[HN Gopher] How a four-day workweek works, from the companies pu...
       ___________________________________________________________________
        
       How a four-day workweek works, from the companies pulling it off
        
       Author : lxm
       Score  : 214 points
       Date   : 2023-09-29 16:30 UTC (6 hours ago)
        
 (HTM) web link (www.wsj.com)
 (TXT) w3m dump (www.wsj.com)
        
       | atleastoptimal wrote:
       | If I was asked to test a four-day work week, I would work harder
       | and more efficient than I usually would to make a four-day work
       | week look like a better option, even if it wasn't.
        
       | billy99k wrote:
       | If you want to work less and get paid more, there are better
       | alternatives:
       | 
       | 1) start a business 2) become a contractor/consultant. You can
       | charge much more than a regular job and cut hours to get paid the
       | same amount as you did before. I've been a consultant for 10
       | years and almost never work 40 hours. If I do, it's on my side-
       | business and it's by choice.
       | 
       | The problem with these 4-day work weeks is that you are imposing
       | your lifestyle changes on potential employers by expecting to get
       | paid more for working less. It's a losing battle and will most-
       | likely only be temporary, like remote work (I've been remote for
       | 10+ years and it's written into my contracts).
        
       | mkaic wrote:
       | I am a firm believer that I would get _more_ work done with a
       | 4-day workweek than I currently do with my 5-day workweek. I
       | already spend an embarrassing amount of time slacking off daily,
       | it 's not like I'm pressed for time to get stuff done in the
       | office. I could easily meet my weekly objectives in 32 hours
       | rather than 40, and having 3-day weekends every weekend I think
       | would be incredible for my mental health and mood. And when I'm
       | in a better mood, I get more work done!
       | 
       | One thing I feel like a lot of people don't realize is just how
       | big a difference it is to go from a 5-day week to a 4-day week.
       | Sure, it's "just one day" but when you think about the _ratio_
       | between time-on and time-off, the shift becomes a lot more
       | dramatic. 5-on, 2-off means you spend over twice as many days
       | working as not working. 4-on, 3-off means you spend a nearly
       | equal number of days on each. It 's _just one day_ of difference,
       | but it _feels_ like a major, major shift.
        
         | patmorgan23 wrote:
         | Just watched this interesting video comparing how much we work
         | today to medieval times.
         | 
         | https://youtu.be/hvk_XylEmLo?si=uOTc3ndf87enwrZK
         | 
         | TL;DR we work a LOT more hours now than substance farmers did.
         | They worked 4-6 hours a day and only worked about half of the
         | days out of the year.
        
           | linsomniac wrote:
           | I think you mean sustenance... But maybe not. :-)
        
             | hyggetrold wrote:
             | Subsistence farmers, most likely.
        
         | timmg wrote:
         | > I already spend an embarrassing amount of time slacking off
         | daily, it's not like I'm pressed for time to get stuff done in
         | the office.
         | 
         | Just because that is true for you doesn't mean it is true in
         | general. Like, imagine a surgeon -- would he/she spend 8 hours
         | a week slacking? Or a radiologoist -- can he/she read the same
         | number of slides in 32 than 40? Or a barrista at starbucks?
         | 
         | Also, if you worked 32 hours, would you still slack off? Is
         | there a reason to expect that your slack/work ratio would
         | change? You claim you'd be "in a better mood" -- but as humans
         | we tend to adjust to the circumstances we are in. So I'm not
         | sure that would be the case long term.
        
           | [deleted]
        
           | epylar wrote:
           | mkaic isn't saying definitely they would be in a better mood,
           | just that they -think- 3-day weekends would be good for their
           | mental health and mood.
        
           | bluefishinit wrote:
           | "Slacking off" doesn't enter into the equation. Is your
           | output worth more to the company than it costs to pay you to
           | produce it? If yes, then great there is no problem to be
           | solved.
        
             | abujazar wrote:
             | It does enter the equation, because idle time <<working>>
             | or slacking off at work could be better spent pursuing
             | other interests that improve quality of life and most
             | likely increase productivity over time.
        
               | bluefishinit wrote:
               | I don't think this time should be labeled as "slacking
               | off". It's just not working and there's nothing wrong
               | with that if you've already met your obligations.
        
             | TylerE wrote:
             | One way to think of it is that you're not always being paid
             | to be doing something specific, but rather to be available
             | on short (e.g. 15 minutes or less) notice.
        
               | Draiken wrote:
               | Sure, some roles require that, but most definitely not
               | the majority.
               | 
               | In development at least, most of the times I hear this,
               | the "availability" is only needed for random unplanned
               | meetings from useless managers that can't actually plan
               | or work asynchronously.
               | 
               | The organization as a whole or individual managers can't
               | do their jobs well and they make the people that actually
               | get shit done pay for it by "standing by" for no good
               | reason.
               | 
               | Ironically, they also completely ruin productivity with
               | these interruptions.
        
               | __blockcipher__ wrote:
               | > In development at least, most of the times I hear this,
               | the "availability" is only needed for random unplanned
               | meetings from useless managers that can't actually plan
               | or work asynchronously.
               | 
               | Really? Because it's pretty routine for me to get pinged
               | on IRC/slack/whatever by another engineer who's looking
               | for help with something. Obviously I set the expectation
               | that I'm not going to be able to instantly reply to every
               | ping so some things are going to have to be async, but
               | there's definitely a lot more than just managers that
               | could ping me.
        
               | Draiken wrote:
               | Are those pings that require immediate attention? In my
               | experience, no.
               | 
               | The vast majority of time in my career, if you have a
               | minimum amount of decent planning, you won't get blocked
               | because you can't talk to another person immediately. And
               | on healthy organizations, even if you do get blocked, you
               | can simply work on something else while that particular
               | task is blocked.
               | 
               | If you really scrutinize all these availability claims,
               | they pretty much all come down to lack of planning.
               | 
               | Planning for blockers, planning for communication gaps,
               | planning for maximizing asynchronous work, planning for
               | decisions that require specific people, etc.
               | 
               | So many people are horrified by the word "blocked" when
               | it's most times an artificial block created by their own
               | systems. If I can't move forward on something, I'll start
               | on something else and come back to the other one later.
        
               | jlkuester7 wrote:
               | This. If you have a high-functioning team with good async
               | culture/habits, in my experience "blockers" are not a big
               | deal. I work closely with 5 other people and we are in 6
               | different time zones and I can honestly say that we are
               | more productive than teams I have worked with in a
               | traditional office setting. Sure, I cannot just walk over
               | to a teammate's desk and ask a question, but I also don't
               | have anyone walking over to my desk to interrupt me with
               | a question.
               | 
               | We are all intentional about _over communicating_ what we
               | are working on and where we will need support from from
               | each other. Everything else pretty much just flows
               | naturally from that. There are (rare) times were I cannot
               | progress on something that day because I need feedback
               | from someone who will not be online for 10 more hours,
               | but it is just a built-in assumption that this will
               | happen and I always have other work queued up that I can
               | do if I get stuck....
        
               | Paul-Craft wrote:
               | It's not about who can ping you. It's about the
               | expectation of urgency behind that ping. A "ping" from a
               | manager calling an unexpected meeting demands a lot more
               | attention than a ping from a colleague looking for help
               | most of the time.
        
               | BeetleB wrote:
               | > Because it's pretty routine for me to get pinged on
               | IRC/slack/whatever by another engineer who's looking for
               | help with something.
               | 
               | That's why when we were all colocated in one building, I
               | was logged out. I made it clear they were welcome to drop
               | by my cube whenever they wanted, but I would not be
               | available by IM. It cut the interrupts by half, _easily_.
               | People use you as a crutch. When you raise the cost even
               | _minimally_ , they are suddenly willing to solve their
               | own problems.
               | 
               | That's the one aspect that COVID destroyed. Now I have to
               | be online as people can't just walk to my cube.
        
               | owenmarshall wrote:
               | What I have started to do is to block an hour every other
               | day, and when someone sends me a Slack message that feels
               | like I am just their crutch, I snooze it until that
               | scheduled block of time. It works like a charm. I still
               | keep an eye on the urgent questions that I have to answer
               | quickly, and many questions have evaporated by the time I
               | come back to them.
        
             | pelasaco wrote:
             | While the situation might be different in the US, I can
             | tell you that in Europe, particularly in Germany, there
             | seems to be a changing work ethic in the software
             | development field. Our company, based in the south of
             | Germany, has increasingly been hiring talent from Brazil
             | and India over the past year. We're not just bringing them
             | in for developer roles, but also for management positions.
             | It's not about having them work remotely to save costs;
             | we're actively sponsoring their visas and handling their
             | relocation. Here in Germany, it feels like some individuals
             | prefer to work as little as possible, maximize their
             | earnings, and are resistant to fixed deadlines or essential
             | tasks and meetings. This trend is concerning, and I'm
             | genuinely worried about what the future holds for our
             | industry here.
        
               | bluefishinit wrote:
               | > _Germany, it feels like some individuals prefer to work
               | as little as possible, maximize their earnings, and are
               | resistant to fixed deadlines or essential tasks and
               | meetings. This trend is concerning, and I 'm genuinely
               | worried about what the future holds for our industry
               | here._
               | 
               | You should rest easy because all of those things lead to
               | more relaxed and happy employees which leads to less
               | turnover, better output and higher quality software.
               | Software development is a creative field and companies
               | that treat it at as such are rewarded.
        
               | pelasaco wrote:
               | > You should rest easy because all of those things lead
               | to more relaxed and happy employees which leads to less
               | turnover, better output and higher quality software.
               | Software development is a creative field and companies
               | that treat it at as such are rewarded.
               | 
               | That's populism. Software development can be some moments
               | very creative and fun, but it is mostly a hard work.
               | Specially as full stack dev/devops, doing scrum, you have
               | to do everything.. filling bug, tracking problems,
               | looking at telemetry, deploying, discuss new features,
               | improving pipeline..
        
             | aetherson wrote:
             | There's an opportunity cost question. If your output is
             | worth more to the company than your costs, but it would be
             | easy for them to hire someone at the same cost who has more
             | output, then you're at risk.
        
               | munk-a wrote:
               | People are not replaceable parts. HR would absolutely
               | love it if all developer 3s were the same - and it should
               | be the case that one developer 3 is more like another
               | developer 3 than a developer 2 - but people are different
               | and have their own quirks and strengths.
               | 
               | And, of course, you're ignoring training costs which are
               | usually a big factor in companies that aren't
               | incompetent. That Senior Dev that's 15% above marketing
               | asking rate but who knows your system inside and out...
               | do you really want to spend six years training a
               | (potentially highly proficient) newbies on all your
               | systems and the subtle intricacies. And how long will it
               | be until you, the manager, trust that new Senior Dev like
               | you did the old? How many fires will you both need to
               | walk through until you see an availability alert and just
               | trust the Senior Dev either is dealing with it or would
               | be ringing your phone if they need extra resources?
               | 
               | It can take quite a while to get a new employee (again,
               | even a highly proficient one) to that place where in a
               | meet your product team can be going over a proposal and
               | your Senior Dev raises there hand and proceeds to calmly
               | explain the incompatibility with the current system and
               | how much it will cost to overcome those incompatibilities
               | - and if they remain silent then you know they've done
               | those calculations and consider it in hand.
               | 
               | Hiring a replacement is an extremely complicated
               | calculations that most companies just punt on - for good
               | reason.
        
               | bluefishinit wrote:
               | > _but it would be easy for them to hire someone at the
               | same cost who has more output_
               | 
               | History has shown that it's not easy at all to replace
               | someone. It's difficult to find good people and convince
               | them to join you and it can take a _long_ time. If you
               | can write code, you should always have the upper hand on
               | your employer especially if your co-workers also realize
               | that.
        
           | flardartbhhgg wrote:
           | Do you have any idea how much break time surgeons take? Tons
           | of them work 3day weeks because it's more efficient. The rest
           | of their time is either at home or "in clinic" doing
           | busywork.
           | 
           | https://forums.studentdoctor.net/threads/3-day-work-week-
           | wit...
           | 
           | I suspect you've pulled "surgeon" from you-know-where on
           | account of it being a high-status, high-value role. But don't
           | bring that baggage into the conversation.
        
             | dmoy wrote:
             | Also my radiologist neighbor works 3 day workweeks in 12
             | hour shifts I think. Or used to. I forget the details. So
             | that example from GP doesn't make sense to me either.
        
               | DoesntMatter22 wrote:
               | 3x12 doesn't seem too bad to me. You are zonked after but
               | 4 days off is pretty sweet.
        
             | freedomben wrote:
             | I think you were a little harsher than necessary, but this
             | is a good point. Surgeons aren't doing surgery 40 hours a
             | week. They'd be making tons of mistakes if they did that
             | and they'd be getting burned out. The last surgery I had
             | the doc only did ops on Tuesdays and Fridays.
             | 
             | In many ways it's a good analogy to writing code 40 hours a
             | week. It takes high concentration and the quality of output
             | drops heavily when you're tired or need a break or rest.
        
               | paint wrote:
               | [dead]
        
           | onlyrealcuzzo wrote:
           | > Just because that is true for you doesn't mean it is true
           | in general. Like, imagine a surgeon -- would he/she spend 8
           | hours a week slacking?
           | 
           | Don't many surgeons only work a handful of weeks per year?
           | 
           | They're essentially already on a much better model.
        
             | notyourwork wrote:
             | Not to my knowledge. Source: I know a neuro and ortho.
        
           | com2kid wrote:
           | > Just because that is true for you doesn't mean it is true
           | in general. Like, imagine a surgeon -- would he/she spend 8
           | hours a week slacking? Or a radiologoist -- can he/she read
           | the same number of slides in 32 than 40? Or a barrista at
           | starbucks?
           | 
           | My primary care doc has an assistant whose only job is to
           | follow her around and input data into the electronic medical
           | records system.
           | 
           | There are countless blog posts from doctors complaining that
           | a 1/3rd of their time is spent on redundant paperwork.
           | 
           | For a related humorous take on this
           | https://www.youtube.com/watch?v=HFGLDcTKFIY
        
           | manicennui wrote:
           | If you've spent any time in the corporate world, I think you
           | know that the majority of people slack off for part of the
           | day. The medical profession has its own set of time problems
           | that I don't think should be conflated with the time problems
           | in the corporate world.
           | 
           | Your second point is definitely valid. Changing habits is
           | really hard, and some of us are able to get by while spending
           | very little time doing work because we work so much more
           | quickly than the average drone.
        
           | eddmakesio wrote:
           | My best friend is a radiologist and I guarantee he's not
           | working 32 out of his 40 reading slides - there could
           | definitely be a way to organise them to have 32 maximum hours
           | with the same output
        
             | timmg wrote:
             | FWIW, my brother-in-law is too. I and _do_ guarantee that
             | he is reading slides every working hour.
        
         | euroderf wrote:
         | If you're off from 5pm thursday to 9am monday, that's 88 hours,
         | which is 52 percent of a 168-hour week. Goood.
        
         | pelasaco wrote:
         | [flagged]
        
           | epylar wrote:
           | There's probably an optimum number of days to work and the
           | suggestion here isn't that lower is always better, just that
           | 5 is above the optimum amount.
        
           | unbalancedevh wrote:
           | The point isn't that you could work harder now with 5 days
           | and do more; it's that you could be just as productive in 4
           | days as you currently are, which presumably is acceptable.
           | 
           | The big question is, will people continue to slack off during
           | work hours and lose productivity? I do spend a lot of time in
           | between tasks decompressing from one and gearing up for the
           | next. I'm not sure how that would translate if I just tried
           | to collect all that "slack" time up into a separate day.
           | 
           | At the beginning of the Covid shutdowns, my company did go to
           | a 4-day work week. It was great (although our pay was
           | adjusted). I don't think our productivity suffered, but it's
           | kind of hard to estimate because there were a lot of other
           | unusual variables, like the supply chain issues and variable
           | work schedules of people in other companies.
        
             | pelasaco wrote:
             | > The point isn't that you could work harder now with 5
             | days and do more; it's that you could be just as productive
             | in 4 days as you currently are, which presumably is
             | acceptable.
             | 
             | But that is just true if you are underperforming right now,
             | or are too Conformable in a shitty job. There is always
             | some doc too improve, some stack to update, a new issue to
             | be fixed, a meeting that could be better prepared, a
             | backlog to be improved.. People are just "if nobody says me
             | what to do, then I can just slack off"
             | 
             | > The big question is, will people continue to slack off
             | during work hours and lose productivity?
             | 
             | You will. No skin in the game, deliver or not deliver,
             | there is mostly no consequence, boring work, company needs
             | you.. I did the same. I was working 36 hours/week (friday
             | free) until I realized, that there was a lot of things to
             | do and to be done, but the team was just "naah, personal
             | life FIRST".
        
         | mettamage wrote:
         | It's like I could've written this comment. I'm working on 4
         | days per week, and I agree with everything you just said. I've
         | worked on both 5 and 4 days per week. The issue in my case with
         | 5 is: I get insomnia issues for a multitude of reasons. I also
         | have them with 4 days per week, but it's easier to build in
         | fallbacks and so on. My 3rd free day is on the Wednesday for
         | this reason.
        
         | maxRN wrote:
         | Yup, another way to think about it is that it's a difference of
         | 16h, not 8h. You work 8h less and gain 8h of free time.
        
           | sokoloff wrote:
           | Or you work 8h less and gain 24 of "contiguous hours that you
           | control" per week.
        
             | tshaddox wrote:
             | Yes, the disproportionately huge increase in contiguous
             | time off is the big win in my book.
        
               | coding123 wrote:
               | We could just work Monday and Tuesday with a 40 hour
               | marathon each week fueled by coffee, donuts and an
               | occasional pizza.
        
           | [deleted]
        
           | elAhmo wrote:
           | Well... :D You can't add the gained time twice. It is like
           | saying, instead of spending 20 USD on coffee, you spend 15
           | USD. You didn't gain 10 bucks, you are still left with only
           | five more than you would have otherwise.
        
             | hervature wrote:
             | Leisure hours in a 5-day work week: 72 (8 hours per day and
             | 16 on weekends)
             | 
             | Work hours in a 5-day work week: 40
             | 
             | Difference: 32 hours
             | 
             | Leisure hours in a 4-day work week: 80
             | 
             | Work hours in a 4-day work week: 32
             | 
             | Difference: 48 hours
        
               | DollyPartition wrote:
               | [dead]
        
               | elAhmo wrote:
               | That's the diffence. You had 72 hours before, now you
               | have 80 hours of leisure time. It's 8 hours more of
               | leisure time.
        
               | hervature wrote:
               | GP - "another way to think about it is that it's a
               | difference of 16h"
               | 
               | You - "That's the diffence."
        
               | elAhmo wrote:
               | In my reply I said the effective gain is 8 hours.
               | 
               | No matter what kind of math you do, working one day less
               | doesn't give you two extra days off.
        
         | rags2riches wrote:
         | I'm pretty certain a bus driver couldn't do eight hours worth
         | of driving in six hours.
        
           | DanHulton wrote:
           | No, but two bus drivers could.
        
         | sandworm101 wrote:
         | >> I could easily meet my weekly objectives in 32 hours rather
         | than 40...
         | 
         | Sounds like someone needs some more tasks for their to do list.
         | I have to abandon about half of the tasks I am meant to do, for
         | lack of time. I can send you some of them to fill that eight
         | hours.
         | 
         | Who here actually works a 40-hour week? HN isn't a bunch of
         | union factory workers punching timecards each day. I'd bet 60
         | is more common than 40.
        
           | HeyLaughingBoy wrote:
           | For your sake, I hope you're being paid with an assumption of
           | a 60-hour week.
        
           | pelasaco wrote:
           | you will be downvoted for state the obvious..
        
             | lolinder wrote:
             | 60 being more common than 40 is not obvious (it's not even
             | true), and if it _were_ it should not be treated as okay.
             | The downvotes are because OP is trying to normalize
             | workaholism.
        
               | pelasaco wrote:
               | He might have had a different experience than you. I too
               | served in uniform, often working (and earning) for more
               | than 40 hours a week. Later, when I managed a team in a
               | different country, the cultural norm there was to work
               | longer hours as well. It's worth noting that while a
               | 40-hour workweek might be standard in some places, others
               | might see norms of 44, 50 hours, or even more. Even in
               | Europe, roles like production management or working in a
               | SOC often entail more than 40 hours a week.
        
           | [deleted]
        
           | ziddoap wrote:
           | > _Sounds like someone needs some more tasks for their to do
           | list._
           | 
           | Sure, if there is a corresponding pay increase for those
           | tasks.
        
           | the_gipsy wrote:
           | 60 hours? What the _fuck_?
        
             | sandworm101 wrote:
             | 5x12 is 60. Many people in tech regularly do 12-hour days.
        
               | lolinder wrote:
               | Some people in certain parts of tech. In the Stack
               | Overflow Developer Survey, the average number of hours
               | worked per week in the US was 42 [0]. 2020 may have been
               | a weird year, but not weird enough to make 60 normal.
               | 
               | I would consider whether your employer is trying to
               | normalize 60 hours to exploit you, rather than it
               | actually reflecting reality.
               | 
               | [0] https://insights.stackoverflow.com/survey/2020#work-
               | hours-wo...
        
               | profunctor wrote:
               | I have never worked with anyone doing 12 hours a day 5
               | days a week as usual. Then again I'm in Europe .
        
           | ativzzz wrote:
           | I wonder if this has to do with your
           | 
           | > Old Life: Attorney
           | 
           | All the lawyers I know are basically married to their jobs. I
           | think workaholism is just part of law culture
        
         | coding123 wrote:
         | 10 years later...
         | 
         | mkaic
         | 
         | I am a firm believer that I would get more work done with a
         | 3-day workweek than I currently do with my 4-day workweek. I
         | already spend an embarrassing amount of time slacking off
         | daily, it's not like I'm pressed for time to get stuff done in
         | the office. I could easily meet my weekly objectives in 24
         | hours rather than 32, and having 4-day weekends every weekend I
         | think would be incredible for my mental health and mood. And
         | when I'm in a better mood, I get more work done!
         | 
         | One thing I feel like a lot of people don't realize is just how
         | big a difference it is to go from a 4-day week to a 3-day week.
         | Sure, it's "just one day" but when you think about the ratio
         | between time-on and time-off, the shift becomes a lot more
         | dramatic. 4-on, 3-off means you spend over twice as many days
         | working as not working. 3-on, 4-off means you spend a nearly
         | equal number of days on each. It's just one day of difference,
         | but it feels like a major, major shift.
        
           | jonahrd wrote:
           | You copied and pasted, and edited 5->4 and 4->3 in an attempt
           | to make a point about a slippery slope.
           | 
           | But you didn't edit this sentence:
           | 
           | > 4-on, 3-off means you spend over twice as many days working
           | as not working.
           | 
           | Which now doesn't make sense. Proving that it's _not_ as
           | simple as a slippery slope.
        
             | saulpw wrote:
             | Yes. I was quite productive and happy at 4 days/week, and
             | felt a strong part of the team that was still working 5
             | days/week. But when I tried a more "part-time" schedule of
             | 3 days/week, I was less satisfied and less productive and
             | felt less a part of the team. 4 days/week is still full-
             | time, 3 days/week is part-time.
        
           | standardUser wrote:
           | Continual advances in technology can and should result in
           | people working less for the same productive output.
        
         | thegrim33 wrote:
         | The simple fact that more or less every company in the entire
         | world does not do 4 day work weeks, when apparently all they
         | have to do is switch their workers to a 4 day work week in
         | order to magically gain more productive workers, as you claim,
         | means either 1) every person running every company in the world
         | is stupid and you're smarter than them about worker
         | productivity, or 2) there's more downsides that make a 4 day
         | work week not worth it, such as in reality only a small
         | fraction of workers actually being more productive
        
           | harshalizee wrote:
           | Except there's no rationale to the 5-day work week either.
           | Not too log ago, the proletariat class worked 7 days, then 6
           | due to religious coercion, then 5 due to unions. The owner
           | class would have no problem asking labor to work 7 days a
           | week again if it weren't for pesky labor laws.
        
         | isoprophlex wrote:
         | I don't work on Fridays, I'm never going back.
        
         | Negitivefrags wrote:
         | [flagged]
        
           | imachine1980_ wrote:
           | why, if you are paying him its means he is making more money
           | than you spending on him, if you aren't willing to pay the
           | premium for the effort why he need to make the sacrifice of
           | more work for free.
        
           | biesnecker wrote:
           | Does your employer pay you for hours or output? I'm a
           | salaried employee, I get paid for output, not the time it
           | takes to produce.
           | 
           | I think if anything you're stealing from yourself, robbing
           | yourself of the opportunity to take on more responsibility,
           | grow faster, etc.
        
             | [deleted]
        
           | Spivak wrote:
           | > sure you will have all sorts of mental justifications for
           | why that's reasonable
           | 
           | Because I'm salaried and paid for my work not my time. No
           | other justification is needed.
        
           | ziddoap wrote:
           | > _If you don't have enough work, then ask for more._
           | 
           | > _You are stealing from your employer._
           | 
           | Lol, no. I get paid $X to do Y work. I'm not about to do free
           | labor for Z when I complete Y. If you want Z done, I need to
           | be paid for it.
        
           | fasttriggerfish wrote:
           | No, sorry but that's a very dumb way to think about it. If
           | someone can get something done in half the time it takes
           | someone else, and is slacking off the rest of the time, is he
           | stealing from the company ? Obviously not. And would his
           | total output be significantly higher if he tried to work
           | continuously ? Not necessarily. Different people have
           | different productivity patterns. The point is that trying to
           | impose a rhythm or longer hours onto someone does not
           | necessarily improve their output, no matter how much you try
           | to force them.
        
           | kibwen wrote:
           | I find the casual way people flagellate others for having a
           | healthy work/life balance to be concerning.
           | 
           | If your boss is happy with your output, then it doesn't
           | matter how many hours you work to make that happen.
           | 
           | You are paid to produce a result, not to warm a seat for 40
           | hours a week. I'm sure you will have all sorts of mental
           | justifications for why that's unreasonable or why others
           | should be working themselves to death for nobody's benefit
           | but their boss's, but that's how it is.
        
         | woudsma wrote:
         | I feel the same. If I work 5 days I'd feel like I'm wasting so
         | much time, when realistically I can do the same amount of work
         | in 4 days. I'm working as a developer so it's also about
         | retaining my attention span. I just can't do it for 5 days
         | straight anymore.
         | 
         | My perfect 4-day workweek is having the Wednesday off so I have
         | a 'mini-weekend' in my week. I only ever have to work 1 more
         | day until I have some time to clear my head, make some music,
         | etc. It feels like a more healthy work/life balance. And I feel
         | sharper after a day off.
        
           | radiator wrote:
           | Yes. I have tried both Friday off and Wednesday off and the
           | latter is better. Fridays at work are more relaxed anyway, so
           | there is less value in skipping them.
        
             | geodel wrote:
             | Same for me. With Mon-Tues work, traffic, meetings, kids'
             | drop off and pickup gets me drained. If there were
             | wednesday break it'd be great. Mon-Tues hustle, a mid week
             | break and then wrap up things on Thu-Fri.
        
           | pseudosavant wrote:
           | My team currently does Monday through Thursday, although
           | we've done Tuesday through Friday before too. M-Th has
           | aligned much better with other teams in the company. It was
           | never great when someone discovered something late of Friday
           | or over the weekend and our team was the only one there not
           | on Monday to help address it.
           | 
           | That said, I wish we could go to MT and ThF schedule. Only
           | ever have 2 days in a row with out a break would seem pretty
           | magical to me. I'd either had yesterday off, or tomorrow -
           | always. Fridays are such a slower day though that I feel like
           | I miss out on less than I would on Wednesdays.
        
             | xp84 wrote:
             | Same on both counts. MT_TF would be cool, but MTWT has big
             | 'economies of scale' benefits and also reduces unexpected
             | "asynchronous" PTO that we get every time someone wants to
             | take a long weekend. Essentially, almost all of our
             | "working days" should then be working days when we're all
             | here.
             | 
             | Ideally though the 4-day program shouldn't be a thing only
             | for specific teams because the "that team isn't here" side-
             | eye quickly promotes resentment of the "lobsters pulling
             | other lobsters back into the pot" variety.
             | 
             | Teams that need coverage during the full work-week (such as
             | B2B support) should normalize having two schedules which
             | overlap, just as B2C companies have weekend shifts (they
             | don't just force people to work 7 days to achieve this).
        
           | saulpw wrote:
           | This was true for me, I was more productive at 4-days/week,
           | Mon-Thu. I tried having Wed off for the reason you described,
           | but it was hard to get into the flow, both at work and in my
           | home life. Turns out 4 days in a row for work and 3 days in a
           | row for home was actually better for both work productivity
           | and personal satisfaction.
        
             | sixstringtheory wrote:
             | I would love to have Wed/Fri as no meeting days, so I could
             | choose which one to take off depending on how I'm feeling,
             | what the current work streams look like, and personal
             | plans.
             | 
             | A three day weekend is great for a trip. Hump day off is
             | great for a break. Either could be good for an extra day of
             | big exercise/recovery or deep cleaning my house.
             | 
             | And then if working on either day, I get a full day of
             | heads-down time.
        
         | manicennui wrote:
         | Being fully remote gives me 6-8 hours back each week because I
         | don't have to commute. It has been huge for my mental health,
         | mostly because I'm able to get more sleep.
        
           | asciimov wrote:
           | 10-12 hours back a week here. Life is so much better.
        
             | paint wrote:
             | [dead]
        
         | zingababba wrote:
         | Same, it has always blown my mind how I'm consistently one of
         | the most productive members on any team I've been on yet I know
         | how much time I spend just idling. It's the spurts of activity
         | where I get my work done and time off 100% correlates with the
         | intensity and length of those spurts/flow states.
        
         | missedthecue wrote:
         | If you spend only ~75% of your time working (i.e. you can
         | finish your work in 32 hours instead of 40), does this imply
         | that in the event your company switched to a 4 day workweek you
         | would be busy 100% of the time?
         | 
         | It seems more likely that people would retain a similar ratio
         | of slacking to working.
         | 
         | As an aside, how does "I finish my work in 32 hours" even work?
         | What does that mean? Are most developers out there getting
         | paint-by-numbers printouts they need to color in and then
         | they're all done for the week? Almost all of my roles in a
         | professional capacity have required self-starting, and the
         | project life cycles are much longer than a day/week such that
         | there is literally always work to do.
         | 
         | If you're building a house and you're done nailing in shingles
         | by noon you don't go home and come back tomorrow, you go put up
         | sheetrock or install bathroom tiles. The "I finish my work in a
         | few hours" that I see on HN and Twitter must be extremely
         | poorly managed teams or people that are leaving a lot of work
         | on the rest of their teammates.
        
           | zemvpferreira wrote:
           | A lot of work, maybe more than any creative work, requires
           | long breaks for the best output to be created. When you're
           | well rested, the work often comes easily and you're hungry
           | from it. When you're tired, it's a slog to get going and
           | you'll procrastinate your time away. The next day is even
           | worse.
           | 
           | I've managed work in software, marketing, robotics and
           | construction. In every field I have had to send people home
           | to rest who were doing more harm than good with their tired
           | decision-making. Doing the work that was set for the day and
           | going home to rest is a great productivity and morale boost,
           | in my opinion.
           | 
           | Individual work capacity varies, but in my experience most
           | people overestimate theirs by a lot.
        
           | BolexNOLA wrote:
           | The argument is that if people work fewer hours per week,
           | then they will spend less time slacking off. And the numbers
           | so far show that to be true.
        
         | b1gnasty wrote:
         | I used to work manual labour in the reforestation industry and
         | there were two main schedules we would work: 4-and-1s
         | (criminal) and 3-and-1s (manageable). That change in ratio
         | really adds up.
         | 
         | Sadly, management mostly worked us 4-and-1s because, despite
         | the fact that each day we were less productive, over 3 months
         | more trees would get planted in less time.
         | 
         | 4-and-1s of gruelling manual labour inevitably leads to burn
         | out. It did every season without fail, and we all expected it.
         | Burnout was a built-in condition. The key here is that labour
         | tolerated it only because the work was _seasonal_. There was
         | always an end in sight. And most folks spent the off-season on
         | a beach somewhere it was cheap enough to live off the earnings,
         | surfing and eating tacos all day (or the equivalent activity).
         | 
         | The salaryperson should not accept burn out as a built-in; we
         | are labourers for life and we need to learn how to find dignity
         | in such a reality. When I first transitioned to a salaried
         | worker, I brought the burn out mentality to my work and had a
         | lot of pride in that. And though full of bride, the burnt out
         | husk that I as had little dignity.
         | 
         | Ratios that allow for more life and less labour is that
         | dignity.
        
       | djhope99 wrote:
       | Everybody is different. We recently had 2 Fridays off a month and
       | it just dropped back to 1 Friday off a month. I feel more
       | productive, actually, contrary to what most people are saying.
       | Fridays are mostly clear of meetings so I can actually focus more
       | unlike other days of the week.
        
         | zemvpferreira wrote:
         | If all your meetings take 20 hours per week and you're left
         | with no time to do deep work, no wonder you feel more
         | productive with an extra 100% focused day.
         | 
         | Kind of like squeezing all your clothing from two closets into
         | one won't make your room feel less cramped unless you cut half
         | your clothing as well. Most people could do without that extra
         | half and be better for it.
        
       | lnxg33k1 wrote:
       | To me it's the failure of our governments the fact that we're
       | still discussing about a 32-hours work week, the processes have
       | been evolving and have been optimised for the past couple of
       | centuries, the value produced has seen an increased of a order of
       | magnitude, but the benefits of it all has been squeezed from the
       | working class into the pocket of a few individuals, I've broken
       | my balls having to justify why we need shorter weeks, we could
       | work 2 days and produce as much as it was produced 50 years ago,
       | why do I have to have a life of misery always working, to not be
       | able to afford even a house by myself, while these motherfuckers
       | have everything and then tell me to work more, fucking
       | capitalism, it's all useless existence and greed
       | 
       | I feel it insulting that we need justify keeping the level of
       | productivity with a shorter working week, while the change in
       | process and tooling that boosted productivity were never adopted
       | to make the sake of the working class but for the benefit of the
       | powerful, its time to make it a law
        
         | Draiken wrote:
         | Unfortunately that's 100% because of capitalism.
         | 
         | We pay with our valuable time so they get more time to enjoy
         | their yachts.
         | 
         | The government can't really solve this anymore, because
         | corporations control the politicians and public opinion through
         | the media.
         | 
         | The only real solution is, in my view, revolt. But the majority
         | (like myself) are also way too comfortable to risk anything
         | drastic, so the status quo will persist for the time being.
        
           | smithcoin wrote:
           | What's the difference with "them" enjoying their yachts and
           | you being "way too comfortable"?
        
             | yoyohello13 wrote:
             | Two extra 0's on their yearly take home pay.
        
           | yoyohello13 wrote:
           | > The only real solution is, in my view, revolt. But the
           | majority (like myself) are also way too comfortable to risk
           | anything drastic, so the status quo will persist for the time
           | being.
           | 
           | I tend to agree with this. My prediction is the capitalists
           | will continue to extract more and more resources from the
           | working class for the next 50-60 years until there is a
           | breaking point. After some violence, society will swing back
           | to prioritizing workers' rights, then regulations will be
           | eroded slowly over another 100-200 years as people forget
           | what it was like, and the cycle continues until the earth is
           | no longer habitable.
        
             | seneca wrote:
             | Weird how that timeline for the inevitable communist revolt
             | in the west has been a few decades out for 100 years.
        
               | lnxg33k1 wrote:
               | It's idiotic to call communist revolt just people wishing
               | to have a better redistribution of wealth, I don't see
               | why the opposite of going from a 1500x difference of pay
               | from working class to something more balanced, has to be
               | seen like proletarian dictatorship, I guess it's just the
               | stupidity that affects modern society, I wish people with
               | those thought would just be intelligent enough to
               | understand how fucking retarded they are
               | 
               | and you also have the nickname of a guy who enjoyed
               | simple stuff, enjoyed taking care of his time,
               | criticising those who would call the servants for
               | dinners.. I guess it's just that modern society is about
               | showing off without understanding a dick
        
               | yoyohello13 wrote:
               | I didn't say communist revolt. More like, any attention
               | paid to worker quality of life at all.
        
               | lnxg33k1 wrote:
               | These people calling marxists or communists people just
               | wishing for social democracy, how much would it take to
               | let them open a book sometimes, they're a cemetery of
               | human knowledge
        
           | billy99k wrote:
           | "We pay with our valuable time so they get more time to enjoy
           | their yachts."
           | 
           | The alternative is that a few people at the top get yachts
           | and the rest of us are poor and have no chance at even being
           | comfortable.
        
       | standardUser wrote:
       | I'd like a model where every other Friday is off for half the
       | staff. A lot less complicated for companies because they can
       | still operate 5 days a week. Also a lot less radical/daunting
       | from their perspective. But all those extra 3-day weekends, some
       | of which become 4-day weekends due to holidays, will create a lot
       | of much-needed time and space in most working peoples lives.
        
       | hiAndrewQuinn wrote:
       | I'd rather five day workweeks but with shorter days, to be
       | honest. I feel I have about 3 hours of peak mental acuity each
       | day that I'd like to spend on my work. It seems like a better
       | time-for-value trade for my employer.
       | 
       | To be fair I work more remotely than not these. If I had to
       | commute in more often I'd almost certainly prefer 4-day
       | workweeks.
        
         | RangerScience wrote:
         | Interestingly -
         | 
         | I went on ADD meds (Dexedrine, 10mg) ohh 6 months ago. I used
         | to be like you and now I'm the other way around - it's easier
         | to Just Keep Going.
         | 
         | Note that I would totally support you getting "five sixes"
         | (~30hours); I'm just finding it interesting that with the meds,
         | for myself I'd now want "three tens" (or whatever).
         | 
         | PS - It helps a lot that I freakin' love working in Ruby/Rails,
         | so I kinda... _want_ to just keep going anyway.
        
           | hiAndrewQuinn wrote:
           | I could see that as being a quite straightforward effect from
           | taking a drug that increases your ability to focus for
           | prolonged periods at a time.
           | 
           | I don't have ADD myself, however, and I find that even a
           | stimulant as low grade as non-decaf coffee generally messes
           | with my ability to stay focused. Different strokes, I guess.
        
         | koromak wrote:
         | Depends on the job I'm sure, but genuinely only have 3 good
         | hours too. After 5-6, I may as well just not be working. I'm
         | writing garbage code and I'm grumpy.
        
         | IKantRead wrote:
         | I like this better in theory, but my experience is that, given
         | my current hours, work tends to very frequently spill over
         | until later in the evening. If my day was supposed to end at 3
         | or even noon I don't think it would make a practical impact on
         | how late I worked.
         | 
         | Work spilling over into extra days does happen during crunch
         | times, but is much rarer. Though I likewise fear that 4 day
         | work weeks would simply mean you end up working 8-8 everyday to
         | get the same amount of stuff done.
        
         | zemvpferreira wrote:
         | Por que no los dos? For lots of jobs peak productivity is
         | probably around 20-30 hours of work. Could easily be 5-6 hours,
         | 4 days per week. Gives you time to warm up and cool down from
         | your more intense work.
        
           | imachine1980_ wrote:
           | peek productivity not means peek output, i'm agree than the
           | possibility for 30 or 20 hour work week should exist but i'm
           | working 20 hours and even when less productive i will make
           | more in 30 hours, i don't want so i work 20, but i will make
           | substantially more output in 30 hours not 50% more but 35% so
           | my compensation make sense being lower , the 4 day work week
           | means that productivity compensate the loss of hour so the
           | output and to consequence the salary don't change.
        
           | hiAndrewQuinn wrote:
           | You're speaking my language here.
        
         | dilyevsky wrote:
         | I interviewed with one place for a kernel dev role that was
         | explicitly 12-4pm. Yes you read that right. They were in the
         | "defense" space and lowball salary so I didn't take that offer
         | but always thought it was interesting idea
        
           | hiAndrewQuinn wrote:
           | That is a fascinating idea. I could easily see myself going
           | for that if I loved kernel hacking and they were willing to
           | let me work remotely.
           | 
           | I imagine you'd have to have a really stripped down warm up
           | and cool down routine for such a role. 30 minutes to get into
           | the flow, 3 hours flow state, 30 to step back down and do any
           | documentation you needed to.
        
         | jfoucher wrote:
         | I used to work 5 days a week, 9 am to 2pm. I quite liked it,
         | but my employer would often call or ask for "urgent" stuff to
         | be down after my hours, which meant I could not be fully
         | present for family or whatever I had planned. I have now
         | switched to a 3 days workweek at another job, and I find it
         | much easier to set effective boundaries. If I'm not there I'm
         | not there and that's it. I don't think I could ever go back to
         | working 40 hour weeks to be honest. When do you get anything
         | personal done?
        
           | jewayne wrote:
           | > When do you get anything personal done?
           | 
           | This is why my stomach drops when this discussion turns into
           | "the whole organization should shut down for another day".
           | That's what I need a day off for. To go to doctor's
           | appointments. To watch a contractor when he's working in my
           | home. To talk to the lawyer planning my estate. Those people
           | need to be working for me to get the full value of my extra
           | day off.
        
             | zemvpferreira wrote:
             | We don't all need to shut down on the same day, and if we
             | do, we'll schedule around it or use shift work. As you can
             | plainly see, service work still gets done even with two
             | days off in a week. Three won't make a difference.
        
               | jewayne wrote:
               | That's my point. I think the vast majority of adults have
               | some amount of personal business that already isn't
               | getting done. Shortening the week is going to make it
               | worse.
        
         | dijit wrote:
         | one thing I've realised is working style is really something
         | that is highly preferential, you cant possibly satisfy
         | everyone.
         | 
         | Working from Office, Working from home, hybrid- working hours,
         | lunch hours.
         | 
         | you cant ever hope to satisfy everybody.
         | 
         | In my case for example, i bloody hate commuting, I feel like
         | any work I do in a day eats disproportionately too much of my
         | day (like going to the gym, where if you work out for 45
         | minutes you should allocate 90 minutes actually due to prep,
         | shower, travel etc).
         | 
         | I'd much rather have longer fewer days.
        
           | emerongi wrote:
           | This is why working in a company with async communication is
           | quite nice as you can do whatever works for you. I'd do 12h*3
           | and ~30min on the other days to answer any urgent questions
           | from people working on a different schedule. Sadly I don't
           | work in a company with that culture anymore :(.
        
             | TylerE wrote:
             | That sounds amazing. I often do my best stuff at 2-3AM
             | (mega night owl), but I don't necessarily want to work that
             | schedule - not least because it's a shared house so it's
             | not a time frame I'd ever want to be, say, having to take a
             | voice call.
        
           | calvinmorrison wrote:
           | Best is to just have core hours that work for everyone. Ours
           | are 9-12 and 1-3.
        
             | hiAndrewQuinn wrote:
             | I'm a big fan of this. Having an idea of the "golden hours"
             | for different parties is even moreso the way with
             | geographically separated teams.
             | 
             | I'm currently operating out of Finland as a software lead
             | for a quite complex product (the displays on your bus/train
             | that show you the next stop - a smorgasbord of bespoke
             | hardware, embedded Linux, and everything you can imagine at
             | the border of software and electrical engineering) and I
             | keep a laser sharp eye on what hours I work so that I can
             | efficiently communicate with my colleagues in North
             | America. If I need to get ahold of my man in Chicago I
             | thankfully have the clearance at work to come in an hour or
             | two later in exchange for having an hour or two which
             | matches his timezone. There's a golden window where my
             | evenings wrap around to his mornings that I like to try to
             | use for high bandwidth communication before I close out for
             | the night.
        
         | hotnfresh wrote:
         | 4-day weeks have a lower cost than 32 hours spread over 5 days,
         | because some of the days you're off would have been off anyway
         | due to holidays or whatever. You can also get away with
         | offering fewer days off without doing any harm--all weekends
         | are three-day weekends, and you see fewer parents taking days
         | off because of e.g. a Friday school in-service day.
         | 
         | The cost of having Fridays always off is a fair bit lower than
         | 20% of actual hours worked in most 5-day-a-week workplaces.
        
           | hiAndrewQuinn wrote:
           | We are stating subtly different points here. Holding 32 hours
           | a week constant, you are arguing that 4-day workweeks reduce
           | cost to the employer, and I think your arguments are at least
           | situationally true quite often; however, I am stating that
           | shorter workdays would lead to greater average value per hour
           | spent for my employer from me, which I think is also true in
           | my case.
           | 
           | The deciding factor is whether the difference in value
           | generation is greater than the possible cost reduction you
           | propose. That is a difficult question to give a definitive
           | answer to, especially because there are large groups of
           | people who want to spend as little mental effort as possible
           | at work, to whom my personal preferences obviously don't
           | apply.
           | 
           | TLDR: You bring up an interesting point. Thank you for your
           | reply.
        
             | hotnfresh wrote:
             | I do think a 6 hour 5 day schedule could see _zero_
             | productivity drop, sure. At four 8s I'm gonna be zonked out
             | short of 8 hours, anyway, just like with a five 8s. That's
             | a good point.
        
         | Unbeliever69 wrote:
         | I've worked 4-10s for 3 years at an aerospace contractor but
         | after 8 hours I felt done. I worked 5-7s during COVID as WFH
         | and really enjoyed it. Sometimes we would do 4-8s around
         | holidays and vacations and that was also great. It's really
         | about defining a culture that supports quality over quantity of
         | work.
        
           | xur17 wrote:
           | > I've worked 4-10s for 3 years at an aerospace contractor
           | but after 8 hours I felt done.
           | 
           | Same thing here - I enjoyed the day off, but 10 hours was
           | definitely too long, and the day off wasn't really worth the
           | trade off.
           | 
           | My current employer has "my mondays" - half the Mondays are
           | days with no meetings, half are completely off. From an
           | employee retention perspective this is a pretty sticky
           | benefit - it would be difficult for me to go back to a normal
           | schedule.
        
           | [deleted]
        
       | elAhmo wrote:
       | I find this very interesting from the tax perspective too.
       | 
       | In case you reduce your pay by 20% to accommodate for fewer
       | hours, in many countries with progressive tax rates, the effect
       | on take-home pay in absolute terms is not as significant as
       | relative.
       | 
       | For example, in Germany, 100K gross leaves you with 57 after tax.
       | Whereas 80K results in ~47k. In absolute terms, it is 'just 10k
       | less', on a salary of 57k, but with 20% less working hours.
        
       | effnorwood wrote:
       | [dead]
        
       | 303uru wrote:
       | I'm on a true 4x8 work week and it's life changing. I have
       | Tuesdays off. It feels close to half my days at work and half
       | off. I'm more productive at work and the extra day off has
       | allowed me so much flexibility in life; from going to Costco when
       | it's quiet to 5 hour bike rides around Denver and even spending
       | the day with my kids if they're off. It's huge. It's hard to
       | place a value on it, but I'd probably turn down another job that
       | was 5 a week unless it was at least $70k+ in more annual pay.
        
         | kmlx wrote:
         | > I'm on a true 4x8 work week and it's life changing.
         | 
         | while many have shared positive experiences, mine was quite the
         | opposite. i did a 4-day work week for around 1.5 months and
         | didn't find it to be beneficial at all. i went back to a 40-50
         | hour work week. i really love my work and want a lot more of
         | it. not having a family also probably helps.
        
           | orzig wrote:
           | Thank you for specifying that you do not have a family. More
           | people should give their life context when they make posts
           | like this, positive or negative.
           | 
           | There has been a time in my life for each type of work
           | arrangement, and there will be a time for retirement. Talking
           | without that context is just going to result in talking past
           | each other.
        
         | alexhjones wrote:
         | Same here - love my Tuesdays off and going for long bike rides
         | before collecting the kids from school to play. Costco never
         | seems to have quiet times near me any more though! I get the
         | Friday Feeling on a Monday afternoon, get the out of office
         | ready and switch off mentally. Every Public holiday that falls
         | on a Monday gives an automatic 4 day weekend. I try to avoid
         | squeezing in too many odd-jobs like a weekly food shop. Like
         | you, I would also only look for a new job that could be
         | flexible on 4 days.
        
           | 303uru wrote:
           | I forgot to mention the Monday holidays! They're the best.
        
         | ghaff wrote:
         | A midweek day off sounds pretty uninteresting relatively
         | speaking. I'd much rather have (official) long weekends--though
         | Fridays seem to be there in a lot of informal arrangements at
         | many companies these days.
        
           | freedomben wrote:
           | Likewise, but I think it depends on how people like to spend
           | their spare time. I love being able to go on a road trip or
           | camping trip, and 3-day weekends open up an entirely new
           | world of possibility for a weekend trip.
           | 
           | For people that use the time to do errands, I suspect mid-
           | week is better. I do wish we could settle on weekends though
           | because the errands can be easily done on Friday or Tuesday
           | or whatever, whereas a weekend trip cannot.
        
           | jewayne wrote:
           | I'm all for a 4-day week, as long as we all get a different
           | extra day off. I don't need most of society to shut down for
           | another day a week. I need a day when everything's running
           | but I don't have to work. A society-wide 3-day weekend?
           | That's a nightmare, to me.
        
         | benbjohnson wrote:
         | Do you mind if I ask who you work for? I'm in Denver as well
         | and I'm always curious what companies are doing 4x8 or even
         | 4x10.
        
           | blissfulresup wrote:
           | Interested too case OP responds
        
           | mym1990 wrote:
           | There needs to be a catalogue for this!
        
             | imiric wrote:
             | https://4dayweek.io/
        
             | [deleted]
        
           | wil421 wrote:
           | Someone I know worked at Lockheed and had every other Friday
           | off and worked 9-5. Not quite a 4 day work week because half
           | the smallish team needed to be on call Fridays.
        
             | panzagl wrote:
             | A lot of government offices (and therefore their
             | contractors) work '9 nines' to get every other Friday off,
             | though in practice it really becomes '9 eights'.
        
       | Apocryphon wrote:
       | Feels like this had some traction a year ago at the peak of the
       | Great Resignation, when worker power seemed ascendent. Now after
       | all of the mass layoffs, are there more companies actually
       | experimenting with four day workweeks, as opposed to those who
       | had made the switch earlier? Also a shame that one of the more
       | high-profile tech startups with a four-day workweek, Bolt,
       | imploded (though not as badly as their competitor, Fast).
        
       | yieldcrv wrote:
       | doesnt seem like it would work for my overemployment so pass
        
       | hackermatic wrote:
       | I have a four-day, 32-hour work week, and I am less productive,
       | but that was the plan up front and I'm very okay with that (and
       | luckily, so is my management).
       | 
       | I wanted more personal time, and I also needed more time to take
       | care of my physical and mental health with appointments -- which
       | all of my providers schedule during the 9-AM-to-5-PM period
       | anyway -- and simple rest and relaxation. If I didn't have this
       | schedule, there's a good chance I wouldn't still be at this
       | current job or would have burned out earlier in general, and my
       | contributions are valued, so it works out well for all parties
       | involved.
       | 
       | But I don't think you have to justify it so concretely or morally
       | -- you can just want to do a day's less formal work, or want to
       | work toward a society with less work and more leisure time! The
       | 40-hour work week is arbitrary, anyway.
        
         | el_benhameen wrote:
         | Did you exchange the extra hours for a cut in pay?
        
           | hackermatic wrote:
           | Yes, so I get 80% of the normal salary for my role, but the
           | same benefits package (insurance, 401(k) match, etc.).
        
       | nkozyra wrote:
       | I think of a "work week" as a bit of a fishbowl situation for
       | most professionals. If you extend it from 40 hours to 80 hours
       | you'll generally get the same output over time.
       | 
       | Of course, this productivity can only be squeezed into only so
       | small a frame, but I think what we're learning is that 40 hours
       | is probably not the maxima for efficiency.
       | 
       | The simplest way to have more efficient workers is to make them
       | happy. I don't have a panacea for that problem, but giving them
       | an extra day for leisure sure doesn't hurt when possible. But
       | more than that, companies rarely ask and listen to employees
       | about what they want/need, and there's so much social pressure
       | that people seldom speak up. Fundamentally this is a cultural
       | problem.
        
       | statquontrarian wrote:
       | I've had a 3 day work week for years (at 20 hours per week) and I
       | love it. I feel like I'm more productive than before, too. Not
       | just productivity per hour, but total productivity. I was
       | surprised by this result since I'm working half the hours per
       | week.
        
         | jawns wrote:
         | Is that generalizable, though?
         | 
         | Most people I know who are working under 30 hours a week do not
         | qualify for important benefits such as health insurance.
         | 
         | Are you benefiting from a partner's income and health plan, or
         | are you able to sustain yourself entirely on your own income?
         | 
         | And out of curiosity ... how do you spend the extra 4 days per
         | week?
        
           | statquontrarian wrote:
           | I'm earning half my previous salary, and I'm single, so it
           | was definitely an adjustment. I had heard about the 30 hour
           | per week cutoff for benefits, but I was surprised that my
           | company was able to provide full benefits at 20 hours per
           | week. It's a very large company, so I know they're following
           | all the laws properly. Maybe the ones that require a minimum
           | of 30 simply aren't up-to-date on the latest laws.
           | 
           | It probably helps to be a top performer and have years of
           | experience. But if I were to be let go tomorrow, I'm sure
           | it'll be difficult to find again. But I'm going to try! Never
           | hurts to try when you know what you want.
           | 
           | I keep a low profile but the extra days per week are fun to
           | fill! There does seem to be some sort of mental flip between
           | 3 days and 4 days because I know that the majority of my week
           | is whatever I want to do versus the majority (or vast
           | majority) being work.
        
         | emerongi wrote:
         | When applying for senior positions, a 4-day work week is
         | already quite an ask. I feel like the whole agile/scrum
         | approach is so deeply rooted into modern companies that
         | ironically they are unable to adapt.
         | 
         | We had somebody in a different timezone join the team and there
         | was a long discussion about when we should do stand ups. I
         | almost suggested just dropping it, but that would have been
         | heresy.
        
           | statquontrarian wrote:
           | I'm a senior software engineer, but, yes, there are lots of
           | complexities. 3 day work weeks might only work for top
           | performers, but a lot of them never ask.
        
           | Paul-Craft wrote:
           | Did anyone suggest doing standups asynchronously, for
           | instance, over Slack?
        
       | dudul wrote:
       | Companies should just have roughly 20 "core hours" in the week
       | during which everybody is expected to be reachable for calls,
       | meetings, chats, etc. And then just let people do whatever they
       | want as long as they deliver.
        
         | erik_seaberg wrote:
         | Half of every week seems like a lot of talking. I don't find
         | the remaining 20 hours of deep work to be enough for the team's
         | goals, or for me personally.
        
           | dieselgate wrote:
           | That's reasonable and seems like parent was expecting some to
           | work more hours where/when necessary (or not long as they
           | deliver)
        
           | hotnfresh wrote:
           | I believe the proposal is to have 20 hours a week in which
           | everyone's expected to be available at the same time, not
           | limiting weekly work hours to 20.
        
           | Filligree wrote:
           | To be clear, you're saying it's the non-core hours in which
           | you'd get work done?
           | 
           | This is probably true for most ICs, and false for most
           | managers/execs. Hence the tension.
        
             | erik_seaberg wrote:
             | Yeah, clarified that.
        
           | dudul wrote:
           | You don't need to talk for the 20 core hours. It's just time
           | where everybody is supposed to be around if there is need for
           | collaborative work.
           | 
           | It's a maximum.
        
       | mym1990 wrote:
       | I feel like the 4 day workweek will need to be led by new
       | businesses rather than hoping large corporations will ever go
       | there. In my mind a 4 day work week would also increase
       | consumption across the board as people have more time to
       | vacation/have experiences/get into hobbies/etc...
       | 
       | Of course it is not a silver bullet but spreading awareness is a
       | good step.
        
       | freitzkriesler2 wrote:
       | That feel when you work at a job where you can't work from home.
        
       | jedberg wrote:
       | > Nicholas Bloom, an economist at Stanford University, says it is
       | doubtful most businesses can shed a fifth of the workweek and
       | maintain productivity. "Whenever I talk to managers, they find
       | the topic pretty insulting--they argue it implies they are
       | completely wasting a day a week," he said.
       | 
       | Yeah, that's the point. You shouldn't expect the same
       | productivity. You should expect less. Just like in theory if we
       | went back to a six day week we'd expect more productivity.
       | 
       | The change isn't expected to hold productivity, it's expected to
       | make people's lives easier and take advantage of technological
       | advantages. Go to a four day work week and you can expect the
       | same productivity that you had 20 years ago at five days.
       | 
       | Nothing wrong with that, if reduced productivity is even true,
       | but most studies refute that anyway.
        
         | dv_dt wrote:
         | It seems like that most formal studies show that it's just as
         | productive, at least in the few nations that did made specific
         | processes to test it out.
        
         | manicennui wrote:
         | But they are wasting a lot of time in most cases. How many
         | people work in the corporate world and spend hours in meetings
         | keeping people up to date who add nothing?
        
         | ncallaway wrote:
         | > Whenever I talk to managers, they find the topic pretty
         | insulting
         | 
         | Most managers in most organizations *are* completely wasting a
         | day a week. If they find that insulting, they should stop doing
         | it.
        
         | Hammershaft wrote:
         | Nicholas Bloom is an economist & yet he appears to be
         | conflating productivity & output!?
        
           | webel0 wrote:
           | The journalist's phrasing surrounding his quote did seem to
           | do this. But his actual quote did not.
        
         | kibwen wrote:
         | I just now asked some friends who work in the enterprise space
         | the question "how many hours per week do you spend in meetings
         | that feel completely pointless and a waste of your time?"
         | 
         | The lowest answer was 8 hours. The highest answer was 15.
         | 
         | We can absolutely cut a day and lose no productivity. We
         | already have a four-day workweek, we're just forcing people to
         | spend a day of their de-facto three-day weekend in the office
         | with their thumbs up their ass.
        
           | unbalancedevh wrote:
           | I'm definitely not 40-hours-productive, and would love to go
           | to a 4-day work week. But I think that a lot of down-time
           | that I spend between tasks wouldn't go away, because my brain
           | can't just switch contexts that quickly. Or maybe I'm waiting
           | 15 minutes for my computer to run a job, and can't
           | effectively work on some other task for that short of a time.
        
         | tomcam wrote:
         | I assume you'd expect a 20% pay cut
        
           | jedberg wrote:
           | Why? Pay isn't related to output. It's related to what it
           | costs to get me to work for you, ie worker supply and demand.
        
             | trescenzi wrote:
             | And even if it is related to output working less hours
             | doesn't always mean less output. If you can genuinely
             | retain the same output, or similar within reasonable
             | bounds, I'd expect to see no pay cut. I know for a fact I'm
             | more productive a tuesday after a 3 day weekend than a
             | monday after a 2 day weekend so I'd expect to see at most a
             | 5% decrease in output and I'd happily trade 5% of my pay
             | for a 3 day weekend every week.
        
           | thefurdrake wrote:
           | I'd expect to be paid the same amount for accomplishing the
           | same tasks. It's not that hard to comprehend.
        
           | [deleted]
        
           | pelasaco wrote:
           | Never, they want to work less and earn more. They want to
           | arrive Monday, and have the cards there ready to be worked
           | on.. and don't disturb my YOGA at 10 AM!/s
        
         | toomuchtodo wrote:
         | People who make it to management are rarely combinations of
         | self aware, empathetic, or rational about work output and
         | arrangements, hence the challenges around these conversations.
         | 
         | Look no further than Amazon, with their we "feel" in person is
         | better. They don't care about the data, they care about the
         | control.
        
         | winwang wrote:
         | I wonder if that's actually true, though. Especially since
         | engineering is a creative field. For example, what if I churned
         | out 20% less code, but bugs per line decreased by 50%? Or if
         | we're architecting a system and the +50% weekend time led us to
         | a significantly better design?
        
       | SirMaster wrote:
       | Would there be some standard between companies to always agree on
       | the same day being the day off?
       | 
       | Seems like a nightmare for working with other companies if the
       | employees are off on a day you are not, and you need to contact
       | them to work on something with them.
        
         | imiric wrote:
         | What we need is a culture change where companies accept that
         | there are very few tasks that need to be done synchronously and
         | with urgency.
        
         | Paul-Craft wrote:
         | Why do you think that? Assuming both companies worked 4 days
         | between M-F, that would always mean you'd have a minimum of 3
         | days overlap. Unless we're talking about urgent support type
         | issues, for which scheduling would probably need to be
         | staggered at each company, anyway, I think 3 days a week is
         | totally enough time to schedule necessary meetings and get
         | prompt responses to email communications.
        
       | jedberg wrote:
       | This article is so dramatic. "Look at how hard it was for these
       | companies to go to four days a week."
       | 
       | It's not hard. You just declare Friday a weekend. Then you do
       | everything like before.
       | 
       | Did you have meetings on weekends? No? Good, move the Friday ones
       | to another day because they're on the weekend now. Who is going
       | to answer customer support emails on Friday? The same people who
       | answered on Saturday and Sunday, and maybe you'll pay them extra
       | work on the weekend. What if we can't get everything done? You
       | probably weren't getting everything done before, and you either
       | worked on Saturday or just said screw it. Do the same thing.
       | 
       | The only slightly reasonable issue brought up was the lawyers who
       | wanted to work four days but kept having to go to court on
       | Friday. Yes, if you work with external entities, you either have
       | to be willing to say no to working on Friday or if you can't, you
       | have to wait for them to also move to four days. But very few
       | people are actually in a position where they can't say no to the
       | client (the lawyer being one of the few exceptions).
       | 
       | The WSJ wants to make it sound like a massive undertaking because
       | they are pro-business and anti-worker. Don't buy the hype.
        
         | manicennui wrote:
         | I was surprised to see this in the WSJ at all. Obviously they
         | did it so they could sow doubt. This entire article is likely
         | PR for ActivTrak though:
         | 
         | "Many four-day-week employers don't appear to be operating more
         | efficiently, though, according to data from ActivTrak, a maker
         | of workforce analytics software. Gabriela Mauch, vice president
         | of ActivTrak's productivity lab, suspects that is because
         | management hasn't revamped the way teams work."
        
         | ncallaway wrote:
         | > But very few people are actually in a position where they
         | can't say no to the client (the lawyer being one of the few
         | exceptions).
         | 
         | Yea, I agree with this. As the lawyer, when the court asks you
         | your preferred dates for scheduling something, don't give them
         | a Friday.
         | 
         | If the Court asks you to schedule something on a Friday, you
         | could politely request it moved to another day. If the Court
         | says: "too bad, this Court works Fridays, and I'm going to
         | schedule something for Friday", then you show up on Friday.
         | Exactly the same way that you would if the Court said: "I'm
         | going to schedule something for a Saturday".
        
         | chiefalchemist wrote:
         | > The WSJ wants to make it sound like a massive undertaking
         | because they are pro-business and anti-worker.
         | 
         | I agree. It's just a shame that for the most part we're still
         | using a lens that's so binary. I understand why say Fortune 500
         | companies are so slow to change. But why are the rest? If
         | you're competing for talent - and nearly all companies are -
         | and "we're on a 4-day workweek" would be appealing, why not do
         | it?
         | 
         | On my last contract I worked 4 days x ~8.5 hrs with Fridays
         | off. LOVED IT. I was more productive and never had to face
         | "This client / project annoys the shit out of me...And even
         | nore so on a Friday." There's nothing to be said for that ;)
        
           | ziddoap wrote:
           | > _If you 're competing for talent - and nearly all companies
           | are - and "we're on a 4-day workweek" would be appealing, why
           | not do it?_
           | 
           | At my workplace, this is how we ended up shifting to a 4-day
           | work week. We were in a bit of a squeeze for hiring, and the
           | last few candidates we had hired didn't end up working out.
           | 
           | We shifted to a 4-day work week and we have found we're
           | getting higher quality applicants that would have presumably
           | skipped over us for a more prestigious name, a company
           | offering 4-day already, or whatever.
           | 
           | Not saying it's guaranteed to be the same for others, but
           | it's worked remarkably well for us in our talent search.
        
             | chiefalchemist wrote:
             | It is, at least for now, a point of differentiation.
             | 
             | It also could be dog-fooding. That is, how of is it, "We're
             | innovative. We're pro-team...4DWW? What's that?"
             | 
             | The other thing is, not everyone wants Friday off.
             | Therefore, the company can remain open 5 days, but not
             | everyone is available all five days.
        
               | ziddoap wrote:
               | > _The other thing is, not everyone wants Friday off.
               | Therefore, the company can remain open 5 days, but not
               | everyone is available all five days._
               | 
               | We rolled it out this way. Business is still open 5 days,
               | roughly half the staff has Mondays off and the others
               | have Fridays off. Staff have a "buddy" on the other
               | schedule that they touch base with in case something
               | needs to be taken care of on one of their days off.
        
         | yndoendo wrote:
         | To be far, the metric of a salary at 40 hours is not valid. The
         | time to commute should be count against that 40 hours and yet
         | we exclude it. You're driving to work means work is taking your
         | time, they also know where you live and how long it takes so
         | there should be no scruples there.
         | 
         | Current metric fuzzes reality and allows for persuasion against
         | 35 work weeks because people think they are only working 40
         | hours a week.
         | 
         | To be far, I find 9:00-17:00 to be a destructive cookie-cut
         | mentality too. Prefer having about 12 hours of continual time
         | when implementing a new feature or working a new solution. This
         | allows for laying out the solution and better refactoring to
         | make it cleaner. 9:00 to 17:00 does not allow for this because
         | continual thoughts have to be shelved for the next day which
         | takes more energy and time to try and rev-up again to continue
         | where one left off.
         | 
         | To be far, a CEO or President or Owner or Manager seeing you in
         | the office is a social engineering hack. "They are there so
         | they must be doing work, I'm getting what I payed for."
        
           | paulryanrogers wrote:
           | My guess is it's because the commute is really up to the
           | employee. So if someone moves does the employer adjust their
           | salary? What if I ride to work on my bike a few times a week
           | (15 miles)?
           | 
           | Perhaps there could be some time stipend, so days may start a
           | bit later and end sooner than 9-5.
        
         | gwbas1c wrote:
         | > Good, move the Friday ones to another day because they're on
         | the weekend now
         | 
         | That only works if you cancel the bullshit meetings, and
         | empower your employees to say no to bullshit meetings.
        
         | treebeard5440 wrote:
         | I like how you broke this down - it's really not that hard
        
       | hurril wrote:
       | I always thought the perspectives of this question is weird. Are
       | people asking to be paid more than they work, or is someone
       | forcing them to work full time?
       | 
       | I totally understand the urge (and suggestion) to not work too
       | much on the other hand.
        
       | gwbas1c wrote:
       | A few months ago a few recruiters approached me about a job with
       | a company that works 4 days a week.
       | 
       |  _They work 4 10 hour days a week._
       | 
       | There's just no way to balance that kind of schedule and
       | children. I was very frank when I responded to the recruiter.
        
       | [deleted]
        
       | [deleted]
        
       | paulpauper wrote:
       | What about tech support or sales reps. How do the gaps get
       | filled.
        
         | footy wrote:
         | at my workplace it's done by having the same employees we had
         | before, but working fewer hours each.
        
         | munk-a wrote:
         | No, we're not talking about 10/4 or supplemental employment.
         | People are actually just more productive at creative tasks if
         | you don't overwork them so eight hours a day, four days a week,
         | the same team... Your productivity may not drop/Your
         | productivity per hour may increase by 20% or more.
        
         | Paul-Craft wrote:
         | You'd probably do staggered scheduling for positions that truly
         | need the coverage. But, I suspect a lot of these needs are not
         | really "needs."
        
       | brtkdotse wrote:
       | Since becoming a freelancing contractor I've experimented a fair
       | bit with my work week and for me the sweet spot is 5 6-hour days,
       | split up as 2x90min, 2 hour lunch and another 2x90min.
       | 
       | I prefer a five day workweek with shorter days because I rarely
       | have 8 good hours in me. That, and as long as the rest of the
       | world is working 5 days a week it's easier to conform.
        
         | rockostrich wrote:
         | This is pretty much how I work anyway as someone who
         | technically should be working 5 8-hour days and I tell everyone
         | on my team that I really don't care how much they're working as
         | long as: their output is at least meeting expectations, they
         | attend any meetings they're required to be at (although at this
         | point it's almost only stand-up and 1:1s), and they handle on-
         | call when it's their turn on the schedule (although we're a
         | data team so the stakes are a bit lower in terms of incident
         | response).
         | 
         | I usually start anywhere from 8-10, work until around 12-1, get
         | some chores done/eat something/work out, work until around 4-6.
         | Some days there's more in the tank or whatever problem is
         | interesting and I can't put the laptop down. Some days I'm done
         | by 3 pm because I'm not getting anything done. And sometimes
         | it's like 8 pm on a Sunday and I have a great idea about how to
         | solve something so I pick up the laptop.
        
       | GGO wrote:
       | https://archive.ph/C6qmf
        
       | freedude wrote:
       | The challenge comes with debt. If you are not servicing debt,
       | then it becomes easier to be free to do the things you need to do
       | when you want to do them.
        
       | philfreo wrote:
       | At Close we have been offering an 80% salary / 4-day week option
       | for engineering roles for a few years now. This originally was
       | mandatory during early 2020 COVID-19 economic uncertainty as a
       | way to cut costs without doing layoffs. Quickly it became
       | optional - most people moved back to 100% but some people decided
       | they enjoyed it and wanted to continue that arrangement.
       | 
       | What's interesting about 4d weeks is that it's 20% less work but
       | 50% more days off, which can be very impactful for folks.
       | 
       | Our 80% option is a flexible thing, as in you can choose to do it
       | for the summer but not the rest of the year. We try to adjust
       | workloads accordingly. I've taken advantage of it myself for a
       | period of time and it gave me more free time to be with family
       | and also work on side projects.
       | 
       | Some people really love taking our 80% option / 4d and others
       | absolutely don't want to.
       | 
       | Companies offering flexibility in work hours can really help
       | retention IMO, and is a natural progression after (a) remote /
       | freedom of location, and (b) freedom of specific work schedule.
       | 
       | I know a few companies offer "4-day week summers" to everybody or
       | even "everyone always does 4-day weeks". But I like the
       | "fairness" of giving people an option, since different people are
       | in different life situations at different times where working
       | more vs. less can be especially helpful.
        
         | wnolens wrote:
         | > This originally was mandatory during early 2020 COVID-19
         | economic uncertainty as a way to cut costs without doing
         | layoffs.
         | 
         | I'm surprised I've never heard of this solution before. I think
         | it's brilliant, especially for engineering roles where we can
         | still make rent on 80% pay.
         | 
         | I would gladly move back and forth between the options as I get
         | more or less burnt out with work, or take on a new extra
         | curricular.
        
       | Hasz wrote:
       | I have a split lunch schedule -- I usually take 30 minute lunches
       | during Mon-Thu and take an hour for lunch on Friday. Based on my
       | internal notes (and a bunch of metrics) I am _more_ productive on
       | Friday (especially afternoons) than I am on a given Tuesday
       | afternoon. There 's a ton of other variables and probably some
       | contraindications in that anecdote, but it's the kind of counter-
       | intuitive result that a 4-day work week is based on.
       | 
       | I'm also amazed at how variable an hour can be in terms of
       | output. I can easily do 5-10x work at my best compared to my
       | worst. The key here is being completely in the zone, and not
       | trying to do it all the time.
       | 
       | I believe a 4-day work week could help put more people in that
       | productive zone,resulting in as much/more output for less hours
       | spent. Of course, you have to have employees trusting enough and
       | stable enough to use the extra time to decompress.
        
       | imiric wrote:
       | One detail about the 4-day work week that tends to be ignored is
       | that a 4 day work week is not the same as a part-time position,
       | and, crucially, it should be compensated the same as a "full-
       | time" 40 hours per week position. Some companies claim to have a
       | 4 day work week schedule, when in fact they simply negotiate an
       | equal reduction in salary.
       | 
       | The point of working less is for people to have more personal
       | time without this impacting their livelihood. There are many
       | well-studied benefits of this[1], both to workers and companies,
       | yet greedy companies still cling to archaic practices to squeeze
       | as much profits as possible out of each employee.
       | 
       | Even after considerable productivity increases gained in part by
       | automation and technology, we've seen decades of wage stagnation
       | and an increasing productivity-pay gap[2,3,4]. Workers have lived
       | with this short end of the stick for far too long, and the least
       | controversial step forward would be to make the 4 day work week
       | without pay reduction a general policy in all companies in
       | nonessential industries. There are industries that need to
       | operate with longer schedules, and those positions should be
       | compensated accordingly, but most IT companies can certainly
       | operate with much less than 5 days per week.
       | 
       | [1]: https://time.com/6256741/four-day-work-week-benefits/
       | 
       | [2]:
       | https://en.wikipedia.org/wiki/Decoupling_of_wages_from_produ...
       | 
       | [3]: https://www.epi.org/publication/charting-wage-stagnation/
       | 
       | [4]: https://www.epi.org/productivity-pay-gap/
        
       ___________________________________________________________________
       (page generated 2023-09-29 23:01 UTC)