[HN Gopher] Why Scrum is stressing you out
       ___________________________________________________________________
        
       Why Scrum is stressing you out
        
       Author : aard
       Score  : 352 points
       Date   : 2024-09-14 23:11 UTC (1 days ago)
        
 (HTM) web link (rethinkingsoftware.substack.com)
 (TXT) w3m dump (rethinkingsoftware.substack.com)
        
       | debacle wrote:
       | We moved from sprints back to work queues for exactly this
       | reason. Output is exactly the same but no one is cutting corners
       | to "finish" the sprint. We still use a kanban and do estimation
       | the same exact way, but rather than arbitrary deadlines, devs are
       | trained and encouraged to communicate on their velocity in a way
       | that is far more effective than a daily standup.
       | 
       | Scrum was an idea that had its time, but after like...15 years
       | the limitations are apparent.
        
         | aetherson wrote:
         | The main value of stressing about sprint goals and what's "in"
         | a sprint and finishing it is the very specific situation of
         | there being a bunch of people who want to feed in a large
         | amount of work to a team (usually bugs/support
         | requests/operational work) and it results in constant
         | prioritization issues.
         | 
         | If you don't have that situation, you probably don't need to be
         | really careful about what's in a sprint.
        
           | gregmac wrote:
           | Kanban lets you prioritize exactly the same way, except it
           | doesn't have to fit into a sprint schedule. You also have to
           | make good stories, which are independent, have a meaningful
           | thing that gets delivered and are of a reasonable size. Then
           | important bugs can get moved to the top of the to-do column,
           | and get done quickly as possible without interrupting any in-
           | progress work.
        
           | Viliam1234 wrote:
           | Problems with Scrum: It's nice that you did your planning
           | poker, but all these tasks need to be ready by the end of the
           | month regardless.
           | 
           | Problems with Kanban: It's nice that you set priorities to
           | the tasks, but all of them need to be ready by the end of the
           | month regardless.
           | 
           | Conclusion: If there is more work than people can
           | realistically do, and it all needs to be done no matter what,
           | it doesn't matter what process you use; people will be
           | stressed and burned out.
        
         | lloeki wrote:
         | > do estimation the same exact way, but rather than arbitrary
         | deadlines,
         | 
         | The core problem with that is that effort - consciously or not
         | - gets immediately turned into (start day + estimate) =>
         | deadline which only works when you consider spherical cows, not
         | accounting for the hard true practical fact that reality is
         | messy.
         | 
         | And it is quite messy, by the very nature of the work which is
         | to do something that has not been done before (otherwise by the
         | very nature of software you'd just reuse it) and thus carries
         | unknown unknowns. Everyone has experienced this "one-line fix,
         | should be done tomorrow" that turns into a bind-mending multi-
         | week hunt down the rabbit hole; replace "fix" with "feature" at
         | your discretion; replace rabbit hole with "that very urgent
         | task preempting anything else".
         | 
         | The second-order problem is that deadlines are used to schedule
         | higher level dependencies between teams, all the way up to
         | product, and possibly customers, and then it becomes the
         | coupling interface and everything falls apart when there's a
         | delay that inevitably trickles up with rippling consequences,
         | because the system is not designed to handle such a failure
         | mode, having this deadline dependency as its core interface
         | between all the parts.
         | 
         | If you're not convinced of that, "follow the money": the
         | consistent metric across the software industry to evaluate an
         | employee's performance boils down to "deliver on time". Three
         | months down the road, the rational explanation to delays of
         | mandatory rabbit holes and very legit preempting tasks is
         | forgotten, even when acknowledged by management. You're told to
         | factor all that in, but estimating unknown unknowns is by
         | definition impossible (best case you go statistical, with
         | deadly outliers around the corner, which amounts to say it's a
         | bet). Experience reduces these unknowns but they're still
         | around, everywhere. Overall, you tried telling the hard truth
         | with absolute candor were left helpless when it backfired.
         | 
         | Ultimately, whatever the process, the stark reality is that to
         | get shit done you have to take part in the make-believe dance
         | and lie - white lies, because soon enough one realises that the
         | other kind of lies also backfires very quickly - in a way that
         | still communicates some form of deeper truth: "progress is
         | being made, it'll be done (when it's done)". Inflate some
         | numbers, tune wording when reporting, steal time by bleeding
         | some for task X (reported or skunkworks) into task Y. All the
         | reporting meetings and documents entirely become smoke and
         | mirrors, but are somehow important as they're oil to the whole
         | machinery. Two parallel universes emerge and graciously evolve
         | in parallel.
         | 
         | This sleigh of hand is the missing buffer catering for the lack
         | of acknowledgment that producing software is entirely different
         | in nature than producing hardware in a factory. It is in
         | essence more of a creative act, albeit a strangely misleading
         | one because of its technical component. Lots would be amazed as
         | to how much closer it is to advanced drawing or musical
         | composition than it is to more "material world" engineering
         | (although the rigorous process of the latter certainly helps
         | for technical aspects), and taking classes of the former would
         | probably do a lot of good.
        
       | AnarchismIsCool wrote:
       | I've learned to hate software process. If you have team sizes set
       | sanely and empower devs to do what they need to do in order to
       | accomplish the goal, they'll be fine without the management
       | overhead of arbitrarily imposed productivity flow. Agile et al,
       | along with 99% of the features in ticketing systems, exist to
       | make managers feel like they are justifying their paycheck.
       | 
       | If you are a manager and this makes you angry, you're one of the
       | bad ones.
        
         | loloquwowndueo wrote:
         | Just keep in mind that a lot of people equate Agile with Scrum,
         | which is incorrect. Agile is about exactly what you said:
         | empowering devs to get shit done. None of the extra "keep
         | managers happy" crap that Scrum introduces is in any way
         | covered by the Agile manifesto.
        
           | LeFantome wrote:
           | What in Scrum is about keeping managers happy?
        
             | pan69 wrote:
             | Story points, velocity, burn down charts, shit like that.
        
               | wild_egg wrote:
               | None of those things are part of scrum as described by
               | the actual guide
        
               | RussianCow wrote:
               | But nobody follows the actual guide so it doesn't really
               | matter.
        
             | wsc981 wrote:
             | Some things that come to mind:
             | 
             | - burn-down / velocity charts
             | 
             | - retrospectives
             | 
             | - poker sessions
             | 
             | - daily stand-ups
             | 
             | - user stories and related tickets (eg in JIRA)
             | 
             | There's probably more ...
             | 
             | Perhaps these things are not necessarily _meant_ to make
             | managers happy, though managers do seem to like this stuff.
             | 
             | As a dev, I prefer a more fluid approach without all the
             | rituals. In the start-up I joined a couple of months ago,
             | we don't deal with any of the above shit. Which of course
             | is sure to change as the company grows, as that seems to
             | happen often.
             | 
             | Our current way of working (remote company, 4 people):
             | 
             | - 2 calls a week, which tend to last about an hour.
             | 
             | - We discuss work for upcoming week or future stuff.
             | 
             | - We try to deliver every week on whatever was agreed upon
             | at start of week.
             | 
             | Actually, previous company I worked at, was a bit bigger
             | (35 people), but also very little rituals, at least for
             | devs. There was a support department that did the JIRA
             | related stuff. And we had like 2 day-long meetings every
             | year to discuss personal goals/work for next half year. But
             | afterwards just a short weekly meeting for team (sometimes
             | lasting only 10 minutes), no stand-ups and such.
        
               | jghn wrote:
               | I've been a dev, and I've been an EM.
               | 
               | The only thing on that list I've ever liked is the
               | velocity charts. And the only reason I liked them is that
               | it helped me give a slightly less made up date to my own
               | bosses to explain when something might ship.
               | 
               | Over the years I've found that devs have been the one who
               | like retros. Or at least a certain subset of them. When
               | I've been an EM I would try to get rid of them, only to
               | have them requested by my teams. Who knew.
        
               | rpcope1 wrote:
               | As a developer, I find retros most useful when EMs (and
               | probably PMs, depends on how things are configured
               | organizationally) aren't present, as it should give a
               | chance to talk freely about challenges you or the team
               | face, which often are organizational in nature and may
               | involve one's management chain. My current role doesn't
               | adhere to this, and it makes retro often really painful.
        
               | jghn wrote:
               | I would agree with you. I never want my manager there. As
               | an EM, I never want to be there. And yet, as the years go
               | by, when I have an EM role I find my presence is
               | requested. Again, who knew?
        
               | Leherenn wrote:
               | I don't know, at least for my current team a lot of the
               | stuff we complain about in the retro is beyond the team
               | level: coordination between teams, infrastructure issues,
               | ... The intra team issues are usually talked about before
               | (e.g. during standup, or just asynchronously).
               | 
               | If the EM is not there, those are not actionable. What we
               | try to do is: do the retro by ourselves, and invite the
               | EM at the end of there is stuff for them. Usually they
               | are not available though...
        
               | meowfly wrote:
               | Retros all too often focus on the last thing that
               | happened and risk turning into a complaint session.
               | 
               | I've told my team anyone is welcome to ask for a retro
               | whenever for any reason, but we don't make them recurring
               | meetings because there is too much of a temptation to
               | find something wrong to fill the time.
        
               | jghn wrote:
               | This is exactly why I hate retros. It's just a venting
               | session. We're going to whine about some things, of which
               | we have absolutely no power to change, and somehow that
               | changes the future.
               | 
               | But people seem to love them.
               | 
               | I'd prefer to spend that time putting my head down and
               | grinding through whatever sucky thing people were
               | otherwise whining about.
        
               | shade wrote:
               | Best retro I ever had, on a small team of seniors: we all
               | sat down, looked at each other, agreed that a sprint
               | happened and we couldn't think of anything that was good
               | or bad about it. Then we called in our manager, who also
               | acted as scrum master, so we could do planning for our
               | next sprint. I thought this was reasonable enough -
               | ostensibly we'd do retro and then planning back to back,
               | and none of us minded the chance to take a few minutes
               | and reflect if we had anything we should discuss.
               | 
               | By contrast, I've worked with scrum masters who were
               | strict about the process and insisted _every_ retro
               | needed to have at least one improvmenet or action item
               | out of it, preferably more. I found this pointless and
               | I've rarely seen them actually followed up on.
        
               | Stratoscope wrote:
               | And sprints!
               | 
               | When I started at my current job, I naively looked at the
               | bugs and tasks assigned to me, and started picking and
               | fixing the highest priority tickets.
               | 
               | Then I was informed, "Oh no, that's not how we do things
               | here. Don't look at the priority, just work on what is
               | assigned to you in the current sprint."
               | 
               | I had never heard of sprints before.
               | 
               | More recently, I had a conversation with my manager and
               | asked, "Do we really need sprints? I've been in this
               | business a long time. 10, 20, 30 years ago we didn't have
               | sprints and somehow still managed to produce great
               | software."
               | 
               | The reply was "But if we didn't have sprints, how could
               | we possibly measure the team's productivity and
               | individual productivity?"
               | 
               | I knew I wouldn't win this debate, so I politely let it
               | drop. I just wanted to sow some seeds of doubt.
               | 
               | In all fairness, my manager is a very reasonable person.
               | But when this devotion to sprints is ingrained in the
               | entire company, it is hard to question it or get away
               | from it.
               | 
               | At least we don't do daily standups!
        
               | ta_1138 wrote:
               | That's normal nowadays, even in the most ridiculous of
               | situations.
               | 
               | I once found that a system was getting a little
               | expensive. As, AWS was billing us a million a month
               | expensive. I figured this out, and came up with a plan
               | that would cut it down to 80 thousand by spending 4 days:
               | You know, a mild, 11 million a year of savings.
               | Management insisted that the work had to go through
               | scheduling, and intake, a process that would involve zero
               | developers looking at anything, but would delay doing the
               | task a month and a half.
               | 
               | And no, nothing the team was working on came even
               | remotely close to that ROI. Following the process just
               | cost an extra 1.5 million dollars.
        
               | shostack wrote:
               | What was the opportunity cost of potentially
               | deprioritizing other work?
        
               | nine_k wrote:
               | ^ _nothing the team was working on came even remotely
               | close to that ROI._
               | 
               | I read it as that the opportunity cost would be lower.
        
               | fwip wrote:
               | The manager probably can't take the credit for saving 10
               | million dollars if they don't put it through the system.
        
               | userbinator wrote:
               | _The reply was "But if we didn't have sprints, how could
               | we possibly measure the team's productivity and
               | individual productivity?"_
               | 
               | "Do you really need to measure that, or perhaps something
               | else is more important?"
        
               | Silhouette wrote:
               | _" But if we didn't have sprints, how could we possibly
               | measure the team's productivity and individual
               | productivity?"_
               | 
               | A more enlightening question might be what actionable
               | information about productivity they are gaining from the
               | sprint-based metrics.
        
               | jksmith wrote:
               | Good points, and eye-rolling stuff for teams thaqt don't
               | understand the intricacies. For instance:
               | 
               | - burn-down / velocity charts: Teams use this at standups
               | to make sure their sprint isn't drifting. That's why a
               | burn-down should be tracked in hours and not points. With
               | points, the data isn't actionable in a reasonable amount
               | of time. The the team sees a problem, they might make use
               | of a pre-determined emergency procedure to address it.
               | 
               | - retrospectives: Yeah most retrospectives are horrible.
               | Retros should be like post rocket test - examine your
               | telemetry deltas to see what changed (edge cases,
               | governance,compliance, desgn, etc.) These conversations
               | are not forced, but good teams always repeat the same
               | data analysis unless they intentionally change it.
               | 
               | - poker sessions: Yeah this is totally misunderstood.
               | Pointing stories is about snap reactions to comparing
               | difficulties and complexity, and that's it, move on.
               | Teams will tighten up estimates when they do an
               | implementation plan in sprint planning. So they don't
               | sweat estimates.
               | 
               | - daily stand-ups: The whole team is responsible for the
               | sprint backlog, nothing is assigned, everything is
               | volunteered. So if you're working on something that is
               | going south, or you have some extra capacity, let your
               | team know about it. The team will work together to scale
               | capacity to get things done, which is how they can
               | disappear on Friday afternoons.
               | 
               | - user stories and related tickets (eg in JIRA): Well
               | yeah, Jira sucks. So do all the other major backlog
               | tools. Jira gets addins, but the fundamental approach to
               | backlog development hasn't changed in a decade. (I'm
               | working on a soln from scratch, btw).
               | 
               | Also, user stories are meant to be work-items with enough
               | signal so they can be executed with certainty in a
               | sprint. So that means a lot of refinement to the left of
               | the story must occur to get rid of the noise (epics to
               | features to stories to tasks). Once a team says a story
               | meets their definition of ready, that story can be
               | scheduled for a (timely) sprint. Team members may be
               | doing hard-core story refinement because of some
               | technical hurdles, so their time outside of development
               | during sprint can be pinned down with the team's capacity
               | plan. BTW, capacity plans and implementation plans belong
               | solely to the team. They're nobody else's business,
               | including managers to CEOs.
        
               | relaxing wrote:
               | > That's why a burn-down should be tracked in hours and
               | not points. With points, the data isn't actionable in a
               | reasonable amount of time.
               | 
               | I don't follow this?
               | 
               | The arguments against estimates in hours are well known
               | as this point.
        
               | jksmith wrote:
               | Sure, comes from a prevailing view that estimating is
               | bad. But it's only because estimating is treated like the
               | answer, then we just go with that answer.
               | 
               | The best scrum teams I've worked with maintain a very
               | important survival notion: We don't know the full minimum
               | survivable solution today, but that's ok because we do
               | know enough to get to tomorrow at least. We survived
               | another day. Point is, estimating was never meant to be
               | an answer. It was just meant to kick off discovery. And
               | that's a great way to start because humans tend to be
               | exceptionally good at quickly comparing things for
               | difficulty and complexity. It's an instinctive survival
               | skill.
               | 
               | Ultimately, well after estimating this scrum team will do
               | an implementation (tasking) plan in hours if needed
               | during sprint planning. They will compare that plan
               | against their team capacity plan in hours. If the
               | implementation plan blows out the cap plan by say, 30%
               | then that's a warning sign and they'll tell the PO they
               | need to drop a story for the upcoming sprint. If the cap
               | plan compared against the imp plan shows a 30% surplus,
               | then they will pull in a stretch story and bump their
               | velocity, or won't tell the PO and maybe go play golf at
               | the end of the sprint.
               | 
               | So the story pointing exercise just gets the team some
               | data that helps them get to the next day (survival
               | speak). There's still a lot of story refinement to be
               | done, before they will tell their PO a story is ready to
               | be pulled into one of their sprints.
               | 
               | When teams pull in stories to their sprint backlog, the
               | team is committing to get that story done, so they need
               | immediately actionable data on what's going on at every
               | standup. If the burndown was done in points, the graph
               | ends up looking like a straight line for days with sudden
               | dropoffs toward the end of the sprint - that hides
               | problems. So a sharp team will use task hours instead.
               | Makes the plot a lot more actionable from day to day.
               | 
               | Here's a popular presentation I do on estimating, and why
               | we tend to misunderstand its usefulness. "How to do
               | estimating while being chased by a rhinoceros:" https://g
               | ithub.com/jamesksmithiii/Presentations/blob/main/Th...
               | 
               | Also maybe useful: Drawings for what to cover in scrum
               | ceremonies: https://github.com/jamesksmithiii/Presentatio
               | ns/blob/main/Ce...
        
               | relaxing wrote:
               | No, the prevailing view is estimating in _hours_ is bad,
               | hence the push for estimating in t-shirt sizes or other
               | stand-ins for task complexity.
               | 
               | The survival terminology is really off-putting. And
               | what's the obsession with golf? This doesn't sound like
               | any scrum team I've worked with or would want to be a
               | part of.
        
               | jksmith wrote:
               | Well, a rather xor response, but that's ok. Let's go a
               | different route: Someone is using a diet change (fixed),
               | and the elliptical machine to lose weight. This person
               | has no exercise background. The elliptical routine is
               | basic - same program, one hour a day, 8 weeks. BF test is
               | done at the end of each week. Graph the results. What do
               | you think the plot will look like? Why did the subject's
               | weight loss stall out?
               | 
               | Estimations are meant to be exactly that, estimations.
               | Don't try to make them anything else. They offer a grey
               | answer, so use the best tools you have to deliver that
               | grey answer. In this case, it's simply comparing
               | challenges for size, complexity, etc. Don't try to do
               | estimations in a different way just because you want an
               | immediate answer. Estimations are meant to be a starting
               | point to get to a minimum survivable solution. That's how
               | humans use instinctive tools that use the least amount of
               | energy to get to a point that they can survive a
               | challenge. Think about the elliptical example.
               | 
               | In scrum, estimations are the conscious way to get this
               | discovery kicked off; they aren't meant to be an answer,
               | because you don't have enough data yet for a solution.
               | They are meant to be a starting point. Iterate to the
               | solution. When you think you have enough signal for a
               | solution (the sprint), do your final check and balance,
               | which is a tasking plan in hours, during sprint planning.
               | 
               | Another example: The year is 1929, and you're asked to
               | guess the weight of the Empire State Bldg before
               | construction has even begun (1931). What answer delivers
               | more survival information? 180,000 tons, or this: "Well,
               | we know each floor is going to have x concrete, y steel,
               | but not sure about the other construction materials. So
               | it will be something like (x+y+?)*#floors. If your life
               | depended on it, which answer would you go with?
               | 
               | You are looking for a number, and that's why people don't
               | understand what estimating is about. The incorrect
               | approach is like, "Well these estimations are crap, so
               | let's change the estimation methodology." Yeah but it's
               | still and estimation, and you already have a great
               | instinctive tool to make those estimations via relative
               | size comparison, which can be done so quickly, it could
               | literally save your life. Instinctively, we accept that,
               | conscoiusly we don't, so we turn into ill tempered Veruca
               | Salt.
               | 
               | Regarding the golf reference, I'm from Florida. Sorry if
               | the attempt at levity was weak.
        
               | rbetts wrote:
               | > burn-down / velocity charts
               | 
               | You need some coarse odometer to know where the finish
               | line is. Burn-up charts are a reasonable input to that
               | and can be very low effort. Just knowing where you hit
               | the inflection point between new-issues added to a
               | milestone vs. issues resolved is useful. If you can
               | replace a burn up chart with tangible test results matrix
               | or similar - even better.
               | 
               | > retrospectives
               | 
               | I have never found per-sprint retros useful, either. I
               | guide teams to do a retro when the issues raised in the
               | previous retro are resolved. WIP control FTW.
               | 
               | > poker sessions
               | 
               | In my experience, planning sessions are one of the most
               | impactful parts of the stereotypical scrum process for
               | three reasons: (a) Planning creates a consensus within
               | the team about what the story actually means; (b)
               | Planning often leads to someone proposing a good 80/20
               | trade-off or raising an important point that avoids
               | future re-work or unexpected tech debt. (c) Breaking big
               | tasks into actionable, independently useful, small tasks
               | is one of the hardest things for junior developers to
               | learn. A lot of mentorship and teaching happens in good
               | planning meetings. I encourage teams to try planning for
               | the benefits of the process and not worry at all about
               | fine grained points - "trivial", "medium", "unknown" is
               | typically enough. Lots of mature teams will plan ad-hoc
               | as they are ready for new work. This is my personal
               | preference. But teaching teams how to plan effectively in
               | a weekly planning meeting is often a good starting point.
               | 
               | > daily stand-ups
               | 
               | Standups that are control points for managers and
               | expensive status gathering shortcuts are horrible.
               | standups that are self-organizing, especially for teams
               | that have ops + dev responsibilities, can be really
               | useful. Nothing wrong with making a plan for the day - it
               | should just take 10m.
               | 
               | > user stories and related tickets (eg in JIRA)
               | 
               | You should write down what you want to do somewhere and a
               | few checklists go a long ways towards improving quality
               | management.
               | 
               | I have never found scrum to be a good process (like the
               | article, I find it very grinding) and I strongly agree
               | with the posted article. But a good dev process likely
               | includes all of these elements in some shape.
        
             | twunde wrote:
             | Daily stand-ups, the main benefit of which is that managers
             | (EMs/PMs) get daily updates on status. Sprints themselves
             | which promise that a certain amount of work will always get
             | done, without any free time being wasted.
             | 
             | A lot of the ceremonies in general are mostly helpful to
             | the EM/PM. How many things that you're doing are actually
             | improving how you get work done? Especially when you
             | consider how much time is spent on these ceremonies (sprint
             | planning 1 hr, sprint retro 1 hour, daily standup 15-30
             | minutes. Plus whatever prep is needed and the interruption
             | time.) For many companies this is a 20% or more overhead
             | that's mainly busywork because you still need the
             | additional meetings to understand what you're working on.
        
               | gedy wrote:
               | This may sound like a no true Scotsman argument, when our
               | company was trained by one of the scrum founders about 18
               | years ago, they were very clear that the daily standup
               | was only for the team members, and the scrum master. (The
               | scrum master could be a team member, and rotate btw).
               | Managers were not allowed or invited to these. The only
               | thing product managers and engineering managers would
               | participate in and give feedback was in Sprint demos, and
               | the beginning of planning meetings to answer any
               | questions on upcoming stories.
               | 
               | At the time it was incredibly freeing and fixed a pretty
               | awful and behind waterfall project. I was (briefly) at a
               | startup a couple years ago that said they "did Scrum" and
               | what a clusterfuck that was - all the managers meeting
               | daily with devs to see if they were behind and scold them
               | if they were. See ya.
        
               | ta_1138 wrote:
               | But Managers as the center of the scrum is how many, many
               | tech companies the outside world wouldn't call crappy run
               | things. They also use Jira, mostly because they want
               | reports that let people two or three levels up think they
               | have any control over anything.
               | 
               | One of my least favorite standups was even worse than a
               | ceremony for the manager: The manager and the Product
               | representative were there in every single one, but they
               | didn't actually pay any attention: Another 20+ minutes of
               | "parking lot" would be added after the 5-10 minute
               | process as they asked the team all the random questions
               | they thought they needed, in which they also proved that
               | they weren't actually paying attention to the actual
               | updates, or the tickets, or anything. In practice, a
               | sequence of 1:1 meetings where everyone was stuck
               | watching, because after inquisition to one person, it'd
               | come after another.
               | 
               | In practice, I don't think I've seen scrum run without a
               | manager in standup, ever.
        
               | LaGrange wrote:
               | Your scrum master is management. It's just a renamed PM.
               | 
               | I can run a very near standup when allowed to. I also
               | think it's a waste of time. Just send weekly updates to a
               | group email, or something.
        
               | wild_egg wrote:
               | > Daily stand-ups, the main benefit of which is that
               | managers (EMs/PMs) get daily updates on status.
               | 
               | The scrum guide fairly explicitly states that managers
               | should not attend or be part of stand-ups unless they're
               | actively involved in the work as part of the development
               | team.
        
               | erik_seaberg wrote:
               | That's hard to imagine. In big tech it's the team manager
               | who decides that standups should happen and when (maybe
               | this is an expectation from higher-ups). He always joins
               | unless running late.
        
               | bigstrat2003 wrote:
               | Be that as it may, if the scrum guide explicitly says
               | they shouldn't then it isn't really fair to blame scrum
               | for that.
               | 
               | Honestly, the recurring complaints with scrum, agile, etc
               | basically boil down to this: shitty organizations can
               | make any system miserable. People generally are blaming
               | the intermediate cause (how we do scrum sucks) rather
               | than the root cause (our company sucks and nothing would
               | work).
        
               | Aeolun wrote:
               | We blame scrum because the framework provided makes it a
               | lot easier for life to be miserable.
        
               | bboygravity wrote:
               | Oh, the good old "the user is doing it wrong, the product
               | is fine" with scrum being the product.
               | 
               | Can anybody (not PM/leader) give 1 example of a company
               | where they saw scrum being done "correctly"?
               | 
               |  _crickets_
               | 
               | I guess scrum is fine and people just don't know how to
               | do it properly.
        
               | albedoa wrote:
               | Man, I agree with your specific criticism of the "No True
               | Scotsman" refrain and with the larger criticisms of
               | scrum, but this is an example of scrum prescribing _X_
               | and companies doing _!X_ , the literal opposite.
               | 
               | How could scrum, the product, possibly be to blame for
               | that _even if_ it sucks? Or, at what point is it
               | reasonable to blame the PM /leader for actively and
               | knowingly practicing _!$scrum_ while pretending it 's
               | _$scrum_?
        
               | randomdata wrote:
               | Companies try prescribing _X_ , but as developers have no
               | reason to care _X_ doesn 't happen without strict
               | oversight by management, thus leading to _!X_ to keep
               | them in line.
               | 
               | Is the gun with a 180o bend in the barrel, with a caution
               | label that says "WARNING: Don't shoot yourself in the
               | face", that sees everyone who tries using it shoot
               | themselves in the face the user's fault, or could we say
               | that the product is faulty?
               | 
               | If a product relies on weasel words to try and pass its
               | flaws off as being the user's fault, at what point is the
               | product to blame? If one person uses it wrong, perhaps
               | you can say that one person was doing something out of
               | the ordinary, but when _every_ person uses it wrong...?
        
               | oneshtein wrote:
               | > In big tech it's the team manager who decides that
               | standups should happen and when (maybe this is an
               | expectation from higher-ups).
               | 
               | Then it's not a SCRUM process at all. Case solved.
               | 
               | https://scrumguides.org/scrum-guide.html#scrum-definition
               | 
               | https://scrumguides.org/scrum-guide.html#daily-scrum
        
               | nottorp wrote:
               | > Then it's not a SCRUM process at all. Case solved.
               | 
               | Yeah and communism also works in theory :)
        
               | randomdata wrote:
               | To be fair, it probably also works in practice, but by
               | very definition post-scarcity is a necessary
               | precondition. And that is still an ongoing effort that
               | has never been realized. Granted, the UN has declared
               | food to have achieved post-scarcity status so clear
               | progress is being made, but we still have more work to
               | do.
        
               | nottorp wrote:
               | > it probably also works in practice
               | 
               | I've lived the first 14 years of my life under the
               | Romanian communist dictatorship so no.
               | 
               | Let's put it this way. If it's the property of the people
               | it's not everyone's in practice, it's no one's. So you're
               | free to slack, cheat and steal from your "property of the
               | people", you're cheating "no one".
               | 
               | > post-scarcity is a necessary precondition
               | 
               | There is no post scarcity. The goalposts for scarcity
               | just move up.
        
               | randomdata wrote:
               | _> I 've lived the first 14 years of my life under the
               | Romanian communist dictatorship so no._
               | 
               | That doesn't make any sense. Communism's defining feature
               | is that there is no longer a state. How can you recognize
               | Romania, and especially a Romanian dictatorship, without
               | there being a state?
               | 
               | Perhaps you're confusing communism with rule by the
               | Communist Party?
               | 
               | - Communism is a work of science fiction that imagines
               | what life is like in a post-scarcity world - indeed,
               | science fiction that some people would like to see become
               | reality. Star Trek is a more modern adaptation on the
               | same basic idea, which you may be more familiar with.
               | 
               | - The Communist Party is a political group that, at least
               | on paper, is focused on achieving post-scarcity through
               | capturing the means of production. It was once theorized
               | in a certain Manifesto about Communism that post-scarcity
               | would not be achievable through capitalism as the
               | capitalists would set up barriers to seeing it through,
               | and that the way to protect against that was the bring
               | the means of production into social hands. Hence why the
               | Communist Party is so-named.
               | 
               | But that would be like saying that democracy doesn't work
               | because you don't like what the political party known as
               | the Democrats are doing in the USA. Or that workers don't
               | work because you don't like what the National Socialist
               | German Workers' Party (Nazi) did.
               | 
               | > There is no post scarcity. The goalposts for scarcity
               | just move up.
               | 
               | Perhaps. But it remains that communism cannot exist
               | without having achieved post-scarcity. How could it?
        
               | nottorp wrote:
               | > Communism's defining feature is that there is no longer
               | a state.
               | 
               | Seriously? Who takes all the resources and allocates them
               | "according to each person's need" then? :)
               | 
               | > But it remains that communism cannot exist without
               | having achieved post-scarcity. How could it?
               | 
               | All the scarce resources are being stolen^H^H^Hshared in
               | common.
               | 
               | Communism predates the idea of post scarcity by a hundred
               | years or more AFAIK.
        
               | randomdata wrote:
               | _> Seriously?_
               | 
               | Yes. Communism's key attributes are that it is classless,
               | stateless, and moneyless.
               | 
               |  _> Who takes all the resources and allocates them
               | "according to each person's need" then?_
               | 
               | We'd need to know more about how post-scarcity is
               | achieved in order to answer that question. Star Trek says
               | the replicator is responsible, although that seems
               | unlikely outside of the imagined Star Trek universe.
               | Based on what we can see today, I'd guess robots. But
               | this is all speculative as we don't really know what
               | post-scarcity truly looks like, or if it is achievable at
               | all.
               | 
               |  _> Communism predates the idea of post scarcity by a
               | hundred years or more AFAIK._
               | 
               | Are you referring to what is oft referred to as primitive
               | communism?
               | 
               | Although I find it hard to believe that humans have ever
               | not thought about post-scarcity. It seems like the first
               | thought/dream anyone would have when first faced with
               | scarcity constraints.
        
               | nottorp wrote:
               | > what is oft referred to as primitive communism?
               | 
               | Did communist utopians realize it doesn't work so now
               | they're adding "post scarcity" to it to make it work?
               | 
               | Will they add "AI" next?
               | 
               | Edit: "Based on what we can see today, I'd guess robots."
               | Oh yea, "AI" is next.
        
               | thayne wrote:
               | In my experience, if the PM isn't part of it, the standup
               | doesn't happen, because no one else cares that much. If
               | someone gets stuck on something or needs help we just
               | send a slack message, no need to wait for a fixed
               | meeting.
        
               | Aeolun wrote:
               | It may be explicitly stated, but I've never had a scrum
               | meeting without all managers and project managers.
               | 
               | They also tend to make the stand-ups one hour long.
        
               | shepherdjerred wrote:
               | Surely you're exaggerating about a one hour standup?
        
               | bboygravity wrote:
               | The goal is always 15 minutes and the reality always
               | (much) longer.
        
               | mid-kid wrote:
               | I've been at companies where this was indeed the case.
        
               | dathinab wrote:
               | I wich
               | 
               | while it's not quite as bad for us 30min are the norm and
               | it spilling to 40 min not rare and that is with us trying
               | to cut it short
               | 
               | but too many other things are conflicting with short
               | dailies, mainly sure to company structure/size
        
               | throw-the-towel wrote:
               | Yeah, can't believe their standups are so short.
               | 
               | (I wish I was joking.)
        
               | oneshtein wrote:
               | You never had a SCRUM meeting.
        
               | repox wrote:
               | > They also tend to make the stand-ups one hour long.
               | 
               | I'm Head of Development in a midsized SaaS company.
               | Another team's PM went for paternity leave and I stepped
               | in to lean in on any needs.
               | 
               | I discovered that the team of 10 people were using close
               | to an hour a day on stand-up. A culture thing,
               | apparently.
               | 
               | I joined he stand-up a few times, slimmed the scope of
               | the conversation to roughly 10-15 minutes.
               | 
               | This worked for all three months of the PM's paternity
               | leave.
               | 
               | PM returns, is pissed over the change and in less than
               | two days, the stand-up is back to almost an hour a day.
        
               | jghn wrote:
               | It Depends.
               | 
               | I said in another post that I hated all the ceremonies,
               | including standup. And it goes without saying that means
               | long standups.
               | 
               | But, one team I was one, we had long ass standup and it
               | was perfect. It was very dev-driven, we were facing hard
               | problems, and that was our time of the day to really nerd
               | out. The PM would get bored after about 15-20 minutes and
               | then we'd be working out how to deal with the issues that
               | faced us. Sure, it could have happened at any point of
               | the day, but that was our designated time where we were
               | all in the office (this was pre-pandemic)
        
               | relaxing wrote:
               | Why is the PM still employed?
               | 
               | Hasn't the team all quit?
        
               | geodel wrote:
               | Because in real world people play with the hand they are
               | dealt with. Team hasn't quit because there are no better
               | jobs with empowered developers are waiting.
        
               | icedchai wrote:
               | The real reason is why is the team putting up with this.
               | They should be complaining about the PM and wasted time
               | every chance they get, at the "retro", team meetings, and
               | 1:1's... Complain, complain, complain.
        
               | gloryjulio wrote:
               | That's the issue where the PM has so much power. In our
               | company the engineering team dictates their process. They
               | can do however they like as long as they ship the
               | products on time.
        
               | osigurdson wrote:
               | I don't like long daily meetings, but there is
               | essentially no value in the YTNB meeting either
               | ("yesterday, today, no blockers") meeting either.
        
               | lpapez wrote:
               | > It may be explicitly stated, but I've never had a scrum
               | meeting without all managers and project managers.
               | 
               | This, this, this and a thousand times this.
               | 
               | It's always the same with Scrum. Every time you point out
               | something clearly wrong, the response is always "well
               | that's not really scrum, you're doing it wrong".
               | 
               | It's like when discussing communism with some diehard
               | fans - when you point out the flaws, the response is
               | always "well that wasn't real communism that's why it
               | failed".
               | 
               | Well to both of those camps I say: if most attempts ended
               | up implementing it "incorrectly" in the end, it's not a
               | very useful framework to begin with then, is it?
        
               | roenxi wrote:
               | That similarity is superficial. It is observing that no
               | ideology perfectly survives implementation - which is
               | true, but there is no alternative option so it isn't a
               | useful observation.
               | 
               | We don't have any successful countries that use communist
               | ideologies because central planning is destructive and
               | the abolishment of private property is catastrophic.
               | Calling for communism is tantamount to wishing for death
               | and destruction. The path to success through communism is
               | something like China where they eventually learned to do
               | the opposite of communism and got great results.
               | 
               | We do have lots of successful companies using Scrum. They
               | hire Scrum masters. They see Scrum as adding value. The
               | scrum ideal is generally a bit of a compass towards
               | higher value add. So scrum as an ideology seems to be
               | net-successful even if implemented wrong.
        
               | carlmr wrote:
               | >So scrum as an ideology seems to be net-successful even
               | if implemented wrong.
               | 
               | How do you get to this conclusion? I haven't seen any
               | implementation of scrum that didn't slow down development
               | speed, due to unnecessary meetings and micromanagement.
               | 
               | This might be that I've only seen 8 or so
               | "implementations". If there's any evidence that scrum is
               | a key net positive I'd like to see it at this point.
               | 
               | Kanban IME can work well if the manager understood the
               | core principle: Limit amount of concurrent work, use
               | daily standup to prioritize work and unblock people
               | hitting the multitasking limit.
               | 
               | Sadly this concept which is the core tenet of Kanban and
               | can be explained in one sentence was still too much to
               | grasp for some managers, but I've at least seen most
               | Kanban implementations be either a net positive, or
               | neutral.
               | 
               | I might be biased by my own experience, but I still need
               | to see a Scrum implementation that doesn't grind
               | productivity to a halt.
        
               | roenxi wrote:
               | The company isn't optimising for fastest development
               | speed. They typically optimise for low variance,
               | consistent value in support of existing processes.
               | 
               | Interestingly, if you want highest value then for
               | software it is best to use a high-variance strategy. But
               | that is never going to come out of a company large enough
               | to need professional management because it is pointless
               | to manage large numbers of people to a high variance
               | strategy. Google is an interesting case study where they
               | tried that and, by and large, flopped. It makes more
               | sense to spin out separate companies VC-style. I assume
               | programmers occasionally quit companies, build something
               | and sell it back to the company at extortionate prices
               | which would be the right way to do fast development.
               | 
               | That isn't to say professional management is bad - large
               | companies need it. It is just a fact that large companies
               | aren't good at development and something like scrum
               | elevates them from total failure to unproductive but
               | fumbling in a good direction.
        
               | carlmr wrote:
               | >scrum elevates them from total failure to unproductive
               | but fumbling in a good direction.
               | 
               | Where's the evidence for this? I kind of agree on big
               | corporate not being able to achieve great development
               | speed. But they had a system before scrum, and I've yet
               | to see scrum not completely destroying every metric of
               | development achievement, whether it's throughput, latency
               | or iteration speed.
        
               | roenxi wrote:
               | The evidence is in the company choosing scrum then
               | sticking with it. They believe it helped.
               | 
               | > I've yet to see scrum not completely destroying every
               | metric of development achievement, whether it's
               | throughput, latency or iteration speed.
               | 
               | It is too hard to argue from vague anecdotes, so I am
               | resisting the urge to try. However, I will say that if
               | that is a demonstrable thing and there was no upside then
               | it would be surprising that scrum sticks as well as it
               | does.
        
               | carlmr wrote:
               | >scrum then sticking with it. They believe it helped.
               | 
               | Not necessarily. It's well known that there are many
               | psychological biases in favor of keeping the status quo.
               | Whether it's the sunk cost fallacy, the escalation of
               | commitment or the endowment effect.
               | 
               | Humans tend to stick with bad decisions way longer than
               | rational.
               | 
               | https://en.wikipedia.org/wiki/Escalation_of_commitment#/s
               | ear...
               | 
               | I think the problem here is we've had a huge trend in
               | switching to scrum, but then people stick with failed
               | scrum because it's the new status quo. Switching back to
               | waterfall can't be sold by consultants. Even if it would
               | help.
        
               | ath3nd wrote:
               | > However, I will say that if that is a demonstrable
               | thing
               | 
               | It's demonstratable: https://www.theregister.com/2024/06/
               | 05/agile_failure_rates/
               | 
               | > and there was no upside
               | 
               | I'd go on a sarcastic rant here, but it's hard to stop
               | myself. Don't read further if exaggerations upset you.
               | 
               | Sure, there are upsides, but they are hardly benefitting
               | software engineering speed, quality, stability and
               | developer happiness. The biggest upsides are for
               | management:
               | 
               | - keeping the engineers under tight control by one of
               | their business types (PO)
               | 
               | - making sure long-term thinking (like "what am I doing
               | in this company") is suppressed by having a horizon of
               | only 2 weeks in which you are supposed to give all you
               | have to hit an arbitrary deadline. And then you start
               | again! /s
               | 
               | - scrum has the beautiful effect of making engineers
               | feeling either like kindergartners:
               | 
               | 1. what did you do yesterday, Timmy? (standup)
               | 
               | 2. Let's play with some cards, kids (planning poker)
               | 
               | 3. Let's review what we learned last two weeks, children,
               | and let's see what progress you made on your bean
               | drawings (retros and demos)
               | 
               | How can you want a salary increase or question big man
               | POs decisions, when you've just been acting like a kid
               | for the last two weeks? Don't get me wrong, I do see the
               | benefit of retros, demos, and some kind of planning and
               | sync, but the way scrum just dumps it on you and
               | prescribes you how to do it is just humiliating. Adults
               | can sync, plan, retrospect and demonstrate what they did
               | on their own volition and don't need some framework to
               | tell them when and how, and two parental figures (the PO
               | and Scrum master) to tell them what to do and when.
               | 
               | > The evidence is in the company choosing scrum then
               | sticking with it. They believe it helped.
               | 
               | Many people also believe the Earth is flat and are
               | sticking with that belief.
        
               | ramblerman wrote:
               | > How can you want a salary increase or question big man
               | POs decisions, when you've just been acting like a kid
               | for the last two weeks?
               | 
               | I think you just provided me with a small epiphany...
        
               | carlmr wrote:
               | >two parental figures (the PO and Scrum master)
               | 
               | Another great point. The overhead is insane. 2 people
               | that don't directly contribute work output per team.
        
               | marcosdumay wrote:
               | About that article.
               | 
               | We absolutely learned something since the 90s that was
               | beneficial. Corporative software projects now have about
               | a two times higher chance of success than they had back
               | then.
               | 
               | Also, we almost certainly learned that thing from Agile.
               | There is no other credible source.
               | 
               | But the article has a clear point that places where
               | people _say_ they are practicing Agile has an even lower
               | success rate than the overall one from the 90s. So it
               | seems that the actual lesson from the Agile manifest was
               | only learned by the people who don 't claim to practice
               | it.
        
               | ath3nd wrote:
               | > We absolutely learned something since the 90s that was
               | beneficial.
               | 
               | Yes, software engineering has evolved, but to attribute
               | its successes to the methodology used is like attributing
               | higher cancer survival rates to better hospital
               | management. In reality, it's due to the availability of
               | better drugs, more understanding, and a lot of R&D, and
               | it has 0 to do with management. Same with software
               | engineering: we use better tooling, libraries, hardware
               | is more commodified, and a lot of things we don't have to
               | do ourselves. All things that have nothing to do with the
               | methodology.
               | 
               | > So it seems that the actual lesson from the Agile
               | manifest was only learned by the people who don't claim
               | to practice it.
               | 
               | No methodology/manifest and no amount of management can
               | compete with smart, qualified adult people being invested
               | in their craft, and having autonomy and ownership on what
               | they are building. The projects that succeeded are
               | projects having those people, regardless of the
               | methodology. In a way, people succeeded despite Agile,
               | not because of it.
        
               | marcosdumay wrote:
               | The funny thing is that "communism" is a highly
               | overloaded term, with several very precise definitions,
               | one of what is so successful that about every country
               | currently implements and people that dismiss it are
               | ignored and considered radical. (But then, nobody calls
               | that one "communism" nowadays, the the people pushing the
               | others will really hate you if you talk about it.)
               | 
               | While "scrum" is a proper name with a single definition
               | that anybody can look that is absolutely not precise
               | enough for anybody to follow. By definition you can't
               | really do scrum right.
        
               | vannevar wrote:
               | >It's always the same with Scrum. Every time you point
               | out something clearly wrong, the response is always "well
               | that's not really scrum, you're doing it wrong".
               | 
               | Yeah, that would be the correct response. If we were
               | discussing communism, and you started complaining that
               | under communism everyone has to stand on one leg and hop
               | up and down, a communist would correctly point out that
               | hopping on one leg is not communism.
               | 
               | >Well to both of those camps I say: if most attempts
               | ended up implementing it "incorrectly" in the end, it's
               | not a very useful framework to begin with then, is it?
               | 
               | This is like saying that exercise isn't useful because
               | most people who attempt it don't stick with it. Doing
               | actual scrum is hard (particularly for managers), so a
               | lot of teams can't stick with it. That doesn't mean it
               | isn't useful.
        
               | wild_egg wrote:
               | > It's always the same with Scrum. Every time you point
               | out something clearly wrong, the response is always "well
               | that's not really scrum, you're doing it wrong".
               | 
               | Scrum is a victim of semantic drift. The vast majority of
               | people "doing scrum" have never read the guide and are
               | just doing things that other people have told them is
               | Scrum.
               | 
               | It's not Scrum's fault that people have hijacked its name
               | for something completely different. It happens often.
               | 
               | What people call Scrum isn't really Scrum. What people
               | call REST isn't really REST. What people call DevOps
               | isn't really DevOps.
               | 
               | People using the wrong word for something doesn't mean
               | the original definition of the word is invalid.
               | 
               | It's fairly different from the Communism situation in
               | that people discussing Communism are generally talking
               | about the same concepts and the debate is whether or not
               | they're feasible. With the other terms I used above,
               | people are using the same words to talk about completely
               | different concepts with different definitions.
        
               | jjav wrote:
               | > People using the wrong word for something doesn't mean
               | the original definition of the word is invalid.
               | 
               | It doesn't make the original definition invalid, but
               | words mean what society uses them to mean, which changes
               | over time.
               | 
               | So agile & scrum do in fact today mean constant status
               | meetings, treating professional developers as mindless
               | cogs and keep everyone in line with a constant stream of
               | tickets chosen by someone else.
               | 
               | Perhaps it's not what it meant in some idealistic
               | manifesto lost to history, but it is what it means to
               | developers employed in the industry today.
        
               | knallfrosch wrote:
               | > It's not Scrum's fault that people have hijacked its
               | name for something completely different. It happens
               | often.
               | 
               | Scrum contains so many pitfalls that it's inevitable to
               | get it wrong. Oh, the Sprint Review is NOT a report to
               | management? Please do tell me where this then happens
               | instead. If a manager can attend a 1 hour meeting to
               | summarize the 2-3 weeks that the sprint was about, it
               | will be abused.
        
               | Viliam1234 wrote:
               | I have seen teams actually do the Scrum-according-to-the-
               | textbook, but those are rare. Most companies are just
               | doing whatever their managers think is a good idea, and
               | they call it "Scrum".
               | 
               | Ironically, the last time my team was doing Scrum-
               | according-to-the-textbook, it was a decision of the
               | developers... and then the higher management told us to
               | stop, because the entire company decided to switch to
               | "Scrum" (as in: endless meetings with managers present,
               | no retrospective, but we call it "Scrum" because it
               | sounds like we know what we are doing), so basically we
               | had to abandon Scrum in the name of "Scrum".
               | 
               | My conclusion from this experience is that Scrum-
               | according-to-the-textbook never happens as a top-down
               | decision. The managers have strong ideas about how things
               | are supposed to work, and they are unwilling to change
               | their ideas, although they may agree to rename them to
               | "Scrum".
               | 
               | I actually get the real-communism-has-never-been-tried
               | vibe from people who say "scrum sucks, agile is the good
               | idea". Scrum is simply what happens when Agile meets
               | corporate reality. Make "agile" a popular buzzword among
               | the managers... and soon you will see people complaining
               | that agile in practice means endless meetings etc.
        
               | northzen wrote:
               | But ones you are in company which does it right you start
               | appreciate all good things it brings.
               | 
               | I haven't seen working communism though and never heard
               | about it.
        
               | the_other wrote:
               | > It's always the same with Scrum. Every time you point
               | out something clearly wrong, the response is always "well
               | that's not really scrum, you're doing it wrong".
               | 
               | Well, you are.
               | 
               | Give this shitty process you're being forced to follow
               | some other name and stop blaming Scrum.
               | 
               | Do Scrum properly and you'll see why it's actually fairly
               | good.
               | 
               | > if most attempts ended up implementing it "incorrectly"
               | in the end, it's not a very useful framework to begin
               | with then, is it?
               | 
               | You can't say that as you've not actually done the thing.
               | 
               | The main problem is that most managers and senior company
               | people feel like they want more control that scrum allows
               | them to have, and their use their power to overrule it.
               | That's their problem and not the fault of the Scrum
               | system.
               | 
               | You may be onto something with communism. It's definitely
               | not resiliant to the kinds of paychopaths that end up
               | dictators for life. I wish I knew why. Probably something
               | to do with threats of violence.
        
               | kgeist wrote:
               | >It's like when discussing communism with some diehard
               | fans - when you point out the flaws, the response is
               | always "well that wasn't real communism that's why it
               | failed".
               | 
               | Nitpicking, but the Soviet Union, for example, never
               | claimed they were already a communist state. They were
               | the "Union of Soviet Socialist Republics", not "Communist
               | Republics". Their idea was that, to have communism, you
               | must have a transitional form of government first,
               | "socialist government". The USSR even once had a motto,
               | "we will build communism by 1980".
               | 
               | It's like if someone said they were following some other
               | development process which would eventually lead them to
               | Scrum. But no one does that and just calls it Scrum :)
        
               | quartesixte wrote:
               | As someone who works in a hard-tech startup, where daily
               | standups in production manufacturing teams are part of
               | the daily culture.
               | 
               | 1) Anything longer than 15 minutes is insane 2) What do
               | you even talk about for an hour? 3) Why do you even do
               | standups for design work? What "blockers" could you
               | possibly have that require daily, 15 minute tagups with
               | the entire crew?
        
               | marcosdumay wrote:
               | On #2, nothing. People stay an hour trying to look busy
               | because somebody on the meeting expect them to be busy
               | and the meeting to be important. So they spend an hour
               | talking about nothing.
               | 
               | On #3, blockers exist more on design than on operation.
               | But the idea of a daily meeting to solve blockers is
               | crazy-stupid. Imagine if operations did this, every time
               | somebody's work get a wrong input, you'd stop their line
               | until the next morning. That's why operations dailies
               | aren't about blockers, and instead about information
               | sharing. But design work doesn't have separate teams that
               | need to share information, so they invent a bullshit
               | reason to still have the meeting.
        
               | kgeist wrote:
               | >What do you even talk about for an hour?
               | 
               | We once had 1 hour long standups. The reasons were:
               | 
               | 1) large team
               | 
               | 2) many devs loved to go into detail about their work,
               | and no one stopped them
               | 
               | 3) the expectation was that a standup must be about
               | describing what you did yesterday, in detail
               | 
               | What we did:
               | 
               | 1) split the team into subteams where each team has their
               | own standup (down to 5-15 min)
               | 
               | 2) the standup's facilitator now stops devs from going
               | into too much detail, "you guys can discuss it further
               | after the standup"
               | 
               | 3) now the expectation is that a standup should be about
               | checking the project status and if there are any
               | blockers, and that's it, you don't have to recount your
               | whole yesterday in great detail
        
               | kgeist wrote:
               | Our PM quit a month ago and now we have stand-ups without
               | any managers. I think it made the developers more
               | responsible and involved: every stand-up a new dev gets
               | the role of a facilitator. Previously, it was a one-man
               | show. The stand-ups have become slightly shorter, too.
               | 
               | 2 years ago we had 1 hour long dailies because the team
               | was too large. We split into 3 subteams, each has their
               | own stand-up. Now it's down to 15 minutes max.
        
               | jboggan wrote:
               | Real scrum has never been tried!
        
               | rolisz wrote:
               | Sprint planning 1h? Lucky you. At the former employer
               | that was 6h (so basically the whole day was wasted)
        
               | usea wrote:
               | I interviewed at a place whose sprint planning took a
               | full week and was reportedly incredibly stressful.
               | Customers participated. Their product was a website that
               | agile teams used to track their process.
        
               | Lutger wrote:
               | There are a lot of things better than scrum, but mostly
               | these are all wrong ways to implement it.
               | 
               | Daily: should average at 10 min, 15 min is really the
               | maximum. Including prep. So 5-15 min. No status updates!
               | The daily is about getting people unstuck with their
               | current tasks and quickly aligning on what to do next. If
               | it is not useful for the team, the implementation is
               | wrong. Doesn't mean it always has to be useful and
               | interesting to you, there's a difference. Management
               | stays out of the daily.
               | 
               | Sprint planning: the sprints are the compromise to
               | management so we can have some sense of progress, so this
               | is of course the one meeting that is useless to the team
               | getting work done and can hamper productivity. Just make
               | it quick.
               | 
               | Retro: you should do a retro about if you think the retro
               | is useful and why/why not. If the team doesn't think it
               | is, either change it until it works or make this the very
               | last one. Management stays out of the retro. ("But are
               | you then not doing scrum anymore?" "So what, save the
               | pedantry for writing out the functional and technical
               | requirements please")
               | 
               | Thing is, you _do_ need to understand what you are
               | working on, and it needs to be more or less the same as
               | what your team members think they are working on. If you
               | are 100% efficient at building the wrong thing, your 0%
               | overhead amounts to exactly nothing, and the 80%
               | efficient scrum team is infinitely more efficient. Though
               | these extreme cases are usually a problem from higher up,
               | without any way to align your work you will usually not
               | be efficient. And if you are, then good for you, don 't
               | follow scrum like its some cult. But most teams need a
               | little coordination.
               | 
               | Basically if anybody feels a meeting (or anything,
               | really) is a waste of time, there is a problem that needs
               | addressing. And the problem is not the feeling, but what
               | is causing that sense of waste. Take it seriously, it is
               | almost always signaling a flaw in the process. Learn how
               | to talk about this in the retro and get to the bottom of
               | it.
               | 
               | The retro is about debugging anything that isn't working
               | optimal in the team. If you cannot find any bugs and fix
               | them, then you are either perfect or just not good at
               | debugging, and I know which one to bet one to be the most
               | likely. One sure sign a team isn't very capable is when
               | there is a lot of blaming involved. Usually external
               | factors or tools get the blame, but in very dysfunctional
               | teams people blame each other.
               | 
               | If you work in a team that doesn't adequately address
               | these problems and you have no power to change it, then
               | it may be time to look for another job.
        
               | marcosdumay wrote:
               | The ages old "you are doing Agile wrong".
               | 
               | When nobody manages to do the thing right, then the thing
               | isn't good. It doesn't matter what platonic ideal you
               | hold for it.
        
               | lo_fye wrote:
               | If I build a manual transmission car, and you insist on
               | driving it like an automatic, it's not going to work for
               | you, even though it's an amazing car. There are steps and
               | processes that you must follow in order for the thing to
               | work for you. If you don't, it won't. Simple as that.
               | 
               | Put another way, if you enter the olympics for
               | breakdancing, and then just move your body around in a
               | floppy way, you will not win the gold medal.
        
               | geodel wrote:
               | > If you work in a team that doesn't adequately address
               | these problems and you have no power to change it, then
               | it may be time to look for another job.
               | 
               | Huh, this is same for all employers I have known or
               | worked at. Maybe on some distant planet it is done right.
        
             | everdrive wrote:
             | Without a lot of the project reports, the manager would
             | honestly just have no idea what's going on. I recently
             | moved into management, and one of the challenges I'm trying
             | to balance is how to be aware of my team's progress without
             | wasting their time or being a bottleneck for them. It's a
             | legitimate problem which is often tackled poorly.
        
               | skydhash wrote:
               | You can just talk to them. No need to set a ritual around
               | it. Most professionals know about expectations and the
               | team's need to deliver.
        
               | everdrive wrote:
               | That's what I'm doing currently. We're a small team, and
               | I'm a technical manager.
        
               | laboratorymice wrote:
               | regardless of "process", work items should be tracked (in
               | the problem solving record for our future selves sense,
               | not time keeping sense), so you can follow those. If
               | you're a non-technical manager, then either a) the
               | implementation goes super smoothly and the estimate the
               | dev team initially gave you is all the progress update
               | you need, or b) it doesn't go super-smoothly and you
               | should be involved in any discussions that arise. If you
               | find yourself asking "when is it ready?" you've likely
               | gone astray.
        
               | randomdata wrote:
               | At least in the case of software development, which seems
               | to be what Scrum is targeted at, you get the project
               | reports for free by way of the commit log.
               | 
               | That said, the 12 Principles of the Agile Manifesto
               | offers another solution: Get rid of management entirely.
               | It states that developers are best to work with the rest
               | of the business collaboratively. Which is the irony of
               | Scrum claiming to be Agile: Only management wants to use
               | it, defying Agile to its fundamental core.
        
             | dartos wrote:
             | Burn down charts, team velocity, and story points.
             | 
             | They all exist to give software development the illusion of
             | predictability, but saying that a project should take "x
             | sprints" is just setting a deadline with extra steps.
        
               | PaulHoule wrote:
               | There is nothing wrong with burndown charts but story
               | points and team velocity are poison.
               | 
               | The way you get good at estimating is looking at your
               | database of experience. "I did a task similar to this in
               | 8 days". Calendar time is real and punchclock time is
               | real, either can be measured. Story points are not real
               | and not measurable and they leave you lost at sea
               | thinking that estimation is impossible, a scam, etc.
               | 
               | See also
               | 
               | https://en.wikipedia.org/wiki/Function_point
               | 
               | Which is also a kind of development "funny money" but
               | which have a somewhat rigorous method to arrive at
               | estimates.
        
             | _heimdall wrote:
             | I don't know if this is properly part of scrum, but it is
             | how I've seen it implemented on _every_ team I 've been on
             | where scrum was implemented.
             | 
             | Sprints end with some kind of demo, retrospective, and
             | sprint planning designed almost entirely to keep PMs and
             | managers in the loop and happy. Reports are generated,
             | spreadsheets with a few quarters worth of tasks are
             | updated, and PMs or managers get to run that further up the
             | chain, presumably to make it clear that great progress is
             | being made under their supervision and well run scrum
             | methodology.
        
               | lo_fye wrote:
               | There are no PMs in actual Scrum. Scrum Teams are self-
               | managing, so there's no need for a PM.
               | 
               | There's a direct relationship between the Client and the
               | Scrum Team. Where most companies screw up is in their
               | business model. You can't charge a flat fee for fixed
               | project description and call it Scrum. Scrum is
               | iterative, by design. It's supposed to evolve with the
               | CLient's needs and desires. They want to be able to
               | change the scope, the price, and the timeline on a whim.
               | If you aren't billing per-Sprint, then you're going to
               | have a constant "charge the Client for a change request"
               | mentality, which makes them feel like they're being
               | Nickel and Dime. It's much better to say "We welcome your
               | changes at any time for any reason. It may not fit in the
               | next Sprint, but we can always put them in the one after
               | that."
               | 
               | In Sprint-based projects the Client has to be free to
               | terminate the agreement at any time, if they feel they're
               | not getting enough value in exchange for their money.
               | This is why constantly delivering value to the Client is
               | key.
               | 
               | When they charge a flat fee, they feel they need a PM to
               | make sure they don't lose money. And how can you know if
               | you're losing money? You force people to track their
               | hours back. It all gets toxic.
               | 
               | When the Client pays per Sprint, as long as each Sprint
               | is profitable and delivering value, it can be a huge
               | profit center that has no end date. Often times, Clients
               | will just keep adding features forever instead of
               | stopping at the flat fee end date.
        
               | _heimdall wrote:
               | I could have been more clear there, "PM" has many
               | different meanings these days.
               | 
               | I've never been on a team using scrum that _didn 't_ have
               | a project manager or product manager as part of scrum (or
               | both). Most often they have been my scrum leader.
               | 
               | Scrum is supposed to be self-guided, but I have never
               | seen it implemented on a team of any scale.
               | 
               | I also wouldn't expect a team without PMs, whether that's
               | project managers or product managers, to be very
               | effective. Someone needs to be focused on keeping the
               | project moving, and often the skills needed for a scrum
               | leader/master overlap greatly with project managers.
               | Someone also needs to be focused on the product and how
               | the team's efforts fit into the longer term product
               | goals. If that isn't anyone with a PM title it will be
               | someone else playing that role with everything but the
               | title.
        
           | 2-3-7-43-1807 wrote:
           | 1) scrum is even more democratized than agile
           | 
           | 2) no matter what "agile" was supposed to mean - managers
           | anyway interpret it as devs having to be very agile for them
           | all the time ...
        
             | jrs235 wrote:
             | And by "devs having to be agile" you mean "devs having to
             | be interruptible during managers hours and flexible in
             | doing their work after all the bs office hours are over".
        
               | 2-3-7-43-1807 wrote:
               | exactly ... i mean even without hindsight "agile" is a
               | rather poor choice as the label. it just evokes the wrong
               | ideas too easily.
        
               | slim wrote:
               | it's not poor, it's clever. that marketing is what made
               | agile the dominant paradigm nowadays. remember agile was
               | adopted in entreprise despite IBM pushing RUP
        
           | whiteboardr wrote:
           | From experience i haven't come across any "agile"
           | organization that runs true to the manifesto.
           | 
           | There's been plenty of discussions why the "what could have
           | been" got buried in certain people jumping in, creating weird
           | layers and interpretations of some process for their own
           | profit and ego.
           | 
           | Chinese whispers then lost in translation.
        
             | _heimdall wrote:
             | I worked at a small startup that actually handled that
             | distinction well for a while.
             | 
             | We did 2 week sprints, but that really was more to keep a
             | remote team regularly in touch and updated. Sprint work was
             | very much up to each dev, and at the end of the sprint
             | anything that changed or slipped was just chalked up to
             | lessons for future work.
             | 
             | That did change eventually, both as the team grew a bit
             | more and funding started to run low. Eventually we had the
             | worst of both worlds mentioned in the article, sprints with
             | more rigid goals leading to a quarterly goal driven more by
             | marketing goals than anything else. Throw in the fact that
             | the still rather small company ended up with one person
             | making product, marketing, and even technical decisions and
             | we devolved into glorified code monkeys pretty quickly.
        
             | whstl wrote:
             | My team works in an agile fashion. I simply stay out of
             | their way and every week they finish what they promised to
             | finish. The team is high-quality and hasn't missed targets
             | or estimates. Most of our "ceremonies" are purely for
             | socialization, as decided by the team.
             | 
             | But this is extremely fragile, because it takes a lot of
             | energy to fight external people (often product people) who
             | want to remove the self-management aspect.
             | 
             | Unless this is in the DNA of the company, you can't have
             | agile or real Scrum, because it threatens those kinds of
             | power-grabs. For this to work, you literally need someone
             | threatening to fire people who attempt to micromanage
             | others.
        
           | replwoacause wrote:
           | We use Agile at our company and let me tell you, it sucks.
           | Maybe straight up scrum would be worse, but honestly agile is
           | invasive and just feels like you're being babysat and forcing
           | people to give BS updates at standups because they're afraid
           | of sounding unproductive.
        
             | prepend wrote:
             | I find Agile is like democracy. It does suck, but it's
             | better than everything else.
             | 
             | What would you prefer besides agile?
             | 
             | I had a conversation with a young devTM who was arguing
             | that estimating is hard and always inaccurate so we
             | shouldn't estimate. Everyone should just work on things
             | until they are done. He argued this earnestly and didn't
             | recognize that there are opportunity costs and conflicting
             | priorities and the need to choose what to do. He earnestly
             | argued that every single user story should be worked on in
             | order of entry until it was completed. It would have been
             | precious how clueless this suggestion was if he didn't
             | spent 20-40 minutes a week arguing this as an explanation
             | for why his items weren't done and why he was civil
             | disobediencing to refuse to estimate or report time on
             | tasks.
        
               | rightbyte wrote:
               | I'd have the straw man variant of waterfall every day in
               | place of agile.
               | 
               | Like, the constant micromanagement and process lawyers
               | pushing you down makes me misarable.
               | 
               | At least with classic project processes you'd have some
               | oversight plan to follow.
        
               | pyrale wrote:
               | > I had a conversation with a young devTM who was arguing
               | that estimating is hard and always inaccurate so we
               | shouldn't estimate.
               | 
               | Plenty of learned people have made defenses for having no
               | estimates. If you want to make the opposite claim, you
               | don't need to use a junior dev as a strawman.
        
               | prepend wrote:
               | I think estimates are wrong but useful and necessary. I
               | don't think it's a strawman argument at all.
               | 
               | For simple activities you can get by with no estimates
               | but with dependencies estimates become more and more
               | necessary.
        
             | stetrain wrote:
             | There isn't anything here about having to do daily
             | standups:
             | 
             | https://agilemanifesto.org
             | 
             | https://agilemanifesto.org/principles.html
             | 
             | It's common in corporate implementations of Agile (tm) but
             | it isn't actually some commandment or prescribed feature of
             | Agile itself. It's actually prescribed by Scrum:
             | 
             | https://scrumguides.org/scrum-guide.html#daily-scrum
        
               | vegetablepotpie wrote:
               | There isn't anything in the agile manifesto on how to do
               | _anything_. It's a statement of preferences and values.
               | 
               | Business demands process for people in functions to
               | follow. Scrum outlines meetings for programmers to
               | attend, and specific process outputs like user stories to
               | produce and close. Scrum is agile in business because
               | business cannot do agile.
        
               | stetrain wrote:
               | Right, so when someone says they are doing Agile instead
               | of Scrum but don't like it because of the invasive status
               | meetings, they're probably actually doing some form of
               | Scrum whether or not they realize it.
        
               | bluGill wrote:
               | There are agile processes other than Scrum. Scrum has
               | gotten all the press for some reason, but there are other
               | options.
               | 
               | I personally prefer Kanban. The sprint is not a useful
               | deadline for me so I want to ignore it.
        
               | stetrain wrote:
               | Agreed. But Kanban also often incorporates some of the
               | processes from Scrum like daily standups that aren't
               | prescribed anywhere in Agile.
               | 
               | Personally I find it more useful to organize things
               | around useful product milestones that are actually usable
               | and demo-able. Those might take a week, or three weeks,
               | but probably not two months because that's a long time to
               | go without a demo and getting feedback. Sticking to a
               | rigid 2-week sprint with an expectation of demo-able
               | progress after each sprint doesn't feel particularly
               | realistic or useful to me.
        
               | bluGill wrote:
               | The business has a need for a regular status update from
               | everyone. You can call it a standup or not. You can call
               | it not agile, but in the end the business has needs and
               | you cannot ignore those needs.
               | 
               | The business needs to know when something will be done as
               | they need to make promises to customers. The business
               | also needs to know when things will be done as that is a
               | proxy for cost - they need to make sure they are not
               | spending more creating a thing than it will deliver (this
               | is a hard problem as some sales will not happen until it
               | is done and there is typically a competitor customers
               | could go with). That is nearly impossible to say how long
               | engineering will take doesn't mean we don't need to know
               | how long it will take!
        
               | stetrain wrote:
               | Sure. I'm not saying there shouldn't be status updates.
               | I'm just saying that those status updates aren't because
               | they are "doing Agile."
               | 
               | There isn't really any such thing as "doing Agile", it
               | isn't a prescribed process to follow.
               | 
               | And saying that you use Agile instead of Scrum but
               | dislike the invasive status meetings isn't actually
               | congruent with the actual definitions of Agile or Scrum.
        
               | happymellon wrote:
               | Its also not for the business.
               | 
               | > The Daily Scrum is a 15-minute event for the Developers
               | of the Scrum Team
               | 
               | The business doesn't actually need a daily update. They
               | think they do because they dont want to give you the
               | ability to deliver anything.
        
             | Pet_Ant wrote:
             | The stand-up is an opportunity to call out things that are
             | blocking you, not for giving status updates. I got Scrum
             | certified for resume padding, and thought it was gonna be
             | easy, but I was blown away by the things I "knew had to be
             | part of Scrum" that actually weren't.
             | 
             | This is all there is to Scrum, if it's not here it's not
             | part of it: https://scrumguides.org/scrum-guide.html
             | 
             | It's like calling the electoral college part of democracy.
             | Than just a choice one place made, it's not intrinsic.
        
           | lo_fye wrote:
           | "Keep managers happy" isn't part of Scrum, either. If you
           | read any of the Scrum books by the creators of Scrum, you'll
           | find that the way 95% of companies implement Scrum is nothing
           | like what Scrum was intended to be. They mess it up,
           | essentially in the name of marketing, and not wanting to
           | truly change their ways.
        
         | benfortuna wrote:
         | But what does it mean to "empower devs". Do you give them
         | requirements and say I'll check in on deadline day in 6 months?
         | 
         | Presumably you would still use iterations to track progress,
         | Epics/Features to break down requirements, some kind of
         | estimation to track if you're ahead/behind schedule?
         | 
         | I certainly wouldn't go back to Waterfall days, but I suspect
         | many current devs never experienced that.
        
           | shaunxcode wrote:
           | as things are ready to be shown you will see them : this is
           | how you will know
        
           | Retric wrote:
           | There's a world of difference between checking back in 6
           | months and daily standup meetings + a host of weekly
           | meetings.
           | 
           | If you don't trust your team to be productive for 2 weeks
           | without communication something is deeply wrong. Individuals
           | should be in constant communication, but few things need to
           | be said to everyone. Scrum style management may be useful for
           | highly dysfunctional teams, but it frequently adds a great
           | deal of unnecessary overhead.
        
           | gridspy wrote:
           | - One on Ones to discuss roadblocks and thoughts every week.
           | 
           | - Issue tracking as a common place to describe what needs to
           | be done and thoughts / details on how it is solved. Something
           | lightweight like Trello is ideal
           | 
           | - A Kanban board so people have an organised way to pick up
           | new issues when low on work
           | 
           | - A weekly showoff meeting where there are few 5 minute
           | presentations and a 30 minute "I did something really cool or
           | learned something really cool"
           | 
           | - 6 month task split into 1 month ish deliverables, with a
           | flexible deadline for each. Presentation of finished work
           | each deliverable.
        
             | cvoss wrote:
             | This is basically how my team does it. I love it. My
             | manager spends much of her time figuring out how to help
             | remove our roadblocks and planning the 6 month to 1 year
             | horizon (with our input). I lead the weekly meeting where
             | we do the showing off, PSAs, or light brainstorming on
             | issues with broad relevance.
             | 
             | Two scheduled meetings per week = tons of dev time and
             | freedom to explore / innovate! (Ok, three weekly meetings
             | if you count the product-wide meeting, which is usually a
             | waste of N-5 people's time, and I usually have it on the
             | background while I continue working.)
             | 
             | We are remote, so ideally there's also one in person
             | gathering per year to do the big vision casting and major
             | high level brainstorming.
             | 
             | We still have room to improve, especially in the area of
             | ad-hoc dev-dev communication. Always interested to hear how
             | others do it!
        
           | Aeolun wrote:
           | You can have a two week cadence without connecting tasks to
           | sprints.
        
             | gklitz wrote:
             | I'm confused. That is literally all sprints are a regular
             | cadence that tasks and events are connected to?
        
               | relaxing wrote:
               | I think the key is you don't force/pressure tasks to be
               | completed in sprints.
        
         | justmarc wrote:
         | Absolutely right. Well put.
        
         | bdangubic wrote:
         | After 26 years in the industry this is the only process that
         | actually works - hire the right people and get the F out of the
         | way
        
           | tcgv wrote:
           | > hire the right people
           | 
           | That's no easy feat and often oversimplifies the challenge of
           | building competent teams. I think it's achievable if you have
           | a large budget to hire only senior/experienced devs and a
           | mature hiring process/team. Plus, if your company has strong
           | tech branding, it becomes easier to attract top talent too.
           | 
           | But if you're at a startup with limited funding and possibly
           | no branding at all, you'll likely face this situation:
           | 
           | - Hire inexperienced but honest, motivated people with the
           | potential to grow, and invest in mentoring them.
        
             | bdangubic wrote:
             | I do not disagree with anything you said at all! Though
             | chances of success diminish here.
             | 
             | If you have to introduce some "process" - whatever that
             | "process" is - because you do not have competent people and
             | you feel like "process" will fix it, your chance of
             | succeeding are a lot smaller IMO...
        
         | bfrog wrote:
         | Pizza sized teams that can directly interact with customers
         | don't need management. Management is playing telephone with
         | someone in the middle with their own interpretation of
         | everything which is 99% wrong.
        
           | patrickmay wrote:
           | It sounds like you've had bad management (like we all have).
           | Good EMs will unblock you, deal with conflicting priorities
           | from stakeholders, provide you with air cover to have focus
           | time, and help manage your career growth (among other
           | things). If your EM isn't doing that, find another one.
        
             | randomdata wrote:
             | _> Good EMs will unblock you, deal with conflicting
             | priorities from stakeholders, provide you with air cover to
             | have focus time, and help manage your career growth (among
             | other things)._
             | 
             | Those don't really seem like things you'd want to
             | outsource, no matter how good the outsourcee is.
        
         | mrits wrote:
         | The reality is even good devs tend to work hard on the wrong
         | thing. Accountability comes from your peers as much as your
         | manager. If this makes you angry you are one of the bad ones.
        
           | skydhash wrote:
           | Everyone tends to work hard on the wrong thing if it what
           | they like to do most currently. Everyone. A conversation is
           | all that is needed to remind them of the team priority, non
           | need to create a creativity carcan with processes.
        
           | randomdata wrote:
           | Give good devs a direct line to the customer and they're apt
           | to always work on the right thing, but will spend a lot more
           | time dealing with the customer and a lot less time in
           | development in order to do so.
           | 
           | Leave good devs to play telephone through a middle-man, what
           | we call the manager, and they almost certainly will work on
           | the wrong things, but will have a lot more time to do it.
           | 
           | I wonder which is actually more productive? Agile (of the
           | Manifesto kind) posits that the former is most productive,
           | but Agile (of the fake kind) seems to always want to revolve
           | around the latter. The general sentiment is that fake Agile
           | is the one that gets it wrong, so presumably cutting out the
           | manager is what is most productive, but more data is welcome.
        
             | SoftTalker wrote:
             | Disagree. The customer often has tunnel-vision on their
             | needs, and doesn't know what's possible, and might have
             | trouble even describing it except that _their_ manager told
             | them that their foo task was a problem.
             | 
             | The devs have the opposite problem, they can imagine all
             | sorts of new technology that would be fun to use (for them)
             | in helping the customer solve their problems with doing
             | foo, and even if they understand foo from the customer's
             | business perspective they they may not have a great
             | understanding of how big a problem it is in the grand
             | scheme of things and what commitment of resources and
             | expenses are justifed in solving it.
             | 
             | Managers talking to managers can (in theory) draw some
             | boxes around scope and priorities and get the right
             | development problems solved at the right time. They may
             | talk and realize that doing foo isn't even really a great
             | idea and they should be doing bar intstead. Line-level
             | employees working directly with developers will not be as
             | likely to realize that.
             | 
             | Developers can fall into the trap of thinking that because
             | they are smart (mostly) at building software they are
             | automatically smart about all the business processes and
             | problems and goals of the company. They should certainly be
             | informed about those things, but they are not experts in
             | everything.
        
               | randomdata wrote:
               | If we were talking about developers in general, perhaps,
               | but we're specifically talking about _good_ developers.
               | They exist at the intersection of understanding the
               | business, what customers are _actually_ saying, and
               | understanding the technology. Without that, what would
               | make them good?
        
               | SoftTalker wrote:
               | Very very few of these people exist. They like to think
               | that because they are very good at writing and
               | understanding code and technology that they are
               | automatically the smartest person in the room with every
               | other aspect of the business. And I'm not talking
               | exclusively about software developers, you'll find the
               | same issues with anyone who is deeply smart and
               | experienced at any one thing, thinking they must be smart
               | about everything else too.
               | 
               | There are a few polymaths out there, yes. But only a few.
        
               | randomdata wrote:
               | _> Very very few of these people exist._
               | 
               | Well, yeah, that's why they're considered good. Why they
               | get a special title not given to everyone else. It would
               | be nonsensical for "good dev" to refer to everyone who
               | touches software development. "dev" would already
               | communicate everything you need to know. The addition of
               | "good" implies being set apart from what is typical.
        
             | mrits wrote:
             | You generally don't want to act on customer feedback
             | directly. Aggregating the feedback and making decisions at
             | a broader level is a full time job.
             | 
             | Of course, if you are an early stage startup and one of
             | your customer is half your revenue, sure. Do whatever it
             | takes to make them happy.
        
               | randomdata wrote:
               | _> You generally don 't want to act on customer feedback
               | directly._
               | 
               | Obviously not literally. What they want hasn't been
               | invented yet, which means the words to accurately
               | describe what they want also haven't been invented yet.
               | But ultimately you do want to act on what they really,
               | truly are trying to tell you. Indeed, figuring them out
               | is a hard job all on its own.
               | 
               |  _> is a full time job._
               | 
               | Sure. That's the tradeoff. You can spend most of your
               | time figuring them out, and then the small few remaining
               | units of time you have for development will be on point.
               | Or you can play telephone and have all kinds of time for
               | development, but will more often than not go down the
               | wrong path.
               | 
               | It's not really clear which is more productive at the end
               | of the day. But we do know that Agile (of the Manifesto
               | kind) pushes the former, while Agile (of the fake kind)
               | pushes the latter. People seem to hate fake Agile more
               | than they hate Manifesto Agile, so that does suggest that
               | not playing telephone is more productive.
               | 
               | But, still, data?
        
         | Lutger wrote:
         | I've heard a lot of push back against all kinds of process on
         | this forum, and it always surprises me.
         | 
         | But reading the article made something click: it is not about
         | the specific process, the (lack of) autonomy is what really
         | matters. I guess I got lucky to work a lot in teams where we
         | largely controlled our own process, so even if we used bits and
         | pieces of scrum, kanban or other methodologies, it was always
         | of our collective choosing and when it didn't work, we changed
         | it.
         | 
         | I did like to have rules, principles and process. A simple
         | playbook for a daily meeting that made us not forget important
         | things and sped up the meeting. Making things in small
         | increments meant that I didn't have to review thousands of
         | lines of code. Having a visual overview of work neatly spelled
         | out means I don't have to re-think every time I pick up a new
         | item to work on. This also prevents useless work because one of
         | your teammates decides to work on the same thing as you without
         | telling it. All these things make me happier and more
         | productive working together on some big thing.
         | 
         | The key is that the team should be in control of the process,
         | not some manager who isn't part of the team and affected by the
         | process. You need to have a stake in it. The only other factor
         | that undermines this is 'process for the sake of process'.
         | Every part of the process needs to earn the inevitable cost its
         | implementation is bringing. Some people seem to be happy paying
         | the pricing without getting the value.
        
         | mrmetanoia wrote:
         | It seems we go astray when we start defining and evangelizing
         | things that may have worked for some group of people to push
         | them on others.
         | 
         | Somewhere in all this process stuff, I see maybe what some
         | teams were doing but I doubt it was as rigid and I doubt they
         | indulged in it when it made no sense. Once these teams or
         | people are asked what they're doing right - it eventually gets
         | defined into rules and then evangelized to people made to feel
         | they can't deviate or improvise when the framework makes no
         | sense. "Trust the process."
         | 
         | So people start wasting their time going through the process
         | rather than using the process as a framework/tool for getting
         | things done, they 'do' the process.
         | 
         | Their job is standup, their job is scrum, tickets, and points,
         | and as a result their job is only marginally to do the things
         | that need doing.
         | 
         | Company's might take more issue with this inefficiency if the
         | workforce didn't double as something to manipulate pre and post
         | head/tailwind to make the stock rise.
        
         | SoftTalker wrote:
         | All of these methodologies (and most formal software
         | architectures as well) have as a their main sales pitch the
         | idea that you _can_ hire average /entry-level developers and
         | build good software with reduced defects and on a defined
         | schedule if you only follow these magic guidelines.
         | 
         | It refuses to learn from _The Mythical Man-Month_ and recognize
         | that building software has an essential complexity that cannot
         | be avoided. You need smart people to implement and manage it,
         | and you 'll have to pay them what the market says they are
         | worth.
         | 
         | Building software that's more complicated than a standalone
         | CRUD system is hard, it will always be hard, and unpredictable,
         | and to some degree stressful. No methodology will ever make it
         | anything else because the methodology used doesn't change the
         | nature of the problem.
        
         | bunderbunder wrote:
         | My first and second experiences with Scrum couldn't be more
         | different. And they were successive. Actually, they happened on
         | the same team, same people, same project.
         | 
         | Before: the team had internally decided to use Scrum. Other
         | teams were not using it, and inter-team coordination used
         | traditional project management methods. It was fantastic; the
         | team worked like a well-oiled machine and I really did feel
         | more productive. We never had crunch time. I did not feel the
         | "end-of-sprint mini crunch" that this post describes; instead
         | the norm was that, by the last couple days of the sprint,
         | people were starting to finish up whatever tickets they had
         | taken and pivoting to helping teammates get the rest of the
         | work done. Oftentimes we'd close out all the user stories a day
         | or so before the end of the sprint, and have all that time for
         | tidying up the codebase, fixing small technical debt items,
         | experimenting with new tools, or planning ahead for the next
         | sprint. So, if anything, it was the opposite of what the
         | article describes: the last few days of every sprint were
         | downright relaxing.
         | 
         | After: The executives got wind of Scrum, and decided to
         | standardize the whole company on it. We stopped work for a week
         | so that we could have a famous Agile coach do an all-hands
         | Scrum workshop. Which was fun, but the middle and senior
         | managers were conspicuously absent. And then, after that,
         | things kind of went to heck. The way our team did Scrum rapidly
         | started to change as our team manager started getting explicit
         | instructions on how to do things. We also started experiencing
         | pressure to keep or maintain velocity. We started getting
         | questions about why our velocity was so much different from
         | other teams'. We could explain that the story point scale is
         | team-specific and you can't compare story points across teams,
         | but that didn't go anywhere. As I said, the middle and upper
         | managers skipped the Scrum training. They weren't interested in
         | being lectured about what I'm sure they perceived as pedantic
         | little bullshit details.
         | 
         | I left that company and went to another where leadership didn't
         | mandate any Agile methodology. My team did a homegrown Kanban-
         | like thing. A team I collaborated closely with used Scrum. It
         | also seemed to work pretty great. Again, possibly because we
         | chose it for ourselves. I don't think the other team would have
         | done as well on Kanban. Scrum wouldn't have worked so well for
         | our team. I didn't see a problem with that. We each had
         | different business domains that warranted very different "rules
         | of engagement" with our stakeholders and ways of organizing the
         | work.
         | 
         | Since then it's been a couple more companies where "Agile" was
         | mandated from the top, and, apologies to Tolstoy, but they were
         | both miserable in the same way that the first one was after the
         | Scrum mandate got handed down from above.
        
       | cybrexalpha wrote:
       | One of my soft requirements for engineering roles is "no agile".
       | Usually if a hiring manager tells me that team is an agile one
       | it's a very clear sign that I don't want to work there.
       | 
       | Of course, this pickiness is only if I'm in a situation where I
       | don't need to move. I can think of plenty of cases, for example
       | being laid off, where I'd take a role in a scrum team.
        
       | insane_dreamer wrote:
       | We don't do agile, scrum, standups, etc. We meet 1x week to
       | review where we're at and establish/re-establish priorities for
       | the week if needed, use a ticket system for tasks to track
       | progress, a high-level "weekly goals" shared doc, communicate on
       | Slack as needed, and let the devs actually do the f'ing work the
       | way they know best. If someone can't self-manage and produce
       | without a manager over them, or reach out if they've hit a
       | blocker (due to their own limitations or someone else's) they are
       | not the right fit for us.
       | 
       | IMO, if you're a SWE/dev and spending more time doing other stuff
       | (meetings, TPS reports, etc.) than coding (coding includes the
       | time needed to research, experiment and think of good solutions,
       | not just actual coding), then something is wrong.
        
         | iaaan wrote:
         | How do you handle QA and automated testing?
        
           | SamuelAdams wrote:
           | Be like Microsoft. Fire all your QA. QA is now done by
           | developers and end users.
           | 
           | If a multibillion dollar corporation can do this, so can you!
        
             | foobarchu wrote:
             | Honestly that would be better than what I have now. Bad QA
             | who you have to tell exactly what to do is infinitely worse
             | than just doing it yourself.
        
             | sanex wrote:
             | Or Boeing. Works great there.
        
         | sabbaticaldev wrote:
         | and this is quite easy to automate with AI.
        
         | fulafel wrote:
         | You are doing agile. The agile manifesto is:
         | Individuals and interactions over processes and tools
         | Working software over comprehensive documentation
         | Customer collaboration over contract negotiation
         | Responding to change over following a plan
        
           | insane_dreamer wrote:
           | as a philosophy, yes; but as the way Agile is structured at
           | most companies, no.
        
             | skrebbel wrote:
             | Just means you're doing it properly :-)
             | 
             | It's kinda nuts how many capital-A Agile processes (and
             | consultants!) produce situations that are diametrically
             | opposed to the original ideas. Notably, Scrum is often
             | processes and tools over individuals and interactions.
        
         | freedomben wrote:
         | How big is your team? and company?
        
       | forgotacc240419 wrote:
       | I feel like in a lot places the ultimate purpose of sprints is to
       | let executives think they can see data that represents the amount
       | of work getting done down to a fine level.
        
         | Tempest1981 wrote:
         | Indeed. Which is backwards. The goal shouldn't be giving execs
         | a warm fuzzy feeling. It should be identifying issues and risks
         | that execs can help fix. I.e. handle exceptions to the norm.
        
         | freedomben wrote:
         | Exactly right. I've seen it first-hand. It's all about the
         | data. It's also neatly separated from the real operating
         | context in a way that presents it as highly misleading.
         | 
         | Incidentally, if you criticize the data (such as asking "Where
         | does this data show the effort that people who spent time
         | mentoring/pairing but didn't do the actual 'commit'? Where does
         | the data show the effort spent code reviewing?), you should
         | know that it won't be received well. The emperor really does
         | not want to hear that he's not wearing clothes.
        
       | maximumgeek wrote:
       | I think back to the early 2000's, and there are other factors in
       | play as well. Back then, I worked with a team of engineers that
       | stayed together for over 4 years. In that time, we did not have
       | Project Managers telling us to do daily standups. We met as an
       | engineering team.
       | 
       | We often would go days without having a formal meeting.
       | 
       | But, software was different then as well. Everything is
       | interconnected now. One team dropping the ball affects countless
       | other teams. Deployments were whenever we felt a new one was due
       | or at a multi month cadence. Did this introduce problems, yes,
       | but at the same time, they came in controlled release cycles.
       | 
       | Nothing against CI/CD and continuous delivery, but the hamster
       | wheel has gotten to a point where we have to release all the
       | time. Corners are cut on everything, and testing is given lip
       | service.
       | 
       | At this point, I am a manager, and SCRUM stresses me out. Either
       | let us work from a queue, or give us a project with a deadline.
       | Give me back a stupid gant or pert chart. At least then it was,
       | is this done to allow XYZ, not we are going to accomplish this in
       | the next 2 (arbitrary) weeks.
       | 
       | So much more to say, but I am toast.
        
         | saulpw wrote:
         | Well you are a manager, can you at least change how things are
         | done for your team?
        
           | cdaringe wrote:
           | ex manager here. managers are in an even worse wheel. biz
           | demands managers show up to even _dumber_, less organized
           | meetings than devs think they have to deal with. eng to eng
           | meetings tend to be fine, but the rest of company culture at
           | BigCorp weren't trained in structured problem solving. it's
           | negotiating with goldfish half of the time (generally
           | friendly goldfish), and no one actually practices any
           | formalisms or larger cohesive pjm. "just give me a gantt"
           | like the author says would be an absolutely monumental
           | improvement from how i see things get done
        
             | bruce511 wrote:
             | With software you have a situation with two problems.
             | 
             | First is the "gap" between those doing the work, and those
             | writing the checks. (When it's the same person, this
             | problem disappears.)
             | 
             | The guy editing the checks likes to understand progress is
             | being made, and that the project both has an end and will
             | be successfully completed.
             | 
             | The second problem is that by it's nature software "never
             | ends" and many (dare I say most?) projects fail and are
             | simply abandoned.
             | 
             | The moment the check writer is not the direct manager of
             | the development you have an intractable problem. The person
             | in-between (quite literally middle management), is often
             | not technical. But he has to convince the bean-counters
             | that this project is "on time and on budget".
             | 
             | He can't help but feel sometimes that he's herding cats.
             | He's an irritant to those who are "doing the work" so they
             | treat interactions with him as a waste of time. Inevitably
             | he starts trying to measure things. (And we all know what
             | that means.)
             | 
             | His job is hard. He's stuck between developers who don't
             | want anything to do with him and higher-ups who want
             | reassurance, bit don't really trust what he's saying.
             | 
             | The miracle is not that this process sometimes fails. The
             | miracle is that it ever works at all.
             | 
             | And sure, you may not like your meetings, but at least
             | understanding the game might help you understand why his
             | job is the crappiest of all of them.
        
               | shepherdjerred wrote:
               | This is really interesting. Do you know of any
               | articles/blog post that goes into these ideas further?
        
               | bruce511 wrote:
               | No, alas no material to refer to, other than my own
               | experiences at several places in the food chain.
               | 
               | At the moment I'm having fun developing again, but I have
               | had experience of management as well.
               | 
               | Obviously my experience does not speak to all cases, and
               | I'm fortunate that most middle managers I've dealt with
               | are competant.
               | 
               | I am in the fortunate position of being able to "speak
               | truth to power" though, and generally been able to
               | dispassionate translate technobabble into managerspeak,
               | and help all the layers understand each other better.
               | 
               | I've found that when both sides understand (as much as
               | they able) the complex demands being encountered, more
               | realistic expectations and demands are made (and usually
               | achieved.)
               | 
               | But I've been lucky. I've had good dev teams, good middle
               | management, and good product owners. Who have all been
               | pulling together to make projects successful. When one
               | group is pulling the other way, things get tougher.
        
               | intelVISA wrote:
               | It's beyond software: any domain that requires oversight
               | of non-trivial work should really have leadership from
               | the ranks so they are able to ground their observations.
               | 
               | Managers with no domain knowledge are just an extra layer
               | of indirection and overhead without any of the benefits.
               | Would any IC want their career gated by someone who has
               | zero insight into the team's day to day duties, doubly so
               | if it's at a supposed "tech" company?
        
               | cdaringe wrote:
               | Trust and rapport are gained in time, often in short
               | order. Small artifacts of evidence should generally prove
               | to the bean counter that they are cutting checks for
               | something!
        
               | randomdata wrote:
               | _> at least understanding the game might help you
               | understand why his job is the crappiest of all of them._
               | 
               | Well, sure, but that's what the daily standup is for. So
               | that the problem solvers on the team can understand the
               | process, the problems it faces, and, importantly, find
               | ways to optimize it.
               | 
               | But it seems, for how crappy you claim it to be, those in
               | that position don't want to talk about it in fear that it
               | will get optimized away. Job protectionism trumps all, I
               | suppose.
        
         | moribvndvs wrote:
         | In the nearly 30 years of doing this, I've had more success
         | delivering good quality software that meets business
         | requirements under waterfall than any of the SCRUM
         | implementations I've worked with, and I am saying that without
         | disagreeing that waterfall has its problems. In the agile
         | space, kanban is the only one I've felt is productive, but it
         | has trouble scaling to multiple teams.
        
           | Clubber wrote:
           | In my experience, waterfall forces business to think more
           | about the project and plan accordingly. They have to think
           | about how this feature interacts with this other feature.
           | Business also usually has a better understanding of how the
           | software will work because of the planning phase.
           | 
           | In my experience, with 2 week sprints, the business doesn't
           | really have to think about anything outside of bite sized
           | chunks or even how those bite sized chunks affect later bite
           | sized chunks. They can make a snap decision without thinking
           | about it because it can be rectified in the next sprint.
           | Almost no-one has a "big picture," view of the software.
           | 
           | Before agile, we essentially did 4 releases a month (this was
           | back on the burn a CD days), 2 major releases and 2 minor
           | patch releases. It worked really well and we didn't get the
           | burnout as much by sprinting a marathon. With sprints, I
           | always feel burned out. No sense of accomplishment, no letup,
           | working hard just gets you more work. It's like laying bricks
           | one at a time on a wall with unlimited length.
        
             | gtirloni wrote:
             | _> No sense of accomplishment, no letup, working hard just
             | gets you more work. It 's like laying bricks one at a time
             | on a wall with unlimited length._
             | 
             | Also feeling bad every 2 weeks because planning was really
             | bad and now you need to say you're sorry the task has to
             | roll over the next sprint and your manager has to explain
             | to their manager, etc, etc.
        
               | marcosdumay wrote:
               | Yep. Somehow scrum leads to more rigid specifications
               | than waterfall.
        
             | ben7799 wrote:
             | Waterfall forces management to get it's act together. These
             | processes are all about giving management more power and
             | less accountability.
             | 
             | Product Management has fallen a tremendous distance from
             | where it used to be. PMs who have come up completely under
             | Scrum seem to think stories and epics barely require more
             | than 1-2 sentences and the developers should have to figure
             | everything out from there.
             | 
             | Even senior people in their early 40s have completely
             | forgotten how to specify or document anything well.
             | 
             | It makes me wish I worked on something that involved
             | physical products. The whole thing with agile/scrum is that
             | management can change their mind at any time for any reason
             | and the process gives them justification. It works in pure
             | software, it doesn't work in anything physical because they
             | had to sign the POs to buy materials and parts.
        
         | gregmac wrote:
         | > Nothing against CI/CD and continuous delivery, but the
         | hamster wheel has gotten to a point where we have to release
         | all the time. Corners are cut on everything, and testing is
         | given lip service.
         | 
         | Just to call it out: Having CI/CD doesn't mean you have to do
         | all these things, or do scrum. It's imho just good engineering
         | practice. I have it in my side projects, and I've had it at
         | work on a Kanban-driven team (as well as on scrum).
         | 
         | It removes disputes over build process (eg, nobody can ever say
         | "well, it complies on my machine"). It is a form of
         | build/deploy documentation. It removes bottlenecks ("only Tom
         | knows how to deploy that service, but he's on vacation") and
         | stupid mistakes ("whoever deployed this last did it wrong and
         | left a bunch of old files around").
         | 
         | I also have found deploying regularly is stress- _reducing_.
         | For one, with CD the development environment is running the
         | same steps, and we know it works because we do it dozens of
         | times a week. The longer it 's been since last prod deploy, the
         | less confident we can be it'll go smoothly, whereas when it
         | gets deployed every few days it becomes a non-event.
         | 
         | When something breaks, having only 1 or 3 changes makes it
         | really easy to figure out why. Recovering after a big release
         | with 40 PRs in it is absolutely painful.
         | 
         | None of this means you have to release _everything_ on a
         | regular schedule (like a sprint). You can still do long running
         | branches or feature-flag things off, Just try not to go too
         | long without deploying _something_.
        
           | RussianCow wrote:
           | > When something breaks, having only 1 or 3 changes makes it
           | really easy to figure out why. Recovering after a big release
           | with 40 PRs in it is absolutely painful.
           | 
           | This is, by far, the most important reason to practice
           | continuous deployment. I've been part of enough of these fire
           | fighting sessions following big releases to see that it's not
           | a sustainable way to deploy software. And yet, I've never
           | been able to convince any boss I've ever had to adopt CD
           | because they're worried it'll introduce more regressions into
           | production.
        
             | scott_w wrote:
             | The way I've explained this before is "would you rather
             | small issues that we can fix one by one until anyone really
             | notices or would you rather we hit all those issues in one
             | big go?" Your mileage may vary.
        
               | RussianCow wrote:
               | Intuitively, I think most managers think that tackling
               | everything in one go is somehow easier or less risky.
        
               | scott_w wrote:
               | Speaking as a manager: any managers that think that are
               | wrong.
        
         | fireflash38 wrote:
         | > and testing is given lip service.
         | 
         | It's one reason I'm really thankful to work in a
         | certified/regulated industry. It's mandated to effectively
         | prove your work to get the sign off. And since you can't really
         | sell too well in the area without that cert, it's a big part of
         | development.
         | 
         | But holy hell is it still hard to get specific people to test
         | their work. They just don't even think about it.
        
       | foolinaround wrote:
       | are there places today that don't do some variation of scrum
       | today? Waterfall is pretty much non-existent.
        
         | Tagbert wrote:
         | Some teams use Kanban which is a way to manage the number of
         | tasks/tickets and doesn't generally use sprints. It's mostly a
         | bug queue of work.
        
           | 20240915 wrote:
           | Work queues are themselves an issue. Instead you should have
           | ways of documenting things that need doing that is adaptive.
           | For example a groomed page about all the PDF bugs > 56 Jira
           | tickers going back 10 years, some will take a day work to
           | even fathom. It is a big time waste. For customer
           | communication have case tickets. But a JIRA ticket is like
           | body fat. You burn calories just to maintain it.
        
         | userbinator wrote:
         | From what I've heard, aerospace and automotive are still
         | largely using waterfall.
        
           | Jtsummers wrote:
           | Yes. And it doesn't work very well. Lots of late deliveries
           | or reduced project scopes (often still late and over budget,
           | but mot as bad).
           | 
           | Increasingly, iterative models are used and those are much
           | better. For some reason since it isn't Scrum people still
           | insist they do Waterfall even though they do nothing like it.
        
             | 1over137 wrote:
             | Planes fall from the sky far less than, say, some
             | agile/scrum-based web app shitting itself constantly, which
             | happens all the time. Maybe waterfall has its place.
        
               | Jtsummers wrote:
               | Eh. Waterfall adds risk to iterative approaches, not
               | value. Wait 3 years to do integration testing because
               | that's what the schedule says. The smart projects get
               | better quality and use iterative models.
               | 
               | Additionally, there are other iterative models than
               | Scrum. That's pretty much the worst one out there and its
               | only value is to inexperienced teams needing training
               | wheels or overbearing management that doesn't trust the
               | team.
        
               | dezgeg wrote:
               | Good example is SpaceX vs. all the others
        
           | bigstrat2003 wrote:
           | Even worse. When I worked in that sector, the government
           | simultaneously mandated that we use agile methodologies, and
           | also that we do waterfall things. Doing agilefall like that
           | was the dumbest possible thing, because we got the benefits
           | of neither and the weaknesses of both.
        
         | smrtinsert wrote:
         | some places are cheating and doing design sprints and
         | eventually implementation sprints. better than doing mythical
         | pure implementation.
        
         | magicalhippo wrote:
         | We don't do scrum. We release major versions once a month, and
         | bugfixes daily. New features go into the next major version
         | when done, bugfixes gets released as soon as they're done.
         | 
         | We use Kanban boards to get an overview and prioritize work.
         | Apart from that devs mostly manage their own work.
         | 
         | We're a small shop though, perhaps that's why it works well.
        
           | oneshtein wrote:
           | Looks like SCRUM.
        
             | magicalhippo wrote:
             | But is it? Everything is the same if you squint hard
             | enough.
             | 
             | We do not have anything like a SCRUM master.
             | 
             | We don't do stand-ups, we usually don't have a per-release
             | target for features. For example, for the past three months
             | I've had a target of October 1st for a feature, but no
             | specific sub-deliverables for the realeases before that.
             | This is typical.
             | 
             | We don't have a separate sprint retrospective meeting. We
             | discuss such things during our weekly meeting, even between
             | releases (ie we don't wait).
             | 
             | It doesn't feel like what I've been taught and have read
             | about SCRUM. But sure I'll agree it's closer to SCRUM than
             | to the waterfall method.
        
               | oneshtein wrote:
               | Yep, it's typical Agile.
               | 
               | Scrum masters are needed to coach a new team with
               | inexperienced project manager only. Established teams
               | don't need them.
               | 
               | Stand-ups can be easily replaced by a team chat, such as
               | Slack, with even better results.
               | 
               | I saw very few retrospective meetings too. If everything
               | goes smoothly, then retrospective meetings are useless.
        
         | 015a wrote:
         | Many engineering orgs just give lip service to scrum, which is
         | as good as not doing it, which is good and works better.
         | Meaning, in my experience: You work in a priority queue, that
         | priority queue is re-synced with stakeholders (at least) once
         | every two weeks, retros may be there as an opportunity to get
         | other business verticals into the room to see what engineering
         | finished recently, and the concept of "a ticket going over to
         | the next sprint" doesn't raise blood pressure, because the
         | system is designed for this and sprints aren't deadlines.
         | Features might have deadlines, absolutely, but that's
         | independent of the sprint.
         | 
         | I've worked at ~three places that operated similar to this;
         | "minimum viable scrum" is a good name, or even better,
         | "emergent scrum" because it isn't a process that's designed,
         | its the process that emerges when someone toggles the
         | "agile/scrum" button in Jira, but no one really cares one way
         | or the other. Its a _good_ process.
         | 
         | I've worked in one environment that was hard scrum, had scrum
         | masters, extremely strict. To be honest: I felt almost no
         | stress, but the company also delivered very little. There was a
         | lot of "we can't get to swapping the color on that button until
         | Sprint 18 in three months, but we'll schedule it for then".
         | Missing a sprint was life or death, so every estimate got
         | padded like crazy. When you took vacation, it was common
         | knowledge that you needed to leave halfway through a sprint and
         | come back halfway through another, sprint planning would
         | basically forget about you. That (public tech) company doesn't
         | exist anymore, and it radicalized me against agile/scrum: The
         | entropic end-state of perfectly executed agile/scrum is an
         | extremely well-lubricated machine that actually does very
         | little.
        
         | Arainach wrote:
         | There are plenty. All you need is a competent team that trusts
         | each others.
         | 
         | I work for a huge corporation. My team plans and commits to
         | quarterly OKRs and has a team meeting once a week to check in
         | on how folks are doing. There are no sprints and no 2-week
         | deadlines. Once a month or so we update the progress scoring on
         | the OKRs.
        
         | randomdata wrote:
         | To be fair, waterfall was always non-existent. It was a
         | hypothetical invented for illustration purposes.
        
       | zombiwoof wrote:
       | Love this. I've had anxiety about agile and how I've never seen
       | it work well, and the "before days" was in some of the most
       | enjoyable and productive projects until agile came along
        
       | mempko wrote:
       | The secret purpose of Scrum is to get rid of managers and empower
       | the engineering team. Most "scrum" is simply taught wrong because
       | it was sold to companies as a way to squeeze workers.
        
         | jksmith wrote:
         | Evolution of a manager and scrum team achieving high-
         | performance together:
         | 
         | Team: "We are having trouble with Bob." Manager: "Ok I'll talk
         | to him."
         | 
         | Team:"We are having trouble with Bob." Manager: "Don't come to
         | me, you guys need to deal with that in your retro."
         | 
         | Team: "We voted Bob off the island." Manager: 'Ok, I'll forward
         | to HR."
         | 
         | Autonomous teams get more done because they have eliminated
         | management as a wait state and will proactively scale with
         | other autonomous teams to maximize the amount of work _not_
         | done. 21st century managers need to re-focus on flow
         | efficiencies (as business engineers), and not people. 20th
         | century managers won 't have a job in 5 years.
        
           | 20240915 wrote:
           | What if the board hires engineers, who then hire (and can
           | fire) their manager.
           | 
           | What if the entire company is inverted.
        
             | jksmith wrote:
             | Sure, maybe optimize further. Why have managers? The CD
             | pipeline goes throughout the whole value stream, not just
             | at delivery. Just like delivery automation (eliminate
             | intervention of humans), there's also human automation
             | (helping people get out of their own way). So I could see a
             | use case where managers are just eliminated. You need
             | people who can eliminate the noise and replace with enough
             | signal that delivery teams can execute. POs and
             | stakeholders can do that; managers not needed.
             | 
             | I think what you bring up though is an interesting point:
             | maybe managers needs to transition to business engineering
             | roles.
             | 
             | This all will play out in the 21st century. 20th century
             | management is a legacy artifact at this point. Best example
             | is F500s, which are generally mediocre in their execution.
             | If a SpaceX type org (14k employees, private) gets into
             | their space, they're screwed. Even with politicians in
             | their pockets, I don't see how rock swallowing dinosaurs
             | like Boeing (170k employees, public) will make it. Just the
             | energy they have to expend to get anything done compared to
             | SpaceX is massive, due in part to their giant management
             | bureaucracy.
        
         | ath3nd wrote:
         | > The secret purpose of Scrum is to get rid of managers and
         | empower the engineering team.
         | 
         | Then Scrum spectacularly fails in its secret purpose, because
         | it adds managerial type to the engineering team and removes
         | power from the engineers.
        
       | booleandilemma wrote:
       | We have a woman at my company whose job is to update Jira ticket
       | statuses.
       | 
       | Instead of allowing the developers to update the statuses
       | themselves, she will often prematurely update statuses from "In
       | Development" to "Ready for QA" before any code is merged. Or
       | she'll update a ticket that isn't yet being worked on to "In
       | Development". It repeatedly causes a lot of confusion.
       | 
       | I think she feels the need to be so hands on with updating the
       | statuses in order to justify her job, which, in my opinion,
       | shouldn't exist.
        
         | semede wrote:
         | That job definitely shouldn't exist. I'm not seeing where the
         | gender of the person added much value to the story tho
        
           | Biganon wrote:
           | Would you have said anything if the comment said "there's a
           | guy" ?...
           | 
           | "There's a person" sounds weirdly mysterious
        
           | randomdata wrote:
           | "We have a non-binary, genderqueer, genderfluid, agender,
           | bigender, demiboy, demigirl, two-spirit, androgynous,
           | neutrois, third gender, polygender, maverique, hijra,
           | kathoey, fa'afafine, man, or woman at my company whose job is
           | to update Jira ticket statuses."
           | 
           | Better? (apologies to anyone I may have missed)
        
         | 20240915 wrote:
         | I want her job. It would cost me 50c/day in tokens to automate,
         | then grab 2 more jobs like that, and spend Tues onwards at the
         | beach.
        
       | Trasmatta wrote:
       | I'm at a weird point in my career where every development process
       | stresses me out, no matter what. Guess that's burnout.
        
         | etiam wrote:
         | Sorry to hear that, and please have it attended to sooner
         | rather than later. The recovery times can be worlds apart
         | depending on how far burnout is allowed to progress.
         | 
         | I imagine it's still not that every development process
         | stresses you out _equally_ though, so it 's still worthwhile
         | considering _how much_ stress the environment adds and why.
        
         | nyxtom wrote:
         | I'm in the same boat. 15 years of work and I'm very burnt out
         | now. Any development process stresses me out these days.
        
       | paulcole wrote:
       | > The business side just can't help itself. ("We have to market
       | things!" "We need to inform customers about what's coming!" "We
       | have to make promises at conventions!" "That's just the
       | reality!")
       | 
       | Then shortly after:
       | 
       | > Treat [developers] as respected peers, not replaceable cogs in
       | a machine.
       | 
       | Yes, it's hard to know understand the (oft-maligned) "Business
       | Side" doesn't bow and genuflect when they enter a room full of
       | programmers.
        
       | luckydata wrote:
       | nobody has ever done "waterfall", it's a strawman created to
       | explain why traditional project management doesn't work in
       | software development. The fact that the article starts with "in
       | the good old days of waterfall" takes away every expectation that
       | I'll read anything intelligent in the article, I believe this
       | post doesn't deserve your time and definitely doesn't deserve
       | mine.
        
         | wvenable wrote:
         | I was trained to do waterfall in school (and also Agile). But I
         | suppose if you are under a certain age you would have never
         | done it.
        
         | oneshtein wrote:
         | Soviet planning was based on 5 year waterfalls.
        
         | ern wrote:
         | I'm not sure why the above comment is being downvoted:
         | 
         |  _I was reading The Practice of Cloud System Administration:
         | Designing and Operating Large Distributed Systems, and I came
         | across this quote:
         | 
         | Royce's 1970 paper, which is credited with "inventing" the
         | model, actually identifies it so Royce can criticize it and
         | suggest improvements. He wrote it is "risky and invites
         | failure" because "design iterations are never confined to the
         | successive step." What Royce suggests as an alternative is
         | similar to what we now call Agile. Sadly, multiple generations
         | of software developers have had to suffer through waterfall
         | projects thanks to people who, we can only assume, didn't read
         | the entire paper (Pfeiffer 2012) [p. 175]._
         | 
         | https://www.jjinux.com/2015/07/the-waterfall-model-was-straw...
        
           | cassianoleal wrote:
           | Probably because of exactly that.
           | 
           | > Royce's 1970 paper, which is credited with "inventing" the
           | model, actually identifies it so Royce can criticize it and
           | suggest improvements.
           | 
           | That means people were doing waterfall then, just maybe not
           | calling it so.
           | 
           | > Sadly, multiple generations of software developers have had
           | to suffer through waterfall projects
           | 
           | That means even after it being given the name "waterfall",
           | "multiple generations" kept using it.
           | 
           | This is making observations, coming up with a model that fits
           | the observations, giving it a name, and arguing against it.
           | 
           | This is definitely not a strawman as GP or the author of the
           | post you linked seem to think, which is why it's being
           | downvoted (I didn't btw).
        
             | luckydata wrote:
             | You should try actually reading the paper.
        
         | dugmartin wrote:
         | Early in my career (mid-90s) I worked for a defense contractor
         | working on avionics for the F-22 and for GE working on a real-
         | time automation OS. Both used waterfall exclusively. The
         | defense contractor had a multi-year plan with monthly deadlines
         | that could not be missed and the same was true for GE but the
         | deadlines were more delivery based. At GE there were 400
         | engineers working on the overall project and we had a 40 foot
         | long wall where the GANTT chart for the project, generated by
         | MS Project, was taped to the wall - it was about 4 feet high.
        
       | ChicagoDave wrote:
       | I've been building software applications for 40 years. No matter
       | how you slice up the work, we all have to demonstrate progress
       | and goal achievement.
       | 
       | Agile, Scrum, Kanban, Method 1, or whatever are all meant to
       | measure success.
       | 
       | In a lot of cases there is a client or a customer that requires
       | regular progress reports. Management uses reports to measure team
       | performance.
       | 
       | I'm not sure what planet the OP is from, but this will never
       | change. If you have a small team with a simple codebase, kanban
       | is probably sufficient. In larger teams or complex solutions, the
       | reporting just needs to happen.
        
         | 015a wrote:
         | I don't feel anything you've said is logical. The deliverable
         | _is_ , in the best case, what communicates progress and
         | success. Short of that, tickets can do that, which is also not
         | what the article is complaining about. The article also
         | specifically attacks Agile/Scrum; Kanban is different and quite
         | explicitly sidesteps a lot of the stress problems the article
         | outlines.
        
         | BurningFrog wrote:
         | > _Agile, Scrum, Kanban, Method 1, or whatever are all meant to
         | measure success._
         | 
         | In the agile teams I've been on it's been to _produce_ success.
         | Getting good and useful software fast.
         | 
         | Of course, just like there are hundreds of wildly different
         | Christian sub-religions, there are now any number of "agile"
         | interpretations. In the end belief systems can be pushed to do
         | most anything you want.
        
         | gridspy wrote:
         | The post is fundamentally about all the performance of making
         | stories, assigning points, allocating work and doing standups
         | all the time. None of that is required to actually create
         | software.
         | 
         | If people are judgemental around what stories are left
         | uncompleted or points / week then the situation can become
         | stressful for no benefit to anyone.
        
           | bruce511 wrote:
           | >> None of that is required to actually create software.
           | 
           | Agreed. (Assuming you mean "create" as in write, as distinct
           | from create as in get funded.)
           | 
           | >> If people are judgemental around what stories are left
           | uncompleted or points / week then the situation can become
           | stressful for no benefit to anyone.
           | 
           | Clearly no stress is better. But these things create stress
           | in the other direction too. Slower than expected progress,
           | the existence of "intractable problems", work going
           | unfinished creates significant stress up the ladder.
           | 
           | In a perfect world the dev team is given a perfect spec, and
           | a reasonable time to do it in, and after being "left alone"
           | they deliver the finished product on time.
           | 
           | Given that that world doesn't exist, given that the "money
           | we're spending" may turn out to be completely wasted (because
           | the spec was wrong, or because the problem us much harder
           | than anticipated), the ideal case seems unlikely to happen.
           | 
           | I say this not as a defense of crappy management processes,
           | or even less as a defense of crappy managers, but rather in
           | the spirit that understanding the problem goes a long way to
           | solving it.
           | 
           | And yes, many places have bad processes and bad middle
           | managers. I don't envy you that. But finding a way to better
           | solve the manager's problem typically improves the
           | relationship.
        
             | Aeolun wrote:
             | > Agreed. (Assuming you mean "create" as in write, as
             | distinct from create as in get funded.)
             | 
             | You are essentially saying "Shit is bad, give up on it ever
             | improving."
        
               | bruce511 wrote:
               | Not at all. Quite the opposite. To improve the situation
               | you first need to understand it.
               | 
               | It seems to me that most devs don't understand the root
               | problem, so they both don't understand, and don't
               | constructively improve the current solution.
               | 
               | Improvement is not "leave me alone". Improvement is
               | finding efficient ways to remove stress from higher-ups.
               | Because stress rolls downhill.
        
               | ozim wrote:
               | I would not say most devs.
               | 
               | I think ones that are against scrum are loud about it on
               | the internet.
               | 
               | When it comes to have their salary paid out they will not
               | speak up for themselves to push back against shitty
               | management.
               | 
               | Like accepting ever increasing velocity until they burn
               | out or accepting bad requirements because business is
               | sayin "it needs to be done now" and working blind only to
               | be scolded they did bad but requirements were bad in the
               | first place.
        
               | relaxing wrote:
               | > Improvement is finding efficient ways to remove stress
               | from higher-ups.
               | 
               | How about gym memberships and mindfulness exercises?
               | 
               | Is the rise of Agile tied to the demise of the three-
               | martini lunch?
        
               | Viliam1234 wrote:
               | > Improvement is finding efficient ways to remove stress
               | from higher-ups. Because stress rolls downhill.
               | 
               | The stress at the bottom is there by design. If you start
               | meeting the deadlines too reliably, the higher-ups will
               | probably conclude that there are needlessly many people
               | in the team, and will try to remove one and see what
               | happens. Repeat until things start cracking apart.
        
               | bruce511 wrote:
               | I guess that depends on your management. I've not
               | experienced that myself, but I'm sure there are places
               | where it happens.
        
               | Viliam1234 wrote:
               | In one of my previous jobs, I worked on a software
               | project that frequently got the following two kinds of
               | comments from the managers:
               | 
               | "Wow, this is the only project in our company that works
               | reliably. There are no major bugs ever; and all the small
               | bugs are fixed within a day or two. I wish other projects
               | worked like that."
               | 
               | "You have _five_ developers working on one project? Isn
               | 't that too much?"
               | 
               | Seemingly none of them was able to connect the dots and
               | conclude that maaaaaybe these two things are somehow
               | related. That maybe the fact that we are _not_
               | understaffed somehow allows us to write automated tests,
               | refactor when necessary, etc., so we can keep adding new
               | features as required and the project keeps working ok.
               | 
               | So they started removing the developers one by one,
               | moving them to other projects. The last guy left on the
               | project felt overloaded and quit.
               | 
               | The project still worked okay for a few years without new
               | updates, and was gradually replaced by several new
               | projects (because it had a lot of functionality). But the
               | new projects only had two developers each on average, so
               | at least the managers didn't feel like they were wasting
               | money.
        
               | kledru wrote:
               | I must say you are the first one convincing me the other
               | side of the coin does exist.
        
               | noisy_boy wrote:
               | > Improvement is finding efficient ways to remove stress
               | from higher-ups. Because stress rolls downhill.
               | 
               | Good luck with that because higher-ups have even-higher-
               | ups until you reach the top. The bigger the pay packet,
               | the more inflated the lifestyle and the associated stress
               | of missing on the ever ballooning target. It is self-
               | inflicted and never-ending; sacrifices of the lowly
               | soldier will never quench that thirst.
        
           | ako wrote:
           | Scrum/Agile is basically an answer for things that went wrong
           | in the past. Building software has a long history of delays,
           | running over time, running out of budgets, etc. As a
           | stakeholder/customer, you need certainties up front: how long
           | is it going to take, what is it going to cost? And if you
           | think this isn't reasonable, just consider, would you hire a
           | contractor to work on your house that can't tell you up front
           | cost and duration?
           | 
           | Anybody doing work needs to be able to estimate duration,
           | progress, risk of delays, etc. Other people's work depends on
           | your deadlines. Go/no go of a project depends on cost and
           | duration.
           | 
           | Insight and tracking is required. None of this was done any
           | better before agile.
        
             | skydhash wrote:
             | What is required is frank conversation with the
             | stakeholder/customer, because there are so many trade offs
             | decision to make. Devs don't like to estimate tasks because
             | there's an exploration phase (which cost time an energy) to
             | have the solution and the cost of time and energy for the
             | implementation. And it's recursive. Agile was basically
             | saying, let the devs do their thing, but have a
             | conversation every once in a while to discuss new
             | directions to the projects based on new evidence found. And
             | unless the team have already built the same project (with
             | the same people involved), it will always be a bet. No
             | amount of tracking or insight will remedy that.
        
               | ako wrote:
               | Agile recognizes that software development is a design
               | process with uncertainties and not a repeated tested
               | manufacturing process (product development versus product
               | manufacturing). With the uncertainty of a design process
               | in mind, and the need for estimates, it suggests
               | comparing similar tasks to get an empirical estimate. But
               | since it's just an estimate, you regularly need to
               | validate that the estimate is still considered correct.
        
           | Double_a_92 wrote:
           | Stories = Requirements Engineering
           | 
           | Assigning Points = Roughly estimating how long it takes you
           | to implement it
           | 
           | Allocating Work = Well... allocating work
           | 
           | Standups = Talking with your colleagues about the current
           | work and clearing problems
           | 
           | Reviews = Showing your results
           | 
           | None of that seems unreasonable. The only thing that kinda
           | sucks are the rigid sprints, because they just cause
           | artificial stress by setting unnecessary deadlines.
        
             | skydhash wrote:
             | They're not unreasonable in themselves. What sucks is the
             | process around them, because it impedes progress. Why
             | because each tasks varies, and often it morphs while you're
             | working on it. So whenever a metric is fixed or something
             | interrupts you repeatedly, it just sucks.
        
         | nine_zeros wrote:
         | Progress is important. That's why you plan for large
         | milestones. There is no need for micro-ticket-story level
         | updates, tracking, and overhead.
        
           | ChicagoDave wrote:
           | Tell that to a large PM organization. They love tracking
           | minutia.
        
         | SoftTalker wrote:
         | Method 1? Wow talk about a blast from the past. Did you work
         | for or with Andersen Consulting at some point?
        
         | mtrovo wrote:
         | Yeah, I totally agree in theory, it doesn't really matter what
         | methodology you use, at the end of the day dev management is
         | just a means to an end.
         | 
         | The real issue comes from middle management folks who conjure
         | up buzzwords whenever they need to justify whatever they think
         | the team should do. Don't know how to structure tasks but want
         | to look like you're in control to the boss's boss? Just throw
         | up a Kanban board with tiny tickets and a burndown chart
         | trending down. Sprinkle in some Agile keywords in the
         | management reports and call it a day. And let's not forget that
         | by 'sprint' they often mean moving unfinished tickets from the
         | last iteration to the current one, plus tacking on surprise
         | urgent tasks that were not planned before because the product
         | owner never shows up to share their vision and priorities.
        
       | anothername12 wrote:
       | I'm getting performance measured based on number of tickets
       | completed and number of PRs merged per quarter.
        
         | Viliam1234 wrote:
         | I hope you make lots of small tickets, and a separate PR for
         | every commit, and a separate commit for every line of code.
        
       | jksmith wrote:
       | Unfortunately, we aren't understanding the intricacies of high-
       | performance. I've worked with maybe 150 scrum teams. 99% were
       | mediocre. Remaining 1% understood energy usage, how to limit what
       | they took into a sprint backlog, and how to manage their
       | capacity.
       | 
       | When I asked a manager about a particular team, he said "I don't
       | care if they do fight club in the morning, just let them keep
       | doing what they're doing." To reframe, high-performing scrum
       | teams are actually anti-legacy management, they get more done,
       | are happy (low energy state) and stakeholders were satisfied. So
       | their rolling sprint goal was taking a half day each month and
       | going to Top Golf . The key is, everybody on the team was a scrum
       | sme, and understood how to work the process as a team to
       | reinforce certainty and stability. They also didn't need a scrum
       | master.
       | 
       | I've got lots of anecdotes from this couple of teams, what kind
       | of work their managers actually did, and the sneaky ways they
       | made the process work for them. There's a lot more to scrum than
       | a certification. Just the teams approach to sprint planning was
       | in a whole different class from what mediocre teams normally did.
       | 
       | As for the other 99% of teams, they were mostly management tools.
       | Scrum had been co-opted, especially in orgs using the SAFe
       | framework. This has been at F250's in my experience btw.
        
         | TN1ck wrote:
         | I wonder if this team could have choosen any framework and it
         | would have worked, they just happened to use scrum. With the
         | founder mode discussions recently there was this saying akin to
         | "a successful process is a result of talented people" and not
         | the other way around. It stuck in my head and I feel this is an
         | instance of that. Although you definitely can force a process
         | on a talented team and have their productivity diminish.
        
           | jksmith wrote:
           | Agree. It's just that well understood scrum is a great
           | process for delivering certainty and stability, as proven by
           | lots of teams (provided they did scrum correctly).Just saves
           | energy to thoroughly vet the process before tossing it.
           | 
           | But first principle, this is a physics issue: Whatever way a
           | team comes up with to maximize the amount of work not done to
           | deliver the same or better outcomes, I'm all for it.
        
       | binary132 wrote:
       | This article hit really hard. I'm super stressed with my team's
       | cadence right now. I often think about what's pathological in
       | modern-corporate-scaled-agile-abominations and this really hits
       | the nail on the head, but I think for me the main complaint is
       | that if you can only see two weeks into the future, planning can
       | become very difficult.
       | 
       | I also often think of how our scrum process makes me feel like
       | I'm back in grade school doing little busywork projects like
       | coloring a hand-outline turkey or whatever. I really kind of
       | think that's the point. It's for people who never escaped the
       | schoolchild mindset. No doubt it works wonderfully well for them.
       | It doesn't work very well for me.
        
         | swergi0 wrote:
         | does your team not follow any sort of higher-level roadmap?
        
           | binary132 wrote:
           | people invested in scrum all think it's great
           | 
           | people who have to do the actual work don't.
           | 
           | you should pay attention to that
        
       | lispisok wrote:
       | One of my favorite moments was when my non-developer friend at a
       | tech company asked me what scrum masters did because she could
       | not figure out what the scrum masters did at her company. I told
       | her the answer which is nothing.
        
         | n_ary wrote:
         | Schedule meetings, move tickets around, moderate meetings, call
         | more meetings, scold misbehaviour during meetings, help
         | management with their stuff(secretary/personal assistant?),
         | scold other teams for not helping out in time, question about
         | stale tasks(tickets), act as coordinator of
         | news/requests/demands from other teams, attend all meetings
         | which involve tickets, coerce/seduce other teams to deliver
         | something early because our team has messed up, promote more
         | scrum agile topics. At least that is what I observed at my
         | work. They indeed do a lot of work but often not well defined.
        
           | meheleventyone wrote:
           | Scrum Master is a terrible name though, in games we call this
           | role a Producer but I agree they do a lot of often unseen and
           | very useful work.
        
           | lispisok wrote:
           | I cant tell if you're making fun of or trying to justify
           | scrum masters
        
       | 015a wrote:
       | One hill I will utterly die on: Many people (including some in
       | these comments) are fully able and happy to go their entire
       | career mistaking high performing individuals with a high
       | performing work framework.
        
         | Aeolun wrote:
         | Because for high performing individuals the framework doesn't
         | really matter? Most people aren't high performing, so they're
         | designed to get the best out of the mediocre ones.
        
           | n_ary wrote:
           | On the contrary, I'd say frameworks can't set its claws on
           | high performing "politically influential" individuals because
           | they are fairly powerful. In most cases, majority people are
           | high performers but crippled by the frameworks due to power
           | imbalance.
        
       | fulafel wrote:
       | Every post about "Scrum sucks" has comments about how you are
       | doing agile wrong. I don't see any yet so as the devil's
       | advocate:
       | 
       | You're supposed to have autonomous teams who put up their own
       | tasks they want to complete in the sprint, and the sprint length
       | can be more than 2 weeks if the team wants. And if it's tight to
       | get the scrum's tasks done, that's supposed to be feedback to you
       | and the team. You have autonomy in setting sprint goals, you can
       | put less stuff on a sprint so you have the slack you're supposed
       | to between sprints. Or spend more effort refining so you don't
       | get surprises so often. (Or otherwise change things up in how you
       | work)
       | 
       | If you don't have the autonomy and the continuous improvement in
       | your work culture, it's not agile. Scrum is for agile and it
       | doesn't work otherwise. If you do have autonomy you can switch to
       | something else from scrum if you want.
       | 
       | Same goes for the "scrumfall" part of course but that's admitted
       | in the text already.
       | 
       | (I do think scrum is overengineered for agile ideals, has failure
       | modes like in the post, and in 95% of cases you should do
       | something lighter than scrum)
        
       | mortify wrote:
       | There's truth to the ScrumFall design process which is inevitable
       | for most development processes. It's not just that a tool needs
       | to be marketed, but that it needs to be integrated with work from
       | multiple teams and other processes. What ScrumFall does is
       | provide some level of feedback prior to delivery. In the age of
       | Waterfall, devs would develop until they said they were done,
       | we'd get to delivery and UAT only to find that key features work
       | differently than expected and continually extend the release date
       | by months or years until it finally goes out the door more from
       | frustration than actual completion. That stress level would be
       | pegged at 10 for months until it was completed.
        
       | bamboozled wrote:
       | What I dislike about SCRUM specifically is that if you're having
       | a rough week at home, recovering from illness or you just have
       | things to do outside of work, you can't really just have an easy
       | week and make up for it later on. It's a kind of constant grind
       | and we always have a way of "filling up" our sprint. If we don't
       | meet our target, it always feels like a fail. I know it shouldn't
       | feel like that but it's human nature.
       | 
       | Maybe having "easy" sprints would work?
       | 
       | There are benefits too, just that constant grind aspect is why I
       | believe it's mostly a temporary endeavor. After 6-12 months most
       | teams seem to just do something else then come back to it once a
       | new manager joins.
        
         | Aeolun wrote:
         | I just completely ignore sprints, or sprint/standup meetings.
         | Somehow it works well enough that nobody has called me out on
         | it yet.
         | 
         | If they all want to waste 2 hours a day, more power to them.
        
           | Pet_Ant wrote:
           | If your stand-up meeting is more than 15 minutes long you are
           | doing it wrong. It's called stand-up for a reason.
           | 
           | https://scrumguides.org/scrum-guide.html#daily-scrum
           | 
           | > The purpose of the Daily Scrum is to inspect progress
           | toward the Sprint Goal and adapt the Sprint Backlog as
           | necessary, adjusting the upcoming planned work. The Daily
           | Scrum is a 15-minute event for the Developers of the Scrum
           | Team. To reduce complexity, it is held at the same time and
           | place every working day of the Sprint. If the Product Owner
           | or Scrum Master are actively working on items in the Sprint
           | Backlog, they participate as Developers.
           | 
           | If what you are doing doesn't match that, then it's not a
           | Scrum stand-up.
        
             | randomdata wrote:
             | _> If what you are doing doesn 't match that, then it's not
             | a Scrum stand-up._
             | 
             | You must have stopped reading too soon.
             | 
             |  _" The Daily Scrum is not the only time Developers are
             | allowed to adjust their plan. They often meet throughout
             | the day for more detailed discussions about adapting or re-
             | planning the rest of the Sprint's work."_
        
         | siva7 wrote:
         | The sprint goal is a team target. If you're sick that shouldn't
         | endanger the sprint goal because anyone in the team can pick up
         | any work. Of course in mediocre or low-performing teams that's
         | almost never the case but still not the fault of a product
         | framework
        
           | jacknews wrote:
           | This seems like a disingenuous answer to me - the rest of the
           | team will take up the slack? And if they can't they must be a
           | low-performing team?
           | 
           | The OP may have some things wrong, but the 'constant grind'
           | aspect of scrum sprints is spot on, there is no slack.
           | 
           | Add to that the 'radical transparency' aspect of scrum. That
           | works great among a tight-knit team, but it can be insidious
           | and actually self-defeating when certain types of manager get
           | involved and weaponize it.
           | 
           | I'm sure there are many people who love programming, but hate
           | being a programmer as a job, and to some extent that has
           | always been true, but scrum seems in many cases to make it
           | much, much worse, IMHO. The attitude displayed here is
           | exactly the problem.
        
           | JansjoFromIkea wrote:
           | This doesn't apply for pod-based systems though, does it?
           | They were everywhere for years there and are still very
           | common. Basically by definition there's only one or two
           | people that can do each task.
        
           | throwaway89988 wrote:
           | What you say works 100% for trivial CRUD applications. Which
           | is also, where SCRUM is still a bad framework, but at least
           | SCRUM works on this trivial level of software development.
           | 
           | When a project is about non trivial projects, people,
           | especially developers can not be easily replaced, because no
           | one can replace a specialist with several years of experience
           | on the spot. What I can archive in one day and what somebody
           | else can archive on a day highly depends on what it is. Write
           | a field to the database? Works. Write a rule engine? I'll
           | probably be a factor of 10x more productive than an average
           | developer. Write some GUI/CSS? A frontend developer is 10x
           | more productive than me.
        
         | freedomben wrote:
         | > _If we don 't meet our target, it always feels like a fail. I
         | know it shouldn't feel like that but it's human nature._
         | 
         | It definitely is human nature, and beyond that we're so trained
         | to focus on goals and take them seriously that the "sprint
         | goals" actually feel weaponized to me in order to get people to
         | self-motivate/drive themselves. In the Scrum world engineers
         | are fungible, so if one burns up or stops performing, you just
         | replace them with a new one.
         | 
         | Also that "rough week at home" is going to show up on metrics
         | for a very long time. A good manager understands the ebb and
         | flow, but many do not. It also doesn't help that the Certified
         | ScrumMaster(r) people will put so much emphasis on smoothness
         | and consistency, and when it doesn't happen there's always
         | someone/something to blame. When you remove the context (like
         | team lead who knows what happened) and put it in a quarterly
         | chart for upper management, you get a lot of bad and counter-
         | productive conclusions.
        
       | phtevenf wrote:
       | Out of the 8 companies I've worked at as a product engineer, the
       | most successful framework to deliver tangible results has been
       | Basecamp's Shape Up approach. Engineering managers always ask
       | "how many days" of effort when the real question they should be
       | asking is "how much appetite"/"how long do we want to spend" on
       | the particular product/feature we want to build? The Shape Up
       | framework was the only time I didn't feel constantly stressed and
       | it actually provided time to cooldown between the six week
       | cycles. And the fact is it actually led to very successful
       | product deliveries consistently. For those interested here's a
       | link to it https://basecamp.com/shapeup/0.3-chapter-01.
        
       | szundi wrote:
       | While I think the part about neglecting support became true at my
       | org, I didn't forget how awesome E V E R Y O N E felt about Scrum
       | when we started. It lasted for 1-2 years. All the devs and
       | everyone loved it. So... then why?
       | 
       | Because it brought a kind of order to the game. Story points
       | worked. They became boring so the teams started to twist them.
       | 
       | I think Scrum loses its advantage when people get bored - like
       | with any other "process".
        
         | freedomben wrote:
         | I remember that as well, but I think scrum lost it's advantage
         | once it was co-opted as a metrics and management tool, and by
         | people looking to make a career out of "managing." That's the
         | point at which it started shifting to being imposed on the team
         | rather than offered as a tool to the team.
        
       | irrational wrote:
       | I refuse to stress about it. If I don't get the things done in
       | the time allotted by the points, oh well. If I don't get them
       | done by the end of the sprint, oh well. And, while my manager
       | might bring it up in one-on-ones, I've never seen any
       | consequences from not stressing about trying to meet artificial
       | deadlines.
        
         | 20240915 wrote:
         | I have had consequences for not cranking out work fast enough.
         | Usually PIP or PIP-larping processes are run. I then resign
         | find another gig.
        
         | morningsam wrote:
         | Same here. I _have_ become stressed about deadlines that were
         | actual deadlines imposed by external dependencies (e.g. API
         | deprecation) or stakeholders (e.g. launch of feature needs to
         | be coordinated with efforts in other departments), but never
         | about  "deadlines" I've just had a hand in making up out of
         | thin air myself during sprint planning.
        
       | justanotherjoe wrote:
       | I think what people really want is not agile, not waterfall, just
       | to do it in a way that feels natural. No framework. Pretty case-
       | by-case. How I imagine Lao Tzu would have it. Roll your eyes but
       | it's true though.
        
         | oneshtein wrote:
         | Individuals and interactions over processes and tools.
         | 
         | Working software over comprehensive documentation.
         | 
         | Customer collaboration over contract negotiation.
         | 
         | Responding to change over following a plan.
         | 
         | https://agilemanifesto.org/
        
       | kkfx wrote:
       | People like to forget a thing: Kanban, which is the scrum
       | "ancestor", was designed for FACTORY MASS PRODUCTION of already
       | designed parts, not for designing new ones, on other words it's a
       | system that works only if what you do is pre-defined, does not
       | demand much intellectual, creative activities and anything it's
       | well known in advance.
       | 
       | Applying it to creative activities is a classic application of a
       | religion to a society blindly believing it's universal. It's not.
       | That's the substantial stress.
        
         | oneshtein wrote:
         | Continuous delivery IS mass production.
        
           | senko wrote:
           | If a factory is producing N widgets, every widget is the
           | same. If a software teams are producing deliverables, each is
           | different.
           | 
           | Kanban (originally) is an method of sending purchase orders
           | (ie requests to make widgets of specific type in some
           | quantity) from the team(s) who need them to the teams who
           | make them.
           | 
           | In software, quantity is always 1 and while the "widgets"
           | have notionally been designed (specced out in the ticket),
           | they have never been built before, unlike in the factory
           | where every widget at least had a test run before.
           | 
           | That is, Kanban in software development is a cargo cult from
           | Toyota in which an essential difference (time to reconfigure
           | the assembly line for another widget, vs time to design,
           | prototype and test the widget) has been lost.
           | 
           | And it STILL works better than Scrum.
        
             | oneshtein wrote:
             | Kanban was invented for Just-In-Time factories, where each
             | product item is customized to meet demand, so fewer things
             | can be predicted in advance, thus making Waterfall
             | unsuitable. Kanban allows to achieve both the flexibility
             | of customization and cost effectiveness of mass production.
             | 
             | In software development, incoming requests are broken down
             | into _small_ manageable tasks, which are familiar enough
             | for developers to estimate reliably. Then this continuous
             | stream of small tickets is executed continuously (Kanban)
             | or in sprints (SCRUM).
             | 
             | For example, request to add feature X can be broken down
             | into <<Make UI for feature X>> and <<Make backend for
             | feature X>>. If they are still large, they can be broken
             | further, for example <<Make a CRUD for feature X.y>>,
             | <<Make a SQL table for X.y with migration script>>, and so
             | on.
        
               | senko wrote:
               | > each product item is customized to meet demand
               | 
               | No, each product run is customized. Products are already
               | known and fixed (they have been built before, with the
               | same specs), the demand is unknown (in advance). There is
               | a subtle difference between this and your "make CRUD for
               | xyz", where XYZ is always something different (if it
               | wasn't, we'd just reuse the thing we wrote the last
               | time).
               | 
               | I would encourage everyone to read a book about TPS (The
               | Toyota Way is a good one), and compare/contrast that with
               | Kanban as an agile software methodology.
        
         | marcosdumay wrote:
         | Well, it's worth pointing out that the only thing factory
         | kanban has in common with software development kanban is the
         | existence of some artifact called "kanban". What was probably a
         | publicity stunt to use the hype of the other kind, kinda like
         | Java and JavaScript.
        
       | itronitron wrote:
       | In my experience, Agile methods give power to non-developers
       | which can be a good thing or bad thing depending on the workplace
       | and the individual behavior or perspective of participants.
        
       | nineteen999 wrote:
       | Daily standups are horrendous. I don't know how people put up
       | with that level of time wastage and micromanagement.
        
         | Instantix wrote:
         | It can be very useful at the start of a project to synchronize
         | everyone but the over use of it can clearly be a problem.
        
         | fernandotakai wrote:
         | the "daily" part is what kills me, specially because saying "no
         | updates" feels super bad, like you are slacking-off.
         | 
         | i would be totally fine with twice a week (mondays so we can
         | sync up and see what's being done throughout the week) and
         | maybe fridays.
         | 
         | as a tech lead that has to lead standups daily, it's
         | frustrating.
        
         | grumblehound wrote:
         | I didn't mind our daily standups at the last place. They were
         | usually short (10-15) mins. It was all the bullshit and
         | developer grovelling at the end of the sprint, and the lack of
         | allocated time to actually plan future work, that was the
         | problem. I saw people time and time again cutting corners to
         | meet their imaginary deadlines. I'd get sent PR's to review
         | after hours by people in different teams the day before scrum
         | deadlines. It was insane.
         | 
         | The standups themselves were fine and actually I thought they
         | were pretty helpful, especially during covid times.
        
         | randomdata wrote:
         | The problem with standups is that usually the wrong people are
         | talking.
         | 
         | I don't give a rat's ass about what other developers are doing.
         | I either already know by virtue of having to work with them, or
         | they are entirely disconnected from my work and so what they
         | are doing doesn't really matter.
         | 
         | What I really need to know what the managers and executive are
         | doing. That has the most impact on my work. Yet, strangely,
         | they almost never want to share.
        
       | wg0 wrote:
       | >With sprints, there are no breaks, little autonomy, and
       | insufficient time to prepare.
       | 
       | That's the TLDR and on the dot.
        
       | ranjanprj wrote:
       | Agile/Scrum and all forms of project management is a scam you
       | should work in layers serving layer above, have wbs and tasks
       | assigned out of it in your layer, justifying urgency by impact on
       | business/users, reward people who accept and close most tasks by
       | appreciation and break. And fire anyone who misbehaves.
        
         | 20240915 wrote:
         | Is this satire?
        
           | n_ary wrote:
           | I believe, they are describing real world consequences of
           | scrum/agile and how real management uses it, which might be
           | different from what the manifesto actually hoped.
        
       | Too wrote:
       | This guy has clearly never worked waterfall, the progress bar
       | doesn't look at all like in the graph. Instead, there are even
       | more milestones throughout the project. Granted, they are usually
       | spread out further than every 2 weeks, there is no such thing as
       | just one final deadline where you can slack the first half of the
       | project.
       | 
       | Month 1: Specifications need to be frozen, because month 2 all
       | the test plans need to written, so that month 3 all the test
       | cases can be implemented. Then month 4 all code should be written
       | and month 5 we put everything together to test it. Hoping that
       | what you wrote down half a year ago is still relevant and the
       | most important thing to work at now. Add a complex web of
       | dependencies to other teams on a gigantic gantt-chart with fixed
       | dates and you will have deliveries regularly anyway.
       | 
       | Usually, by month 2 you are already overdue on the first
       | milestone. The time plan is not going to shift because of it.
       | Meaning you now have even less time to meet the second deadline,
       | obviously it will be missed, repeat throughout the remaining
       | milestones, resulting in constant stress throughout the project.
       | 
       | That's not to say that the graph doesn't exist, its just not
       | called waterfall. It's longer deadlines with more autonomy
       | between.
        
         | freedomben wrote:
         | > _This guy has clearly never worked waterfall, the progress
         | bar doesn 't look at all like in the graph. Instead, there are
         | even more milestones throughout the project. Granted, they are
         | usually spread out further than every 2 weeks, there is no such
         | thing as just one final deadline where you can slack the first
         | half of the project._
         | 
         | You are misreading the graph and then taking your own bad
         | reading and projecting uncharitably on the author. Nowhere did
         | he say that you can slack the first half of the project. Also,
         | I know the author and I know that he _has_ worked waterfall, so
         | your conclusion isn 't even accidentally correct.
         | 
         | Look at the Y-axis. It's measuring _stress_ , not
         | effort/work/slack/etc.
         | 
         | Also, the graph itself refutes your conclusion that it is
         | representing only one single "milestone." Notice the graph
         | falls after achieving the milestone, and then begins again.
         | It's a continuous cycle.
        
       | drzzhan wrote:
       | I learned scrum back in college and I hated it so much. I
       | remember we had to meet 2-3 times a weak. And for each meeting we
       | had to present something, with slides as well. We spend more time
       | thinking about usercase than writing the code. I guess that's
       | good in its own way but honestly I don't have such superpower to
       | report something new every meeting. In fact most of my meeting
       | back then were "I am still coding X" and that was it, then the
       | scrum master or the leader would talk about big picture over
       | again.
        
       | mrsaint wrote:
       | When challenged why we'd scrum since we were doing better as a
       | whole before (better products, happier devs), mgt replies that
       | they'd need scrum to detail the work we did so that they could
       | write longer bills to the clients.
        
         | freedomben wrote:
         | Wow, that's remarkable honest of them! I actually respect and
         | appreciate that a lot more than I would some BS about it being
         | for your own good or whatever.
        
       | VeejayRampay wrote:
       | there has never been a conclusive study about the actual
       | usefulness of those things, the agile, the scrum, etc.
       | 
       | as such, it's more akin to something like litho therapy or
       | astrology, that is what's stressing me out
        
       | al_borland wrote:
       | I was less stressed when doing scrum. When a new VP came in and
       | tossed it out, he didn't replace it with anything. The void has
       | been filled with chaos, where our priorities change based on who
       | the last person to speak was. I'll take scrum over chaos any day.
        
       | vannevar wrote:
       | There are several flaws in this article's arguments, but the
       | central one is easily revealed when you ask this question: why is
       | there a big spike in stress for the "waterfall" project?
       | 
       | The answer is that as the deadline nears, the team realizes that
       | they have not made enough progress to meet the deadline. They
       | must work longer hours, start cutting corners, and toss out
       | features at the last minute. All of this is extremely stressful.
       | It's also a cascading problem on bigger projects where this
       | team's product is a subsystem that subsequently has to be
       | integrated into a bigger platform, because they may have broken
       | compatibility at the last minute to make their deadline.
       | 
       | Contrast this with scrum, where the team collaboratively sets
       | goals on a regular basis and regularly monitors the work
       | remaining and the rate at which they are progressing, so that
       | they know early whether they need to start making trade-offs or
       | adding people to the team. As the author notes, this trades peaks
       | of extreme stress for a predictable (and manageable) medium level
       | of stress. But it also ensures a more consistent and panic-free
       | delivery process.
       | 
       | The problem of burnout is a separate issue. Neither scrum nor
       | waterfall offers a solution to burnout---that is up to the team's
       | management. Nothing in scrum prevents a team from taking breaks
       | from sprints, either as a team or individually.
        
         | uldos wrote:
         | Why do you assume that its devs who are slacking in waterfall?
         | Devs enjoy deving, usually there are either discoveries during
         | execution or change of mind of client or pms figure out that
         | their guestimation for year ahead was not exact. Surprise,
         | surprise and who is going to have crunch time? Devs of course.
        
           | vannevar wrote:
           | I didn't say they were slacking, but they may be working on
           | the wrong things, or prematurely optimizing things at the
           | expense of other priorities. Ironically, it's the author who
           | suggests implicitly that devs can slack more in waterfall
           | ("Sprints never stop").
           | 
           | Since the client is involved in every sprint, any change of
           | mind they have during the development process (and keep in
           | mind that changes of mind are a virtual certainty in either
           | case)is at least better informed than if the touchpoints were
           | much less frequent (or as is too often the case in waterfall)
           | all back-loaded towards the end of the project.
           | 
           | Does scrum eliminate crunch time? Of course not. But if it's
           | done well, the impact is minimized because there has been so
           | much more opportunity for course correction throughout the
           | project.
        
             | skydhash wrote:
             | It's that culture of fear that I don't understand: devs
             | working on the wrong thing. More often than not, it usually
             | means: Is the dev spending more time than me (who is not
             | doing the work) is willing to give him? Every professional
             | understands priority and expectations. And communication is
             | all that is required. But PM usually don't understand the
             | nature of software development and fear of losing control
             | (the bad ones). The good ones just let people work after
             | they made it clear what should be worked on.
        
       | jakub_g wrote:
       | The forever-sprinting approach indeed is unmanageable long term.
       | 
       | In my prev job we used to have a cycle of 2-3 sprints followed by
       | 1-2 weeks of rest (to handle tech debt etc.)
       | 
       | In other companies it could be named "innovation week" or
       | something similar.
       | 
       | I still didn't love this, precisely due to always wanting
       | tangible deliverables within 1-2 weeks, while sometimes you just
       | need more time to think clearly about some problem.
       | 
       | We partially mitigated it though by explicitly stating whether a
       | giving story is "delivery" or "discovery", the latter being used
       | to better understand the scope of the problem, current status
       | quo, validate assumptions etc.
        
       | satisfice wrote:
       | This was evident fron the beginning. The mystery to me is why was
       | this adopted as the default way of working?
        
       | Viliam1234 wrote:
       | On a related topic: Why reading discussions about Scrum is
       | stressing me out.
       | 
       | Unlike most people here, I have read the Scrum Guide
       | https://scrumguides.org/scrum-guide.html and I actually worked in
       | a team that did Scrum almost by the textbook. And it was a great
       | experience! But then higher management decided that the entire
       | company needs to switch to "Scrum", so we were told to stop doing
       | what we did, and switch to the corporate version of "Scrum"...
       | which was exactly the kind of experience most of you are
       | complaining about. (Then, gradually, the disappointed developers
       | quit.)
       | 
       | The sad truth is that managers do what managers want to do. They
       | may be happy to adopt a new buzzword, but they will keep doing
       | the same old thing. Anyone who says "agile is great but scrum
       | sucks", please realize that it's merely because managers decided
       | that "scrum" will be their favorite buzzword. If tomorrow they
       | decide that "agile" is their favorite buzzword, soon HN will be
       | full of people saying "agile sucks". You should be happy that
       | "agile" is not a popular buzzword, because it means you still
       | have something to dream about.
       | 
       | In other words, it is not the fault of the Scrum process being
       | somehow incorrectly designed. It is the fact that the design does
       | not matter in practice, because almost no one is going to follow
       | it anyway! It's the same thing as with ISO 9001 -- most companies
       | have the certificate, but when you actually read the standard,
       | you will find out that it does not resemble what actually happens
       | in your company at all. You can't fight against people who decide
       | to use the name of your idea, but ignore the content; which is
       | the standard thing that happens in companies.
       | 
       | If I was a manager, I would probably be happy when people say
       | "Scrum sucks", because it means they are looking in a wrong
       | direction. It's the way how companies are managed that sucks.
       | Scrum or no scrum; agile or no agile; ISO or no ISO; the buzzword
       | or a different buzzword... it's still the same thing, we are just
       | pretending that it is something else than it was yesterday.
       | 
       | Back to the article:
       | 
       | > There is no time to breathe, no time to collect yourself.
       | 
       | First, let me ask you: who decides how much work you should do in
       | a sprint? Because if that person is you, they you only have
       | yourself to blame if as a result you have no time to breathe, and
       | you keep making the same mistake over and over again. Why don't
       | you discuss this at the retrospective?
       | 
       | Ah, let me guess. It's the management who decides how much you
       | should do, and when are the deadlines. But they generously let
       | you choose whether you do A in the first sprint and B in the
       | second one, or the other way round. Or they let you do the cute
       | game of poker planning or whatever, and then say: anyway, you
       | must have all of this ready by the end of the month.
       | 
       | Also, let me guess: you probably have no retrospective, because
       | those are just a waste of time. No one is going to listen to your
       | feedback anyway, so what's the point?
       | 
       | > If a development team were to sit down and decide to deliver
       | code every two weeks, based on a process of their own design
       | 
       | Okay, let me stop you right in the middle of the sentence: it's
       | not supposed to be two weeks! Two weeks are for beginners; for an
       | experienced team, three weeks are generally recommended, but
       | anyway that is a thing that the team should decide during the
       | retrospective! Which you probably don't have, because no one is
       | going to let you decide anything about the way you work.
       | 
       | This may seem like an unimportant detail, but it's a red flag. If
       | the management tells you it has to be two weeks no matter what,
       | you don't really need more evidence that their "Scrum" has very
       | little in common with the Scrum according to the textbook.
       | 
       | > Every aspect of a sprint is prescribed: its duration, its
       | meetings, its tasks, and even the roles of its participants.
       | 
       | Yes. Specifically, the meetings are prescribed to be short. And
       | the managers... wait, there are actually no managers in Scrum.
       | And no, it's not because they were renamed to "Scrum masters" and
       | "Product owners" and whatever. Those are completely different
       | roles. The product owner should actually be someone from the
       | customer's company. And the Scrum master is not supposed to be
       | your boss.
       | 
       | So, yeah. Every aspect is prescribed... and then ignored
       | regardless.
       | 
       | > This happens because no time is set aside for proper
       | engineering prep work. There's far more to a task than simply
       | typing out a solution.
       | 
       | Exactly. So why don't you put the prep work as a task in your
       | sprint?
       | 
       | Ah, let me guess: your manager said no. So much for self-
       | organizing.
       | 
       | > The only remedy is to restore autonomy and professionalism to
       | software development.
       | 
       | Ah yes. If only there was some system that would say "no more
       | managers; the developers decide for themselves how long the tasks
       | are going to take; the meetings should be 5 minutes at most; and
       | every few weeks the developers will reflect on whether they are
       | happy with the rules, and will adjust them if needed". If only.
       | 
       | I am sure your manager would allow you to do so. As opposed to
       | e.g. using the name of your system as a buzzword, and saying
       | "yes, we will do it... but we will do it my way: the managers
       | will stay, you will be told what to do and how long should it
       | take, the meetings will remain long, and the company is not
       | really interested in your feedback. But we really like the name
       | you invented for your system, so from now on our company will be
       | using it officially. If someone later complains on Hacker News,
       | we will tell them it was all your idea."
        
       | yqtjnvou wrote:
       | Scrum is useless.
       | 
       | it's just another method of demanding results. Where there isn't
       | anything to tell, you shouldn't be forced to do so. All this
       | imbecility does is to create competition, and weed out the ones
       | that don't comply.
       | 
       | I've worked in teams where we were forced to have something to
       | report even when nothing was to report. This made the team create
       | "things" to match their daily scrums, because the truth might get
       | you fired..
       | 
       | Those that actually do work, have nothing to say in these scrums.
       | It's a fact.
       | 
       | Intellectual work is never measured.
        
         | ath3nd wrote:
         | > All this imbecility does is to create competition, and weed
         | out the ones that don't comply.
         | 
         | This ten million times. It's about control, and it's about
         | showing you that the only way to be considered to be doing your
         | job, is if you abandon all dignity, and allow yourself to be
         | treated as a child.
         | 
         | The adults (POs and managerial folk) are making your planning,
         | your regime, you constantly report to them them what you are
         | busy with, you summarize what you learned last week and what
         | you'd be doing today, and you present to them your paintings
         | for evaluation. It's so degrading and humiliating, but that's
         | by design!
        
       | Kalanos wrote:
       | Normalize 3 week sprints. Enables the team to do what they need
       | to do. Less planning overhead. Enables the product manager to be
       | more forward-looking and spend more time focused on customers/
       | market research.
        
       | spacecadet wrote:
       | Ive mainly work at startups and as a consultant/sub-contractor
       | and have encountered many implementations of agile and waterfall.
       | One place I consult for, and this is not a defense of agile just
       | an observation of some good in what this shop is trying to do,
       | well this place handles sprints as "multi-week" (defined by the
       | team up front, weighing factors like; are we blocked by client,
       | complexity, etc). The projects are still more or less waterfall
       | with a client deadline at the end (They are mostly fixed
       | scope/budget after all), and the only sprint deadlines are
       | periodic client demos that have no expectations (progress check
       | ins, see what we did, yay). The teams here only seem stressed in
       | the old sense, right before the end. They often joke and call it
       | agilefall, with the agile part intended to force teams to share
       | progress and collect progressive feedback. As well as hold other
       | internal meetings like sprint plannings (really just team
       | checkins, are we blocked? should we start this vs that, have we
       | learned something, etc) and retros (also just checkins, how we
       | feeling? are people butting heads, etc). My biggest gripe with
       | them is that no one takes responsibility for any form of ticket
       | management and it can be chaotic knowing who is actually doing
       | what day to day, requiring too many stand-ups and slack messages.
       | They try to map tickets to scope up front but no one moves them
       | along and they usually just follow the estimate document... since
       | all the subs are global and remote it would be awesome to just
       | check a board each day and dive into work instead of everyone
       | needing and hour at the ass crack of dawn, during dinner, or at
       | bed time, their local time...
       | 
       | Again, not saying this is my recommendation, but its definitely
       | not some feature-mill, even tho we are literally a feature-mill
       | as a fixed scope/fixes budget consulting shop, lol... not the
       | most interesting work, but pays well, low stress, and if I heads
       | down and get it done, I get tons of free time to do my own thing.
        
       | lasereyes136 wrote:
       | Interesting article and I have observed all of the situation
       | described in it.
       | 
       | I would like to point out that when agile, and even Scrum to some
       | degree, was introduced it was a way for people creating software
       | to take back control of a runaway process that prevented team
       | from doing their best work. It was a grassroots movement
       | championed by people invested in finding better ways to create
       | software that were less stressful and more successful.
       | 
       | Most of the issues in the article were coopted in Scrum to take
       | control of software creating back from the teams. Whatever
       | replaces Scrum, and agile, will need to learn from the mistakes
       | and compromises of Scrum or it will suffer the same fate as Scrum
       | and become a tool to force teams into a delivery model that gives
       | managers and executives more control while reducing their
       | accountability.
        
       | skrebbel wrote:
       | Back when Scrum was new I already wondered how it could make
       | sense to make developers be constantly sprinting. I mean it's
       | right there in the word choice. You can't sprint all the time! A
       | sprint is short and fast and then you rest. Making everything in
       | work life be only sprints is madness.
        
         | hawski wrote:
         | You rest at all the meetings.
        
           | skrebbel wrote:
           | Hahahahah i LOL'ed
        
           | gtirloni wrote:
           | If HN had a way to pin a comment, this would be the one :)
        
           | GoToRO wrote:
           | I hope this comment is sarcastic. Nothing is more exhausting
           | than having to hear people that have no clue about anything,
           | i.e. managers, speak.
        
             | randomdata wrote:
             | You're not supposed to pay attention.
        
           | datavirtue wrote:
           | The meetings wear me out and make me disengage the rest of
           | the day.
        
           | tjr wrote:
           | Especially the meetings which are held for the purpose of
           | planning more meetings.
        
         | freedomben wrote:
         | Heh, I say the same thing nearly every time a meta-discussion
         | on Scrum/sprints is had. As a former sprint-runner, it
         | irritates me to no end that nobody sees a problem with
         | sprinting all the time...
        
       | dbingham wrote:
       | It seems like HN has gotten one of these posts every month or two
       | for as long as I've been reading it (about 15 years now). They
       | always make me some combination of sad and angry, because they
       | almost always misdiagnose the issue.
       | 
       | Process isn't the enemy. The various named and defined processes
       | are just tools. It's all in how the tool is applied. And while
       | this post wrongly blames a process, it does get one thing right:
       | 
       | > If a development team were to sit down and decide to deliver
       | code every two weeks, based on a process of their own design--one
       | that made sense to them and suited their circumstances--that
       | would be one thing. [...] Autonomy--the ability to direct one's
       | own work--plays a significant role in how work is experienced.
       | 
       | The development team (which ideally includes design and product
       | as equal members) should be deciding its own process collectively
       | and with a high degree of autonomy. Scrum, Kanban, Scrumban,
       | Waterfall, "no process", these are just the defined and tested
       | tools we select from in deciding our processes. We can mix and
       | match them, draw from them as needed, or throw them out and try
       | something new.
       | 
       | But we as a development team should be deciding, together, what
       | process to adopt in order to achieve the businesses goals with
       | the resources and time as best we can without burning ourselves
       | out.
       | 
       | ---
       | 
       | I was a full stack IC for 10 years and an engineering manager for
       | 5 years.
       | 
       | I've done more or less all the processes. I'm currently back to
       | being an IC in an org where Product dictates exactly the
       | sprintless "no-process" this post is advocating and it is every
       | bit as stressful and bad as he's claiming sprints are.
       | 
       | The best team I've been on was one where we had full control of
       | our process. We started with scrum-like month long sprints, of
       | which the first week was planning week where we did deep dives on
       | our stories, wrote them up and ended the week with the scrum
       | planning ceremony and agile pointing. We used an "ideal day" as a
       | point to give our estimates some level of concreteness, but
       | largely stuck to our recorded velocity. And you know what? It
       | worked! We got surprisingly good at estimating and, while we were
       | never perfect, if we overran our sprints it often wasn't by much.
       | 
       | Planning week was definitely rough, and we eventually chose to
       | ditch it in favor of two week sprints with planning stories
       | worked into the sprint as needed. That worked really well too
       | (and I think that's my preferred process).
       | 
       | But the point was, we choose these processes. We ran these
       | processes. Our retros were vibrant and highly critical
       | discussions where we asked ourselves every sprint what was and
       | wasn't working and made changes.
       | 
       | When I became a manager, I carried this forward on my teams. We
       | iterated through the two week sprints with planning SPIKES, to
       | continuous flow kanban, and back to two week sprints with
       | planning SPIKES. When I became a manager of managers each of the
       | teams in my org choose its own process. One stuck with the scrum-
       | link, one adopted kanban, and one (the smallest) decided to throw
       | it all out and go with "no process". Each made their respective
       | process work. Each had different challenges, because no process
       | is perfect. Each continued to iterate on their respective
       | processes. And I worked with the leads - the manager and staff
       | engineer of each team - to form the cross team processes and
       | communication to ensure that each of these autonomous teams could
       | still collaborate.
       | 
       | Process is not the enemy. Process is just the structure of our
       | collaboration.
       | 
       | It becomes bureaucracy only when someone else is dictating that
       | structure and preventing us from structuring our collaborations
       | in the ways that best work for us.
        
       | dartos wrote:
       | Kind of off topic, but when articles have a "conclusion" section
       | nowadays it just screams chatgpt to me, even if chatgpt wasn't
       | involved at all.
       | 
       | I wonder what the tech blog meta will shape up to be in a couple
       | years.
        
         | whaleofatw2022 wrote:
         | It's getting bad. I'm even seeing what I'd almost certainly ai
         | writeups for language releases and it's so ugly.
        
         | freedomben wrote:
         | Interesting, because I was trained in writing classes to always
         | have a "conclusion" where you make sure to summarize and
         | restate your thesis for emphasis and focus. That AI does this
         | feels like a result of training/emulating what humans do. If
         | people think my writing is AI driven because of that, that's
         | quite unfortunate. If we have to start introducing errors or
         | mistakes into our writing so people don't assume it's AI, that
         | seems like a quick race to the bottom.
        
           | dartos wrote:
           | I don't think NOT having a conclusion is a mistake, but
           | calling it "conclusion" is a stylistic choice that smells
           | like AI to me.
           | 
           | It's how style changes. Just like how websites influenced
           | graphic design, AI influences writing.
        
       | _heimdall wrote:
       | > Scrumfall: The Real (and Worse) Picture
       | 
       | This section is very, very accurate. I was at a startup that ran
       | scrum really out of a need to jeep our remote team communicating
       | regularly. Goals were loose and generally defined by each dev
       | doing the work.
       | 
       | That eventually broke down and we had quarterly goals driven by
       | marketing and sprints with rigid, increasingly stressful goals.
       | The difference in developer burnout was plain as day, once scrum
       | ends up overlaid on a quarterly (or similar) waterfall the value
       | of scrum is gone and people burn out fast.
        
       | FpUser wrote:
       | SCRUM is mostly self-serving abomination
        
       | liampulles wrote:
       | Ok, hot takes incoming:
       | 
       | * Some of the article and commentary here read to me like Scrum
       | is being equated with bad management, or a bad relationship with
       | management. If the source of stress boils down to unrealistic
       | deadlines and high workloads, then that problem will persist with
       | a kanban process, or extreme programming, or "yolo free for all".
       | 
       | * A relationship is a two-way street. Yes its certainly possible
       | that your manager is a dickhead, or incompetent, or both - but it
       | is also possible that they don't know how unrealistic their
       | expectations are because you have failed to PUSH BACK properly. A
       | healthy relationship includes saying no, and explaining problems
       | - that is part of a developers job.
       | 
       | * So many developers (my younger self included) WILDLY
       | overestimate their ability to communicate effectively with non-
       | tech people. The idea that you are going to go from having a bad
       | management relationship, to talking to the business directly
       | is... lets say "misguided". I'm still pretty bad at it, but at
       | least I know that I'm lacking here - I'm very thankful for the
       | people who are well versed in stakeholder management (which
       | really is a skill).
        
       | prepend wrote:
       | What does "sprints are involuntary" mean?
       | 
       | My team chooses the characteristics of the sprint. It's not like
       | they are randomly assigned. It's a collaboration between
       | leadership, team members and non-team stakeholders. It's not like
       | there's anything mandatory, so we set our release schedule and
       | what a release means based on what makes sense.
       | 
       | What's the alternative proposed?
       | 
       | I wonder how the author is working if they think that these
       | things are involuntary. It seems like their environment sucks and
       | it's expressed through saying scrum sucks. Scrum is so generic it
       | can be adapted for many needs. I'd like to see the author explain
       | why their scrum is so rigid. Does he suck at estimating? Suck at
       | communicating? Lacks resources? Leadership is poor at estimating?
       | Who knows, but it seems like blaming scrum is like blaming
       | software development in general and more of a "this job would be
       | great if it wasn't for the customers" type screaming into the
       | void.
        
         | nottorp wrote:
         | > My team chooses the characteristics of the sprint. It's not
         | like they are randomly assigned. It's a collaboration between
         | leadership, team members and non-team stakeholders. It's not
         | like there's anything mandatory, so we set our release schedule
         | and what a release means based on what makes sense.
         | 
         | But then it's not Scrum. Scrum is weekly.
        
           | naavis wrote:
           | I don't think anything in Scrum dictates iterations must be
           | one week long.
           | 
           | https://www.scrum.org/learning-series/what-is-scrum/
        
             | freedomben wrote:
             | No dictation on length, but the length is supposed to be
             | _consistent_. If you want to take a three week sprint or
             | something instead because the feature makes sense, you mess
             | up a whole lot of things, especially the metrics. And, let
             | 's be honest, the metrics are the biggest reason why
             | management imposes Scrum. They want to be able to quantify
             | everyones contribution down to hard numbers that they can
             | then use to know how everyone is performing. If you screw
             | up the metrics, it won't take long for someone to step in
             | and "get your team back on track."
        
               | ebiester wrote:
               | Metrics and software process are orthogonal. Now, you can
               | argue that consistent processes across teams is used to
               | enable metrics, but Taylorism is going to creep up any
               | place that has management that has been infected by it.
        
           | ebiester wrote:
           | "They are fixed length events of one month or less to create
           | consistency. A new Sprint starts immediately after the
           | conclusion of the previous Sprint." - scrumguides.org
           | 
           | You also need to understand that "release" might mean behind
           | a feature flag. Further, while continuous integration is not
           | within the Scrum guide, it is a common practice in Scrum
           | teams. Yes, there is a concept of a sprint goal, but the
           | sprint goal may be a subset of the product goal. You may
           | choose to group increments across sprint boundaries to
           | present to customers independently of the end of the sprint.
        
           | prepend wrote:
           | Scrum is not necessarily weekly. You can pick any period for
           | the sprint length. I think I've seen two week as the most
           | typical.
        
         | teeray wrote:
         | > My team chooses the characteristics of the sprint. It's not
         | like they are randomly assigned...It's not like there's
         | anything mandatory, so we set our release schedule and what a
         | release means based on what makes sense.
         | 
         | Count your blessings. This is not the case everywhere.
        
         | freedomben wrote:
         | If you are working in a place that lets your team pick the
         | sprint length each time based on how long you think it should
         | be for the work you're doing, that is absolutely _not_ typical.
         | 
         | You seem to be either taking your anecdotal experience with
         | what was called "scrum" and projecting it back onto the spec.
         | Or, redefining "scrum" to be what you think it _should_ be, not
         | what it _is_. Incidentally, I find nearly everyone who defends
         | scrum does the same thing. It 's a continual No True Scotsman
         | that gets to the point where "scrum" becomes meaningless. I
         | actually blame the Scrum people for that because there's a ton
         | of things that are guidelines rather than rules, although the
         | ultimate decision is with the ScrumMaster or PM, so the level
         | of flexibility of the Scrum implementation is dependent on the
         | benevolence of this ScrumMaster(r).
         | 
         | I worked as a consultant for several years and have been at
         | many different startups, so I've experienced a lot of different
         | flavors of Scrum, and the effectiveness varies widely. There
         | are Scrum implementations that are authoritarian hell-holes
         | where devs are just mice on wheels, and there are some that are
         | pretty good. The problem is, both are still "scrum." So it's a
         | lot like saying "monarchy is good" or "monarchy is bad." Well,
         | it depends a lot on the monarch, but the system itself gives an
         | enormous amount of control to one (or a few) people, and then
         | it's up to that person to divvy out autonomy as they see fit.
         | You might get a benevolent ruler who gives autonomy, but you
         | might not, and both fall under the system.
        
           | prepend wrote:
           | I've never had variable sprint lengths, but picking the
           | internal is exactly how I've done agile for years.
           | 
           | The whole point, I thought, is that you're just frequently
           | releasing so you want some fixed interval rather than
           | adjusting it based on workload. Pick work that fits into the
           | time period, not the other way around.
        
         | rickdeckard wrote:
         | I don't know which process you follow, but while sprints are
         | created in collaboration, in mid/large organizations everything
         | is supposed to be in-sync across departments (so you can align
         | interdisciplinary tasks).
         | 
         | In most cases I've seen, Agile basically introduces an
         | additional company-internal clock with tick-tocks for days and
         | weeks.
         | 
         | To me the article correctly describes how agile is assumed to
         | be somewhat abstracted from "real-world" time, but in reality
         | it's just two other hands on the same clock with pressure and
         | tasks still increasing close to "real-world" clock-events
         | (launch-dates, exhibitions, customer-events,...)
        
       | nottorp wrote:
       | Hmm I think 95% of the conversation in this thread can be
       | summarized as:
       | 
       | Person 1: Scrum sucks at my job because X, Y, Z.
       | 
       | Person 2: That's not the ideal spherical cow! Sorry, it's not
       | "real scrum".
        
         | Pet_Ant wrote:
         | Well I think that comes from top-down micro-managing
         | organizations that just want to call themselves "scrum". They
         | want to do what they want to do and will dress it up in
         | whatever language is buzzword compliant.
         | 
         | A director of engineering flat-out told me that being self-
         | organising wasn't part of our scrum because we couldn't
         | guarantee that each team made the same decisions and we needed
         | developers to be interchangeable between teams.
        
         | kristjank wrote:
         | It's the "but it wasn't real communism" of the software world
        
         | typeofhuman wrote:
         | Person 3 (me): what's your proposed alternative - considering
         | all stakeholders?
        
       | filoeleven wrote:
       | Rich Hickey put it best.
       | 
       | "What kind of runner can run as fast as they possibly can from
       | the very start of a race? Only someone who runs very short
       | distances. But we're programmers, we're smarter than runners. We
       | know how to fix that problem, we just fire the starting pistol
       | every hundred yards, and call it a new sprint!"
       | 
       | https://youtu.be/liUiRfN9NzQ?si=CRkbMokVLXLIdF42
        
         | sevensor wrote:
         | I would love to bring some scrum masters down to the local high
         | school track and have them run back to back sprints until the
         | message sinks in.
        
           | lo_fye wrote:
           | The Scrum Master is supposed to be part of the team,
           | constantly helping with the Sprint, whether that's getting
           | clarification for you, or pushing back on unrealistic
           | expectations, or getting more resources, or whatever. Sprint
           | was a bad choice of terms. It shouldn't have been related to
           | races at all. If anything, it should be more like walking.
           | It's about figuring out what pace is sustainable for your
           | particular team, and sticking to that pace. Not driving
           | anyone too hard, but delivering value (i.e. working software
           | features and updates) at regular intervals. If a feature is
           | too big to deliver in a single increment of time (Sprint),
           | then it should be broken down into multiple features that
           | build upon one another to eventually be the whole thing.
        
             | sevensor wrote:
             | Why should we give them a pass on the metaphor? If that's
             | not what they mean, they can use different words. It's
             | telling that they don't.
        
             | bunderbunder wrote:
             | Yes, sure, all of that. But also, my boss's boss and my
             | boss's boss's boss are looking at velocity and continually
             | asking for more. They've got dashboards for it. Managers
             | have to answer for why their team's velocity is different
             | from another manager's team. Et cetera.
             | 
             | You can say "don't do that that's not how it works" until
             | you're blue in the face, and it will still happen.
             | 
             | That's the critical failure of Scrum: it's one giant
             | managerial dark pattern that's full of enticements to abuse
             | it. Those enticements are constant. The exhortations to not
             | do it that way are buried in the fine print somewhere, and
             | the only reminders about them are coming from disgruntled
             | individual contributors, probably from lower-performing
             | teams, whose opinion is therefore suspect. The managerial
             | opinion is probably that they should stop whining and make
             | the deadline already.
             | 
             | I keep wishing we could instead have an agile framework
             | that works with human nature instead of fighting against
             | it.
        
               | randomdata wrote:
               | _> I keep wishing we could instead have an agile
               | framework that works with human nature instead of
               | fighting against it._
               | 
               | What you describe is human nature. Any framework that
               | tries to work with human nature will end up there.
               | 
               | A framework that successfully fights human nature is the
               | only hope. But, can you really fight human nature? My
               | guess is no.
        
         | mech422 wrote:
         | LOL - that sounds uncomfortably accurate :-)
        
       | rickdeckard wrote:
       | Great description on what happens especially in scaled
       | organizations, where sprints/iterations are supposed to be in-
       | sync across departments (so you can align interdisciplinary tasks
       | etc.).
       | 
       | In most cases I've seen, it basically introduces an additional
       | company-internal clock with tick-tocks for a custom frame of days
       | and weeks.
       | 
       | Everyone acts like this is more consistent and somewhat
       | abstracted from "real-world" time, but in reality it's just two
       | other hands on the same clock, with pressure and tasks still
       | increasing close to "real-world" clock-events (launch-dates,
       | exhibitions, customer-events,...)
        
       | lo_fye wrote:
       | This article has Scrum all wrong.
       | 
       | What they're talking about is a process that someone is calling
       | Scrum, but is nothing of the sort.
       | 
       | A real Scrum process can be modified at any time to make it more
       | workable/manageable/realistic. The Sprint Review is FOR modifying
       | the process.
       | 
       | If Sprints seem to be never ending-stress, then you're self-
       | selecting too much work for a Sprint. Yes, self-selecting. In
       | real Scrum, everyone chooses what tasks they agree to get done in
       | the next Sprint. You set your own pace, and it's meant to be
       | sustainable and constant, unlike the pace in Waterfall work.
       | 
       | "Every aspect of a sprint is prescribed: its duration, its
       | meetings, its tasks, and even the roles of its participants" --
       | yes, and prescribed by who? THE SPRINT TEAM! The people doing the
       | work. You.
       | 
       | "Autonomy--the ability to direct one's own work--plays a
       | significant role in how work is experienced." -- the article
       | stated this as an argument for NOT using Scrum, but that's
       | exactly what Scrum is meant to provide you with.
       | 
       | "In Scrum, programmers are like those mice subjected to
       | involuntary effort, forced to run on treadmills of our bosses'
       | making" -- In Scrum, you don't have a boss. Your team has
       | members, and everyone who's part of the team does real actual
       | work in the Sprint. Yes, you have a Scrum Master, but their
       | entire job isn't to track your hours, or force you to commit to
       | something -- it's to run the Sprint meetings, solve your
       | problems, and anything preventing you from getting the work you
       | committed to for the Sprint, done by the end of the Sprint.
       | That's it and that's all.
       | 
       | "Sprints Neglect Key Supporting Activities" - Really? That's
       | weird, because the team working in the Sprint can specify what
       | needs to be part of every task in the Sprint.
       | 
       | "There's no time is set aside for proper engineering prep work."
       | -- Scrum is about constantly delivering value to the client. If
       | you need to figure out the best way to do something, and can't
       | manage to produce any working code while you do that (doubtful)
       | then you can at least say you'll provide the client with a Report
       | on your findings, and why you're going to proceed with Route A
       | over Route B. And as I said before, if there's no provision for
       | that, make one! or do it in Sprint Planning. If you're part of
       | the Sprint Team, you're in control of your process, and if it's
       | not working, it's your fault, and your responsibility to help fix
       | it. Maybe if someone normally does 20 points of work per Sprint,
       | but they need to plan a lot this Sprint, then if the Sprint Team
       | is ok with them delivering only 10 points of client-facing
       | working code, but also 10 points of valuable research, then
       | that's ok! You can also do a lot of this planning (at least at a
       | basic level) during Discovery with the Client, even if the Client
       | is internal.
       | 
       | "There's always a Waterfall-like, big-bang deadline quietly
       | lurking in the background" -- You have been betrayed by all of
       | the companies you've ever worked at who said they were doing
       | Scrum, because they weren't. They were doing "sprint until you
       | die", which isn't an actual process, but is how a lot of places
       | work.
       | 
       | "The business side just can't help itself" -- your Scrum Master
       | needs to go to bat for you. The Business Side should only be told
       | about features that have been completed, or are about to be
       | completed, not about upcoming features except to say that "It's
       | on our roadmap, but I can't tell you for when".
       | 
       | "With sprints, there are no breaks, little autonomy, and
       | insufficient time to prepare." -- True (but the pace is self-
       | managed to be sustainable), False (Scrum is all about autonomy),
       | & False, as stated above.
       | 
       | "Let developers control both their craft and their process. Treat
       | them as respected peers, not replaceable cogs in a machine." --
       | Did your Scrum team miss the memo about the people that comprise
       | the team is a crucial aspect of the team? A Scrum team should be
       | 100% self-contained, and be comprised of all the people it needs
       | to be able to get the job done. This means from architecture, to
       | UX/UI, to coding, and design." -- If you don't think the unique
       | individuals on the team matter, you're dead wrong.
       | 
       | "Achieving these conditions will likely require grassroots
       | efforts" -- yes, and that's how Scrum came about! It's literally
       | solving what you're complaining about... except that companies
       | have misused its name and implemented it so incorrectly that you
       | now think it's the problem not the solution. How did this happen?
       | Developers found out that Agile and Scrum were amazing. They were
       | a much better way of working, that was sustainable, and
       | fulfilling, and dare I say fun. They started quitting places that
       | didn't do Agile or Scrum, and only applying to places that did.
       | Shitty companies couldn't hire any good developers, so they
       | started saying they "Do Agile". They started getting applications
       | again. Only problem was, they already had a corporate
       | infrastructure that didn't support Agile or Scrum, so you'd start
       | noticing little things like "Hey, why is my Scrum Master asking
       | me how many hours I've spent on a task instead of asking me what
       | they can do to get barriers out of my way?" -- and this went on
       | until the Agile and Scrum that companies professed to be
       | practicing didn't resemble actual Scrum in the least. It was a
       | bait and switch.
       | 
       | Scrum is a process designed to help you continuously improve your
       | own process, while always delivering value to the Customer along
       | the way. That's it. Dead simple.
       | 
       | Here's Scrum in a Nutshell:
       | 
       | Sprint Planning: Make sure everything in the Product Backlog has
       | estimations attached. If not, estimate them now. Make sure you
       | know your own personal velocity. Then each person answers: What
       | work can each of us realistically commit to have done, for sure,
       | by the end of this Sprint?
       | 
       | Daily Standup: (Each person answers) What did you finish since
       | the last standup? What will you finish before the next one? Is
       | there anything slowing you down?
       | 
       | Sprint Retrospective: (Present to Client) We finished all of the
       | work for the Sprint. We will now demo it for you. [demo it] How
       | do you like it? Any feedback? Do you like the list of tasks we
       | have scheduled for the next Sprint, or would you like to
       | reprioritize it? Thanks, see you at the next Sprint Retrospective
       | meeting.
       | 
       | Sprint Review: (Team Meeting) What do you think went well? What
       | do you think could have gone better? How do we want to change our
       | process to reflect these?
        
       | xbar wrote:
       | Do Agile without Scrum.
        
       | hydrogen7800 wrote:
       | As a mechanical engineer I love lurking here because you software
       | folk have a way of classifying and describing a technical
       | workplace that I don't find anywhere else on the web.
       | 
       | I was recently part of a program for ~2 years that was
       | essentially in perpetual sprint mode. We never had time to stop
       | and consider the impact of decisions, because requirements were
       | constantly shifting beneath our feet. All the tasks and sub
       | tasks, and their interrelated nature was haunting my dreams. I
       | would have sudden panicked realizations in that brief window of
       | clarity before bed that I forgot or missed something.
       | 
       | There was always an acknowledgement among all in the (virtual)
       | room during calls that the problem was outside the room, or that
       | "yeah this sucks, but it's the least bad way to run the program"
       | or something like that. The technical problems were interesting
       | to me, but not enough to sustain my motivation through that.
       | 
       | "Sprints, on the other hand, are fake deadlines". Amen. As a
       | result of what I described above, it was hard to take these
       | "deadlines" seriously.
        
       | typeofhuman wrote:
       | We all know these problems.
       | 
       | What's the solution?
        
       | borvo wrote:
       | When agile first started it was developer centric and brought in
       | the ideas of continuous improvement, inspect and adapt,
       | eliminating waste (handoffs, extra communication etc). One of the
       | core ideas was to look at what was working/not working - if it's
       | not working you drop it. Then we got the scrum cult. Ironically
       | it has led to a huge amount of wasted time and effort, as well as
       | stressed devs. In a lot of cases these extra processes get added
       | by well meaning people who don't look at the whole system of
       | work. If you can't drop what is not working then it's not agile.
        
         | randomdata wrote:
         | If a team has reluctance to drop something where you see a need
         | to drop it, it is _you_ who is not working. Will you drop
         | yourself?
        
       | pragma_x wrote:
       | When managing a project scrum I stick to a few things that have
       | worked well for me.
       | 
       | - Make it clear that the name "sprint" is a bad one. This is
       | marathon. Encourage maintaining a steady pace and do not become a
       | party to burn-out.
       | 
       | - Use Agile pointing methodology by the book.
       | 
       | - Standups are for communicating wins and blockers; your overall
       | general status is not useful to the rest of the team and makes
       | the standup go long. Project chit-chat, problem-solving, and
       | talking about wins, is for afterwords or completely different
       | meetings.
       | 
       | - Defend the team from management's attempt to deconstruct points
       | into hours, days, or any other more conventional metric; Agile
       | exists to neuter these anti-patterns, and the points exist only
       | to figure out what gets done in a "sprint" interval. Offer
       | velocity tracking and focus on results instead.
       | 
       | - Defend the plan and the team from all stakeholder asks, and
       | make it clear that adding to an existing plan also means taking
       | other tasks away.
       | 
       | - Carefully triage emergencies, bugs, into the plan with
       | stakeholder consent and involvement.
       | 
       | - In fact, everything for Scrum is just triage, including
       | features. Mark everything with a relative priority, even the
       | normal things.
       | 
       | - Celebrate every single last win, no matter how small. There are
       | no victory ceremonies in the standard Agile Scrum playbook; this
       | is on project leadership to address and absolutely must be done
       | without fail.
       | 
       | If done well, the project says on a relatively even keel for the
       | duration. Using Agile for evil, by instilling a false sense of
       | urgency every two weeks, will burn your team out faster than any
       | Waterfall crunch ever could.
       | 
       | Here's where people get this all screwed up: Agile methodology
       | requires constant communication between the team and
       | stakeholders, leaving the PM/Lead to play goalie for the
       | project's run. That leader must be comfortable saying "no" to
       | anyone/everyone, manage stakeholder expectations at regular
       | intervals, and must have a keen sense of how to break down a
       | project's deliverables into achievable increments. In short: this
       | person must be both technically and socially adept.
       | 
       | If that doesn't sound like your lead or organization, Waterfall
       | may be a better move. It pushes a lot of this communication and
       | negotiation to the planning phase, before any engineering work is
       | done. In the case of contracting, it also escalates project
       | change to a legal process, which can blunt/halt the influence of
       | meddlesome forces. It's also possible to avoid big crunches and
       | burnout, if (and only if) your project management has a clue and
       | is dogged about milestone due dates. Overall, it pushes the
       | bigger social aspects to a preparatory phase which can be
       | executed by different personnel than the team that implements the
       | product.
        
       | tcgv wrote:
       | A lot of the criticism here comes from people who had bad
       | experiences with poor managers, leading them to reject the idea
       | of work processes altogether.
       | 
       | The few defending Scrum are doing so based on positive
       | experiences with great teams and strong leadership.
       | 
       | In my view, high-performance teams don't just appear by "hiring
       | good people and letting them do their thing." Good people
       | naturally communicate, take initiative, prioritize, estimate,
       | provide updates, and mentor less experienced team members. In
       | other words, they often follow a pseudo-process or even suggest
       | routines that resemble a formal process, if one is not already in
       | place.
       | 
       | Alignment, communication, transparency, and prioritization are
       | key to achieving results. Processes should be designed to support
       | these, providing space for creativity and autonomy, including
       | review and constant improvement of the process itself.
        
       | moominpapa wrote:
       | Once upon a time, ivory tower "programmers" met in a cafe or
       | something and grandiosely produced a manifesto called Agile and
       | unleashed merry hell for poor souls who just want to produce
       | something that works. Instead they must listen to managers who
       | haven't written so much as "hello world", tell them how it should
       | be done. I don't care of the intentions, it has been coopted into
       | corporate micromanagement and busy work for deadwood corporate
       | lifers. Enough, the original authors need to get back in that
       | cafe and explain where it went wrong.
        
       | nyxtom wrote:
       | Every now and then I enjoy the opportunity to build things
       | without planning around them. No ceremony, no tickets - just pure
       | code and building things people are interested in or are looking
       | to solve problems.
        