       Story points are pointless, measure queues
        
       Author : brightball
       Score  : 308 points
       Date   : 2024-07-15 17:16 UTC (2 days ago)
        
 (HTM) web link (www.brightball.com)
 (TXT) w3m dump (www.brightball.com)
        
       | quantified wrote:
       | Story points were only ever an approximate unit of time. To fit
       | them into a clear unit of time such as a sprint is a clear
       | indicator of this. To call them complexity or anything else is
       | misleading- transcribing a dictionary by hand into a CSV file is
       | super simple (1 pt) and takes a long time (how many points is 3
       | FTE-months in your calibration?).
       | 
       | Eatimating effort-time vs completion time are quite different,
       | serving different stakeholders. A story that takes 1 point of
       | effort by anyone's pointing system could still take a week due to
       | any number of factors (crucial collaborator gets sick, laptop
       | crunched by a car, ransomware attack, whatever). The only really
       | estimable aspect is how long the developer will spend on the
       | work, not when it will be done. Air speed, not ground speed.
       | 
       | That said, it's not clear how queue analysis helps when you
       | haven't spent any time saying how long you might expect each task
       | in the queue to be, or what the dependencies are between tasks
       | within and across teams. Given engaged team members, I've gotten
       | very good results on predicting the pace of progress for sprints,
       | and it all never mattered because everything needed to be
       | shipped. About 4-6 weeks before each X was to be completed we
       | could say with confidence that X would be ready in 4-6 weeks. Not
       | terribly useful.
        
         | bboygravity wrote:
         | I just don't get what the new terminology is for. Like how is
         | this helping anybody?
         | 
         | Manhours = story points Task = story Subtask = sprint Upcoming
         | tasks = backlog Task turn around time = ?? Project goal(s) =
         | epic(s)
         | 
         | I'm probably not even doing this right, but what are we doing
         | here anyway?!
         | 
         | It gets real fun when the project involves software/firmware +
         | mechanical engineering (think machines, robotics, etc), gotta
         | love their faces when you teach them the special magic advanced
         | project words for special software people.
        
           | drewcoo wrote:
           | The idea was to not use direct measures of time to estimate
           | because someone above you will start assuming those estimates
           | are promises and then life gets unpleasant.
           | 
           | Story points, much as I personally dislike them, were
           | invented for developer defense.
        
             | bboygravity wrote:
             | There has always been a perfectly fine word for that which
             | means exactly the same thing: man hours.
             | 
             | I remember learning in school (way before the hocus pocus
             | fancy new words came out) that the development of an Intel
             | CPU cost around 1000 man-years.
             | 
             | I don't understand how expressing this as "it took 1000
             | kilo-story points" or whatever would bring any advantage
             | whatsoever.
        
             | usea wrote:
             | I've never seen such systems emerge from the team as a tool
             | for self-empowerment. They are always foisted upon the team
             | by managers who are trying to, ultimately, turn estimates
             | into promises.
        
           | dennis_jeeves2 wrote:
           | >I just don't get what the new terminology is for. Like how
           | is this helping anybody?
           | 
           | The corporate world likes to come up with new terminology for
           | old stuff and brands it as some new profound discovery. The
           | result being that the new young generation of employees
           | believe that they are living in a new enlightened age
           | (bestowed by their corporate overlords) compared to their
           | older counterparts who were living in the intellectual un-
           | enlightened, dark ages.
        
           | IanCal wrote:
           | The broader point with all this is every field comes up with
           | jargon because it's a form of compression rather than
           | repeating the same phrases again and again. The differences
           | between what you've written there and how they've been used
           | in the teams I've been in are the point here. Instead of
           | saying "manhours but with a conversion factor that we figure
           | out over time and an understanding of the variation" you say
           | "story points".
           | 
           | Story points aren't hours. People are _really bad_ at
           | estimating with time, but they 're much better if you just
           | get them to compare things and say which one seems like it'll
           | take longer.
           | 
           | Stories aren't tasks, either. A task is a single unit of work
           | that you can do and complete. Stories are groups of things
           | that solve a particular problem.
           | 
           | For example, adding a password reset is a story. But that
           | might be distinct tasks that different people can take on, or
           | should be coded and released independently. Maybe that
           | requires setting up an email service or server, UI changes in
           | the frontend, backend changes, is there design that needs
           | doing for it, etc.
           | 
           | > Subtask = sprint
           | 
           | Sprint is a bit of a weird one sure but it's a short length
           | of time. Different for different teams, typically 1-4 weeks.
           | 
           | > Upcoming tasks = backlog
           | 
           | Backlog isn't a very custom term here is it? Also it's not
           | the upcoming tasks, it's things that probably should be done
           | but _not right now_. New idea? New feature? Cool, backlog,
           | doesn 't interrupt the current set of work for the next
           | couple of weeks.
           | 
           |  _Every_ field can do this with _every_ other field. Doctors
           | with their fancy words like anterior, why don 't they just
           | say "the bit at the front"?
           | 
           | I know there can be cringey project managers, yes. On the
           | other hand, I've also seen highly skilled engineers scoff at
           | these kinds of things then spend way too long building stuff
           | that doesn't actually address what the user needs, misses out
           | key parts because they never thought about who was actually
           | tracking those ancillary pieces of work and making sure
           | they're done, and fail to deliver.
           | 
           | Oh and finally if someone wants to come along and say "well
           | we did it differently", if that worked for you then great!
           | The classic point of agile was that you should _try things_
           | and _keep what works_. None of these concepts are
           | particularly complex imo.
        
         | ozim wrote:
         | But you have !sprints! and if you have laptop crunched you
         | either have other dev taking over - so something else doesn't
         | get done - or story that dev with crunched laptop is not going
         | to deliver. That's just life and I also understand how
         | disconnected management can be - but a lot of time you cannot
         | say "exactly" when something will be done, because that is just
         | not possible.
        
         | dilyevsky wrote:
         | All of these shenanigans are just dancing around the
         | intractable problem which is - nobody ever figured out a way to
         | produce reliable estimates.
        
           | skydhash wrote:
           | That's because you're dealing with a pile of abstractions on
           | top of the cpu, data storage and channels that connect them
           | all. You're perched on top of the babel tower trying to
           | figure where to put the next stone without everything
           | crumbling around you. And you don't even know the shape of
           | the stone. You only have a vague description of it.
           | 
           | Just too many unknowns.
        
       | andrewstuart2 wrote:
       | Story points aren't time (as OP states). They're relative
       | complexity, and uncertainty (hence the fibbonacci sequence
       | building uncertainty in to larger numbers). And stories should be
       | able to sized as big numbers. I've never been on a team
       | comfortable with more than a 7, at least not since my first agile
       | experience where we all took an agile/scrum training together for
       | a few days. We'd frequently give things like 21 or 30 or 50
       | points, as appropriate. That's the only place I've ever seen a
       | burndown chart that looked like it should. Everywhere else, it's
       | flat until the last day and then drops to zero as all those "it's
       | a 7 I promise" get carried over to the next sprint for the 3rd
       | time.
        
         | ozim wrote:
         | I agree - just countless times I have to beat that up into
         | peoples head and even people who I would consider smart "points
         | <> time".
         | 
         | After the sprint you can kind of infer the time but it should
         | not be guideline for next estimations unless these are tasks
         | like "fix typos".
        
           | throw310822 wrote:
           | If they're not time, why use numbers? Use fruits: easy peasy,
           | it's a lemon. A really tough story, a coconut. You can't add
           | them in any case, because they're not time.
        
             | ozim wrote:
             | That is one of the complications - one thinks developers
             | should be smart as in abstract thinking so they should
             | understand (just like all the other numbers humanity made
             | up): "numbers we call story points are not having property
             | to add them and they are not convertible to time".
             | 
             | * _Properties of Whole Numbers:                   Whole
             | numbers are closed under addition and multiplication.
             | Zero is the additive identity element of the whole numbers.
             | 1 is the multiplicative identity element.         It obeys
             | the commutative and associative property of addition and
             | multiplication.         It satisfies the distributive
             | property of multiplication over addition and vice versa.
             | 
             | *_
        
               | recursive wrote:
               | Why use a measure that creates this footgun? Why should
               | our task estimation require this much abstract thinking?
               | Why not invent the measure so that it's not misleading?
               | Numbers generally have well-understood properties. Using
               | them in a way where the properties don't apply is asking
               | to be misunderstood.
        
             | 1xdevnet wrote:
             | I like this, I'd advocate for a fruit-based task system -
             | although I suppose the exact fruit ranking would depend on
             | the team.
             | 
             | - easy peasy: lemon
             | 
             | - easy but needs careful handling: kiwi
             | 
             | - regular but boring: red delicious
             | 
             | - regular, who wouldn't want to take one of these?: mango
             | 
             | - large task, risk of splash damage if mishandled:
             | watermelon
             | 
             | - tough to crack, needs time or a hammer: coconut
             | 
             | - technically we'll do this, but not really our job: tomato
             | 
             | Edit: I am sad that emojis aren't allowed in comments,
             | though it's understandable.
        
             | icedchai wrote:
             | If you try this (and I have, just not with fruits), someone
             | will complain they can't graph fruits. You'll tell them
             | that's the point. They won't listen, so they'll map fruits
             | to numbers, and now you have the same problem anyway.
             | 
             | My personal preference is to use time estimates with some
             | uncertainty. A day or less. 2-3 days. A week at most.
        
               | wolpoli wrote:
               | > My personal preference is to use time estimates with
               | some uncertainty. A day or less. 2-3 days. A week at
               | most.
               | 
               | In the project management world, there is an assumption
               | that tasks that are overestimated and underestimated
               | would even themselves out so that the total estimate
               | would equal the actual time needed. Sad to say that
               | accuracy of estimates don't follow normal distribution in
               | software development.
        
               | SoftTalker wrote:
               | I had one manager who used time in orders of magnitude.
               | He'd ask, "is it a day, a week, a month, or a year?"
        
               | jon-wood wrote:
               | I've done exactly this in the past, and then when someone
               | asks how long the project as a whole is going to take
               | it's easy enough to give a range. If someone says a task
               | is going to take hours that's a range of 1-6 hours, if
               | they say it's months that's 1-12 months. If you want more
               | certainty in your estimate then you're going to have to
               | give us some time to break things down.
        
             | vannevar wrote:
             | Just because they're not time, doesn't mean you don't want
             | to add them. Imagine you have an empty basket, and you're
             | not sure how much fruit you can toss in it. So the first
             | time, you just start tossing stuff in until it's full. The
             | exact number of lemons, coconuts, etc will vary. But after
             | a few rounds, you'll get a feel for how much of each you
             | can get into the basket. That's story points. You feel your
             | way into a groove where the team gets a more concrete sense
             | about how much it can get done in a sprint, given the
             | variability of the work, external projects/distractions,
             | and the makeup of the team.
             | 
             | Story points get a bad rap because a lot of engineering
             | managers don't get scrum and just see a convenient way to
             | measure productivity. Which story points are absolutely
             | _not_ meant to do, outside of the team itself setting its
             | own sprint goals.
        
               | tsimionescu wrote:
               | My experience is that story points get a bad rep because
               | they don't mean anything unless you use them as an
               | explicit proxy for time. There's no way to say in reality
               | "this task is small" unless you have some idea of how
               | long it takes. Additonally, this concept of velocity
               | makes no sense because a task that's big for me might be
               | small for someone else in the team, so then we either
               | pre-assign tasks and set points based on assignment (and
               | then have problems if we switch the assignee for any
               | reason), or we assign "generic points" and that ends up
               | not meaning anything at all if the team is not very
               | uniform (e.g. all seniors with similar skills and
               | ownership of most of the same code, or all juniors).
               | 
               | Additonally, all methodologies tend to discourage
               | correcting point values after the fact. That makes the
               | process of deriving time estimates (velocity) even more
               | error prone, because it conflates uncertainty with
               | mistakes. That is, you can correctly estimate a task at 8
               | points and finish it in four weeks; or you can
               | incorrectly estimate a task as 3 points and finish it in
               | 4 weeks. That doesn't mean that the team has a velocity
               | of about 1.35 points/week, it means it has a velocity of
               | about 2 points/week, but made a mistake with one task.
        
               | vannevar wrote:
               | >My experience is that story points get a bad rep because
               | they don't mean anything unless you use them as an
               | explicit proxy for time.
               | 
               | So when you shop for clothes, Small/Medium/Large are
               | useless? You require precise measurements for every item,
               | and they have to be exactly the same size across
               | manufacturers, or else sizes have no utility for you? The
               | reality is that a Large can be large on you in different
               | ways, even if it's a t-shirt. And software complexity has
               | a lot more dimensions than a t-shirt. The utility of
               | story points is that they allow a team to create a rough
               | idea of their capacity over a sprint, so that they don't
               | consistently under- (or more commonly) over-commit.
               | 
               | If you try to use story points purely as a uniform proxy
               | for time, of course they're going to be useless, because
               | you can always just use time instead.
        
             | candiddevmike wrote:
             | I use Halo difficulty levels: Easy, Normal, Heroic,
             | Legendary.
        
           | wewtyflakes wrote:
           | Ultimately, we are bound by time, not complexity. Why does it
           | matter how complex a task is? The product managers and
           | customers wont care how hard we as engineers have to think or
           | reason about a problem; to them, the only thing that matters
           | is time until delivery.
        
             | robertlagrant wrote:
             | Story points aren't useful outside the team. They're for
             | the team to help it figure out roughly how much stuff it
             | can do each sprint. They shouldn't leak out of the team.
        
               | throw310822 wrote:
               | A sprint is a unit of time, how does measuring a
               | "complexity"- whatever that is- helps in figuring out how
               | much stuff you can put in *time*?
        
               | robertlagrant wrote:
               | I understand what you're saying - of course in some sense
               | they're convertable. But the point is to not think about
               | time when estimating, because if you estimate time you
               | don't factor in things like other tasks, or holiday, or
               | anything else. Or if you do you have to spend ages trying
               | to account perfectly for time.
               | 
               | Instead, if you estimate complexity (e.g. I think this
               | task is a 3, just as a starting point, then this task is
               | roughly the same, so it's also a 3, then this one is
               | similar but will take almost as much testing due to its
               | difficulty, so we'll call it a 5, then this one is very
               | simple, not even half as difficult as the first one, so
               | it's a 1, etc), then try and keep that up for a few
               | sprints, then figure out how many points fit into a
               | sprint, you automatically factor in other factors (like
               | "I have to log into Okta ten times a day", or "people
               | keep getting pulled into meetings") through practical
               | observation of what got done, and you get better at
               | predicting what you'll be able to achieve in a sprint.
               | 
               | It's not perfect; it just removes the need for certain
               | entire jobs devoted to accounting for time, which you can
               | spend on another developer instead, while also being a
               | reasonable measure of what you'll get done, and only
               | takes about an hour every two weeks.
        
               | recursive wrote:
               | If the problem is "we're not accounting for holidays in
               | our time estimates", I can't see how the solution could
               | possibly be "time is obviously a flawed measure, so we'll
               | use this other measure which has this hazy relationship
               | with time, but we all agree that it's _definitely not
               | time_ , although we have trouble saying what it _is_ "
        
               | convolvatron wrote:
               | personally, I find it much easier to say 'normally, I
               | would get this to you by wednesday of next week, but we
               | have that offsite and my wife's parents are visiting, so
               | does friday work for you?'. than 'this is a 3', so, I
               | guess this fits in this sprint?
               | 
               | changing units and names of things really seems like a
               | deliberate attempt to rob the discussion of any actual
               | meaning. just a comfortable empty formalism that masks
               | the fact that we aren't trying to come to grips with the
               | most difficult parts of our job
        
               | ozim wrote:
               | But you don't estimate holidays in ... you estimate how
               | long it would take if someone picks on the task Monday
               | morning and works on it full time.
               | 
               | If someone picks up task on Monday then has 20 other
               | meetings - estimation is still the same, he just
               | continues after those 20 meetings and you just don't care
               | when estimating.
               | 
               | Only thing is if at the end of sprint dude is saying "I
               | started X then I had 20 meetings so I did not make it" -
               | well you just accept that or you don't put guy into 20
               | meetings.
        
               | robertlagrant wrote:
               | > But you don't estimate holidays in ... you estimate how
               | long it would take if someone picks on the task Monday
               | morning and works on it full time.
               | 
               | You estimate tasks that way, but you estimate capacity to
               | do tasks on your actual track record, which will include
               | holidays and other things.
        
               | DSMan195276 wrote:
               | Functionally you're just created extra steps and
               | confusion by not calling it a time estimate, or at least
               | something equivalent to time. Even with a real time
               | estimate you shouldn't be planning by going "well you
               | work 80 hours this sprint, so we plan 80 hours" - you
               | should be doing the same consideration of looking at how
               | many "hours" were completed in the last few sprints and
               | plan based on that number. If we're in agreement that
               | these numbers are for the team only then it shouldn't
               | matter if they consistently under or over estimate the
               | hours, nobody outside the team should know or care how
               | many "hours" they complete in a sprint.
               | 
               | The confusion part is that by calling it "complexity" and
               | saying it's not a time estimate you've muddied the waters
               | on what it is, people will debate the definition and
               | intentionally differentiate it from actual time. I've
               | seen this before, the points-per-sprint never stabilizes
               | because teams have cards where "that's a 1 point card
               | because it's simple, but it will probably take a week".
               | And then suddenly they're ignoring the points during
               | planning to instead come up with an actual time estimates
               | (which also don't work because they don't track those
               | against multiple sprints).
        
             | ozim wrote:
             | So they are bad product managers and customers.
             | 
             | Time until delivery for good managers and customers is a
             | range. Can you estimate getting 10kg of potatoes from
             | grocery store that is 35m driving roundtrip away? Can you
             | say it will be exactly 40mins because you can pick up and
             | pay in 5 mins? I don't, I can say it will take between
             | 40mins and 2h. There are always things like card terminal
             | stops working or you get stuck in traffic because of an
             | accident.
             | 
             | Complexity in that example is uncertainty like I do expect
             | high traffic and there might be an accident happening but
             | if there is less traffic and I hit all green lights 40mins
             | going to be easy.
             | 
             | We all know bad managers and bad customers will expect me
             | to get that bag of potatoes in 37 minutes and then ask 10x
             | why did I not drove over that police officer that was
             | stopping the traffic because of an accident to get their
             | potatoes on time.
        
               | wewtyflakes wrote:
               | I don't follow how we go from "they are bad product
               | managers and customers" to... therefor time estimates are
               | bad. I do not think it is unreasonable for our primary
               | stakeholders to ultimately care about time. I also do not
               | think it is unreasonable to give error bars in estimates
               | like "this project is uncertain, therefor estimates will
               | be variable".
        
               | EVa5I7bHFq9mnYK wrote:
               | "Time until delivery for good managers and customers is a
               | range."
               | 
               | Sometimes it's not. In the gaming industry Christmas is a
               | hard deadline.
        
               | LinXitoW wrote:
               | No, it's still a range, the difference is simply that a
               | good manager would plan such that Christmas is at the
               | very far end of the range. Bad managers will plan with
               | the optimistic end of the range, and then expect crunch
               | time from exploited workers following their passion.
        
             | terr-dav wrote:
             | I think time variability increases with the level of
             | complexity. In this context I see the idea of task
             | complexity being related to uncertainty in the time
             | estimate. This makes it fit nicely with the Fibonacci
             | sequence.
        
               | tsimionescu wrote:
               | Time variability also increases with the time estimate
               | for a task. If a task is "about two weeks", then it might
               | be 1.5 weeks or it might be 4 weeks.
               | 
               | But if a task is about 1 day, it may take 4 hours or 4
               | days, but it will almost certainly not be 1 month.
               | 
               | Points are always just a proxy for time, and work the
               | same way. Not matter what anyone claims, as long as you
               | use points to plan time-abound sprints, points are
               | directly a measure of time.
        
               | brightball wrote:
               | Yep, that's completely accurate.
               | 
               | At the same time, that's one of the reasons to prioritize
               | removing as much uncertainty as possible.
        
             | __MatrixMan__ wrote:
             | Points are about uncertainty, they're the difference
             | between:
             | 
             | - 3-4 weeks
             | 
             | - 3-9 weeks
             | 
             | Product managers can get their head around that.
        
               | yibg wrote:
               | Why not just say that then? It'll take 3-9 weeks. You can
               | then just add all the min and max and get a full range.
        
               | BlackFly wrote:
               | Yes, project managers easily can have that level of
               | comprehension, but it is rare to meet a project manager
               | that understands that a time range is something like a
               | confidence interval. That is, if it is estimated a task
               | will take 3-9 weeks, with some probability (say like 10%)
               | it will take an even shorter or longer amount of time.
               | There is uncertainty encoded in the time range, but the
               | time range itself is also uncertain.
               | 
               | Fundamentally, the problem is that project managers set
               | deadlines based on statistical estimates from developers.
               | Despite the fact that they set the deadline and do not
               | understand the dispersion, they want developers to be
               | responsible for misses. Sometimes, people mistankenly
               | believe that there is some magical practice that can
               | eliminate the uncertainty from estimation. You can make
               | predictions with things like story points and achieve a
               | certain amount of accuracy with a certain amount of
               | dispersion. Statistically, it is the longitudinal
               | behavior that can be predicted (sprint success rate at a
               | specific velocity on a stable team), but we focus on
               | cross sectional details (we missed this sprint).
               | 
               | Project management is generally not considered a field
               | requiring statistical expertise but modeling reality of
               | the work requires it.
        
               | tsimionescu wrote:
               | No, points mash together size and uncertainty. A task
               | that's "3-9 days" will have fewer points than a task
               | that's "3-9 weeks". And a real that's "3 months give or
               | take a week" will have more points than either.
               | 
               | Of course, there's actually no such thing as a "3 months
               | give or take a week" estimate for a task. It's basically
               | impossible in programming to have a task that takes that
               | long with that low a level of uncertainty. So in reality,
               | time estimates have the same properties as points: the
               | higher a time estimate, the more uncertainty it
               | represents.
        
           | recursive wrote:
           | I continue to treat story points as a measure of time,
           | despite being told repeatedly they're definitely _not_ time.
           | I will continue doing this until someone can explain to me,
           | in a way I can understand, what they _actually are_ that is
           | not time.
        
             | pests wrote:
             | Difficulty level?
             | 
             | You can't promise you can beat a game on hard 2x as fast as
             | you can on normal, or 3x as easy.
        
               | recursive wrote:
               | Estimates never represented a promise in the first place.
               | If you have someone who is holding you to your estimates,
               | you have to address that.
               | 
               | Regarding difficulty, easy things aren't even expected to
               | be faster than hard things. I'd rate a backflip as much
               | harder than counting to 100,000, even though it wouldn't
               | take nearly as long.
        
             | JohnFen wrote:
             | Because in the end, they are a proxy for time. We can call
             | them "complexity" or whatever, but that doesn't help much
             | with planning a time-boxed period of activity. So they end
             | up meaning "time".
        
             | steelframe wrote:
             | The identity of story points depends on what information
             | you have. If you don't know your team's velocity then story
             | points are only relative complexity. Once you have your
             | team's velocity you can use that information to convert to
             | time.
        
               | tsimionescu wrote:
               | What is relative complexity? How can you compare the
               | complexity of <changing the colors of one button> with
               | <implementing a sorting algorithm>, other than by how
               | long they might take?
        
             | burnished wrote:
             | Having points not be a measure of time is a means of
             | estimating how much work you think the team as a whole will
             | accomplish while diminishing the risk that a given estimate
             | (delivered in time range) will mutate into a 'promise'.
             | 
             | Its also a good way of communicating what you think the
             | blend of known unknowns and unknown unknowns is.
        
           | pizzafeelsright wrote:
           | Points are almost worthless as they can be gamed.
           | 
           | We're judged on delivery. Measured by time. Complexity is
           | arbitrary.
           | 
           | If points aren't time bound why am I limited on the amount of
           | points I can take? Every team had a max point load. If
           | there's no stick for rollovers then you're Kanban.
        
         | xboxnolifes wrote:
         | Yeah, it seems like it's fairly common for people/teams to
         | follow the idea that any story that is 8 or more points should
         | be broken down to tasks of 5 or less. This simply doesn't make
         | sense to me. If the most simple task is 1 point, is your most
         | complex task allowed _really_ only 5 times as complex? Story
         | points usually follow an exponential increase for a reason,
         | enforcing staying in the mostly linear portion is just
         | pretending the complexity and uncertainty has been decreased.
        
           | IanCal wrote:
           | The idea is that if a task is that large can you really not
           | break it down into smaller steps? Do we understand the
           | problem well enough to implement or are we hand waving over
           | likely areas of complexity? Maybe if you tried to break it
           | down you'd realise that the 21 point card is actually more
           | like 10+ 5 points tasks and you had just though "big" not "I
           | know what needs to be done and can size this accurately".
           | 
           | Doesn't mean these cases never occur but it's worth seeing if
           | it's actually smaller related pieces of work.
        
             | brightball wrote:
             | > Do we understand the problem well enough to implement or
             | are we hand waving over likely areas of complexity?
             | 
             | Nailed it. That is exactly the right question to ask.
        
             | xboxnolifes wrote:
             | > Maybe if you tried to break it down you'd realise that
             | the 21 point card is actually more like 10+ 5 points tasks
             | 
             | It didn't even occur to me think of it this way, because
             | the times I've been exposed to breaking down tasks the
             | total number of points stayed constant. 13 pointers
             | becoming an 8 and a 5, and the 8 pointer becoming a 5 and a
             | 3.
        
         | danparsonson wrote:
         | > Story points aren't time...
         | 
         | > ...burndown chart...
         | 
         | The x-axis of a burndown chart is time, right? So if you create
         | a chart that measures points/time then you encourage the idea
         | that a certain number of points can/should be completed in a
         | day, ergo that points are a proxy for units of time. Otherwise
         | what's the point in the chart?
        
           | drewcoo wrote:
           | If you're measuring foo/time, then foo is probably not time.
           | Unless you're measuring some kind of acceleration.
           | 
           | Charts are supposed to be pretty and reassuring and go up and
           | to the right. That keeps the managers happy!
        
         | klysm wrote:
         | The use of the Fibonacci sequence is so pseudo-intellectual.
         | It's completely arbitrary, but use of the Fibonacci sequence
         | makes it sound smarter or justified somehow.
        
         | SoftTalker wrote:
         | I haven't done story points estimating in years, but at the
         | time, an 8 was rarely acceptable, a 13 surely was not.
         | Estimates that high were basically saying "this story is too
         | big or too poorly defined to estimate accurately" and we'd try
         | to break it down into several stories of 5 points or less.
         | 
         | The vast majority of our stories were 2, 3, or 5 points.
        
           | Too wrote:
           | Now you are doing exactly the same mistake the article starts
           | out with. Comparing story points outside your own team, of
           | which you have zero context about how much 8 point
           | represents.
           | 
           | How big your points are make no sense at all outside your own
           | team. It is a relative measurement. 8 could mean 8 lines of
           | code, 8 rest endpoints, 8 database columns or 8 interviews
           | with customers. It certainly should not mean 8 days.
        
             | IanCal wrote:
             | Not really.
             | 
             | The point there is the granularity. If 8 points to you is
             | fixing a minor spelling mistake in your docs, what value is
             | there in having anything smaller than 8?
             | 
             | If 1 is "build the entire backend" then how can you
             | represent anything smaller?
        
               | siva7 wrote:
               | You're just proving their point
        
       | jf22 wrote:
       | I've personally had great success with story points.
       | 
       | Success with story points comes when everybody realized they are
       | useless for anything outside of a dev cycle and when you realize
       | that the effort into making them somewhat accurate is the
       | valuable part.
        
       | KothuRoti wrote:
       | My personal experience with story points is that the number never
       | really mattered, but the process of the team discussing how to
       | rate the complexity of a task was very useful. In terms of having
       | utility of estimating how long something will take, I personally
       | have never been able to translate story points into a reliable
       | indicator for that for many reasons (e.g team changing, domain
       | changing, variability in operational load outside of development
       | work).
       | 
       | Overall I tend to avoid using story points, but on the few teams
       | I worked on who really wanted to use it, I always framed it
       | around building shared understanding rather than a metric that is
       | actually useful for estimating work.
        
         | bsder wrote:
         | In addition, I like the whole "Full Queues Amplify Variability"
         | chart.
         | 
         | It's intuitively obvious, but I never realized it was _that_
         | bad.
         | 
         | I'm going to have to run that down and see if it's _actually_
         | backed by real data. Too many business books are complete
         | flimflam.
        
           | buescher wrote:
           | Reinertsen's books are very, very good. The most recent and
           | most up-to-date is Principles of Product Development Flow,
           | which that chart came from. The previous one, Managing the
           | Design Factory, is pretty similar and I think it's a better
           | read.
           | 
           | Another great takeaway from it is to prioritize things by
           | cost of delay, or even better, what he calls Weighted
           | Shortest Job First, where you divide the cost of delay by the
           | expected length of the task. The only problem is that the
           | same people that want to get oddly formal and inappropriately
           | rigorous with things like story points will want to turn
           | cost-of-delay into an accounting exercise - or object that
           | it's impossible because they don't have the accounting system
           | for it - which misses the point entirely.
        
             | jrs235 wrote:
             | Every CTO needs to read that book.
        
             | jksmith wrote:
             | Yes, and WSJF gives you two units of data: priority and
             | sequencing - because everybody's pet is priority 1. Much
             | better than MoSCoW.
        
               | buescher wrote:
               | I hadn't specifically seen MoSCoW before. Some people
               | need to have everything spelled out for them, I guess.
        
               | brightball wrote:
               | That is very true. I'm going to write something up about
               | WSJF in practice in the future, but it has some real
               | benefits to fixing that issue.
               | 
               | Particularly when you get the decision makers in a room
               | and get them all to agree on the estimated value of each
               | item. Not only does it remove the numerous priority #1's,
               | it also gets everybody aligned on what the real priority
               | #1 is and why.
               | 
               | I've seen it done where people are surveyed separately
               | and it only works well when the people involved are
               | forced to have a conversation to put real numbers to
               | their assumptions, coming out with agreement. The other
               | side effect is that it solves the squeaky wheel problem.
        
           | vitus wrote:
           | The shape is about right for the variance of the M/M/1 queue
           | (what is an M/M/1/[?] queue??), but it's a little
           | disingenuous since variance is a higher-order moment.
           | Standard deviation is probably more sensible to think about
           | here, since that brings it back down to the same scale as the
           | queue length.
           | 
           | > Thus the average number of customers in the system is r/(1
           | - r) and the variance of number of customers in the system is
           | r/(1 - r)2. This result holds for any work conserving service
           | regime, such as processor sharing.
           | 
           | https://en.wikipedia.org/wiki/M/M/1_queue#Average_number_of_.
           | ..
           | 
           | In the cited example, going from 75% utilization -> 95%
           | utilization drags your standard deviation from a modest 3.5
           | items in the queue all the way up to 19.5 items. And, in both
           | cases, that's not far off from your average queue length,
           | either.
        
         | immibis wrote:
         | "Plans are useless, but planning is indispensable."
        
           | jksmith wrote:
           | Eisenhower. Here's another from the great philosopher Mike
           | Tyson: "Everybody has a plan until they get punched in the
           | face."
           | 
           | Point being, have a continuously ready backlog consumed by
           | short iterations with great telemetry - like SpaceX.
        
         | freitzkriesler2 wrote:
         | Those items after your eg are part of the problem why story
         | points don't work for you.
         | 
         | You really do need to control the amount of time your devs get
         | distracted by other things. If they're solely focusing on that
         | one project, you'll be fine.
         | 
         | Its why i personally appreciate XP more than plain old scrum.
        
           | icedchai wrote:
           | This, 100%. When engineers have focus, no context
           | switching... things get done. When they're interrupted with
           | useless Zoom meetings every 2 hours, productivity drops off
           | the cliff. If you have 2 meetings 1 hour apart, that 1 hour
           | is basically useless: by the time you're in the zone, you're
           | interrupted again.
        
             | bryanlarsen wrote:
             | And then when we're given a nice long stretch of
             | interruption-free time, we ruin it by hitting HN.
        
         | shrimp_emoji wrote:
         | > _I personally have never been able to translate story points
         | into a reliable indicator_
         | 
         | You haven't discovered the secret formula: make your estimate
         | and then mindlessly triple it.
        
           | khalladay wrote:
           | multiplying estimates by PI has proven to be a scarily
           | accurate rule of thumb over the course of my career.
        
         | hnthrow289570 wrote:
         | The points are needed because it's convenient to do reports
         | based off of it. If we used estimation language such as "easy,
         | medium, hard, dummy-thicc" they'd still need to assign points
         | to those labels so they can do math on reports and graphs to
         | watch your performance
         | 
         | The biggest sin of course is then trying to predict velocity,
         | but the consequences of that usually just make people doing the
         | reporting look silly for no reason. I think even the slow
         | developers rarely get fired, and you also get nothing for
         | clearing more story points than other developers.
         | 
         | No bonuses for higher velocity is the real reason no one takes
         | it seriously.
        
           | icedchai wrote:
           | It's also easy to game the system. Turn a couple of 3's into
           | 5's. Your "velocity" goes up for no real increase in work.
        
           | cassianoleal wrote:
           | > No bonuses for higher velocity is the real reason no one
           | takes it seriously.
           | 
           | Bonuses for higher velocity based on guessed story points
           | would be an even bigger reason for not taking it seriously -
           | or rather to overestimate everything in order to gain the
           | impression of higher velocity and the bonus associated.
        
             | hnthrow289570 wrote:
             | Non-developers might have to learn something about
             | development so they can push back on inflated estimates,
             | which honestly would be helpful to everyone.
             | 
             | If I quoted you $1,000 to unclog your kitchen sink trap,
             | you'd call bullshit because you can probably find out how
             | easy it is to do that. Likewise, if I quote you 13 points
             | to add a generic error toast message because a POST went
             | badly, you should call bullshit on that too.
        
               | geraldwhen wrote:
               | And yet Fred will take 2 weeks to do the work, and the
               | team is dysfunctional so only certain people work in
               | certain areas.
               | 
               | Fred sucks. We can say his work is easy, and continually
               | make him feel bad without firing him, or we can pretend
               | it's two weeks.
        
               | Nathanba wrote:
               | that really is the truth behind storypoints, somebody
               | wants a way to create pressure. Which is also why
               | storypoints are so bad because now you are pressuring
               | everybody, even the good workers, despite only wanting
               | pressure on a couple people. And on top of that you are
               | wasting the time of the good workers with the whole story
               | point estimation dance.
        
               | gregors wrote:
               | The problem with your kitchen sink example is that you'd
               | think that they've unclogged 7k kitchen sinks so that
               | they can you give you a great estimate.
               | 
               | If we've built the same software before ....we wouldn't
               | have to build anything we'd just use the previously built
               | software.
               | 
               | Software isn't built like a kitchen but by exploring an
               | infinite list of design choices and then choosing one way
               | and implementing it ..hopefully without impacting
               | existing architecture. And it seldom stays static - the
               | name of the game is constant change and then add group
               | dynamics to that.
               | 
               | A better example is to call a plumber and ask how much
               | would it be to add a "rainbow spout to the horse-drawn
               | wheelie-do" oh and there will be several other teams of
               | plumbers there as well. I bet you get a few questions.
        
               | jon-wood wrote:
               | Oh come on. There are certainly a bunch of things which
               | nobody on a team has done before in any given project, an
               | error toast is not one of them. Almost every project _is_
               | using previously built software for them, and the way
               | they fit together is reasonably well known.
        
               | convolvatron wrote:
               | this is nonsensical. first of all more programming these
               | days is hardly invegigative, it is literally plumbing.
               | attach this service this queue. translate this request to
               | this api. compile this code under a new version. put this
               | thing in a container.
               | 
               | secondly, and I've done alot of this, its entirely
               | possible to build useful estimates around greenfield
               | projects like 'define a new language', even though there
               | are lots of variables in play. one useful technique is to
               | work backwards. 'if we dont have a working draft spec in
               | 2 weeks then we can really start the parser, so we're
               | gonna say that, and if we cant hit it, we know we're in
               | trouble'
               | 
               | if your ability to assign semantics and use your
               | experience to plan out the work stops at 'horse drawn
               | weheelie-do', i wonder if this is the right profression
               | for you.
               | 
               | if as a culture we just throw up our hands 'whelp, its
               | all unknowable, we'll just do the best we can and thats
               | you can ask for', then we cant really criticize our
               | customers for being frustrated with us and not
               | 'appreciating our brilliance and how hard this is'.
               | 
               | and the truth is, we can and have done better than that.
        
               | gregors wrote:
               | I'm a big fan of evidence base scheduling by Joel Spolsky
               | [0].
               | 
               | Story points hold very little value in estimation, the
               | discussion that occurs however, is extremely useful.
               | 
               | [0] https://www.joelonsoftware.com/2007/10/26/evidence-
               | based-sch...
        
           | brayhite wrote:
           | To your own point, the reports serve little value aside from
           | a fabricated narrative that some companies like to build
           | feel-goods around.
           | 
           | Discuss the complexities and needs. Break the work into small
           | chunks. Define what progress means. Set expectations for
           | making progress. Regularly and honestly review why you/the
           | team are or aren't meeting expectations. Rinse and repeat.
           | 
           | Perhaps this is over simplifying it, but these are the tried-
           | and-true high notes in my experience. If at any point one of
           | those steps isn't feasible, then it's a larger issue that
           | implementation process likely isn't going to solve, so the
           | "to measure velocity or not" point seems moot.
        
           | ashton314 wrote:
           | > points are needed because it's convenient to do reports
           | based off of it
           | 
           | So, you're saying it's convenient for _management_ , yes?
           | Making things convenient for management at the expense of the
           | front-line workers inverts the priorities of a company. The
           | managers ought to be working _harder_ to make things as
           | efficient and convenient for the workers to build the right
           | thing. Putting management first is the stupidest thing you
           | can do for your company. You immediately separate yourself
           | from quality and by and by your company will whither and rot.
           | If it doesn't die, it certainly will never be great.
        
             | tbrownaw wrote:
             | The purpose of a company is to make money. Even if you hate
             | shareholders (like for example your own 401k) and think
             | invested capital deserves zero return, making money is
             | still what allows the company to pay your salary.
             | 
             | Most companies do this by selling things to customers,
             | whether services or products.
             | 
             | If you're building software for a specific customer,
             | they'll want to know when then can start using it.
             | 
             | If you're building something for retail, marketing will
             | want to know what release date to advertise.
             | 
             | These are the mind of things that management _uses_ those
             | reports for. Saying that actually customers don 't need to
             | be able to make plans, or marketing doesn't need to be able
             | to advertise, is effectively saying that _your employer
             | doesn 't need to make any money_.
             | 
             | Which is quite a silly thing to say, at least if you
             | recognize that devs don't exist in isolation and maybe even
             | aren't the center of the universe.
        
               | ashton314 wrote:
               | > Saying that actually customers don't need to be able to
               | make plans, or marketing doesn't need to be able to
               | advertise, is effectively saying that your employer
               | doesn't need to make any money.
               | 
               | That's not at all what I said. I _said_ , if you choose
               | to make management more efficient to the detriment of
               | _the people making the thing your company sells_ , you've
               | made a bad choice. Bad managers like story points because
               | it usually doesn't hurt their heads too much to add and
               | compare scalar values. But a story point doesn't come
               | anywhere close to representing the complexity of building
               | any product. I've had one or two bad managers who wanted
               | to make all things subservient to their precious Excel
               | file. The productivity of that team (when the manager and
               | story points process were introduced) plummeted and the
               | entire team quit within a month of each other leaving.
               | 
               | The best managers I have had have worked by discussing
               | customer and business needs with engineering and walking
               | away with a richer picture of the tasks involved and an
               | estimated timeline. It is very hard work to do this--it
               | usually takes someone with a little knowledge of how
               | software engineering works. I've had good product
               | managers like this and I've been able to deliver some of
               | the highest-value code I've written (measured strictly
               | monetarily) thanks to managers who took a rich, nuanced
               | view of the process.
               | 
               | I am not advocating for no management or no planning. I
               | am advocating for management not requiring over-
               | simplified metrics because it makes their life easier.
               | Management does not exist to make its own tasks easier.
               | It exists to make it easier for the people making the
               | product to build the right thing at the right time and
               | sell it. _You can make plans without story points._
        
             | hnthrow289570 wrote:
             | >So, you're saying it's convenient for management, yes?
             | Making things convenient for management at the expense of
             | the front-line workers inverts the priorities of a company.
             | 
             | You'd end up having a points system whether you like it or
             | not. If it wasn't story points, it'd be days/weeks/months
             | estimates.
             | 
             | Almost nowhere you will find "it's done when it's done,
             | don't bother me until it's done" as an option for a
             | developer.
             | 
             | If you want an even more utopian arrangement, management
             | would know how to look at git and use the software once in
             | a while to see how things are progressing.
        
               | ashton314 wrote:
               | You, like tbrownaw, are arguing against something I
               | didn't say. (Please go read the sibling thread.) I _didn
               | 't_ say that planning, goals, etc. are bad. What I said
               | was that _story points lead to bad plans_ because they
               | _oversimplify the complexities of software development_.
               | A project timeline can be fine--but only if it is born
               | out of a _nuanced discussion_ and not by adding up a
               | bunch of unitless points.
               | 
               | Developers (at least, ones like me) despise story points
               | because they ask developers to collapse a _ton_ of nuance
               | and detail into a single scalar. It's about as meaningful
               | as this comparison of food recipes: compress the cook
               | time, number of ingredients, cost of ingredients, quality
               | of ingredients, whether or not some of the ingredients
               | are allergens, and how much you like the food independent
               | of the weather and your mood _into a single scalar value_
               | and using _that_ to plan what you will eat during the
               | week. Madness!
               | 
               | Story points can enable corporate despotism. Bad managers
               | who demand developers make up story points, and then turn
               | around and use that to dictate what developers will work
               | on--without engaging in a thoughtful discussion on what
               | is feasible and what will keep the product stable--are on
               | a power trip and are treating developers like cogs in a
               | machine. They know the price of everything, but the value
               | of nothing.
               | 
               | The _good_ managers that I have had in the past regularly
               | discussed with the dev team what was needed and--with the
               | developers ' input and without artificially compressing
               | the complexities of the task at hand--set good goals that
               | gave the dev team focus and direction.
               | 
               | Using story points is lazy management.
        
           | lll-o-lll wrote:
           | Having worked where a megacorp attempted to normalise points
           | and incentivise velocity, there is a fatal flaw. The people
           | doing the work estimate the size of the work! Increased
           | "velocity" will happen automatically. Actual work throughput
           | will remain the same. Prediction becomes impossible.
           | 
           | The most damning problem with "points" is that you can't even
           | do basic math with them. Does 4 points take twice as long as
           | 2? No, no it doesn't. The whole thing is just a giant waste
           | of time.
        
             | NoMoreNicksLeft wrote:
             | My team needs to get 17 points done daily, but no-shows-no-
             | calls keep kneecapping efforts. When they do show up, they
             | complain incessantly about how management makes everything
             | a 0.5 no matter the list of features in the story, and why
             | can't they get more than 29 hours a week so they can have
             | insurance. But it's attitudes like that which keep them
             | from getting raises on their yearly performance reviews.
             | It's a good thing scrum was invented so we could finally
             | measure the consistent low performance of you computer
             | science nerds.
        
         | JohnFen wrote:
         | This is my experience as well. Story points in and of
         | themselves are worthless, but as an excuse to discuss the
         | project as a team, they can have some value.
        
           | tdb7893 wrote:
           | My thing for any agile methodology is the self organizing
           | team aspect really is the most important part, any time-like
           | metric going up the chain is gonna be painful.
           | 
           | I liked story points when the team used them to get aligned
           | on the work being done. I did not like story points when
           | middle management had them on a chart they would review.
        
         | vannevar wrote:
         | >In terms of having utility of estimating how long something
         | will take, I personally have never been able to translate story
         | points into a reliable indicator for that for many reasons (e.g
         | team changing, domain changing, variability in operational load
         | outside of development work).
         | 
         | If your measure of the utility of story points is how well they
         | help you estimate time, then you're right, they're useless to
         | you. If you're on a scrum team, they're a useful back-of-the-
         | envelope way to estimate which bits of validated functionality
         | you're going to be able to get into the codebase this sprint.
         | No one outside the scrum team should care about story points,
         | and they certainly shouldn't be used to generate reports.
         | Velocity is for the team's benefit, as a tool to help manage
         | workload and schedule.
        
           | happytoexplain wrote:
           | >back-of-the-envelope way to estimate which bits of validated
           | functionality you're going to be able to get into the
           | codebase this sprint
           | 
           | >help you estimate time
           | 
           | How are these different?
        
             | roonyh wrote:
             | Same way that throughput and latency is different. You can
             | use it to predict what the team can deliver in a quarter
             | for example. But difficult to give ETAs to individual
             | stakeholders.
        
               | Nathanba wrote:
               | if you are at a point where you employ such a factory
               | throughput thinking for information workers then you're
               | misusing information workers in my opinion. Focusing on a
               | throughput metric is just as nonsensical as focusing on
               | how many lines of code somebody creates, in fact, it's
               | really astonishingly similar in how nonsensical it is.
               | Bug reports, issues and features are not just lumps of
               | coal that you need somebody with a pickaxe to beat it
               | with. If you are treating employees like cogs then they
               | will mold themselves to be empty, unthinking cogs. They
               | will not think of outside solutions anymore, they will
               | not care anymore, they will just take the next issue and
               | beat it as ordered.
               | 
               | In my opinion it could even be seen as the biggest red
               | flag of a team when they start using story points. It
               | fundamentally means that this team started to measure
               | their work in terms of raw issue throughput instead of
               | real value. It may work for a while. Maybe your managers
               | are just so awesome that all the issues they create are
               | perfect and great for the business and you never have to
               | think for yourself at all. But inevitably there will come
               | a point where the company would be better off if everyone
               | was using their full potential but by that point you are
               | stuck with a bunch of cogs that you have molded into cogs
               | over years.
        
               | roonyh wrote:
               | ah, we are not using it as a measure of teams
               | performance, like throughput though. Its just used to
               | predict what the team can deliver in a sprint or a
               | quarter etc and make business decisions based on that.
        
               | skydhash wrote:
               | That is kinda the same thing. With story, it's either we
               | roughly know how to do it or we need to do some research.
               | In te first case, estimates will be wrong because of edge
               | cases and contextual differences.
               | 
               | Businesses decisions should be based on things like
               | feature requests from customers, not the amount of
               | "points" a team can get done.
        
               | StackRanker3000 wrote:
               | It's extremely useful for a business to have a rough idea
               | of when they'll be able to deliver something. Budgets,
               | contracts, client relationships, marketing, etc are
               | affected by it.
               | 
               | So should Engineering give a best effort to estimate
               | that, or just throw up their hands and say "it's done
               | when it's done"?
        
               | n4r9 wrote:
               | Counterpoint: it's extremely useful for the Trisolarans
               | to know when their next stable period will be, but that
               | doesn't make it reasonable to demand an estimate and
               | factor it into a contract unless you're _really really_
               | clear about the uncertainty in the estimate.
        
               | StackRanker3000 wrote:
               | Yes, we should all live in reality and use our best
               | judgement. If estimating based on story point velocity is
               | literally useless, then no one should be doing it.
               | However if it _does_ help make planning more accurate,
               | even by a little, then it might be worth the cost of
               | doing so. It's a conversation to be had between different
               | functions, hopefully based on empirical evidence.
               | 
               | I feel like a lot of engineers overlook that there's more
               | to a viable business than just producing high-quality
               | software. People don't ask for estimates just to annoy
               | developers.
        
               | n4r9 wrote:
               | > People don't ask for estimates just to annoy
               | developers.
               | 
               | No, I know, there's just a systemic difficulty with
               | scheduling dev items that are difficult to estimate.
               | 
               | My team is currently working on performance improvements
               | for a certain service in order to get it to a level that
               | our biggest client is happy with. Based on some profiling
               | and some intuition, I built some Jira cards with rough
               | ideas of what changes _might_ make some improvements and
               | added some rough estimates of how long it would take to
               | trial each idea. Of course, what 's actually happening is
               | that we try one idea, it counter-intuitively makes
               | performance worse, we dig into why that's the case and
               | refine the idea, then try a different version of it. It's
               | fundamentally impossible to give an estimate for when we
               | will have run through all the ideas (plus new ones we
               | think up along the way) and how much of an improvement it
               | will make.
               | 
               | I just came out of a slightly painful standup where the
               | dev manager repeatedly asked "Is this doable by mid-
               | August?", and I repeatedly answered that it's not
               | possible to give such an accurate estimate, that we would
               | do what we can in that time and hope to give a better
               | idea of what's possible by the end of this month. Of
               | course it's not great for the dev manager to hear,
               | because they have a client who needs to know how quickly
               | they can scale up their use of the service. There's a
               | conflict between what we can possibly know and what the
               | client "needs" to know. I wish that I knew how to resolve
               | it. It feels wrong to agree to deliver something with
               | such a level of uncertainty, since it just leads to a
               | ridiculous amount of pressure like this.
        
               | StackRanker3000 wrote:
               | That's all fair. It's an inherently difficult problem. In
               | a healthy organization, leadership is aware of this, has
               | reasonable expectations and factors in the risk.
               | Unfortunately not all organizations are mature in this
               | way.
        
             | tbrownaw wrote:
             | The assumption is that it's already unreasonable to expect
             | developers to estimate how many hours something will take,
             | and then due to meetings and such it's effectively
             | impossible for them to then those already bad numbers into
             | calendar days. So instead, the proper answer is to bypass
             | all that by having developers estimate in made-up units
             | that can be added up and trivially converted into calendar
             | days.
        
               | dilyevsky wrote:
               | The assumption that anyone can estimate work they have
               | never done with a reasonable degree of accuracy is just
               | plain wrong. That is why management pretends they arent
               | doing that either
        
             | dilyevsky wrote:
             | They aren't. I've seen this argument rehashed a thousand
             | times - "we arent estimating time, just complexity so we
             | can estimate how much we can do in a sprint. which is two
             | weeks. wink wink"
        
               | Rinzler89 wrote:
               | Which is just time and effort estimations with extra
               | steps and cargo culting.
        
             | tgma wrote:
             | Only one requires an overpaid clown (SCRUM master/Program
             | Manager/etc) to do the unit conversion.
        
             | vannevar wrote:
             | One is a fuzzy and subjective measure of how much software
             | a team can develop in a sprint, the other is a precise
             | measurement in a single dimension. I could sit there and
             | try to calculate how many expertise-adjusted person-hours
             | each team member represents, then estimate our capacity
             | that way, but why fool ourselves with that kind of false
             | precision? Just eyeball it the first sprint and then
             | observe how much we get done. Explicitly tying story points
             | to time just invites abuse of the velocity by managers who
             | don't understand how scrum works.
        
               | mcluck wrote:
               | I frequently hear about this abuse of estimates and even
               | ran in to it myself when I was a more junior engineer. In
               | my opinion, part of maturing as an engineer is learning
               | to call your shots and properly communicate when you
               | aren't sure how accurate you are. It's one thing to say
               | "I promise this will be done tomorrow". It's another
               | thing to say "we're not positive but within the month
               | seems likely"
        
           | bluefirebrand wrote:
           | > No one outside the scrum team should care about story
           | points, and they certainly shouldn't be used to generate
           | reports. Velocity is for the team's benefit, as a tool to
           | help manage workload and schedule
           | 
           | These two sentences are somewhat in conflict imo. Workload
           | and schedule is tied into capacity planning and resourcing,
           | which happens at a higher level than the scrum team. The
           | people having those conversations need _something_ to go off
           | of, so it 's pretty easy to see why they latch onto story
           | points and velocity.. those are numbers that their teams are
           | already producing!
           | 
           | I do agree with you that this is a misuse of velocity and
           | story points, but I don't think it's possible to keep such
           | things from being used (abused?) by upper managers above your
           | team
        
             | skydhash wrote:
             | There are other numbers that kept getting ignored like bugs
             | count, backlog size, time lost to tooling and meetings,...
             | maybe those can help with planning and resourcing too.
             | 
             | It's always measure the team's productivity, not make the
             | team productive.
        
             | samus wrote:
             | Apart from the impact on team motivation and the incentive
             | to inflate estimates, another problem with that approach is
             | that the story points might not correspond cleanly with how
             | much time was actually spent on the task. Story points are
             | anyways an example of multidimensional data squeezed into
             | one dimensions and in the process losing valuable
             | information.
             | 
             | Are there teams out there that correct the story points
             | based on actual amount of work and complexity?
        
             | vannevar wrote:
             | But at that point you should be at a higher level of
             | abstraction, looking at the number of sprints that will
             | probably be needed to clear the backlog (hopefully
             | understanding that the backlog itself should always be
             | regarded as incomplete). The discussion then should be
             | something like, "Hey, we're four sprints in, the backlog
             | already has about seven more worth of stories, and we only
             | have four more sprints until our target deployment date. Do
             | we cut features, move the date, or add more team members?"
             | 
             | In the pathological case where management is constantly
             | monitoring the team velocity and converting that to
             | individual productivity, you'll get managers who (often to
             | cover their own recklessness in setting an unrealistic
             | date, or procrastinating on starting the project) will
             | decree that the team is going too slow. I know that happens
             | a lot, but it's not the fault of scrum, it's just poor
             | management. Scrum can't make a bad manager good, but
             | avoiding scrum won't make them good either.
        
         | rerdavies wrote:
         | Software does not exist in a vacuum. You are probably right in
         | thinking that story points should not matter to you, as a
         | developer; but they do matter to external stakeholders.
         | 
         | Forecasting and management of expectations is necessary because
         | software often has external real-world dependencies: available
         | funding for a first release, marketing materials, hardware that
         | can't be released without software, trade shows, developer
         | conferences, yearly retail release parties, OEM partners,
         | cyclic stable releases for enterprise customers who won't push
         | software into production without extensive pre-testing,
         | graphics adapters that can't be released without drivers,
         | rockets that won't launch, cars that won't drive, etc.
         | 
         | All of these things require some degree of forecasting and
         | appropriately-evolving management of expectations. Here's where
         | we stand. Here's what we can commit to. Here's what we might
         | deliver, but are willing to defer to a future release. Here are
         | the (low value) items were under consideration that we will
         | definitely defer to a future release, here are the features you
         | will need to drop to get feature b in this release.
         | 
         | The purpose of story points is to help provide forecasting and
         | management of expectations (with appropriately limited
         | commitments) to stakeholders, on the understanding that
         | forecasts are approximate.
         | 
         | Calibrated burndown of story points is pretty much the only
         | basis on which forecasting and management of expectations can
         | be done in an agile process. The key is to make sure that
         | stakeholders understand the difference between forecasting and
         | commitment, and to make sure your development team is
         | appropriately protected by a healthy development process.
         | 
         | Whether the author's claim that you get better forecasts by
         | just counting stories, instead of summing story points... color
         | me skeptical. I do get that it prevents some obvious abuses of
         | process, while enabling other that are just as bad. If somebody
         | is using story points as a developer performance metric (which
         | they shouldn't), there's nothing that prevents them from using
         | completed stories as a developer performance metric (which they
         | shouldn't). The corresponding abuse of process to combat that
         | metric would be to hyper-decompose stories.
        
           | JohnAaronNelson wrote:
           | There was a part of the article that discussed that you
           | create tasks, not stories.
           | 
           | You can group the tasks into stories or milestones or
           | iterations or epics.
           | 
           | In general, he's saying you should always keep breaking down
           | a task until it's a 1, since 1s are easy to estimate.
           | 
           | The key part that may be missed is the "mob programming" or
           | "pair programming" aspect where all the engineers on a team
           | sit together and work through a story or milestones or epic
           | to come up with a list one 1 point tasks.
           | 
           | Obviously this still can't be done, so the only effective end
           | solution is maximum pair/mob programming unless all tasks in
           | an iteration are accounted for and broken down into easily
           | understandable and estimable bits of work.
           | 
           | There is at least some truth to the notion that if you use
           | mob programming, estimating becomes pointless.
        
             | Zanfa wrote:
             | > The key part that may be missed is the "mob programming"
             | or "pair programming" aspect where all the engineers on a
             | team sit together and work through a story or milestones or
             | epic to come up with a list one 1 point tasks.
             | 
             | My issue with this has always been that once an issue is
             | straightforward enough to estimate as a 1 point task, you
             | could've implemented the task already during the estimation
             | process. The unknown effort is almost never in the writing
             | code part, but figuring out the complexities around
             | business rules & externalities.
             | 
             | But this doesn't fix the process, it just moves the
             | variability of effort & time into a different part of the
             | process.
        
               | brightball wrote:
               | I have actually always had the same feeling about 1
               | pointers, but in this case you're talking about a
               | collection of small tasks that make up a larger feature.
               | 
               | The larger feature probably couldn't have been
               | implemented during the estimation process, but a single
               | isolated small task could have.
        
           | dasil003 wrote:
           | > _Calibrated burndown of story points is pretty much the
           | only basis on which forecasting and management of
           | expectations can be done in an agile process._
           | 
           | Do you mean in an Agile process?
           | 
           | Sorry I have a visceral reaction to this, having seen teams
           | try to accomplish large things by breaking them down into
           | story-level tasks and then sum up the estimates, and then
           | watch the slow motion train wreck as gaps emerge,
           | requirements evolve, learnings accumulate, and everyone
           | throws their hands in the air and points to the long paper
           | trail of tickets that prove they did their job.
           | 
           | Scrum and story points are a reasonable way to drive local
           | incremental improvements when you have no greater ambitions
           | than local optimizations of an established system, but they
           | have a low ceiling for achieving anything ambitious in a
           | large system. At best you'll get solid utilization of
           | engineering resources when you have a steady backlog of small
           | requests, at worst you'll redirect engineers' attention off
           | of the essential details that make or break difficult
           | projects towards administrative overhead and ticket
           | shuffling. I understand why this might be the way to go in a
           | low trust environment, but it's really no way to live for an
           | experienced and talented cross-functional team.
        
             | Royce-CMR wrote:
             | I would love to hear your view of handling ambitious
             | changes in a large system.
             | 
             | (In the middle of this scenario. Mix of
             | experienced/talented and low trust environment.)
        
           | brightball wrote:
           | > The corresponding abuse of process to combat that metric
           | would be to hyper-decompose stories.
           | 
           | You're right about that, but that's also one of the benefits
           | to the approach. Inflating a point estimate is easy and
           | there's no real audit trail for why the value is what it is.
           | 
           | On the other hand, if a team creates tasks like "Commit the
           | code" or "save the file" it's pretty easy to identify as
           | fluff.
        
         | recroad wrote:
         | Story points were never meant for forecasting. To do that you
         | can use Monte Carlo analysis
         | https://observablehq.com/@danielfrey/monte-carlo-simulation-...
        
           | piuantiderp wrote:
           | Please don't
        
         | vladgiverts wrote:
         | I used story points for years with my teams and they worked "as
         | advertised", which is they helped the teams understand the
         | effort, complexity and risk for each story involved.
         | 
         | When there was disagreement, it helped them dig deeper to
         | understand why and usually reveal somebody's incorrect
         | assumptions.
         | 
         | It helped make sure teams didn't overcommit to the amount of
         | stories they stuffed into a sprint and avoid either burning
         | out, or worse, normalizing not finishing the sprint causing
         | negative impacts to morale/motivation. (For some reason my
         | teams often thought they could do more than the points
         | implied!)
         | 
         | Most importantly, when large projects were proposed or were in
         | progress, we were able to give realistic estimates to the
         | various stakeholders about when to expect the various
         | milestones to arrive, which bought us engineers a ton of
         | credibility, trust, and respect with the rest of the company.
         | 
         | And yes, management wanted to see the story points and measure
         | the team against them. I told them to F-off. Nicely. Kinda.
         | 
         | It helped that I was either a CTO or a senior enough exec in
         | those cases with 3-8 agile teams. I essentially was the middle
         | management and could put a stop to any destructive practices
         | like evaluating teams against their velocity.
        
           | urban_winter wrote:
           | Absolutely my experience too. Story points have been an
           | effective tool for me with multiple teams in several
           | different companies over the past two decades. They aren't,
           | by themselves, the complete answer to any problem - they need
           | to be applied within the context of a healthy team and
           | engineering culture. And some senior management persistently
           | misunderstand them and want to do insane things like compare
           | velocities between teams. But they are a good and useful tool
           | in the hands of a good team.
        
             | brightball wrote:
             | Healthy engineering culture is a cure for many, many
             | issues.
        
           | Sammi wrote:
           | So story points work when they are used as an internal tool
           | for a team to understand themselves.
           | 
           | And story points don't work when they are a tool used to
           | communicate to the external world outside the team.
        
             | sumtechguy wrote:
             | They are good for 'hey can I get this crap done in a
             | sprint'. Once someone starts measuring it for 'how good a
             | team is' that is when it falls apart.
             | 
             | One teams points almost always do not equal another teams
             | points either.
             | 
             | Agile has a TON of anti-patterns that look good to do and
             | are enticing to do. But in the end are self destructive.
             | Usually making it about the process instead of 'I have X
             | amount of work and Y number of people how much can I get
             | done in Z time'.
             | 
             | For example velocity. I measure it so I do not overcommit.
             | Trying to do 50 points when 20 is the norm and something
             | will happen that we do not want. But now that you have a
             | measurable number some manager will want to brag on it
             | (that is their job to brag about you). In the end being put
             | on some spreadsheet to be presented to some other manager.
             | It becomes a score to measure you against other teams and
             | an anti-pattern. As actually testing if something is being
             | productive is hard. But numbers you can get all sorts of
             | them out of agile, leading straight to anti-patterns.
        
               | lsaferite wrote:
               | Story Points are inherently team specific as is Velocity.
               | Trying to normalize them across an org for the purposes
               | of a performance metric is folly. Velocity should be used
               | internally on the team when doing timeline _estimations_
               | , but exposing that outside the team is, again, folly.
               | Even on a singular team, SP and V are subject to small
               | drift or large corrections based on team makeup, time of
               | year, or numerous other metrics. They are simply a
               | planning _estimation_ tool. As others have pointed out,
               | the act of assigning SPs is a useful tool itself as it
               | requires a team to collaboratively estimate complexity
               | and it frequently helps surface miscommunication and
               | missing details.
        
           | zelphirkalt wrote:
           | > It helped that I was either a CTO or a senior enough exec
           | in those cases with 3-8 agile teams. I essentially was the
           | middle management and could put a stop to any destructive
           | practices like evaluating teams against their velocity.
           | 
           | I am sure teams quite appreciated you shielding them from
           | overzealous management. But here is a thought: Doesn't this
           | stand or fall with you being there or leaving? Will the next
           | middle management be as capable and looking out to shield the
           | teams from the destructive influence? Why not change the
           | system, so that the middle management does not need to shield
           | the engineers?
        
             | 8organicbits wrote:
             | A manager cannot protect teams after they leave. The new
             | manager can change all the existing process when they take
             | over, and you're back to square one.
        
               | zelphirkalt wrote:
               | I understand that. So the question arises: Is it more
               | difficult for a new manager to ruin the work processes
               | through inaction (not shielding the team) or by reworking
               | established processes? My bet is on it being very easy
               | through inaction.
        
               | stackskipton wrote:
               | Most of time, I find new manager was brought in to be a
               | yes person because previous manager quit due to conflicts
               | with their management that maybe you didn't see.
        
           | brightball wrote:
           | You sound like an excellent technical leader and that fixes a
           | lot.
           | 
           | One of the main drivers for writing this down is to make it
           | easy to pass along for people who aren't as aware of the
           | problems that come from those anti-patterns, as well as to
           | explain why they are so destructive. The hope is to raise
           | some awareness for people in tougher situations.
        
         | shalmanese wrote:
         | They're also useful in retro for the simple fact that something
         | was written down. If your story point estimate was way off for
         | a particular task, you can pull up the original conversation,
         | identify what assumptions were violated or what new info was
         | surfaced that wasn't present at the original estimation and
         | whether there's learnings/process changes to be made.
         | 
         | Of course, retro is usually the first thing to go in a deluded
         | attempt to increase velocity and story points hang on as this
         | vestigial tail, contributing to more cargo cult software
         | engineering.
         | 
         | edit: One scenario that might play out:
         | 
         | The team all agreed that tasks A, B & C were worth 3, 5 & 1
         | points respectively but Steve and Mei thought task D was worth
         | 5 points but Carol thought it should be 13 because it involved
         | integration of an external API where her experience was that
         | other API integrations in the past had exposed hidden
         | complexity.
         | 
         | Task D ultimately was not completed because during the process
         | of integration, it was discovered that the API did support a
         | key feature that was needed and instead, an in house
         | alternative needed to be built.
         | 
         | It was decided that going forward, the team would instead
         | assign a 1 point task to building a toy app for any new API
         | integrations that would then feed into the process of deciding
         | the story points for features requiring that integration.
        
         | burnished wrote:
         | Yeah, the discussion can be really illuminating. If the points
         | weren't recorded or mentioned afterwards I think it would be a
         | net positive in some cases.
        
           | brightball wrote:
           | That's one of the main points of the approach mapped out.
           | 
           | You still get the discussion value, you just end up
           | documenting things better as a practice and make a more
           | concerted effort to add clarity where needed.
        
         | brightball wrote:
         | That's a very healthy approach to it and deserves applause.
         | Kudos.
         | 
         | The goal of mobbing around task breakdowns is to drive the
         | communication and building that shared understanding. Just with
         | an output of writing most of it down in a way that makes it
         | easy to track progress and approximate the size at the same
         | time.
        
       | d_watt wrote:
       | I'm not sure I agree with the framing of this article.
       | 
       | It seems to be comparing two different things, 1. Points as a
       | method for attributing difficulty to a work item, vs 2. The
       | collaboration process of creating a task list as a method of
       | breaking down work.
       | 
       | Running a team, I found pointing useful, more useful than the
       | individual line engineers did, as we had different goals. My
       | goal, in optimizing the team, was to go through all our work, get
       | everyone in a room and create a relatively optimal plan for the
       | next couple of weeks.
       | 
       | By going through the exercise of pointing, we often found that
       | something one person thought was hard, another found easy. That
       | act of estimating would reveal knowledge one person had that
       | another didn't, that made the task easier. Without that process,
       | the work might have been harder do do, because the easy way was
       | never revealed. We also adhered to a 8 points is too many
       | philosophy that meant any item that hard needed to be decomposed
       | to simple tasks to repoint.
       | 
       | The "queuing" section basically implies the planning process
       | should decompose tasks all the way to nothing but 1 point stories
       | (or at least similarly sized work items within some variance).
       | It's basically the same process as pointing, except not calling
       | out some things are chunkier than others because it all comes out
       | in the wash.
       | 
       | TL;DR this articles definition of queuing is basically pointing
       | where task = 1 point items.
        
       | ravenstine wrote:
       | We should be thankful that it's commonplace to use points instead
       | of units of time like days even if points are horseshit.
       | Estimates aren't that useful most of the time, and the last thing
       | I would need is a manager telling me they're concerned because my
       | ticket took 3 days instead of the two that the whole team
       | estimated.
        
       | ooterness wrote:
       | As someone looking at algorithms for managing buffer bloat, this
       | resonates.
       | 
       | In IP routers, the goal is to keep the congested link busy. i.e.,
       | Idle time from a momentary hiccup is wasted time. You need a
       | small buffer to do this, but piling on more data adds latency
       | without actually doing any good.
       | 
       | Algorithms like CoDel realized that a lot of previous attempts to
       | make this were noisy as heck. Minimum latency through the queue
       | is the signal that makes sense. Everything else is misleading or
       | gives inaccurate predictions. Why should it be any different for
       | managing tasks for human workers?
       | 
       | [1] https://en.wikipedia.org/wiki/CoDel
        
       | mikeocool wrote:
       | Given the size of my scroll bar, I rate reading this article a
       | 13. My PM has decided I shouldn't bother reading it, as the
       | likely value isn't worth the effort, because whenever we take on
       | a 13, it ends up dragging on for like 4 sprints, and preventing a
       | lot of other higher value/lower effort stuff from getting done.
       | 
       | Maybe at some point in the future, we'll break the article and
       | have a few people on the team each read it part of it for lower
       | effort, and then synthesize their take aways.
        
         | brightball wrote:
         | Totally get it. :-)
         | 
         | I did include a helpful TLDR near the beginning with the
         | highlights though.
        
           | choppaface wrote:
           | I found the tldr really confusing and next-to-useless. It's a
           | really really long article and I just wanted to read about
           | queuing since yeah story points can suck.
        
             | brightball wrote:
             | I'll see what I can do to improve it.
        
         | jurassicfoxy wrote:
         | This article was not written for the reader, but written
         | because the writer loves to hear himself write.
        
         | josiahpeters wrote:
         | I feel personally attacked by this comment. This hits so close
         | to home. I think I have some personal reflection to do.
        
       | egeozcan wrote:
       | Story points are pointless on their own, but estimation meetings
       | are invaluable. In those meetings, story points serve as
       | shortcuts for expressing gut feelings. However, after the
       | meetings, they become completely useless, and even harmful,
       | because, as the article mentions, people start treating them like
       | precise numbers and do arithmetic with them.
        
         | andirk wrote:
         | Much like one huge difference between string "42" and the
         | number 42 is that the latter can have math done to it. If you
         | want to avoid the arithmetic, label tasks with words like
         | "simple", "small", "quick", or my favorite "Won't fix".
        
           | egeozcan wrote:
           | > Much like one huge difference between string "42" and the
           | number 42 is that the latter can have math done to it
           | 
           | I actually agree with your comment but this part made me
           | laugh out loud because JavaScript :) ("42" - 1 === 41 but
           | "42" + 1 === "421")
        
       | steveBK123 wrote:
       | Story points are UBI for Product Managers
        
       | einpoklum wrote:
       | But my managers say I have to allocate story points! I'm sure
       | they know what's best and not just making me jump through hoops
       | because of their artificial imposition of JIRA under the title of
       | being supposedly "agile"! Right?
        
       | xn wrote:
       | Estimate using time (hours, days, weeks, months, years).
       | 
       | Reflect your uncertainty in your estimates using confidence
       | intervals.
       | 
       | If your confidence intervals are too wide, break down the work
       | and estimate the smaller tasks and/or spend some time doing the
       | work necessary to narrow your confidence intervals.
        
         | psychoslave wrote:
         | I can estimate rather accurately how much time it will take me
         | to cook a meal assuming that:
         | 
         | - I already mastered the receipt as I prepared the very exact
         | same one many times in the past
         | 
         | - I already checked that I have all the ingredients required at
         | hand
         | 
         | - I will cook in my own kitchen
         | 
         | - no entropy engine (aka family members) was thrown before in
         | the kitchen to put utensils in an other place than the place
         | were I tidily store them (admittedly without conducting formal
         | formation of the rest of the disruption forces)
         | 
         | - no one will interfere because the way I do it is not the
         | super fancy other way in which it could also be done
         | 
         | - no external catastrophe happen which obviously need to be
         | taken care of immediately, just at this point in recipe where
         | by the time I will come back most of what I did so far will be
         | better started again from scratch because the underlying laws
         | of physics I was assuming so far changed so significantly that
         | the left ongoing work is now utterly incompatible with the
         | divergences that universe bumped to
         | 
         | Meanwhile, in the easier transparent stationary landscape of
         | software development, whenever I came with a to-my-mind-
         | credible estimate for a non trivial endeavor, it was
         | systematically rejected and superseded by a soon-to-be-blown-
         | away deadline.
        
       | psychoslave wrote:
       | I find the requirement to give a note together is a good
       | insensitive to stay focus on what the topic is, try to grab it,
       | ask questions to start to put some lights on the biggest dark
       | corner of the task.
       | 
       | I couldn't care less about the resulting quantification. What
       | matter is how well we communicate in the team, how helpful we are
       | with each other, how well we can progress and keep motivation
       | where struggle with huge hindrances paving the way. The points
       | are not the point, but they are not pointless.
       | 
       | The map is not the territory. Everyone can have a different map
       | and a different metric system if any. If at the end of the day
       | people inhabiting the territory do it in a satisfying way, all
       | good. It doesn't matter much what the plan on the paper might
       | look like: it will always be a mere epiphenomenal artifact of the
       | actual human processes at play.
        
       | Unknoob wrote:
       | Story points are in fact time, and I'm tired of pretending
       | they're not.
       | 
       | You can sugar coat it all you want and say they represent
       | complexity, but at the end of the day(or sprint), the higher the
       | complexity, the more time it takes to complete.
        
         | herpdyderp wrote:
         | The problem therein is that that time depends on who is given
         | the story. Perhaps that should be part of the estimation
         | itself? (Who is working on it.)
        
         | nucleardog wrote:
         | Fixing the machine at the factory can be quite complex, but you
         | might have a technician in and out in a day or two to get it
         | done.
         | 
         | Assembling 5,000 identical widgets is not complex, but it might
         | takes you weeks or months.
         | 
         | Complexity and wall time occasionally move the same way on the
         | graph (generally with wall time climbing much faster than our
         | view of complexity), but they're not necessarily or always so.
         | 
         | I tend to explain "complexity" more in terms of "at what skill
         | level of employee would we stop seeing substantial gains in
         | quality/speed/maintainability/etc when we assign this work
         | out".
         | 
         | Something that a senior could do substantially better/faster
         | than an intermediate is "high" complexity. Something that the
         | intermediate could do substantially better/faster than the
         | junior is "medium" complexity.
         | 
         | Adding some fields to a form is low complexity--an intermediate
         | or senior won't do a substantially different job than the
         | junior--but doing 10 fields versus 100 fields will change the
         | amount of time it takes quite a bit. Architecting a new service
         | will see gains to senior and beyond and is high complexity but
         | may not actually take all that long.
         | 
         | Ultimately, this boils down to "how many decisions remain to be
         | made". Most tasks can be made lower complexity by making those
         | decisions in detail. "Rearchitect this module" becomes medium
         | complexity when someone turns that into "rearchitect this
         | module following X pattern" and low when someone turns it into
         | "move methods A, B, C into new class X and split method D into
         | E and F along this line".
         | 
         | This view of complexity doesn't directly drive wall time, but
         | _does_ very directly impact the variability of that estimate.
         | The more decisions remaining and the more unknowns up front,
         | the wider the range of possible outcomes. Reducing the
         | complexity will reduce the range of estimates.
        
         | steelframe wrote:
         | I don't think anyone is really saying that story points aren't
         | time. It's just that you don't know what the story point <->
         | time conversion factor is until your team is calibrated.
        
       | tetha wrote:
       | The article lost me at a certain point, somewhere around the
       | "solving the conondrum".
       | 
       | It lost me, because we have two estimations - an overall size
       | guess of an epic and an actual implementation estimation of an
       | epic. Like the overall size guess is just 2-3 seniors looking at
       | an issue and wondering if this takes days, weeks, months or years
       | to implement.
       | 
       | The actual implementation discussion is however what the article
       | is talking about. We get most or all of the team into a meeting
       | and we talk through what needs to be done, and structure all of
       | that into individual concrete tasks everyone can have an idea of
       | implementing them. And then we estimate those tasks.
       | 
       | And this estimation in turn is communication to management. Like,
       | we've realized that about 21 is what one of us can do in a usual
       | monthly iteration outside of massive outages and such (we're an
       | operational team). So if an epic turns out to require some 3 21's
       | and 3 13's... that can easily take 6-12 months unless we put
       | exceptional focus on it. With high focus... as a team of 4-5,
       | that will still take 3-6 months to do.
       | 
       | On the other hand, something that falls into a bunch of 5's and
       | 9's and such tends to be muddled and struggled through regardless
       | of whatever crap happens in the team much more reliably. It needs
       | smaller chunks of overall attention to get done.
       | 
       | And note that this communication is not deadlines. This is more
       | of a bottom-up estimation of how much more or less uninterrupted
       | engineering time it takes to do something. A 21 in our place by
       | now means that other teams have to explicitly make room for the
       | assigned person to have enough headspace to do that. Throw two
       | interruptions at them and that task won't happen.
       | 
       | It's more bin-packing than adding, tbh.
        
       | jordanmorgan10 wrote:
       | Or just lose Agile altogether
        
       | xyst wrote:
       | So basically a "kanban board" with priorities attached to each
       | unit of work. Gotcha
        
       | bb88 wrote:
       | This is a problem from a management perspective, not a developer
       | one.
       | 
       | Story points are usable, but they're a "Wild Ass Guess" metric,
       | not a true metric of actual work, and treating them other than a
       | guess is fraught with problems. A 13 point story could fall
       | somewhere between 8 and 21.
       | 
       | Some stories we guessed 8, and ended up being more like 21
       | (because the dev had to fight unexpected politics, or the API was
       | billed as being "easy to use" but anything but.)
       | 
       | All these are fine and should be fine to developers, except to
       | management.
        
       | 23B1 wrote:
       | Project Management should be called Project Leadership, and the
       | tools of the former should inform - but not dictate - the
       | decisions of the latter.
        
       | lmm wrote:
       | The post is correct about some problems but completely wrong
       | about solutions. Breaking down tasks that are already sub-sprint-
       | sized in a meeting is the wrong way to do it; you'll put the
       | boundaries in the wrong place and end up duplicating work, and
       | then going overtime when the integration stage takes longer than
       | you thought it would. The right place to do that breakdown is
       | agile, just-in-time: give one person or pair/mob responsibility
       | for a piece of user-facing functionality (that they've already
       | agreed is sub-sprint-sized) and let them do whatever breakdown
       | makes sense for that. If they get confused or stuck they can
       | always raise it in standup (that's why we have them!).
       | 
       | Similarly:
       | 
       | > What happens when the team has turnover? What happens a few
       | months down the line when this work comes back up based on the
       | points that were given previously?
       | 
       | Why would you ever put points on it a few months ahead of time?
       | You do estimation in the sprint planning when it's a candidate
       | for that sprint. There's no need to write down the reasoning for
       | the estimation because the estimation is only relevant for the
       | duration of that meeting (as you prioritise stories for that
       | sprint), and _maybe_ in the retrospective two weeks later if the
       | estimate was way off.
       | 
       | I can see the argument for t-shirt sizes. The "queue" idea is the
       | opposite, and has all the problems of point/time estimation.
       | 
       | > When anyone not directly involved with the project asks why
       | it's taking longer than they thought, the answer will be spelled
       | out in the tasks list. These changes were added on these dates,
       | for these reasons based on this feedback from these people. There
       | is no "your estimate was wrong" situation. There is no "re-
       | estimating" process. There's not even an ask to approve if you
       | can change the point value. It just happens.
       | 
       | Guess what? They're going to ask for dates. They're going to ask
       | why the estimate changed, and not care about the answer because
       | they just want to blame you for _their_ estimates being off. And
       | your  "tasks" have just become the same time tracking that you
       | were (rightly) scared of; you have the same problem of having to
       | do a bunch of pointless busywork to justify that you were
       | actually working. (Suppose a "task" is suddenly twice as complex
       | as you thought it was; now you've got to file a second "task"
       | with a fake description to justify why you only did 3 tasks this
       | week when Bob did 4).
       | 
       | The problems the article identifies are: spending too much time
       | and effort on estimation, estimating too far in advance (and then
       | having the team and/or circumstances change), and treating
       | estimates as deadlines. These are all real problems. But they're
       | not problems with story points (indeed story points are actively
       | helpful on the last one, since everyone has to at least pretend
       | to admit that story points are not time estimates), and they're
       | just as easy or difficult to solve whether you use story points
       | or something else.
        
         | Jtsummers wrote:
         | > Why would you ever put points on it a few months ahead of
         | time? You do estimation in the sprint planning when it's a
         | candidate for that sprint.
         | 
         | Because people (customers and managers in particular, but not
         | just them) want to plan ahead, they can't escape the optimistic
         | (and usually wrong) planning mode of BDUF projects. They fear
         | uncertainty and want to know, at a glance, how long the work
         | will take based on their current backlog/queue/whatever.
         | Customers don't like to be told "We'll deliver when we deliver"
         | so managers (salespeople) give an optimistic schedule now based
         | on today's staffing (and optimistic assumptions about future
         | staffing levels and future staff abilities).
         | 
         | If they'd spend 5 seconds thinking they'd realize they can
         | produce _and deliver_ most (but not all) systems in an
         | incremental fashion that will satisfy the customers while
         | leaving key decisions and estimations to be made when there 's
         | enough information to actually make them. But that takes 5
         | seconds and that's too damned long.
        
       | jmward01 wrote:
       | The fundamental issue isn't addressed but it sure is hinted at.
       | Scheduling is an NP problem. As queue size, or backlog, or
       | (insert thing here that tracks work to be done) grows it takes
       | n^p calculations to schedule it optimally. This is hit on when it
       | mentions small teams hitting their estimates. They can do this
       | because their task list is small enough to go through all the
       | permutations and actually come up with an accurate estimate. The
       | only way to keep an n^p problem under control is to divide and
       | conquer it. The leafs of that process must not go beyond a fixed
       | size and the task divisions can't be recombined prematurely.
       | Everything else is just yet another management idea that that
       | will fall apart when the task has too many pieces. Once agile or
       | any other management methodology acknowledges the fundamental
       | mathematics at the core of things I may actually take them more
       | seriously.
        
         | duskwuff wrote:
         | > Scheduling is an NP problem. [...] it takes n^p calculations
         | to schedule it optimally
         | 
         | That isn't what NP means. (An O(n^p) algorithm would in fact be
         | in P.)
        
           | jmward01 wrote:
           | yep. I wrote without thinking. c^n would be better right.
        
       | T-zex wrote:
       | What stops management from committing Feature A to be delivered
       | after 250 tasks are completed? Yes the fact and the reasons that
       | the Feature A expands to 500 will be documented, but who will
       | care about it? This will still be a "delay" from the management
       | point of view.
        
         | wombatpm wrote:
         | To quote Douglas Adams: I love deadlines. I love the whooshing
         | sound they make as they blow past.
        
       | JohnMakin wrote:
       | Story points are a useful exercise when trying to discuss
       | complexity of a task but IME it completely falls apart when used
       | as a metric to determine anything useful like velocity.
       | 
       | I had a terrible experience with them once. I was a relatively
       | new, enthusiastic engineer on a struggling team of guys who'd
       | been at the company a long time and were pretty burnt out.
       | Inevitably I started getting all the "hard" stories with a lot of
       | points, til it got to some stupid point where I was outputting
       | about 80-90% of our team's combined story points. Management
       | caught wind of it, didn't like it, so what they decided to do was
       | adjust my points "downward" to be more in line with the rest of
       | my team's output. It really irritated me, because it'd result in
       | absurd situations where my teammates would get a "3 point" ticket
       | that was like, just updating some field in a config file to an
       | already-known value and checking it in somewhere, and I'd get
       | this whole-ass project wrapped in a single ticket and they'd give
       | me the same amount of points for it. And of course this was tied
       | in to performance reviews, adding to how annoying it was.
       | 
       | Another super irritating thing that would happen is I'd be asked
       | to estimate complexity on some super vaguely defined ticket
       | describing some problem that would take a lot of detective work
       | to even figure out how to solve, so how am I supposed to give an
       | accurate estimate of complexity? If I knew that much, I'd already
       | have probably fixed whatever the issue was.
        
       | fallinditch wrote:
       | I think some of the problems and issues we're discussing here
       | derive from confused project management methodologies that call
       | themselves 'agile' yet require detailed estimation, measurement
       | and reporting of task timing.
       | 
       | Story point allocation can be useful to give a quick and easy
       | 'good enough' estimation of time/effort required for a
       | significant chunk of work (epic).
       | 
       | I find that this approximate approach is almost always more
       | accurate than trying to estimate every little task.
       | 
       | If the project manager and engineers try to break down a project
       | into small granular tasks with time estimates then it's almost
       | inevitable that the effort will be underestimated because it's
       | virtually impossible to anticipate every sub task, blocker,
       | unforseen delay, etc (and then there's the extra time it takes to
       | manage all these micro tasks in your PM system!).
       | 
       | In such situations the old project manager trick of doubling all
       | estimates tends to provide a more accurate timeframe.
       | 
       | This is why story points can be more accurate: because you are
       | estimating the effort it takes to do something _relative_ to your
       | previous experience of similar workloads.
       | 
       | So, if you avoid estimating granular tasks and keep your
       | estimates as the approximate amount of effort relative to
       | something you've done before, then you will end up with a more
       | realistic timeframe. Story points can help with this mindset.
       | Also your team will not have to waste time faffing around in Jira
       | too much, or whatever system you use.
        
       | rerdavies wrote:
       | The value of story points is that it acknowledges that not all
       | stories are equally time-consuming. Importantly, story points
       | also provide a process for identifying stories that should be
       | further decomposed.
       | 
       | In my experience, story points allow forecasting that's as good
       | as any forecasting method I've ever used. And I've used pretty
       | much every schedule forecasting method over my long career.
       | 
       | The author touches on many of the reasons why story points don't
       | work. And pretty much every reason he gives is something that you
       | are not supposed to do.
       | 
       | The key to getting them to work is trust, and a commitment to
       | never use story points as metrics to measure the performance of
       | developers. Any attempt to do so will result in gaming of the
       | system. The tradeoff that stories provide is lack of precision in
       | exchange for not having to spend 50% of your development cycle up
       | front doing detailed analysis required to provide detailed
       | estimates (which never worked anyway).
       | 
       | Things you must also never do:
       | 
       | - compare calibrated burndown factors between teams.
       | 
       | - Ask why the calibration factor isn't N. THe calibration factor
       | is.
       | 
       | - Have stories with more than N story points (where N is 3 or 5).
       | Decompose them.
       | 
       | - Introduce the least bit of stress.
       | 
       | - Use burndown rates to generate commitments, instead of
       | forecasts.
       | 
       | - Use forecast results to justify asking developers to work
       | overtime.
       | 
       | The last point, I think, is particularly interesting. The manager
       | who was my first scrum master made the following commitment to
       | us: you will never work overtime again. And voluntarily working
       | overtime will be consider a bad thing, not a good thing, since it
       | impairs predictability of the team's productivity. "I know you
       | don't believe me", he said. But he was right. We never worked
       | overtime again.
        
       | rerdavies wrote:
       | Could somebody explain how queue theory fits into agile
       | processes? Where are these unmanageable queues, that need to be
       | emptied coming from?
       | 
       | Queue theory only becomes a problem when (1) stories are being
       | added to the active story queue at a furious rate; and (2)
       | nothing gets shipped until the active story queue is emptied. I
       | don't think think either of those things are supposed to be true
       | in an agile process, especially the last.
       | 
       | It sounds suspiciously like a symptom of gamification to me (if
       | new stories are being added by the development team). Or a broken
       | process where field defects (which are supposed to go to the top
       | of the queue) are so numerous that they completely overwhelm
       | active development, which is an entirely different issue,
       | requiring an entirely different response from management.
       | 
       | If story points are so wrong that it no longer fits in a sprint,
       | it seems reasonable to split the story. In my experience, I don't
       | think I've seen it happen more than a handful of times. How often
       | is an initial story point estimate so wrong that it has to be
       | revised upward to the point that it no longer fits in a sprint?
       | If it's wrong, but still fits in a sprint, just do it. It makes
       | me wonder whether there's gamification going on around using
       | story points to evaluate developer performance.
       | 
       | (Assuming that stories are converted to tasks at the start-of-
       | sprint meeting).
        
       | sithlord wrote:
       | In my world, on my team - everything is a 3. and if its not a 3
       | lets figure out why. IE, lets have a fairly sized piece of work
       | we scope for most tickets. If its bigger than that, lets discuss
       | it, see if its worht breaking down (if its larger) and if not
       | lets just agreee thats a larger piece than 3. that way we can
       | just keep an eye on relative size of issues.
        
         | ecshafer wrote:
         | My team doesnt really have story points. But we work kind of
         | similar to you: is this too big? If it is, lets see if we can
         | break it down to smaller tasks. I think it works much better
         | than arguing over story points.
        
         | andrewflnr wrote:
         | That's pretty close to what the article is describing, if I
         | understand it right. They functionally define "tasks", the ones
         | put in the queues they suggest measuring, as bits of work small
         | enough that most of the uncertainty is gone. So until that's
         | proven wrong (when reality smashes a task into a bunch more
         | tasks), it's more-or-less equivalent to all your stories having
         | the same number of story points.
        
       | aetherspawn wrote:
       | I am reading this slowly and there's some good stuff in here, but
       | it's really long and I don't have 1-2hrs to sit down and read it
       | properly.
       | 
       | I liked the suggestion of having a dedicated architecture team to
       | break things down into work items.
       | 
       | Comment your favourite parts/highlights?
        
         | brightball wrote:
         | I struggled with the length but couldn't find a good way to
         | shorten it more unfortunately. That's the main reason I
         | included a TLDR.
         | 
         | Thanks for giving it your time though.
        
           | andrewflnr wrote:
           | You could trim down the parts dunking on story points a lot.
           | It starts to feel redundant and most of it is dubiously
           | relevant. If we care about the topic at all, we probably
           | already have an idea of what story points are and what's
           | wrong with them, and are mostly interested in your proposal
           | to replace them. You only need to refresh our memory about
           | the existing system, and maybe link to other critiques.
        
             | brightball wrote:
             | Fair critique. I was mostly trying make a thorough case
             | first.
             | 
             | I'll definitely have a followup focused more on queues.
        
       | jmull wrote:
       | I've never had a problem estimating projects using time units.
        
       | iampracticising wrote:
       | Don't the tasks in queues have the same issues with the tasks
       | from story points do? What if the tasks are not defined well
       | enough? So some tasks in the queue might take a day to complete,
       | another could take months?
        
         | eksx wrote:
         | A task that takes months is a project. I view tasks as
         | something I could get done in one day with full focus. Then at
         | the 2 day mark I reevaluate. The additional day can always act
         | as a buffer.
        
       | wsc981 wrote:
       | Just estimate time. In the end, whenever I worked with story
       | points in various companies, even though developers, Project
       | Managers or Scrum Masters would often state that Story Points are
       | a measure of complexity, in the end, the Velocity for a given
       | sprint was measured in Story Points as well. So, in the end a
       | Story Point is equal to an amount of time in a sprint.
       | 
       | This is also stated in the article:
       | 
       |  _> Story points do not represent Time, yet the Velocity metric
       | they are usually combined with defacto converts them to time,
       | sabotaging everyone from the start by doing the thing that you
       | can 't do with a precise number and a range...adding them
       | together._
       | 
       | Better yet, just don't bother with SCRUM and all it's pointless
       | and time-consuming ceremonies and just get shit done. This is my
       | preferred mode of working and I've been lucky to be able to work
       | like this for the last couple of years.
        
         | happytoexplain wrote:
         | I disagree with the first part. The only thing less useful than
         | estimating points is estimating hours.
        
           | stanislavb wrote:
           | If story points convert to "hours"/"days"/"time" in the end
           | of the day, why is estimating in time less useful?
           | 
           | Asked in another way - why is it more useful to estimate in
           | an unit that's more abstract/distant-from-reality?
        
           | XorNot wrote:
           | I mean I agree, but it's because you should estimating in
           | days.
           | 
           | No task significant enough to warrant a ticket in a queue and
           | design effort takes less then a day. Even if you you swear
           | it's "done", the more likely outcome is you'll be dealing
           | with it for hours later that week when some sort of an issue
           | crops up.
           | 
           | I've seen so many people "bid" 0.5 and 0.25 day units of time
           | (in points or whatever) and then act offended when I
           | challenge them on that, yet 3-4 days later they're still
           | plugging away at the same task due to "complications".
        
             | kelnos wrote:
             | Yep, I've been guilty of this in the past. Any estimate
             | shorter than a day is for a task that wasn't worth the time
             | to break it down and estimate it as a single unit. Like
             | "modify firewall rules to allow traffic to port 1234" --
             | no, that's not a separate task, that's part of whatever
             | task requires you to do that to get the whole thing to
             | work.
             | 
             | And any task that is meaty enough to be a task will take at
             | least a day, and probably longer.
             | 
             | The one place where I will more or less disagree is when
             | bug-fixing. There are always some bugs where you pop open
             | the debugger and have it solved in an hour or two. I've
             | been at places where bug report tickets were handled
             | differently from stories/tasks, though, so maybe this is
             | fine to just think about separately.
        
         | wisemang wrote:
         | I believe this latter suggestion is known as the "programming,
         | motherfucker" methodology [0]
         | 
         | [0] https://programming-motherfucker.com/
        
         | JohnAaronNelson wrote:
         | The real question is "how to get shit done"?
         | 
         | Scrum, agile, safe, etc.. are ways to get shit done that all
         | target the measurement.
         | 
         | Estimations are that measurement.
         | 
         | The nugget from this article that seems to missed by many is
         | the subtle but strong advocacy for XP style Mob/Pair
         | programming.
        
           | jksmith wrote:
           | Say no to SAFe. It's a middle-management orgy of mediocrity.
        
       | al_borland wrote:
       | When my company first started using Scrum it was with Rally. It
       | had story point, but also estimated time and actual time. We used
       | them all, and I found the estimated and actual time to be the
       | most useful. We then went to Jira, which kept the points and
       | dropped the time.
       | 
       | Since we were tracking the actual time things took as well, our
       | estimates got better over time. The team would help to keep
       | others honest. For example, writing documentation always took at
       | least 3x longer than anyone expected, so we'd alway make people
       | add more time to those stories.
       | 
       | Once we had reasonably accurate time estimates, there was also a
       | feature for available hours. If someone was on vacation, we'd
       | subtract those hours while planning the sprint. It was then easy
       | to see who was over committed, balance the work, and to make sure
       | we were being realistic.
       | 
       | We worked like this for about 2 years. It was probably the best 2
       | years I had in the job. We got a lot done, we were being
       | strategic about our work rather than reactive, and while we would
       | push to get things wrapped for the end of the sprint and the
       | demo, it never involved all nighters or heroics. We pushed
       | because people on the team wanted to do more and go faster, not
       | because of pressure from the outside. I noticed people got more
       | down when they tried to do less, so I'd often push back on people
       | trying to overload the sprint. If they finished everything, we
       | could always add more. Outside the team, our VP told us we were
       | 3+ months ahead of everyone and if I wanted to go hang out in a
       | cafe in Europe for a few months, go.
       | 
       | This is all a distant memory now. So many lessons learned, but
       | they all fall on deaf ears in the current organization.
        
       | kelnos wrote:
       | Ugh, yes, thank you.
       | 
       | I wish management types would get it through their heads that you
       | just cannot reliably estimate most software development projects.
       | (I said "most" -- there are of course exceptions.) You can't
       | evaluate employee performance by looking at a burn-down chart.
       | You can't show pretty graphs at the end of every sprint and
       | expect that to predict the future of the project.
       | 
       | What you _can_ do is set a reasonable deadline with your team,
       | have them work toward it, and allow them to adjust your
       | expectations on what exactly you will be getting by that
       | deadline. Yes, establishing that deadline in the first place
       | requires some sort of estimation, but story points, t-shirt
       | sizes, etc. are useless for that. Everyone on the team sitting
       | down, breaking things down into as-small-as-possible tasks, and
       | coming up with time ranges for each task is the way to do that.
       | Then you add up all the minimums and maximums and you have a time
       | range for the whole project. But that range is still only a
       | guess, and can 't be taken as gospel. And it may be wild, like
       | "somewhere between 6 weeks and 6 months", and you have to accept
       | that.
       | 
       | That's it. That's the best you can do. As the project carries on,
       | the only thing you can reasonably report on is the list of
       | features or functionality that's been implemented so far, and the
       | new range of the estimate based on what's remaining to do. You
       | can also look at the completed work, and map out where in the
       | per-task estimate range the team ended up hitting, but that still
       | can't predict the future.
       | 
       | You especially can't evaluate performance based on this stuff.
       | That requires being an involved (but not micro-manager-y) manager
       | who knows the team and can identify when their people are shining
       | bright, and when they are struggling (or just slacking off). It's
       | called _people_ management for a reason; you have to involve the
       | humans in that process and can 't evaluate them based on some
       | made-up numbers and dodgy, hand-wavy math.
        
       | Terr_ wrote:
       | I've always thought of story points as ideally* working like a
       | kind of international currency exchange, where it is normal and
       | expected that Team Teal Dollars will not have any permanent or
       | consistent relationship to Team Maroon Doollars nor to Actual
       | Time. (The saying "time is money" notwithstanding.)
       | 
       | The points will inflate or deflate over the course of months, or
       | even abruptly change with team composition or shifting to new
       | technologies or even vague morale issues. All that is normal, it
       | captures important facets of work, and trying to stop it from
       | happening only creates other problems.
       | 
       | What matters is that somebody is looking at near-past behavior
       | and using it to make a near-future estimate.
       | 
       | * If someone tries to mandate a fixed arbitrary correspondence
       | between points and real world time, that would be a non-ideal
       | scenario for various reasons.
        
       | roenxi wrote:
       | Story points are primarily a social tool - senior management
       | politics requires that something gets measured; story points make
       | them happy and provide a quantitative way of communicating with
       | the rest of the business. Until we come up with a way of
       | measuring programmer productivity - which is not a queue - there
       | is hard to improve on using story points.
        
         | eksx wrote:
         | "Which is not a queue" why not a queue?
        
       | danielrhodes wrote:
       | People take these kinds of things way too literally. There is no
       | golden solution here. What gets repeated over and over continues
       | to be true: teams should choose a system that works for them. And
       | ideally that system is measurable, so the team can evaluate
       | progress, improve its own performance, and align itself better
       | with other teams and the business.
       | 
       | But in terms of scrum and points here's my take:
       | 
       | I've seen points work on some teams and not work so well on other
       | teams. It's imperfect, but if you just accept that, you can make
       | it work quite well.
       | 
       | The reason it's helpful to estimate complexity as opposed to time
       | is that people with different experience levels would give
       | different estimates based on their abilities. Complexity allows
       | you to rally around a common understanding of a solution
       | regardless of how fast one team member might be able to complete
       | it versus another.
       | 
       | Does complexity have some relationship to time? Absolutely.
       | Everybody knows this. That doesn't mean that we should be using
       | time instead.
       | 
       | So how can a team estimate accurately? You will hear from some
       | people that their estimates were wildly off or that it's
       | impossible to estimate a project or they felt pressure to under-
       | estimate. If your estimate is too broad, you need to do the
       | mental work of breaking it down into smaller chunks that are
       | easier to estimate. If you feel under pressure to ship on an
       | unrealistic schedule, that's not a points/scrum problem. But the
       | "it's done when it's done" is also not realistic either.
       | 
       | The idea that the estimate has to be 100% spot on is also not
       | true. Again, it's imperfect and that is ok. But you'll find that
       | the better a team knows their codebase and knows the product, the
       | better they'll get over time at estimating. But if the work is
       | too vague, the team should push back until they have enough
       | information to more accurately break things down. This process
       | makes for better software, especially when the team does it
       | together.
       | 
       | Another missing aspect I see a lot is having a feedback
       | mechanism. If you as a team are discussing why a task took longer
       | than the estimate, or track metrics over time, you can all get
       | together and figure out where problems on the team are. For
       | example: maybe there are too many bugs that are hindering product
       | work? Why? Maybe you're moving too fast vis-a-vis the expected
       | quality bar. Some sort of feedback mechanism (e.g. retros) is
       | crucial - the team as a whole should aim to deliver what it says
       | it would and understand why it couldn't.
       | 
       | The whole point of these things is that as a team you can deliver
       | _consistently_ not more speedily. Consistency comes before speed.
       | The other important thing is having a way to continually improve.
       | You want to use each sprint as a way to measure the team so it
       | can get better.
       | 
       | When I've seen teams that did this well, they were dramatically
       | more productive than the teams that didn't do it well.
        
       | gregwebs wrote:
       | Story points seem to be a reaction to a process that doesn't
       | include the proper amount of time needed to actually make a
       | proper estimate. They seem designed to obscure how long something
       | will take to accomplish. I think people like this because
       | estimating is really hard and obscuring is seen as the solution.
       | 
       | The alternative approach is to do more detailed estimates. In
       | addition to any design work this can require time boxing a
       | "spike" to better understand things. This approach works well for
       | estimating but leaves the sprint uncommitted until the spikes are
       | complete.
        
       | iftheshoefitss wrote:
       | Are there any companies that have no estimation no pointing etc
       | just figure out what needs to be implemented and implement it
       | type situation?
        
         | hu3 wrote:
         | Startups that have their spec aligned to chaotic good.
        
         | slater wrote:
         | You forgot to add "on bro"
        
       | lifeformed wrote:
       | But what exactly is a "task"? It still seems like an arbitrary
       | unit.
        
       | osigurdson wrote:
       | I think if you have a clear and compelling vision, along with
       | motivated people, story points, scrum, etc. can all work well. If
       | you don't have that, then no process works. So, get the former
       | and don't worry too much about the latter.
        
       | jasonlotito wrote:
       | In this example, example task sizes are assumed to be the same
       | level of effort. That's not necessarily an easy thing to do, and
       | sort of falls into the same problems that pointing out stories.
       | 
       | If your tasks aren't the same level of effort, then one task
       | could take a week, and then next takes an hour. The author seems
       | so sure, I'm almost sure I missed something, but unless you can
       | reconcile how you can have 1 hour tasks and 1 week tasks and
       | consider them the same, well... I'm just confused.
        
       | jksmith wrote:
       | Completely missing the point, which often happens with xor
       | thinking. The beauty of story points is that they rely on human
       | ability to compare things quickly. It's almost instinctive. ex.
       | You're being chased by a rhinoceros through the jungle. You come
       | upon a tree with branches and a boulder with handholds. 2
       | seconds, which do you choose?
       | 
       | Story points are just a warmup for more elaboration, not an xor
       | decision. This article is making a single-level decision, which
       | completely misses point of using story points. The work-effort
       | really required will be discovered in more elaboration. Story
       | points just give you a live or die measurement, that's it.
        
       | mvkel wrote:
       | The system doesn't matter per se. What matters is that you have
       | one
        
       | citrusx wrote:
       | The problem with the proposed solution is that many teams can't
       | accurately break down tasks small enough. And, even those smaller
       | tasks have variability in how long they take to do. What I've
       | seen is that most teams don't really know how far "stories" break
       | down into their simplest tasks until they actually do the work.
       | 
       | So, that puts us back at square one, for the most part. A story
       | point may not tell you a lot, but tasks in this form often
       | present the same problem.
        
       | Hnrobert42 wrote:
       | Good lord. Get to the point.
        
       | Mathnerd314 wrote:
       | What about function points?
       | (https://en.wikipedia.org/wiki/Function_point) They are basically
       | just lines of code, but LOC has a precise definition and is not
       | just "whatever it takes" like a story point.
        
       | aussieguy1234 wrote:
       | Ive been in lots of teams using story points. What I've found is
       | that what one point is worth is never consistent between teams. A
       | 3 for one team could be a 1 for another. Or a 1 could be
       | 0.5/0.25.
       | 
       | In one team, 3 points might be equivalent to 3 days work. In
       | another it might be 1 day.
        
         | captaincaveman wrote:
         | Yeah, and thats fine, there is literally no need to have them
         | consistent between teams.
        
       | jiveturkey wrote:
       | I'm not sure I get it. If you're doing story points, you are
       | doing big-A Agile yes?
       | 
       | In that case, you absolutely always have an impossibly long
       | queue. The things that don't get done keep going into technical
       | debt, which as a rule doesn't decrease. Until at some point you
       | declare technical bankruptcy.
       | 
       | If you reduce this to just the queue for the current sprint, that
       | is generally a smaller size, the queue length is determined by
       | ... the story points.
       | 
       | So to manage the queue without story points, your job is to break
       | the stories into equal-sized tasks, so that the queue size has a
       | meaning. However, you cannot break a story up that way (this
       | requires estimation of task complexity -- the premise of the
       | article and our own battle tested experience is we don't know how
       | to do that) and even if you could you run into the infinite queue
       | as I mentioned.
       | 
       | > I am certified to teach it as a SAFe Practice Consultant (SPC)
       | 
       | :sus:
        
       | ChicagoDave wrote:
       | My experience is that when used with cross-team members as level
       | of effort, discussed with each story and receives a high
       | confidence vote (fist of five), then measured against each team
       | members capacity (measured over several sprints), story points
       | serve a valuable way to manage work.
       | 
       | They do not equate to hours and cannot be boxed by management
       | expectations.
       | 
       | Management can separately track actuals (hours), but that really
       | should never concern the team.
        
       | forgotpassword2 wrote:
       | In my opinion, I think that assigning days to story points and
       | breaking down task/sub-task to fit within a max of 5 days solves
       | most of the problems. Yes, every task can't be estimated
       | correctly but it does help in tracking things.
        
       | Too wrote:
       | This article argues against story points but then concludes that
       | the solution is breaking down work packages into atoms called
       | tasks and measure the queue length. Those are two different
       | dimensions. No matter how hard you try to break things down, a
       | task queue will still have items in it with different sizes.
       | 
       | There is nothing saying you can't refine work packages together
       | in your team, while still using story points. That's actually how
       | it's done almost everywhere. When items end up with a very high
       | estimate there will be a push to refine it to something smaller.
       | Something you should do but only as long as it still makes sense.
       | 
       | In fact the worst place i ever worked at was where we were given
       | strict orders to break down every story until they all became 1
       | story point (still using story points...). Doesn't take a genius
       | to figure out what happened next. All packages started having
       | pointless micro-tasks with thousands of cross dependencies
       | between them: "open the editor", "write a function" "write a unit
       | test", "commit the code", "review the code". How am i supposed to
       | write a unit test before the function signature has even been
       | made? How am i supposed to iterate when finding bugs? More
       | complex tasks still overran their estimates by factor 10, in fact
       | even worse than before, some things just can't split, yet they
       | still needed 1 point estimate.
       | 
       | Using the queue length and the impact on variability is still an
       | interesting concept, i just don't think you should connect it
       | with breaking down everything into single-sized items.
        
         | hi_hi wrote:
         | The bit where it broke down for me was where they initially
         | make the (great) point that agile falls down where small story
         | points for simple tasks (which is accurate) are added to large
         | story points for complex tasks (which is much less accurate),
         | leading to a net inaccurate estimate. So the take away is to
         | break down complex tasks.
         | 
         | Then they introduce queues, which are made up of small tasks.
         | 
         | I admit I stopped reading at this point. Is the useful thing
         | the queue, or the fact everything is now broken down into small
         | tasks?
        
           | brightball wrote:
           | > Is the useful thing the queue, or the fact everything is
           | now broken down into small tasks?
           | 
           | Yes. :-)
           | 
           | There are numerous benefits to both that are explained in
           | more detail.
           | 
           | The short version is that the small tasks will give you a
           | more accurate rate of progress. The exercise to break things
           | down that way will benefit the entire team's communication
           | and understanding of the problem. Writing them down will keep
           | a record in place for new developers who join where a point
           | measure wouldn't provide any real context.
           | 
           | The queue gives you a clearer picture of job sizing that can
           | be measured and naturally changes with scope changes. It
           | gives you a leading indicator of additional complications so
           | that you can pivot earlier in the process if needed.
           | 
           | Awareness of variability amplification from the queuing
           | process also makes people conscious of flow control of work,
           | as well as the extreme negative consequences that happen when
           | that work is over-scheduled.
           | 
           | They work together to create multiple benefits.
        
         | Karrot_Kream wrote:
         | I wish the article spent longer with discussing the queuing
         | view and less time on pointing out the flaws with story points,
         | but I guess I'm biased because the flaws already are "obvious"
         | to me.
         | 
         | I think there's an inherent tradeoff between the overhead and
         | misery of breaking down a task into granular subtasks and the
         | variance of task completion time. In practice what this would
         | mean using a queue style form of tracking would be that you
         | trust your team to break down work and do time-bounded
         | investigation into unknowns. Then you look at your task
         | completion rate. Now measuring this as an RV gives you not just
         | the average task completion time, as we reduce to using
         | Little's Law, but also variance of task completion time. If we
         | find task completion time to have too much variance despite the
         | input queue length of tasks not actually growing very much
         | (i.e. the arrival rate is staying stable and low), then it's
         | probably worth having the team break down tasks in a more
         | granular fashion (or maybe it's a single person who keeps
         | making giant tickets or something). On the other hand if the
         | team keeps complaining about straight-jacket ticket discipline,
         | it's probably worth letting folks be more loose with task
         | creation. There's a human element here but there always is,
         | since it's humans who are doing the work, and that's fine.
         | 
         | I've always argued that output per person on a team should be
         | modeled as RVs, but I really like this queuing approach and
         | it's something I may bring up on my team. Again in practice I'd
         | probably just track task completion times on a weekly basis.
         | This would be much simpler than story points and instead of the
         | bickering that comes with trying to break a ticket up, it would
         | give engineers more autonomy over task creation.
         | 
         | I really like the idea.
        
           | brightball wrote:
           | I'll do that for a followup post. Watching the discussion
           | here it seems like that would be beneficial. I struggled with
           | where to put the emphasis on this write up but ended up
           | deciding that I need to clearly make the case for Story Point
           | flaws first as a warning reference for people experiencing
           | these issues in their current environments.
           | 
           | I would have separated queue management into its own post but
           | thought writing about a problem without presenting the
           | solution would result in a lot of "okay, so what should I do
           | instead?" But that created a length complication where I had
           | to keep it succinct because it was already a long post.
           | 
           | Anyway, there will be a followup with more detail on queues.
           | Probably the biggest complication for them is the lack of
           | good reporting built around them in most existing systems.
        
       | clement_b wrote:
       | Very interesting take and definitely an article I will come back
       | to, but in the end, the size of tasks is relative, and the author
       | counts them. How's that better than counting story points? Feels
       | like a lot of folklore for a similar result. In the end, like
       | with story points, what matters is the effort put into splitting
       | a problem to better understand it and plan accordingly.
        
       | avereveard wrote:
       | Yeah sure everything eventually averages out with enough
       | sampling, and maybe queue based forecast converge faster than
       | velocity and point based forecast.
       | 
       | Why? Don't know, whole article reeks of gut feeling, which is
       | strange as data should be available since the whole point of
       | scrum masters is clerking things out.
       | 
       | The problem with a queue system is not in the averages tho, but
       | in the exceptions: say sprint or project is late, which features
       | give you the largest impact when moved around or canned? If the
       | customer wants to reduce cost, how do you give visibility of
       | feature effort? Or are we in the toxic agile version with fixed
       | scope, cost and deadline? Because then just ditch the overhead
       | and waterfall your way trough
       | 
       | OH and btw this system is not gaming resistant, people may pick
       | the smaller task first to meet queue processing frequency, and
       | then you'd get massive frequency drop at the end.
        
       | resonious wrote:
       | The proposed queue system seems somewhat orthogonal to story
       | points to me. You could easily do the queue thing with or without
       | story points, or vice versa.
       | 
       | With the pure queue solution, you still need to make sure the
       | tasks are all "small". The problem of defining "small" is the
       | same problem that makes story points so unreliable and confusing.
       | So I suspect the kicker here is just having a group of motivated
       | and competent people.
        
       | luke-stanley wrote:
       | `Measure queues` like `Work In Progress limits` from Kanban.
       | Cleverly the article dodges mentioning those terms!
        
         | mnsc wrote:
         | From when I was doing kanban there were, very intentionally,
         | little to no forecasting done. We broke up a feature a bit and
         | started chugging along. Every question from mgmt like "when
         | will it be done?" was met with a "we are working on that right
         | now, so asap" and that flew. However that was a stable product
         | that was mature and had quite a few customers paying an annual
         | license that were mostly happy, but of course appreciative for
         | new features. Right now I'm working on a bigger product that
         | fails to capture customers in a highly competitive sector and
         | everything is about time and estimates. Middle mgmt is pretty
         | stressed out and the latest bid is to estimate tshirt sizes.
         | But really, it should be translated to time/increments.
        
       | bitwize wrote:
       | Remember, for any project -- software or otherwise -- in any
       | business, the business is going to need to know the answers to
       | two key questions:
       | 
       | * When is it going to be done?
       | 
       | * How much is it going to cost?
       | 
       | You should therefore estimate in units of time because you will
       | be held accountable for time. (And time is money.) This is
       | straightforward if you break the work down into components of
       | manageable size _beforehand_ and prepare a bill of materials
       | itemizing each component that the final product will require.
       | Using the BOM approach means that completion progress for the
       | system as a whole can be tracked in terms of _which_ materials
       | are complete and ready to go, not just a number or percentage of
       | how complete someone thinks it is.
       | 
       | Now what if your team gives one set of estimates and the
       | estimates are off? Well, what managers have found is that usually
       | there's a pretty consistent ratio between the time a programmer
       | estimates a certain task will take vs. the time it takes them to
       | actually perform a task. Therefore, the correct way to go about
       | time accounting is, for each task, the developer should give a
       | time estimate before starting the task _and_ record the time it
       | actually took them to complete it when they are finished. The
       | ratio between the two, as it stabilizes over time, will give
       | project management increasingly good information about how long
       | it will actually take a given developer to do a given task, based
       | on their estimate, and enable them to calculate schedules
       | accordingly.
        
       | dfgdgf wrote:
       | The article brings up a great point--story points often end up
       | being a proxy for measuring effort, but they don't always
       | translate to value delivered. Measuring queues, on the other
       | hand, can give a more accurate picture of bottlenecks and
       | inefficiencies in the process. Has anyone here shifted from story
       | points to a queue-based system? How did it impact your team's
       | productivity and workflow?
        
       | poikroequ wrote:
       | Story points don't help me do my job. They do a great job of
       | wasting my time and making me less productive. It's not just
       | story points, but the whole agile/scrum methodology feels
       | terribly wasteful. The gross amount of time we waste setting
       | estimates, refining stories, sprint planning. To what end? So
       | management can make some meaningless charts? So that the
       | "decision makers" can use these contrived numbers to figure out
       | who gets cut in the next round of layoffs?
        
       | heywire wrote:
       | Is there anyone else out there still doing waterfall and
       | estimating in hours and everything is just going fine, or am I
       | just that lucky?
       | 
       | I work on a small professional services team customizing a couple
       | of our products for our customers. A few times a month we get a
       | request for an estimate to add a new feature or workflow. We do a
       | high level customer requirements doc, discuss it as a team, the
       | seniors from each area (design, development, qa) each provide an
       | estimate in a range of hours. This all gets wrapped up into a
       | final price to the customer. If they approve it, we dive into
       | detailed design and have them sign off on the result. Then we go
       | into development for weeks to months, qa, and then release. Our
       | processes really haven't changed in over 20 years. We're
       | constantly ranked as one of the most productive teams, and get
       | high scores on our post-project surveys from our customers.
        
         | sumedh wrote:
         | What does QA do when you guys are building the software?
        
           | heywire wrote:
           | They're working on other projects. Whether it is testing a
           | general release for a customer, testing bug fixes, or testing
           | a recently completed customization project.
        
       | azangru wrote:
       | > Scrum tried to fix this in 2011 when "Commitment" was changed
       | to "Forecast"
       | 
       | I've checked scrum guides released in 2010 and in 2011. The word
       | "commitment" does not appear in the pre-2011 version. And, as far
       | as I remember, the word "forecast" replaced the word "estimate"
       | in the 2020 edition of the scrum guide compared to the 2017
       | edition.
        
       | arcbyte wrote:
       | I don't understand people like this author. I guess I do. It's
       | all marketing flamebait to get attention.
       | 
       | He knows exactly what story points are, he goes through them
       | exhaustive, but strangely deriding them the whole time.
       | 
       | Then he concludes by purporting to invent the very practice you
       | ALWAYS were supposed to have been doing to make story points
       | work. You have to find a set of repeatable work to compare new
       | stories to for reference. That's the whole game. That's his tasks
       | "idea". That has always been part of every implementation and
       | lesson on story points ive been exposed to.
       | 
       | It's a completely nonsensical article.
       | 
       | Story points have always been about queues and implementing
       | Little's Law. Always.
       | 
       | Yes, it sucks to be on teams that just argue about points and
       | don't work to refer to standard architectures for building
       | blocks. That doesn't mean story points are broken, it's pointing
       | out something else in your organization is broken.
       | 
       | A lot of real criticism in this comment, but props to the author
       | for writing at least. It's more than I do as a part time internet
       | complainer.
        
         | brightball wrote:
         | I can see that perspective I suppose, but it's certainly not
         | marketing flame bait.
         | 
         | Whatever story ports were always supposed to be, they aren't.
         | Numerous people's real world experiences go sideways, because
         | of the way that they are designed. You're setup for failure and
         | confusion.
         | 
         | I never claimed to invent anything. I'm highlighting Donald
         | Reinertsen's work that more people should be following.
         | 
         | The purpose of the article is to remind people of why
         | everything is broken so that they can identify it and fix it,
         | including examples.
        
           | ffsm8 wrote:
           | As far as my current employer is concerned, 3 story points
           | equal 8 hours of work.
           | 
           | The previous one considered only complexity, so a simple
           | change that needs adjustments all over the project would
           | still be considered 1 story point, even if you needed
           | multiple days to get it done.
           | 
           | The PO in the job before that kept asking "but how much time
           | will you need for that" until he got an answer, ultimately
           | making story points redundant.
           | 
           | Really, ymmv
        
           | tacitusarc wrote:
           | So this may not be fair, but you lost me quite a bit with the
           | positive take on SAFe, which is the worst, most unproductive
           | experience of any process I've had.
           | 
           | I also do not understand the queues and capacity issue. I
           | have never been in an environment where we do not have so
           | much work that we cannot meaningfully see past the end of the
           | queue. I don't necessarily view that as a bad thing.
        
             | brightball wrote:
             | I've read the horror stories on here and I understand.
             | There's what it is supposed to be, what is taught and how
             | it ends up.
             | 
             | Rigidity is probably the biggest issue. It's supposed to be
             | adapted to an organization leveraging what works well,
             | handing more control to developers and addressing some
             | communication gaps.
             | 
             | When people try to implement it strictly and force the
             | company into the example template it creates a lot of
             | friction.
             | 
             | When I've previously explained on here what it should look
             | like, it's typically nowhere close to that in the horror
             | stories. Developers should have significantly more control
             | in a SAFe environment fwiw. I'll explain it more if you
             | like though.
             | 
             | I have to run out but I'll come back to explain the queue
             | stuff too.
        
               | arcbyte wrote:
               | I do totally agree on the SAFe bits. I've seen it
               | implemented extremely well when 1) everyone got regular
               | training (biannually or quarterly) and 2) senior leaders
               | adopted their appropriate SAFe roles.
               | 
               | Quite often i see organizations do a SAFe kickoff and
               | then nobody ever learns more about it and senior leaders
               | view it as a team level thing only. It doesn't work then
               | because nobody's actually doing it.
        
               | brightball wrote:
               | Having senior leadership on board is critical to the
               | entire process.
        
             | brightball wrote:
             | Alright, comment part 2 since I have a little more time
             | now.
             | 
             | First, the SAFe explanation. I've been a software developer
             | for a little over 22 years. My first experience managing a
             | team was 12 years ago and I shifted to it full time in
             | 2018. My entire motivation for doing this was living
             | through environments that were painful and unproductive for
             | everyone involved.
             | 
             | I found Reinertsen during a lot of reading when I was
             | trying to learn the best ways to do things and get a
             | clearer picture of things that I didn't understand because
             | I hadn't had a view of them in my dev/arch/ops roles
             | previously. When I picked up that book I periodically
             | shouted, "YES! EXACTLY!" while I was reading because it
             | showed the math to prove just about everything I'd
             | experienced. Then I used his methodologies to lead two
             | teams with a great deal of success from my perspective.
             | 
             | What I was not doing a good job of was communicating with
             | the business side of the company regarding what was
             | prioritized, why and how. That lead to a lot of back
             | channel grumbling from other people in leadership who had
             | different priorities. I'd just spent months talking with
             | everybody about what their priorities were and mapped out a
             | plan to have it all done in about 6 months. I was extremely
             | confident in this plan at the time. It was beautiful.
             | 
             | One of the senior guys, who I will call "Squeaky Wheel"
             | torpedoed the plan because his top priority wasn't first.
             | That was the moment that I realized I needed to find a
             | better way to get these folks involved in the process that
             | wouldn't blow up all of the great things we had happening.
             | 
             | Long story short, I found SAFe and the CEO sent me for
             | training after I explained my rationale. Here's what
             | appealed to me about it.
             | 
             | 1. WSJF - All facets of the company come together to agree
             | upon the value of different initiatives. Sales, Support,
             | Product, Legal, Marketing and other senior leadership when
             | necessary. Following the discussion all of the back channel
             | "we should be doing this" stops because everybody knows
             | exactly why we're doing what we're doing.
             | 
             | Then you combine that with an effort estimate to get a
             | projection about the best value for your time. This will
             | naturally end up prioritizing a bunch of small stuff that
             | has been ignored for a while first, but once you get
             | through that you start more cohesive conversations about
             | larger initiatives. In that first experience, Squeaky Wheel
             | had a low value high effort project that went to the
             | bottom. Aside from him, it went beautifully for everybody
             | else.
             | 
             | 2. The PI process - After people have put in the effort to
             | agree on priorities, PI planning happens where Dev gets to
             | lay out the plan for the best way to achieve those
             | priorities. You spent a couple of days planning it,
             | presenting, reviewing and everybody comes out knowinng what
             | the priorities are for the next 8-12 weeks. Then as a dev
             | you get to execute without dramatic shifts in direction.
             | Now, when somebody in sales doesn't close and tries to make
             | a case to change everything you're doing he's directed to
             | make a case to product for WSJF consideration for the next
             | PI. This brings sanity to the dev process.
             | 
             | The PI plan also involves capacity planning so you build in
             | a natural buffer too. As a side benefit, you find out most
             | of the vacation plans of your teams over the next quarter
             | well in advance. One of the big goals of PI Planning is
             | building camaraderie and skipping future meetings with
             | people who may need to provide input. This factor is
             | significantly more difficult in a remote environment.
             | 
             | 3. The "Solution" Backlog - Part of the process is that dev
             | gets to keep and prioritize its own backlog of technical
             | priorities for the next PI. You typically split the
             | capacity planning 70/30 or 80/20 across the
             | Feature/Solution backlog. This gives the tech side of the
             | house the ability to ensure work that they know needs to be
             | done, gets done without having to make a case to the
             | business about why. This gives time to improve processes,
             | automation, reduce tech debt, refactor, performance tune,
             | etc if it hasn't already been built in.
             | 
             | When those 3 things happen every developer's life should
             | get easier. Unfortunately, it doesn't always work that way
             | and you'll end up with more layers of control + dictation
             | rather than handing over control to interested parties.
        
             | brightball wrote:
             | Finally, Queues and Capacity.
             | 
             | There will always be something else to do, that is
             | definitely true. In this context we are talking about
             | taking a chunk of that and trying to create an expectation
             | of when it can be ready.
             | 
             | In a Sprint, for example, you take a slice of work from
             | that queue, a few stories with the goal of trying to get it
             | completed in the next couple of weeks (hopefully). That
             | creates a new queue for the sprint, essentially.
             | 
             | You've controlled the flow of work based on the teams
             | historic capacity using some metric, which has previously
             | been velocity.
             | 
             | Overloading that capacity is what happens when new work
             | sneaks in. Support items. Requests from people outside the
             | team. Long meetings. A team member unexpectedly being out.
             | Either the amount of work has gone up or capacity has gone
             | down. If anything that was planned is much larger than
             | initially expected, you're going to end up way behind. That
             | will push everything else farther behind at the same time.
             | 
             | The moment you start scrambling to try to get it all done,
             | you're going to start making mistakes. People are not going
             | to take the time to refine things. Errors will happen.
             | They'll take longer to fix or worse they'll end up in
             | production and create new problems...that will create more
             | unplanned work for the next time.
             | 
             | Hope that helps?
        
         | hobs wrote:
         | That's like saying a system that generally yields bad results
         | isn't to blame, its people.
         | 
         | For a vast majority of managers in "software companies" things
         | like story points are about asserting control over what is
         | created, getting commitments from various folks, and then
         | increasing stress to have you "sprint" constantly "behind
         | schedule" so they can inject additional requirements or pivot
         | to the new thing they want to do.
        
       | monkeynotes wrote:
       | I don't really understand why the author needed to use all those
       | words to suggest t-shirt sizes instead of story points.
       | 
       | All the stuff about breaking down tasks, watching a backlog queue
       | to monitor cadence, and have regular meetings is already
       | happening with, or without story points.
       | 
       | People overthink this stuff all the time. Every team should
       | figure out what works best for them, even down to project by
       | project. Getting shit done isn't hard to monitor. You have a
       | bucket of well defined tasks, have sprint meetings, look for
       | blockers and assumptions, watch work flowing through. It's not
       | really that difficult. Whether you use story points or some other
       | estimation tool is really just an exercise of calibration, it's
       | not gospel. The estimation process is the important thing,
       | discuss as a team, agree on complexity, make sure the task is
       | bite sized etc.
        
       | ath3nd wrote:
       | To me story points, planning poker, scrum, and a bunch of other
       | "agile" artifacts are funny concepts.
       | 
       | Making 4-5 highly paid professionals sit around in a circle with
       | a bunch of cards trying to estimate how long/complex/??? the task
       | is, writing it down, and doing that every two weeks, to dubious
       | results, is exactly what one can expect out of today's
       | businesses.
       | 
       | My guess is management doesn't trust that engineers aren't just
       | fiddling around, so they hire a bunch of management-like people
       | to watch over the drones, and show them who's in control. And how
       | else you can show you are in control if you don't introduce
       | magical rituals and tracking useless metrics, and make grown
       | people participate? That way, all these meeting rooms can be
       | occupied and the owners can feel like something important's
       | happening and that they are getting their money's worth.
        
       | cynicalpeace wrote:
       | The point of all of this is to communicate to management how long
       | a task is going to take.
       | 
       | I would suggest that a good manager doesn't need this
       | communication.
       | 
       | A good manager will have already done the task, or something
       | similar, to already know how quick it can be done.
       | 
       | If they haven't, they're probably inexperienced in the task. They
       | were appointed because they were a "people person" but this fact
       | has actually introduced more friction to the team (needing the
       | story points yada yada) rather than just assigning a simple
       | deadline from the get-go.
       | 
       | Once a deadline is introduced, Parkinson's Law kicks in and you
       | get more or less efficient work depending on how aggressive the
       | deadline is.
       | 
       | I'm advocating for experienced managers, not deadlines per se,
       | since that is just 1 tool in the toolbox.
       | 
       | I'm also advocating against the countless asinine ways to
       | communicate to lousy managers. Throw the points in the trash and
       | start hiring cracked programmers as your engineering team's
       | standard bearer.
       | 
       | See the company grow and have happier employees.
        
       | 0xbadcafebee wrote:
       | > what if we substitute something else for story points?
       | 
       | Then that new thing becomes the new measure, you change what you
       | do to meet that measure, and things are screwed up again.
       | 
       | The author's final paragraphs describe implementing a complex
       | process that an intelligent team has to use in a nuanced way. And
       | somehow simultaneously declares that the original problem was
       | _story points_ , one single aspect of a complex process, and not
       | the fact that there's a complex process that nobody understands
       | or follows correctly.
       | 
       | You know how Toyota gets TPS to work so well? They do one thing,
       | well, at a time, repeatedly.
       | 
       | Product development sucks because it's trying to do a million
       | things once, constantly changes its mind, doesn't train its
       | workers, and conflates designing, engineering, assembling, and
       | operating, as one giant "thing". Then it wonders why it can't
       | keep track of time.
        
       | yesbutnobutyes wrote:
       | In my experience people mainly like to complain or exist within a
       | state of conflict where they are against something.
       | 
       | Story points are relative value as defined by the team, for the
       | purpose of forecasting and reporting. They really can be anything
       | the team decides, as long as it's a reliable measure. Ultimately
       | they exist to answer"How long will this take?", which is the most
       | dependable question from people writing the cheques.
       | 
       | People asking that question don't care if it's Fibonacci or hours
       | or t-shirt sizes or anything at all.
       | 
       | "Is x bigger (or smaller) than x", followed by "is this more
       | important than this" should be brain-dead easy and logical for
       | everyone involved.
       | 
       | In my 10+ years I've learned that it's ultimately just that
       | people don't want to be told what to do and/or need tribalism (an
       | "other") to feelat balance with their environment.
       | 
       | There's no escape from prioritization and sizing. Throw scrum in
       | the garbage and you'll still be doing it by another name.
        
       | pixiemaster wrote:
       | Well history in IT repeats itself in cycles. look up #NoEstimates
       | for good and thoughtful content about this topic, and various
       | anecdotes for inspiration. then derive your own conclusions.
        
       | csbbbb wrote:
       | > Now, if you're paying attention and reading this with a
       | critical eye something in your brain just told you "Wait, this is
       | just waterfall! We can't know everything up front!"
       | 
       | The article presents the "story points" problem to be caused by
       | an ignorant or presumptive misunderstanding of how the system
       | works by outside parties.
       | 
       | I think articles like this are an interesting and necessary part
       | of the overall project-managent discourse. However, they tend to
       | infer that the problem of ignorance can be resolved by the
       | management framework directly, to which I disagree.
       | 
       | Ignorance, regardless of project-management, has to be addressed
       | by clear communication and boundaries.
        
       | sirwhinesalot wrote:
       | I've never understood the point of the points (pun intended) you
       | can try to convince yourself they're measuring "complexity" or
       | whatever but what they're measuring is time, so why not cut out
       | the middleman?.
       | 
       | I'm not saying to estimate tasks accurately to the hour. Just
       | rough ballparks: "I think I can do these 3 on friday". "Give me a
       | week, it's gonna take a pile of tests to make sure we get it
       | right". "Hmm I probably need the whole sprint for that, we don't
       | have a clear view of the impact, it sounds like a small change
       | but it uppends our current architecture".
       | 
       | These are the real discussions, the numbers are a silly
       | abstraction on top of this and are unnecessary.
       | 
       | It should also be 100% expected that the estimates will be wrong.
       | New bugs will show up, regressions will be introduced,
       | requirements will change last minute. It should also be expected
       | that some tasks that were supposed to get done won't be and other
       | tasks that weren't in the planning could be snuck in. You are
       | "Agile" are you not?
       | 
       | If you're not than just go back to waterfall and stop dragging
       | the Agile Manifesto through the mud, thanks.
       | 
       | The entire point of the exercise is the discussion, it gives you
       | some idea of what is likely to go well and be finished and what
       | is a risk factor. If you're measuring "velocity" god help you.
        
       | beryilma wrote:
       | Regardless of what anybody says to the contrary, story points are
       | and have always been used as an obfuscated measure of time. When
       | we can never estimate plan timelines correctly in the first
       | place, why would anybody think that we should be able to measure
       | story points with any accuracy? It is just another stupid PM
       | gimmick to create useless management metrics.
        