       | jll29 wrote:
       | Many companies, and certainly some people I know, are keeping
       | busy and confuse "operationally busy" with "successful". Most
       | people that are too busy stop thinking strategically, and instead
       | restrict all their energy and attention to short-term
       | firefighting.
       | 
       | Rapidly-changing diaries are problematic already at much lower
       | levels than "business level 7"... they also interfere with your
       | own ability to plan your day.
        
       | GCA10 wrote:
       | I'll offer a companion scale that speaks to when/how we declare
       | stuff done and ship it.
       | 
       | A. Levels 1 and 2. I ship stuff when it's as excellent and
       | finished as I can possibly make it.
       | 
       | B. Levels 3 and 4. I'm too busy to get every last detail tidied
       | up, but when I ship stuff, it's 90% of what I wanted it to be. I
       | don't always nail the deadline 100%, but on both quality and
       | timeliness, I'm respected and seen as someone who doesn't let the
       | team down. I secretly like peeling away when it's almost done,
       | because there's usually something more valuable and exciting
       | coming next.
       | 
       | C. Level 5. I'm very erratic. On a few key projects, I'm still
       | shipping in a pretty dependable way. But the amount of half-done
       | stuff in my mental attic is scary. I've still got the willpower
       | and credibility every now and then to offload/kill the most
       | hopeless projects, and that gives me a bit of a reprieve.
       | 
       | D. Levels 6 and 7. I don't have a coherent approach to shipping.
       | Incomplete work leaves my control when someone else seizes it
       | from me. There's a ton of stuff that's half-done that I may never
       | have time to revisit. I'm too tired to sort out anything -- or
       | put up a fight.
        
       | klyrs wrote:
       | After years of burnout, my psyche rewrote 6 to prevent 7. When I
       | get to that point, my subconscious rebels and I stare into the
       | depths of the void rather than work. My conscious mind notices
       | this behavior, I tell everybody what's happening and I cancel or
       | indefinitely delay _everything_ except for literal life and
       | death. I take a few days off, then set a goal of one focused task
       | a day. If that only takes an hour, that 's fine, I did the task.
       | Gradually I increase the load, but I know from repeated burnout
       | cycles that impatience will deepen the wound.
        
         | feoren wrote:
         | > a goal of one focused task a day. If that only takes an hour,
         | that's fine, I did the task.
         | 
         | It's a rare privilege to be able to rebalance your own workload
         | like that. As a consultant, I have some ability to do this, but
         | if I accomplish one focused task that takes an hour one day, I
         | only get paid for one hour that day. I cannot make myself less
         | busy without literally lowering my pay.
        
           | klyrs wrote:
           | It is. I'm an established researcher, and my coworkers see
           | the lead-up to the crash -- at levels 3-5, I'm over-producing
           | enough to keep folks busy through the lull. I know that my
           | productivity has peaks and troughs, and when I'm on fire it's
           | difficult to hold back (ADHD life-hack: doing what you love
           | risks detrimental hyperfocus). But, as a researcher, when I'm
           | doing my job, I'm not unblocking issues; I'm creating work
           | for others months to years down the road. Supporting that
           | work (this is where I can be a blocker) is often very low-
           | touch and high-reward so that's what I focus on in the down-
           | times.
           | 
           | If I was an hourly contractor, I'd be billing for those extra
           | hours in the hopes that I could cover myself after a crash.
           | But I'm not sure that contract research is a thing. And...
           | have you considered billing by the day? I've never been a
           | contractor but I've heard it's a thing.
           | 
           | But... it's not like I have a choice in the matter. I've
           | forced myself to work through burnout for literally years at
           | a time, and now that part of me is broken forever. That's
           | what "unsustainable" means. I will eventually quit tech, or
           | move on to management, when the time comes.
           | 
           | If you cannot find slack and your busyness is frequently
           | hitting 5-7, breakdowns will occur. If you can't recover
           | without going broke, you haven't found a sustainable balance.
           | Again, not a contractor, but the advice I've heard from
           | contractors is to charge more.
        
             | feoren wrote:
             | > the advice I've heard from contractors is to charge more.
             | 
             | Maybe I need to get out. I can't charge more: I'm salaried
             | in a giant corporation full of consultants. They literally
             | have a "quota" for how much they can give out in raises
             | each year, despite the fact that me earning more means
             | _they_ also earn more (via the multiplier). Doesn 't
             | matter, it's heresy to give employees high raises.
             | 
             | Except I'm not _really_ salaried, because I only get paid
             | what I bill. And I can 't bill for downtime, because that's
             | fraud. So I really have the worst of all worlds. Going for
             | a 30 minute walk to clear my head means 30 minutes of less
             | pay, even though my employer benefits from that. For tax,
             | overtime, and labor law purposes, I'm salaried and exempt
             | (to the benefit of my employer), but for my actual
             | paycheck, I'm hourly (to the benefit of my employer).
             | 
             | Frankly I doubt the practice would be legal in any country
             | with reasonable fair labor laws. Unfortunately, I live in
             | the U.S.
             | 
             | Still, it's better than working in some code mill where
             | they burn you for 60 or 70 hours per week and pay you for
             | 40.
        
       | mgrassotti wrote:
       | There are higher levels
        
         | jamesgreenleaf wrote:
         | If Level 7 is minute to minute, then Level 8 must be something
         | like a combat or survival situation in which every split-second
         | matters.
         | 
         | What's beyond that? Eldritch horrors?
        
       | [deleted]
        
       | mv4 wrote:
       | Being busy feels entirely different when you are in charge. If,
       | however, your calendar is controlled by other people...
        
       | sublinear wrote:
       | Why break it up into levels? You schedule time and stick to it.
       | All unscheduled time is considered busy. No interruptions. Deal
       | with it.
        
         | DharmaPolice wrote:
         | What % of employees do you think are in a position where they
         | can just blanket refuse all interruptions?
        
           | Maxburn wrote:
           | Seriously, as a tech lead I take a lot of calls for
           | help/advice from junior techs up through senior leadership.
           | Cut all that off and see how long I still have a job.
           | 
           | I encourage use of "asynchronous" communication like txt and
           | email and letting calls go to voicemail. Key item is to
           | actually follow up on those things several times a day.
           | 
           | I've taken to coming in at 6AM and getting things done before
           | the 8AM flood hits. Second flood happens during lunch. Not
           | much during the end of the day so generally off at 4 which is
           | nice.
        
             | dopidopHN wrote:
             | > Cut all that off and see how long I still have a job
             | 
             | Don't cut it. Ask if it's urgent. If not, say you can come
             | to it in X amount of time. If the person is junior or
             | insisting, tell them the laundry list of questions you will
             | have to get context. And ask if they did all that research
             | already.
             | 
             | It has the double nice effect of motivating people to
             | diagnose their stuff better. And usually once you are free,
             | the stuff is solved.
             | 
             | I tend to avoid tech lead position now but I hold many and
             | it went well. Setting boundaries works !
        
               | pixl97 wrote:
               | In general it's the senior people that are the problem
               | as, well, that's how seniority tends to work.
               | 
               | Ignoring junior people has its own risks. You generally
               | have to follow up and ensure they did the research, by
               | asking questions, which takes up time. Most of the time
               | as a team lead you'll be there for training and guidance
               | to ensure your Jr team members get beyond that position.
               | 
               | Honestly it just sounds the parent poster is given too
               | much to do which will always lead to stuff getting
               | dropped, something ignored, or overwork on someones part.
        
               | Maxburn wrote:
               | We have a good crew and most do that. Some seem to only
               | live in the moment, walk in and give me a updated IP for
               | something and I'll tell them to email it and I'll update
               | it when I'm working on that. There is a certain
               | percentage of problems I can solve with a email link to
               | our intranet docs though...
        
               | Maxburn wrote:
               | Oh, the real frustration is I've got a senior in another
               | dept that doesn't answer emails and texts. He is in a
               | world of immediate chaos because everyone knows that so
               | you either call him three times or it doesn't ever get
               | done.
        
               | bloopernova wrote:
               | I know one of those too.
               | 
               | They intentionally don't fix their "broken" deployment
               | environment so someone else has to do anything CI/CD
               | related. It's infuriating because their attitude reads as
               | anything is beneath them, and they have no respect for
               | others' time.
        
               | tomrod wrote:
               | Time to apply Machiavelli.
               | 
               | This is the situation where you escalate to their boss.
               | If you don't have the clout, have your boss or your skip-
               | levels escalate.
               | 
               | Don't accommodate bad behavior by others. Get email
               | documentation so when they cause your things to break you
               | have leverage.
               | 
               | Fortune 500s operate this way. CxOs like the crab-in-a-
               | bucket approach because they get to be heroes and build
               | their empires on the corpses of failed departments they
               | take over. Tell them exactly what you need of them and
               | why things are breaking and they are all too happy to
               | assist since this aligns to their incentives. If they
               | fail to help, your department is the one that will soon
               | be the corpse, and you can freshen the resume.
               | 
               | (Note: I personally hate those kinds of organizational
               | dynamics, but its one thing to find them distasteful but
               | useful and another to deny their existence).
        
               | projectazorian wrote:
               | > Don't accommodate bad behavior by others. Get email
               | documentation so when they cause your things to break you
               | have leverage.
               | 
               | Who says it's bad behavior? Maybe they're at capacity and
               | their manager told them to deprioritize requests coming
               | from outside the team. Maybe the OP's requests are
               | unreasonable or better handled by someone else.
               | 
               | Not enough information here to make a determination one
               | way or the other. One thing is for sure, people need to
               | stop viewing colleagues as their servants. Most people
               | want to be helpful, if someone doesn't help you when you
               | ask for help, there is usually a reason.
        
               | tomrod wrote:
               | Requiring everyone to place three telephone calls because
               | email / IMs are ignored is objectively bad behavior. The
               | drivers may be varied but* the outcome remains the same.
               | Assuming OP's claim is an accurate retelling, this person
               | serves as a delivery roadblock and is either incompetent
               | or lazy at managing their time and resources. Ergo, there
               | is clear need for the OPs organization to either realign
               | the roadblocker's priorities or to build out the
               | functionality themselves.
               | 
               | Roadblocker's intent to do good is immaterial -- their
               | actions and tactics are resulting in poor outcomes for
               | those that are required to partner with them.
        
             | sublinear wrote:
             | Preferring async communication and advising people to
             | prepare before attending scheduled meetings is what I was
             | suggesting, yeah.
             | 
             | Everyone needs to be at the same level of organization and
             | agree upon what topics are and aren't relevant for each
             | meeting. This is the flip side of work from home culture.
             | You have to have your shit together. No excuses.
        
           | [deleted]
        
         | throwaway98797 wrote:
         | must be nice to be that valuable
         | 
         | us mortals of meddling ability and position need to compromise
        
       | agumonkey wrote:
       | Pretty useful for my own use. I realize that I hate living above
       | triage-hard level. Thanks
        
       | krallja wrote:
       | What's it called when your brain skips straight from level 2 to
       | level 7? Asking for a friend, who is myself.
        
       | pizzaknife wrote:
       | Id offer that simple vocabulary we use in "agile" is indicative
       | of why we even reach stages above 3. I offer the use of the term
       | "sprint" as evidence.
        
         | ttyyzz wrote:
         | you can use agile in a good way here - say you are a dev and
         | somebody wants something from you. your schedule is set, all
         | the tasks for the sprint have been planned and you commited to
         | doing them. you can just say "i have not time for that but you
         | could try to to talk to the PO. the product owner could adjust
         | the prioritization for the next sprint accordingly.."
         | 
         | Working at the shout of other people tends to damage you and
         | the company in the long term (If you are building things and
         | have to maintain them).
         | 
         | I understand that not everyone is a developer and this example
         | does not fit every role. Likewise, an "agile" way of working
         | should not be used for every job.
        
         | kybernetikos wrote:
         | It is very odd that the two week cadence gets referred to as a
         | sprint. Sprints are definitionally not done at a speed that can
         | be kept up for a long period of time, yet we expect our teams
         | to 'sprint' unendingly.
        
           | Sakos wrote:
           | That's an interesting take. Are sprints sustainable?
        
           | marcosdumay wrote:
           | Yet they are sprints by definition. There is no pause to
           | evaluate the work, fix past mistakes, globally plan the
           | system, understand how it will fit when applied.
           | 
           | Scrum only has the part when you get your head down and code.
           | Finished it? Good, let's see what is the next task, get our
           | heads down and code again. "Sprint" is a very apt name.
           | 
           | (Of course, that is because the activities that actually
           | bring product quality got somebody specialized on them. You
           | can't find a best portrait of the Western management culture
           | looking at management, disenfranchise the workers that
           | actually know how to do things, bring somebody with no skin
           | on the game and plenty of conflicting interests to make all
           | the decisions.)
        
             | krallja wrote:
             | Scrum also has the sprint planning and retrospective phases
             | in between the sprints. Many teams also take time to do
             | "backlog refinement" as a second-order sprint planning
             | process.
             | 
             | My scrum trainer said, with full conviction, "I've never
             | seen a retrospective done well that took less than four
             | hours."
             | 
             | Nobody does Scrum. Everybody just does the part where you
             | have a defined list of tasks for a sprint and burn it down
             | until you get close enough to zero before the next sprint
             | starts. It's called "scrum-but."
        
       | revskill wrote:
       | Ahh, i've seen my friends busy debugging and manual testing their
       | code throughout the day.
        
       | warner25 wrote:
       | I know this is supposed to be about "work" instead of "life," but
       | I'm trying to decide which one is the baseline level as a parent
       | of several children. I'm thinking Level 4, but maybe Level 5.
       | When my kids ask if / when we can go somewhere special or do some
       | project together, I frequently find myself just shaking my head
       | and saying that I can't answer for anything beyond the next
       | couple of hours, because I need to coordinate with mom and all
       | their siblings' schedules, and because I don't know who's going
       | to get sick or have a tantrum that derails our plans, etc.
       | 
       | When my wife or I go down with illness or injury ourselves, it
       | immediately goes to Level 6 or 7 for the remaining parent.
        
       | thenerdhead wrote:
       | I believe that being busy is a myth. It's one that we all fall
       | prey to and end up accomplishing nothing because of it.
       | 
       | Like any system, you need enough slack. That slack makes you
       | resilient over the long term. It gives you what you value in
       | life. Autonomy, relatedness, and competence to whatever you set
       | your goals towards.
       | 
       | I hate the mentality of "if it's not in a calendar, it's not
       | happening" because this is the opposite of slack. There's a
       | beauty in serendipity when it comes to not being busy. It opens
       | more doors than closes them in my experience.
       | 
       | I would argue that the optimal level is negative in that you're
       | not "busy" by the definition, but you are tackling your top goal
       | until it is accomplished and then to the next one. You won't even
       | make a dent in it if you're constantly distracted by small
       | immediate things. You have to learn to set boundaries and say no.
       | It's the only way things actually get done.
        
         | WhitneyLand wrote:
         | Even if it were true as you say that there is an optimal amount
         | of "slack" with which to operate, how does that mean being busy
         | is a myth?
         | 
         | There are jobs where you can get hired and almost immediately
         | be at the higher levels of busy as described here, and it's not
         | really easy to get an entire culture or organization to quickly
         | buy into a new philosophy.
         | 
         | People have paid the price in health and happiness for
         | surviving in these situations. Whether they could be handled in
         | a better way or not, I don't see how it makes any sense to call
         | their business a myth.
        
           | thenerdhead wrote:
           | Thanks for the candor comment. Here's how I think about it:
           | 
           | I'm arguing for the individual to buy into a new philosophy.
           | One of not being busy. Modern busyness is a construct we
           | accept out of fear. Fear of getting fired, fear of missing
           | out, fear of being passed over for a promotion.
           | 
           | Most of the things we think we need to do, we don't need to
           | do at all. Constant context switching and divided focus is
           | not a thing humans do well at. I think we've misunderstood
           | the power of mono-tasking.
           | 
           | There's a great paradox in it all. The less busy we are, the
           | more we can accomplish. Maybe others have noticed similar
           | phenomena.
        
         | artitars wrote:
         | In my opinion needing enough slack in a system certainly rings
         | true for many jobs that rely on high intrinsic motivation
         | (probably also academia). Slack is also something that is
         | essential for creative jobs, where you need the space to think
         | and come up with new ideas.
         | 
         | Looking at the levels of busyness the concept of requiring
         | slack is still compatible for me. If I am at low levels of
         | busyness (< 4) there should be capacity for planned slots of
         | slack, where goals can be worked on with own pace, ad-hoc
         | meetings and guidance from peers (to fulfil the SDT
         | motivational needs).
        
         | lob_it wrote:
         | Technology added the phrases "set it and forget it" and "one
         | and done".
         | 
         | Analog (some) can chase their tail and consider that busy while
         | innovation is onto the next goal.
        
         | iamthirsty wrote:
         | So you don't think someone like, I don't know, the President of
         | the United States is not _actually_ a busy person? (At level 7)
        
           | thenerdhead wrote:
           | I'm saying people fall into the "busy" trap. There are
           | presidents who are level 7 and accomplish nothing. There are
           | presidents who are level 2-4 and accomplish a lot. Eisenhower
           | comes to mind. He was pretty famous for his philosophy and
           | methodology on this while willing to "do nothing". He
           | accomplished plenty without the need of constant human
           | intervention.
        
           | sweuder wrote:
           | If the president is at Level 7 then it is an utter failure of
           | their administration. Whatever the president's busy level is,
           | it needs to be something that can be kept up with for years
           | at a time without breaking down. They've got whole branches
           | of government at their disposal to delegate tasks. I'd
           | imagine the president's staffers try and keep it at or below
           | a 4 90% of the time.
        
         | astral303 wrote:
         | There's a great book by Tom DeMarco that argues for having
         | slack, and for that being critical for innovation: "Slack:
         | Getting Past Burnout, Busywork, and the Myth of Total
         | Efficiency"
        
           | thenerdhead wrote:
           | Thanks for the recommendation! I'll add it to my book list.
           | Would love to dive much deeper into this idea but have only
           | found a few books thus far that barely touch the subject.
        
         | RajT88 wrote:
         | If you are wall-to-wall with meetings, any follow up items
         | which require concentration have to necessarily take place
         | after your work day.
         | 
         | I have been the top level of busy before, where I have work day
         | full of meetings, and then a work day of actual work after all
         | the meetings.
        
       | kortheo wrote:
       | I find this a useful framework for thinking about busy-ness. I'm
       | someone who skews towards feeling over-responsible for things,
       | has a hard time saying 'No', etc. Comments here are making me
       | realize that not everyone is like this and that maybe a better
       | workload balance is possible. Does anyone have suggestions for
       | books, articles, etc that have helped you improve your workload
       | management and set boundaries regarding projects, ask for help
       | when you're overloaded, etc? I often feel like I'm just at the
       | mercy of what is put on my plate by other people.
        
         | teach wrote:
         | I'm not such a person myself but I hear "The Art Of Saying NO"
         | by Zahariades is pretty good. Not quite the same topic but I've
         | also heard good things about "The Subtle Art of Not Giving a
         | F*ck" by Manson
        
           | kortheo wrote:
           | That looks promising, thank you!
        
       | vegetablepotpie wrote:
       | I like that he describes it as levels, and that there are hints
       | of objective measures for each level. If this were adopted in
       | organizations, it would be a useful tool for management to assess
       | who needs the most help.
       | 
       | The common through line is how much stuff is getting dropped, and
       | how much control do you have on what work you take on.
       | 
       | There are some context dependent things that tells me this is
       | written from the perspective of someone who works in an office,
       | such as "Work hours spill into life hours." and "It is clear by
       | how I walk how busy I am."
       | 
       | There are some undefined aspects, for example, I'm at level 2
       | when I have tasks that "are reasonable, knowable, and not
       | deadline-based." What level am I at when I have at-least one
       | deadline based task. If I'm on a scrum team, and everything needs
       | to be done by the end of the sprint, does level 1 & 2 not exist
       | and everyone starts at level 3?
       | 
       | I would love to be able to point to something like this. I see
       | three books on this authors website, if it's in any of these
       | books I'd like to ask people in my office "have you read x?
       | There's an idea in there about y that I think you'd be interested
       | in."
        
         | 1123581321 wrote:
         | I've read his management book and I don't remember anything as
         | easy to use as this scale.
         | 
         | 7 Habits is a classic self-help book that would accomplish some
         | of this. Although, it approaches the problem of business
         | indirectly with concepts like degree of control vs. degree of
         | concern. It also suggests principles that an overly busy person
         | cannot follow, but never connects the dots by explicitly saying
         | "you're too busy."
         | 
         | Another one to look at comes from R&D management: Principles of
         | Product Development Flow. The first couple chapters,
         | especially, explain the problems of trying to maintain a full
         | schedule (queueing theory.) I would probably make a resource
         | based on the book rather than just handing someone a copy,
         | unless you know they'd not be intimidated by it.
         | https://www.amazon.com/Principles-Product-Development-Flow-G...
        
       | JoeAltmaier wrote:
       | Prioritize your work by importance, not urgency.
       | 
       | Work only on the first item on the list until it's done.
        
       | xwowsersx wrote:
       | I'm at a Level 6 :(
        
       | Pelam wrote:
       | I'd say anything beyond level 3 is likely already unsustainable
       | for longer periods if you want to avoid stress related ilnesses.
       | Depends on other factors of course.
        
         | Rygian wrote:
         | Indeed.
         | 
         | The post neglects to mention at which Level one would start
         | saying "No." And I argue it should be Level 3, to avoid going
         | to Level 4.
         | 
         | If I found myself in Level 5, 6, or 7 the only explanation I
         | would find is that I've very badly mismanaged my time for too
         | long.
        
       | phtrivier wrote:
       | So... What ? I've yet to find myself in a position where I was
       | wondering on which level of such a scale I am.
       | 
       | The only interesting question is "I'm perpetually at one of the
       | last two or three stages, how do I go down the scale ?"
       | 
       | (Ironically, reading HN is one of the things _not_ to do.)
        
       | surfsvammel wrote:
       | This makes me thankful. I realise that I am leading a very
       | balanced life today.
       | 
       | There was a time when I was completely overworked. A short
       | project, but it was devastating. It was stressful for everyone
       | involved, but mostly so for me and a colleague of mine. I was in
       | my early thirties and she in her early sixties. We worked day and
       | night, taking taxis to and from work, to get home, for 4 hours of
       | sleep. She came out of the period unscathed, no problem at all
       | while I developed claustrophobia, insomnia, paranoia and
       | depression.
       | 
       | Those went away, after some time, within a year or so. But I, to
       | this day, think that I dodged a bullet. It could've gone so much
       | worse.
       | 
       | One big learning, or realisation, that I had, from that
       | experience, was that taking one of those self tests, showed all
       | the signs of being over worked and stressed. But. I didn't feel
       | stressed. That was the killer. I didn't feel stressed, and so I
       | kept going thinking 'I guess those tests/signs apparently don't
       | apply to me'.
       | 
       | Never again.
        
       | edw519 wrote:
       | When I'm working for someone else, I'm usually around Level 4.
       | Most difficulties are details I know don't really matter like
       | dealing with others, especially meetings and calls. I stay on top
       | of them, but I'd prefer to never have to deal with them, taking
       | time away from what's really important.
       | 
       | When I'm building something for myself, I'm almost always at
       | Level 2. At Level 1, I never finish anything. At Levels 3 and
       | above, I never seem to find the time to dig deep enough to build
       | it good enough.
       | 
       | I honestly believe that the greatest stuff can get built at Level
       | 2, which I've always thought of as the "Baby Bear Level", not too
       | hot, not too cold, just right.
       | 
       | I don't think I've ever allowed myself to get above Level 4. My
       | father and all my uncles seemed to be around Level 6 or Level 7
       | their whole lives at work to make a couple more bucks. They all
       | worked themselves to death. I vowed I would never do that. Sure,
       | I could have done more and earned more, but I kept my promise to
       | myself.
       | 
       | I'm taking a little break for this HN visit, but the results of
       | what I was working on before look good and I'm excited to move
       | on. No immediate deadline. Loose schedule. Going to have a ball
       | getting 5 or 6 things done today. For me, this is the only way to
       | work.
        
       | aflukasz wrote:
       | Somewhat related: Oliver Burkeman has some interesting thoughts
       | about time management and how people have this tendencies to
       | schedule too much as a coping mechanism to deny their limitations
       | around the time they have and how much they can accomplish given
       | their constraints.
       | 
       | I didn't read any of his books, but heard him on Sam Harris'
       | podcast/app and found his take interesting and stimulating
       | reflection about my own behaviors. Certainly worth looking up, if
       | you believe you might be affected by similar phenomenon.
        
       | andsoitis wrote:
       | "For every parcel I stoop down to seize
       | 
       | I lose some other off my arms and knees,
       | 
       | And the whole pile is slipping, bottles, buns --
       | 
       | Extremes too hard to comprehend at once,
       | 
       | Yet nothing I should care to leave behind.
       | 
       | With all I have to hold with hand and mind
       | 
       | And heart, if need be, I will do my best
       | 
       | To keep their building balanced at my breast.
       | 
       | I crouch down to prevent them as they fall;
       | 
       | Then sit down in the middle of them all.
       | 
       | I had to drop the armful in the road
       | 
       | And try to stack them in a better load."
       | 
       | --- Robert Frost
        
         | kvathupo wrote:
         | Tangentially related: has anyone found luck with book clubs?
         | 
         | My friends have a few, but I'm not terribly interested in
         | science-fiction (further narrowing the pool I imagine). I'm not
         | limiting myself to book clubs full of programmers, but I
         | suppose it'd be nice to discuss tech-adjacent books, e.g.
         | Bostrom.
        
         | nerdponx wrote:
         | Sounds like my ADHD.
        
         | evancoop wrote:
         | These pings annoy me, night and day, Incessant asks without
         | delay, And lines to code to earn my pay... And lines to code to
         | earn my pay.
        
         | seanhunter wrote:
         | Little known fact: Robert Frost wrote this after playing "Death
         | Stranding".
        
           | mjrbrennan wrote:
           | I had no idea he wrote the first Strand-type poem.
        
       | dspillett wrote:
       | This applies to trying to do too much in non-working hours as
       | well as conflict between the two. I feel I'm at 5 and have been
       | for a while in terms of not having time for everything I've
       | decided to do (particularly the things I've told others I will
       | do) and I'm too belligerent to let things drop. I perhaps must do
       | something about this!
        
         | jasperry wrote:
         | The trick is to become more and more resentful about how you
         | are being used until that feeling is stronger than the
         | stubbornness that won't let things drop. ;)
        
           | dspillett wrote:
           | One of my key issues is being (sorry for the technical
           | medical terminology here) a bit of a manic depressive
           | fuckwit. Manic me gets big ideas & plans things, and being
           | all excitable he tells everyone about said intentions so that
           | the rest of me then feels the need to find a way of making
           | happen! I do it to myself more than there being other people
           | to be resentful of.
        
       | jasperry wrote:
       | I was surprised that even at level 5 it still says "stuff isn't
       | getting dropped." Might I suggest starting to drop stuff well
       | before that level? Yes, on purpose. It can even help you find out
       | what's really important and who actually is relying on you to do
       | all that stuff.
       | 
       | Overall, this sounds like it was posted by a person with an over-
       | active sense of responsibility, which I can relate to all too
       | well...
        
         | nuclearnice1 wrote:
         | I agree with the sentiment.
         | 
         | From the text I _think_ he draws a distinction between
         | consciously deciding not to do something and missing it
         | entirely.
         | 
         | Level 5 allows consciously dropping -- saying "I'm sorry [can't
         | do it] a lot"
         | 
         | Level 6 - you aren't seeing everything and they are getting
         | dropped WITHOUT intent. "Just saying "No" to inbound things is
         | not enough."
         | 
         | As an aside, guidelines violating clickbait number title? "The
         | Seven Levels of Busy"
        
           | scott_w wrote:
           | It's not clickbait because it gives you what it promises you
        
           | ryandrake wrote:
           | As someone who's work days are always level 5, and
           | occasionally level 6, I think that transition (5 to 6) is the
           | point where you absolutely need to ask for help. 6 inevitably
           | leads to 7 if uncorrected.
           | 
           | At many workplaces, it's totally OK to drop things
           | deliberately. I've been told by managers that [Company]
           | deliberately loads you with more than you can do and expects
           | you to make the right judgment calls. It's even sometimes OK
           | to drop them by accident as long as you know they are being
           | dropped and communicate the droppage after the fact. When you
           | start dropping things and don't even know you're dropping
           | them, that's usually where it starts becoming a problem for
           | the organization and where it starts coming up in performance
           | reviews.
        
         | ajb wrote:
         | Yes, it's well observed, but the fact that only the top level
         | is considered 'unsustainable' is an issue - level 4 is already
         | sub-optimal as there is no margin. And there are 3 levels above
         | that.
        