | hire x police officers for y hours in overtime security
           | positions a month, use xyz contractor etc.
           | 
           | Those are not pre-construction costs are they? Massive
           | differences in labor costs described there.
        
         | jjcm wrote:
         | To wargame the a rebuttal to this, the red tape might be
         | circumvented just because there aren't rules to govern robotic
         | work. You can fully agree to only use union labor, to only have
         | humans working 8 hour days, or to only use certain contractors
         | for hired work, simply because these systems aren't human
         | operated (likely they will be early on, but you could spin it
         | as this).
         | 
         | There are laws for people, but not necessarily for tools.
        
           | htrp wrote:
           | they will put the rules on place for automated tools very
           | easily ( look at how every state is pulling together a
           | patchwork of AI regulation)
        
         | xyst wrote:
         | > a small cost seems to be the actual labor and materials
         | 
         | Say less.
         | 
         | HN used to be a message board to gain better knowledge around
         | certain topics, but seems it more or less has the same armchair
         | dilettantes that plague other platforms.
        
         | kevinmpeterson wrote:
         | There is red tape and certainly there are planning bottlenecks,
         | but the GCs already deal with this. Once a project is funded
         | and started, an established GC will move quickly to execute on
         | projects. Also - some states (CA in particular) have an absurd
         | amount of red tape. If you go to states like Texas, it's much
         | easier. Robotic tools are pretty common already (machine
         | guidance for bulldozers, remote ops for excavators, mine
         | trucks), so there's good precedent. We view our machines as
         | tools for people to use, and given the labor challenges, have a
         | ton of customer interest as a result.
        
         | scrubs wrote:
         | Wanna know what we need? MARPA: management and research process
         | advancement.
         | 
         | Yes or no: can the USA get a medium sized build done on time
         | and budget comparable to the top 15% worldwide?
         | 
         | There has to be way to kick this problem in the butt. And i
         | think management side has gotta step up
        
         | iwontberude wrote:
         | It doesn't matter. The costs are fungible to the buyer, if the
         | price is lower in any regard it becomes a better value.
        
         | jdmena321 wrote:
         | Politics certainly adds layers of cost, but it doesn't change
         | the fact that budget overruns almost always stem from
         | unpredictable, non-political variables, sudden material price
         | hikes, weather delays, labor shortages, or subcontractor
         | disputes.
        
         | PaywallBuster wrote:
         | This would help mega projects in middle east
         | 
         | all the labor is imported from abroad and live in miserable
         | conditions, no unions or paperwork, just lots of earthworks to
         | be done
        
         | yreg wrote:
         | > Hell these robots if they work will be made illlegal.
         | 
         | Why are heavy machines like diggers and cranes legal then?
         | Human operated, but replace countless workers on the site.
        
         | gniv wrote:
         | Tech startups have become giants by flaunting rules. This seems
         | like an opportunity.
        
           | pugworthy wrote:
           | Rules for things like environmental studies, zoning, and
           | planning exist for very good reasons.
        
         | itsoktocry wrote:
         | And yet, despite all of this, in most of my country (Canada) we
         | have a construction labour shortage. Getting anything built is
         | hard (and expensive).
        
         | amadeuspagel wrote:
         | Tech can help with the politics as well. More construction
         | would happen if it was technologically possible for it to be so
         | fast that major projects could be finished in a single election
         | period.
        
         | wpm wrote:
         | Pre-fab is illegal in a lot of places too. Pre-fab is for the
         | poors! Houses in this neighborhood must be assembled on site by
         | lumber by a team of expensive humans from raw lumber, not at a
         | factory churned out by the hundreds, shipped on site on a
         | truck, and quickly put together.
         | 
         | Like yeah, typical pre-fab, where it's legal, is going to go
         | into a trailer park or something, but nothing says pre-fab has
         | to be cheap and crummy. Why are we still cutting lumber on
         | site?
        
         | gosub100 wrote:
         | This is a bit like saying "if everyone was just honest and a
         | good person, we wouldn't need police or jails or criminal
         | judges". All these things exist for a reason (except for
         | kickbacks). We have labor unions because of worker
         | exploitation. We have zoning to protect personal freedoms of
         | existing property owners. We have environmental impact studies
         | because corporations have proven they are willing to freely
         | dump toxic materials wherever they feel like.
        
         | orochimaaru wrote:
         | You must live in Chicago - lol.
        
         | mattigames wrote:
         | If you read the other comments made by this user they are
         | exactly the political leaning you expect, including support for
         | the BBB among other similar opinions.
        
       | shorbaji wrote:
       | With the construction equipment market at $160B, this certainly
       | is quite a sizable niche. Specializing in it is clever.
       | 
       | And an $80M round sounds sane these days
        
         | xnx wrote:
         | > With the construction equipment market at $160B
         | 
         | Wouldn't the value of their target market be the pay of
         | operators (~$30/hour)?
        
           | shorbaji wrote:
           | At first, yes. Longer term, self-driving construction
           | vehicles will likely change the entire market - perhaps
           | similar to how self-driving passenger cars would change that
           | market. Vehicles will be designed differently and
           | consumption-based business models would potentially make up a
           | larger part of the market. Investors are probably see that
           | opportunity.
        
       | barbazoo wrote:
       | > Bedrock Robotics is focused on developing a self-driving kit
       | that can be retrofitted to construction and other worksite
       | vehicles
       | 
       | > Bedrock is "upgrading existing fleets with sensors, compute,
       | and intelligence that understands project goals, adapts to
       | changing conditions, and executes work around the clock,"
       | 
       | I can also imagine this applying to all kinds of mining too,
       | where there's already all the heavy equipment to mine and
       | transport resources and we're just turning it into a robot so
       | they don't have to employ a human anymore.
        
         | consumer451 wrote:
         | So, comma.ai but for construction. That's pretty cool. Although
         | as another user mentioned, right to repair/modify is likely the
         | worst in heavy equipment.
         | 
         | I wonder how that problem could be solved. Could something
         | along the lines of warranty and service indemnification work,
         | maybe?
         | 
         | But really, an acquisition by the OEM might be the only way to
         | make this work in the long term?
        
           | torginus wrote:
           | Maybe it won't be necessary?
           | 
           | Once they have the whole stack vertically integrated, you
           | could just contract out the job to them entirely? If the
           | excavator breaks, that's their problem, they'll bring
           | another, you're paying for results not equipment.
        
         | bluGill wrote:
         | In some mines they are willing to pay more for robots than
         | human labor because of safety (which is to say they know they
         | can't make it safe enough)
        
       | themanmaran wrote:
       | One big barrier I haven't seen mentioned is all the OEM
       | competition they are going to face.
       | 
       | Caterpillar, John Deer, etc. already have remote operation
       | vehicles. And a lot of provisions on what types of kits can be
       | retrofitted onto their equipment without violating their
       | terms/warranties.
       | 
       | I'm sure this is already something they've taken into
       | consideration, but it seems like this will be more focused on
       | partnerships with existing OEMs rather than selling add on kits
       | to current fleets.
        
         | echelon wrote:
         | > Caterpillar, John Deer, etc. already have remote operation
         | vehicles. And a lot of provisions on what types of kits can be
         | retrofitted onto their equipment without violating their
         | terms/warranties.
         | 
         | Sounds ripe for disruption, then.
         | 
         | If a startup demonstrates promise, VC money will flood in. Then
         | it's just a balancing of economics. Is the new VC-backed method
         | cheaper? If so, the incumbents will lose market share relative
         | to the value prop.
        
           | beau_g wrote:
           | To the parent posters point though, those manufacturers are
           | holding outsized control over what can be retrofit to their
           | machines, so to disrupt them, you have to make your own
           | machines. Working on and owning heavy equipment myself, I of
           | course have looked at it and thought there's a lot to
           | improve, but at the the same time, I don't really see where
           | the big brain Silicon Valley + venture bucks ethos can be
           | applied to the space, it would be a long and slow grind of
           | doing mostly straightforward mechanical engineering and
           | supply chain/vendor agreements to build something like a
           | bulldozer, just to enter a near impenetrable market due to
           | many existing sunk costs and long relationships between
           | buyers and the existing manufacturers.
        
             | bluGill wrote:
             | The manufactures are aware of monopoly laws and will give
             | you the 'key' to put your own thing on and even sell it -
             | for a 'reasonable fee' which may be six figures and proff
             | you will care about safety. Universities have got the key
             | for student projects (under nda)
             | 
             | disclosure: I work for jonh deere but am not speaking for
             | the company. The above is all I feel I can say on the
             | subject
        
             | Espressosaurus wrote:
             | Orrrrrr...venture capital money comes in and they sell for
             | a loss until they achieve monopoly status and jack up the
             | rates!
             | 
             | Might be less successful now that money isn't free.
        
               | foobiekr wrote:
               | Venture hasn't managed to make a dent in Nvidia despite
               | massive investments.
               | 
               | Maybe they aren't as powerful as you think outside the
               | comparatively trivial "build some software" markets. Hell
               | even in networking, compute and storage there are only
               | three or four real success stories in the last two and a
               | half _decades_.
        
             | 93po wrote:
             | my understanding is that the barrier to entry in this space
             | isnt manufacturing the equipment, but rather having a large
             | dealer network for people to use for service and repairs.
             | my impression is that people largely buy whatever has a
             | nearby dealer for this reason. and these dealer connections
             | are more and more important as they make it more and more
             | impossible to work and maintain the equipment as an
             | individual
        
           | kevinmpeterson wrote:
           | CAT, Deere are both doing very interesting things with older
           | autonomy techniques. Deere has acquired several companies,
           | and partnered with others to bring in talent from outside.
           | CAT has worked with outside companies (notably Trimble,
           | Topcon) for key technologies when it makes a big difference.
           | Both are awesome companies, but not AI/ML companies at the
           | core and it'll take a lot of work for them to get there. I
           | think this is very much like the self driving world 10 years
           | ago where OEMs tried very hard to become software companies,
           | but ultimately Cruise and Waymo were the ones that executed.
        
             | nickff wrote:
             | Neither Cruise nor Waymo seems to be profitable yet, and
             | the jury is still out on whether they will win the market.
             | They may be the MySpaces (or the Fiskers) of autonomous
             | driving.
        
         | khurs wrote:
         | The money raised is $80m rather than $800m which likely
         | reflects all the challenges faced.
         | 
         | It's the kinda startup that may be able to pivot easier than
         | others.
        
         | CGMthrowaway wrote:
         | >One big barrier I haven't seen mentioned is all the OEM
         | competition they are going to face.
         | 
         | Seems like that is a pro not a con. An exit scenario
        
           | nickff wrote:
           | It's only a pro if Bedrock has some sort of advantage that
           | the existing companies don't and can't easily get. Without
           | some sort of innovator's dilemma-type situation, they're
           | likely to be crushed (into gravel).
        
             | CGMthrowaway wrote:
             | Aqui-hire. The modern-day labor union (get more for your
             | skilled labor than you would otherwise)
        
               | whiplash451 wrote:
               | Meh. Being acqui-hired by Caterpillar or John Deere can't
               | really be a dream of theirs. Plus the financial upside
               | would be limited as these giants would tie it to tough
               | long term milestones. Does not sound like a great deal.
        
         | _carbyau_ wrote:
         | > One big barrier I haven't seen mentioned is all the OEM
         | competition they are going to face.
         | 
         | Not sure on this one. The company likely has it's own vision
         | but I've thought for a while that a swarm of small electric
         | rubber tracked earth moving vehicles (small enough to fit one
         | or two in a tradies van?) could work longer hours due to being
         | much quieter. For larger jobs you put a single person in a
         | small tower on overwatch and run it 24 hours a day.
         | 
         | This'd give you a somewhat scalable approach from small
         | residential jobs to somewhat larger jobs while not competing
         | against the incumbents directly and allowing you to work out
         | the kinks. Then _if_ it makes sense later, you build bigger
         | machines with hopefully better battery technology.
         | 
         | Ultimately though, for proper big jobs, you need proper big
         | tools. Maybe a partnership or "exit strategy" works.
         | 
         | Though maybe I've played too many RTS games like Supreme
         | Commander...
        
         | defrost wrote:
         | Equipment operators are lead by their largest clients, mining
         | companies such as Rio Tinto for example.
         | 
         | 24/7/365 large fleet operators that move a billion tonne of ore
         | per annum and alter the spin balance of the planet by a
         | detectable amount.
         | 
         | Pages such as
         | https://www.riotinto.com/en/mn/about/innovation/automation are
         | out of date and don't do justice to the extant of and demand
         | for grand scale semi autonomous mining and construction
         | equipment.
         | 
         | BBC coverage of one site and mining automation:
         | https://www.bbc.com/news/articles/cgej7gzg8l0o
         | 
         | There's a large yet to be built copper project in the US that
         | has autonomus mining plans in the economic technical report.
         | 
         | https://resolutioncopper.com/mining-method/
         | 
         | https://resolutioncopper.com/wp-content/uploads/2021/11/RTRC...
         | 
         | https://en.wikipedia.org/wiki/Resolution_Copper#Reactions
        
         | threatripper wrote:
         | If the missing ingredient is not some secret technology that
         | only few of these old players have, they are probably too busy
         | with their existing business.
         | 
         | Management may invest many years developing some new key
         | technology on the side but when it comes to actually taking the
         | market, it's hard to focus on two areas at the same time.
        
         | amelius wrote:
         | Do they have a large patent portfolio that might get into the
         | way?
        
       | CharlesXY wrote:
       | Definitely echo the concerns about bureaucratic red tape (looking
       | at you, California high-speed rail fiasco) that kind of
       | environment makes innovation in infrastructure extra hard. Still,
       | there's something compelling about Bedrock's approach if they can
       | genuinely deliver a system that adapts in real-time to the
       | complex nature of construction sites. The big question is whether
       | they can win through retrofitting existing fleets or by locking
       | in tight partnerships with OEMs, adding to that the competition
       | is going to be pretty tough
        
       | khurs wrote:
       | > is focused on developing a self-driving kit that can be
       | retrofitted to construction and other worksite vehicles
       | 
       | Seems sensible a project. $80m raised also seems a sensible
       | amount. And the guy has a background in this field. Good luck
        
       | hnpolicestate wrote:
       | Just nonstop putting people out of work lol.
        
         | khurs wrote:
         | Most people don't enjoy the work they do.
         | 
         | As long as the bills are paid then most people will be happy to
         | not go to traditional work, but instead do more interesting/ of
         | value to the community work.
        
           | hnpolicestate wrote:
           | I pray LLM's put programmers out of work. You don't enjoy it
           | anyway, just bills etc. Learn to enjoy gardening or
           | something.
        
             | khurs wrote:
             | What would a programmer rather work on. Some boring app for
             | someone else, or an app to solve a problem he has of his
             | own.
             | 
             | What is more enjoyable, working on the language and
             | database dictated by work, or whatever tech he wants to
             | use.
             | 
             | As long as a person gets out of bed and does a days work
             | doing something productive in some way, it doesn't matter
             | that it's not traditional work.
        
             | yunwal wrote:
             | I feel like most people who got into programming because
             | they liked it (rather than for money) feel this way. I
             | certainly don't wanna be solving the same problems over and
             | over again.
        
           | davidcbc wrote:
           | Oh please, the billionaires who control these things aren't
           | going to share the wealth with the people they put out of
           | work. They're going to suck as many of us dry as they
           | possibly can
           | 
           | "As long as the bills are paid" is the key point. They won't
           | be because people will be out of a job with no safety net
        
           | hooverd wrote:
           | who is paying?
        
             | khurs wrote:
             | Money is a made up system that the people have decided best
             | meets their needs at this time.
             | 
             | If AI completely changed the system, then the present
             | method of exchanging labour for money would also need to be
             | replaced or tweaked.
        
               | lc9er wrote:
               | Is this your first day on earth. You sound like you're
               | new here. The wealth-hoarding overlords won't allow for
               | that.
        
               | khurs wrote:
               | There are more of us then there are of them. So they will
               | need to either kill us all, or work with us.
               | 
               | And as many of the overlords claim to believe in a
               | Christian/Jewish God, and so believe that one day God
               | will come down to Earth and build a city at Jerusalem (or
               | something like that) they will not want to anger their
               | god by killing all of us (perhaps just the remainder of
               | Gaza...)
        
       | cbdumas wrote:
       | I don't know anything about this startup but this is definitely
       | an important problem worth solving
       | https://www.chicagobooth.edu/review/us-construction-has-prod...
        
       | halfcat wrote:
       | > intelligence that understands project goals
       | 
       | > adapts to changing conditions
       | 
       | The real play here is starting a business that specializes in
       | getting construction equipment unstuck from the mud.
        
       | cperciva wrote:
       | Unrelated apart from the words "rock" and "construction": I
       | wouldn't be surprised if we see dry stone construction becoming
       | very practical thanks to advances in computer vision and
       | robotics.
       | 
       | Dry stone construction is incredibly durable -- it doesn't rely
       | on mortar which can weather away -- but it is limited by needing
       | to reshape stones to fit together tightly (often by making flat
       | surfaces). A human stonesmith can look at a handful of stones and
       | find one which is close to fitting in the necessary spot; but a
       | computerized system could scan thousands of stones and build
       | tightly-fitting stonework with minimal need for reshaping.
        
         | AngryData wrote:
         | An interesting thought, im pretty wary on most automated
         | construction techniques, but dry stone construction does seem
         | like a good fit for automation. It needs to be done before any
         | other construction is really done and takes a decent chunk of
         | time even for a team of humans so not a lot of people or other
         | things going on around the area or in the way. There are still
         | some issues that need experimentation. You can go 99% of the
         | way with fairly simple imaging, but that last 1% can be tricky
         | and usually requires tactile sensation and probing and pushing
         | on stones to get a rock solid fit, but perhaps the actual
         | technique/style of stone fitting would alleviate that last bit.
        
       | qrush wrote:
       | These guys are going to learn a fun lesson about organized crime
       | and labor unions in construction real soon.
        
       | cadamsdotcom wrote:
       | Construction robots can't happen soon enough!
       | 
       | Eg. if bricklayers could talk to their machine the way we can
       | with coding agents, and say "yep, wall here please, check the
       | blueprints to confirm how high and where the holes for the
       | windows go", retired & injured tradespeople could choose to come
       | back. Less injuries means cheaper insurance & better margins.
       | People could work in multiple parts of a site by supervising
       | several robots, and not be exhausted at the end of the day. The
       | list of benefits to individuals and the industry is long.
        
         | atbpaca wrote:
         | Machines will need humans, for sure. The question is how many?
         | For instance, there is a company using printing technology to
         | build homes in Austin, Texas. The target number of workers
         | needed to operate the "printer" is 3, down from 10. So on the
         | positive side, the remaining 3 workers will have a better work
         | environment, maybe the costs of building houses will go down a
         | bit, etc. In the other hand, 7 workers are no longer needed. My
         | point is that the gains in efficiency will come with some
         | winners and, in my humble opinion, many losers. And that will
         | only help to downsize the middle class even further. Don't get
         | me wrong, from a scientific/technological point of view, I am
         | looking forward it. But I am concerned with the social impact
         | in the long term.
        
           | newsclues wrote:
           | How many humans and where they are!
           | 
           | Lots of remote jobs (pipelines etc) could be done with robots
           | and satellite internet.
           | 
           | If the maintenance and recovery teams can also be robots,
           | suddenly lots of big projects could get done in very hostile
           | environments.
        
         | maxglute wrote:
         | >if bricklayers
         | 
         | If legit construction robots were a thing they'd be primarily
         | trained on assembling the most automation friendly cladding
         | systems instead of wasting time laying bricks, incidentally why
         | brick fell out of favor.
         | 
         | Ironically a lot of construction robot explorations has been
         | bricklaying / mason bots, but that's because laying bricks is
         | computation and mechanically simple repetitive task not because
         | it's an efficient building system. The benefit is we'll
         | probably be able to build with bricks/masonry cheaper, the
         | caveat being it will probably be relative more expensive
         | relative to automation optimized building systems.
        
         | spoonsort wrote:
         | Well said. The company is actually more focused on earth
         | moving, but the same arguments you make apply there, if not
         | even more. Earth moving is a very exhausting job that most
         | would be glad to have automated. A little known fact is that
         | you actually get boiled no matter what machinery you use in
         | there on the black dirt mid day, and it's not totally safe;
         | your machine could roll over if you aren't at the height of
         | your awareness.
        
       | brudgers wrote:
       | My desire to believe in the technology runs aground upon the
       | Conjunction Fallacy.
       | https://en.m.wikipedia.org/wiki/Conjunction_fallacy
       | 
       | To build a commercially successful autonomous bulldozer requires
       | building a commercially successful bulldozer. That's hardware and
       | hardware is hard. Probably harder than the autonomous part
       | because bulldozers are a century past the proof-of-concept era.
       | 
       | My cynical take is this is financial engineering more than
       | construction engineering. YMMV.
        
         | xnx wrote:
         | > To build a commercially successful autonomous bulldozer
         | requires building a commercially successful bulldozer.
         | 
         | Wouldn't it only be necessary to put a "robot" in the driver's
         | seat of any existing dozer?
        
         | shorbaji wrote:
         | I wonder what fraction of the hardware goes into hosting the
         | human operator and into ensuring their safety. How much
         | hardware cam be optimized away when there is no longer a human
         | operator?
        
           | brudgers wrote:
           | Very little. All the reduction gears, tires, and hydraulics
           | are the same.
           | 
           | Basically you can get rid of the air conditioner and the
           | seat. Most of the hazards related to heavy equipment involve
           | hitting something outside the machine.
           | 
           | Rolling is the major hazard to an operator and you still want
           | to avoid that without one.
        
         | kevinmpeterson wrote:
         | Waymo doesn't build cars
        
         | poly2it wrote:
         | They are also building a vehicle which doesn't have to adapt
         | for a human, shifting the domain. Definitely not just
         | complexity which is AND-able.
        
       | iamleppert wrote:
       | I wish them luck, but I highly doubt they have been on a real job
       | site, or have actually operated a heavy.
        
       | kevinmpeterson wrote:
       | I'm the CTO and one of the founders of Bedrock. I was very
       | pleasantly surprised to see the excitement from this crowd! Happy
       | to answer any questions about us (and will look through the
       | comment threads here). We're looking for really really awesome
       | MLEs and software engineers, so if you're interested take a look
       | at our careers page https://bedrockrobotics.com/careers
        
         | noosphr wrote:
         | Are you planning on using humanoid robots as drop in
         | replacements for humans using the same tools?
        
           | margalabargala wrote:
           | Probably not. They've already gotten the VC funding, so no
           | need to sabotage their chances of success like that.
        
           | kevinmpeterson wrote:
           | Humanoids will be amazing when they get here, but I think
           | there are a lot of challenges between now and then - hardware
           | alone is very challenging - add a ton of sticky mud and it's
           | going to be complex even if the software works.
        
           | 93po wrote:
           | i had to look up whether stuff like mini excavators use
           | control-by-wire/CAN bus or if the controls are actually
           | mechanically operating valves, to determine how hard it'd be
           | to just throw a lil computer connected to the CAN bus to
           | autonomously operate equipment. it seems like newer and nicer
           | models are control by wire, and older ones have joysticks and
           | pedals that directly open and close hydraulic valves.
           | 
           | i looked this up in a "cost of humanoid robot" versus just
           | doing a retrofit on a computer/actuators on older equipment.
           | i think even in the actuator approach, adding 12
           | electronically controlled hydraulic valves to replace the
           | human actuated valves is still gonna be cheaper than a
           | humanoid robot
        
             | kevinmpeterson wrote:
             | 100%
        
         | scythe wrote:
         | I read your careers page out of curiosity. It's like all
         | software and equipment (what I interpret from "hardware").
         | Shouldn't you also hire some structural engineers and similar?
        
           | kevinmpeterson wrote:
           | We're mostly focused on the AI and software side of things.
           | There are many great manufacturers for the machines
           | themselves. We have amazing hardware engineers, so if we need
           | to do structural work for our parts, we will. At the moment
           | it's not core.
        
             | AftHurrahWinch wrote:
             | Structural Engineer is a type of Civil Engineer.
             | 
             | https://en.wikipedia.org/wiki/Structural_engineering
        
               | kevinmpeterson wrote:
               | Ah I misread. We're working very very closely with design
               | partners/customers for that side right now - they do more
               | civil work than we will ever do and are happy to help us.
               | We also have advisors who are in the civil space.
        
         | dolebirchwood wrote:
         | Small piece of feedback: It takes far too much scrolling to get
         | to the list of open roles. Maybe that's deliberate, so you know
         | your applicants are truly serious about working for you, but I
         | could see a lot of potentially highly-qualified candidates just
         | dropping off due to plain annoyance.
        
           | 93po wrote:
           | to add to this, hijacking default scrolling behavior is such
           | a massive no-no and super freaking annoying. it's also
           | problematic for accessibility reasons.
        
         | chaosbutters314 wrote:
         | make robots that cnc cut brick to cover the ugly ass houses
         | around the US
        
           | kevinmpeterson wrote:
           | Cool idea
        
         | torginus wrote:
         | This is more of an open-ended question, but do you think there
         | will be a sure in traditional (non-software) engineering
         | demand, as well as software engineering in more of a hands-on
         | hardware context?
        
           | kevinmpeterson wrote:
           | Couple of thoughts here:
           | 
           | Software engineering IMO is alive and well, we're just going
           | faster. Job will shift with AI, but that happened with
           | compilers, etc. Clever engineers will continue to build.
           | Going faster could mean you mean fewer SWEs, but could also
           | mean you just go faster and build more things. If we go
           | faster, the next thing will be down the chain (enough
           | compute, enough hardware to work on). Since AI has always
           | been insanely software bottlnecked, if it goes faster yeah
           | there will be more jobs.
           | 
           | Robotics works now! We should build more robots! Some of the
           | best companies in the next decade will for sure be building
           | some of the robots from Star Wars and the Jetsons. This will
           | be heavy on hardware. Outside of robots, hardware will change
           | too - no idea if Meta's glasses are the best thing, but
           | certainly the iPhone format isn't AI native. This will be new
           | hardware, and we'll need smart objects everywhere in our
           | lives (car, home, etc). Will be very cool and definitely more
           | hardware oriented.
        
         | Symmetry wrote:
         | Are you planning on having these robots work collaboratively
         | alongside humans? Or something more complicated like only
         | driving near humans to start with but digging near them being a
         | longer term goal?
        
           | kevinmpeterson wrote:
           | They will work collaboratively with people
        
         | maCDzP wrote:
         | This looks cool. So this is extending the tech from
         | Trimble/Topcon with LiDAR in order to have a fully autonomous
         | excavator?
         | 
         | How would I handle faulty geotechnical surveys? It has happened
         | several times that the trench caved in and the operator saved a
         | persons life.
        
           | kevinmpeterson wrote:
           | We don't have any relationship with Trimble or Topcon, but
           | yes much more advanced capabilities on the machine. On
           | caving/shoring - ideally we avoid having people in at least
           | some of the trenches... if you can dig a trench and lay a
           | pipe down without manipulating it by (human) hand, then
           | trench collapse is less of an issue. Obviously doesn't work
           | for everything, but we have LIDAR on board, so we can handle
           | surveying remotely without someone standing in a cut with a
           | stick.
           | 
           | Faulty geotechnical - I'd be interested in understanding how
           | the operator helped here. Will take time, but anything the
           | operator is doing (watching subsidance, feeling the ground,
           | watching a wall collapse, confirming that the ground is
           | actually what you think it is), will be doable with the
           | sensors we have on board. The operator we're building will
           | have many lifetimes of experience, so will be able to learn
           | things that even the best operators can't. We saw this at
           | Waymo (now at 100 million miles!!!!) - it seems like magic,
           | but if you had 1000 lifetimes of experience, you'd be
           | incredibly good at very subtle things like this.
        
         | waynenilsen wrote:
         | do you see a change in the machinery landscape due to the
         | removal of humans?
        
       | to11mtm wrote:
       | Semi-shitpost, but Bedrock at this point has hit 'lazy name' tier
       | for projects/startups...
        
         | y1n0 wrote:
         | Seems appropriate for a construction related company.
        
       | ChuckMcM wrote:
       | I could see this really accelerating strip mining or
       | deforestation in places where there either isn't a lot of local
       | opposition or there is a favorable regulatory environment. It
       | makes me wonder if Tinto is an investor.
        
         | ripped_britches wrote:
         | Banks generally aren't allowed to finance strip mining
         | 
         | Deforestation is usually bottlenecked by major multi-million
         | dollar equipment, not hourly unskilled laborers
        
       | beanjuiceII wrote:
       | but they didn't even automate cars yet
        
       | mNovak wrote:
       | From the imagery, they seem to be focused on earthmoving. Some
       | cursory googling indicates an excavator operator can cost on the
       | order of $1000/day (to the end customer, presumably less to an
       | owner-operator). For some loose context, a slab-on-grade
       | warehouse project I was distantly involved with a couple years
       | back budgeted some $3.5M of sitework (includes other things than
       | just earthmoving), which was about 10% of the total construction
       | cost.
       | 
       | Plug in your own longevity and uptime assumptions, but if that
       | roof-mount kit costs on the order of $50k, it seems viable.
        
         | achatham wrote:
         | And imagine a hypothetical project that's 75% excavation. It'd
         | never be built today, but if excavation gets cheaper the
         | project could be feasible.
         | 
         | And then an explosion of underground bunkers and volcano lairs.
        
       | stego-tech wrote:
       | This feels more plausible for long-term success than Waymo for a
       | number of reasons:
       | 
       | * Construction sites are smaller in footprint
       | 
       | * They're more easily covered in sensor networks to support
       | autonomous operations
       | 
       | * They're typically controlled-access environments, which reduces
       | potential interruptions to automated routines
       | 
       | * Since they have higher risk profiles than public
       | infrastructure, the expectation is that workers will be more
       | aware of autonomous operations and any deviations before they
       | cause serious harm
       | 
       | Honestly, I'd wager closed-site autonomy takes off before anyone
       | nails national or global self-driving on existing infrastructure.
        
         | whatever1 wrote:
         | The flip side is that they work with a lot more degrees of
         | freedom (a car has just steering and speed to adjust), very
         | diverse machinery and a ton more exceptions that need to be
         | handled frequently
        
           | stego-tech wrote:
           | True, but they have more freedom to attack low-hanging fruits
           | and build capabilities in order of ease. With a self-driving
           | car, there's not a whole lot of iteration allowed - you have
           | your capital to do R&D, but eventually investors expect that
           | car to drive on public roads without incident or support,
           | something nobody can do at the moment.
           | 
           | For construction sites, on the other hand, you could (more)
           | easily automate things like dump trucks or material
           | transports using preprogrammed routes and manual triggers
           | when something is done or needed. Then you can iterate on
           | those systems to add more capabilities, more automations,
           | more integrations with other equipment.
           | 
           | Kind of like how tractors have iteratively improved over time
           | because they benefit from a lot of the same limitations as
           | construction sites. At least that's my thinking on it.
        
             | whatever1 wrote:
             | Definitely they can keep slicing the problem and deliver
             | viable solutions within the boundary specified.
             | 
             | I just don't think that a single solution will cover the
             | full suite of construction site machinery. Scaling will be
             | tough. But as you said they will be printing cash in the
             | meantime.
        
             | tetha wrote:
             | There are btw modern tractors that can drive autonomously
             | on the fields. You configure the GPS coordinates of the
             | field and the tractor can do various routes and patterns
             | through the field on it's own. You're just not allowed to
             | leave the wheel alone with current laws.
        
       | Duanemclemore wrote:
       | I'm an architect. Well really now an architecture professor who
       | (elevator pitch) writes computational tools to implement
       | sophisticated geometries in advanced fabrication...
       | 
       | That's all to say I want advancements in jobsite automation
       | desperately. But it's WAY harder than people from other domains
       | think. Imagine driving on a road while you're also building it
       | while others are doing both around you too...
       | 
       | These folks seem to be concentrating at the moment on excavation
       | which (without looking) if I recall is already a pretty active
       | and developed in terms of automation. But get out of the ground
       | and you hit some pretty big issues pretty quick. To get a sense,
       | heres's one of my go-to articles when people wonder about jobsite
       | automation...
       | 
       | https://www.construction-physics.com/p/where-are-the-robotic...
        
         | brudgers wrote:
         | Construction is dominated by scheduling. The high bit of
         | construction scheduling looks a lot like job shop scheduling
         | and job shop scheduling is NP Hard. To the degree that is true,
         | there are no generic optimization algorithms.
         | 
         | But like all real world optimization problems, better solutions
         | based on the specific nature of the inputs are usually
         | possible.
         | 
         | In the case of construction scheduling, relationships are the
         | most likely route to optimization. You can dig all night long,
         | but if the plumber does't show up in the morning to lay pipe,
         | your schedule is not improved and the plumber shows up in the
         | morning at your job site because of the long term business
         | relationship across many projects instead of some other
         | jobsite.
         | 
         | [I practiced architecture in the past. Everything takes as long
         | as it takes].
        
       | Sophistifunk wrote:
       | The wasted time and money in construction comes entirely from two
       | places: a small percentage of crooked builders (and their local
       | council mates), and the bureaucracy that is trying to protect the
       | citizens from same. Big brother puts in a lot of hoop-jumps
       | standards and supposed checks and balances that end up creating
       | massive delays and costs for the consumer, but the actual
       | standards (while usually quite sensible) are easily sidestepped
       | by the crooked builders, so the war continues, and the overhead
       | constantly increases with the usual expansion-only government
       | regulation ratchet.
       | 
       | None of these things are susceptible to "AI" and other such
       | automation. We have had prefab construction for decades.
        
       | jmyeet wrote:
       | Automation will break the back of capitalism. That's a good
       | thing. But it's going to get very bad before that happens.
       | 
       | There are a ton of jobs that should be automated like working in
       | an Amazon warehouse. Automation can go one of two ways: it can
       | make all of our lives easier or it can displace the workforce and
       | suppress the wages of those who remain so those are the very top
       | can have $250 billion isntead of $200 billion.
       | 
       | Those displaced will be told to find new jobs and that will work
       | for a time with considerable personal hardship for those
       | affected. We've seen the impacts of this with manufacturing jobs
       | being shipped overseas from the Rust Belt, for example. But at
       | some point we'll start to run out of jobs for people to go. And
       | then things will get very, very bad.
       | 
       | I imagine a distant future where food is grown with automation,
       | houses will be built that way, robots will pick up the trash and
       | so on. This will leave people to find more meaningful pursuits.
       | But this will require the ultra-wealthy to share and history has
       | taught us that this will get bloody.
       | 
       | Instead we'll face a future where companies will fail because
       | there simply aren't customers because nobody can afford anything.
       | 
       | I welcome less labor intensive constructions but construction is
       | a significant (~20%?) sector of the economy. The potential for
       | negative impacts from such mass layoffs is enormous.
       | 
       | and as others have mentioned: there's a ton of cost built in that
       | really comes down to corruption and overcoming NIMBYism.
        
       | thelastgallon wrote:
       | First, real estate in US designed to be the sink for excess money
       | globally gained by nefarious means, sell and make the money
       | clean.
       | 
       | Second, all the prep work before actual construction costs the
       | same regardless of the size of the home. Its profitable for
       | builders to build large homes (cheaper per square foot) and sell
       | them at a premium.
       | 
       | Third, zoning laws that make anything thats not a SFH mostly
       | illegal to build.
       | 
       | Fourth, manufactured homes are illegal in most areas.
       | 
       | Finally, The building codes are localized to each county, there
       | is no federal/state building code.
       | 
       | As long as these perverse incentives exist, costs are not going
       | to come down.
        
       | nikolayasdf123 wrote:
       | robotic construction is going to be big. 99.9% of what is
       | constructed will be constructed by robots
        
       | nikolayasdf123 wrote:
       | soon you submit YAML and get something build in physical world
        
       | svag wrote:
       | So is this like https://comma.ai/ but for bigger vehicles?
        
       | OkPin wrote:
       | What's interesting here isn't just the move from self-driving
       | cars to construction, it's how Bedrock is betting that autonomy
       | will take off faster in industries where safety, labor shortages
       | and cost pressures already demand it.
        
         | tartoran wrote:
         | Safety becomes a non issue when no humans are involved.
        
       | pilaf wrote:
       | This is tangential, but I recommend Katsushiro Otomo's (of Akira
       | fame) dystopian take on large-scale automated construction, the
       | short movie Construction Cancellation Order, part of an anthology
       | known in the west as Neo Tokyo[1], released in 1987 (Akira was
       | released in 1988).
       | 
       | I won't link to it here, but it seems someone uploaded it to
       | archive.org (most likely illegally).
       | 
       | 1: https://en.wikipedia.org/wiki/Neo_Tokyo_(film)
        
         | skatanski wrote:
         | This to me vibes with the world of manga Blame by Tsutomu
         | Nihei. In it large automata, have been building the mega
         | structure long after biological humans are gone. The structure
         | already encompasses the moon, and they are still building. Cool
         | concept, which goes well together with the architecture
         | background of the author.
        
       | beskababan wrote:
       | Ty
        
       | mycatisblack wrote:
       | Near-topic: does anyone know of automated deconstruction
       | attempts? i.e. dented car goe in one end, parts come out the
       | other?
        
         | lnsru wrote:
         | I love science fiction, so I could imagine decomposition
         | machine where dented car goes in and buckets with
         | rubber/plastic/steel/copper/aluminium/glass come out. Identify
         | materials and cut them piece by piece should be doable.
         | Identifying individual greasy parts and removing them maybe in
         | 25 years.
        
       | PicassoCTs wrote:
       | Looked at the linkedIn career paths in the profiles. Nobody there
       | worked in construction before this. They may have hired some
       | domain experts, but i doubt they will get it together.
       | 
       | Especially, as automated construction has very little to do with
       | "copy human" constructors and replicate and all todo with
       | abstract the environment away and get it done. Meaning, you will
       | want classic autonomy with excavators and trucks and concrete
       | trucks - until you have poured the base plate for a house.
       | 
       | Then the best approach still is, to have basically a factory for
       | pre-built components and assemble them on site. The "doing
       | constructor things" with machines on site- does not scale.
        
       | ironman1478 wrote:
       | I'm skeptical of the plan to provide a "kit" that can be put on
       | arbitrary construction vehicles. I think Cruise tried something
       | similar with personal vehicles and quickly learned it really
       | could only build a system for a specific vehicle. There are tons
       | of complexities associated with mounting of sensors and
       | interfacing with the vehicle specific control systems.
       | 
       | Not saying it can't be done, but I wouldn't be surprised if the
       | company has to pivot to supporting a subset of their goal and
       | then gets bought out by some larger company to work on their line
       | of construction vehicles.
        
         | poly2it wrote:
         | It might be easier to collaborate with an established producer
         | of a specific vehicle and create a partially custom vehicle
         | from the same "car platform".
        
           | foobiekr wrote:
           | It is not. These companies are actively hostile to this sort
           | of thing and with good reason: muddy liability in a context
           | where people can be injured, maimed, crippled and killed.
           | 
           | The "add on" thing belongs in he list of tarpit ideas.
           | Watching Cruise and Ghost Automation flail about for years
           | vaporizing cash trapped on this idea was like watching a
           | comedy.
        
             | ironman1478 wrote:
             | Waymo did it successfully with the Jaguars. I think the
             | idea is that the VC environment isn't conducive to this
             | type of work (I worked for Cruise). The companies grew too
             | big too fast b/c they need to show results to investors.
             | This forced them to invest in custom hardware before they
             | even knew how to solve many of the fundamental problems and
             | got their software stack in order.
             | 
             | Waymo got away with what they did b/c they stayed focused
             | and didn't grow too big, but they could only do that
             | because they had Google to finance them.
        
               | foobiekr wrote:
               | Waymo didn't do it for anyone else's gear. They own it
               | all. The liability is all on Waymo.
               | 
               | Traffic laws are a hell of a lot more lax than the
               | situation around on the job injuries.
        
       | poly2it wrote:
       | Is this site built in some futuristic new framework? Why does it
       | not allow scrolling at an adaptable speed on mobile?
        
       | AndyMcConachie wrote:
       | There are already so many specialized machines in construction.
       | When I was a kid I thought we needed exo-skeletons. Then I
       | watched modern construction happen and realized we already have
       | all these wild Bobcat like machines doing all the heavy lifting
       | that humans have done in the past.
       | 
       | I guess it's cheaper to use a computer to drive a Bobcat than a
       | human driver. But I wonder if the cost is worth the loss in
       | immediate knowledge and speed. There's no way a computer is going
       | to be faster than a human while also being safe. So I have my
       | doubts.
        
       | amelius wrote:
       | I'm still waiting for a robot that can put a LEGO model together,
       | given nothing but the bricks and the instruction booklet.
        
       | Aeroi wrote:
       | I've been building a voice+vision AI assistant for tradesman,
       | industrial services, and DIY consumers the last 8 months.
       | 
       | It streams vision+voice+text+spatial data to a multimodal llm, to
       | help users solve problems on the job. Basically a "Cursor" for
       | tradesman. Most of my work now has been figuring out what to put
       | in the context window, when, and how to provide the best
       | deterministic response.
       | 
       | This assistant is a bridge between where we are now (little to no
       | tech for these guys) and where the future will be (robotic
       | automation). I think the in between stage will be a significantly
       | longer timeframe than people realize, and I hope my app can
       | provide value to these guys while they work. www.camerasearch.ai
        
       | xnx wrote:
       | Look like Caterpillar has been doing some of this too:
       | https://www.cat.com/en_US/news/machine-press-releases/caterp...
        
       | 1970-01-01 wrote:
       | An old idea for colonization of the solar system is to create a
       | self-replicating machine that just goes and carves out
       | settlements for settlers.
       | 
       | https://en.wikipedia.org/wiki/Self-replicating_spacecraft#Vo...
        
       | cstanley wrote:
       | Did these guys just kill their QSBS status by raising 80m instead
       | of 75?
       | 
       | Cool idea, but a lot cooler to be able to attract talent with
       | QSBS stock
        
       ___________________________________________________________________
       (page generated 2025-07-17 23:01 UTC)