[HN Gopher] Why long-term plans don't work and how to fix them
___________________________________________________________________
Why long-term plans don't work and how to fix them
Author : lucasfcosta
Score : 246 points
Date : 2022-07-18 06:50 UTC (16 hours ago)
(HTM) web link (lucasfcosta.com)
(TXT) w3m dump (lucasfcosta.com)
| twawaaay wrote:
| I disagree.
|
| I think there is no single reason for why long term plans don't
| work. It is more like you need to do this dozen things right for
| the plan to work. The longer the plan the more things you need to
| be doing right to be able to see through the plan.
|
| Accomplishing short term plans can be done _relatively_ easily.
| There is less chance something unexpected will happen that will
| throw your plan into disarray. You have a chance to "just focus
| and get it done". You can take on debt in order to accomplish the
| task.
|
| The longer the plan, the better you have to be at dealing with
| various things that require you to have much wider view of
| whatever you are trying to accomplish.
|
| For example, if your plan is to loose 3kg in one month, you can
| just do it pretty much on your own with little
| interference/inconvenience to your wife and kids.
|
| Try loosing 30kg over course of a year and you start having many
| more problems that you might not appreciate before you took on
| the project. Maybe your family is unhappy with the change of the
| diet and your schedule? Maybe your wife is unhappy with your
| lower libido/irritability? If you want to keep your gains you
| need to learn to make your diet stick and change your eating
| habits, which is super hard.
|
| In a company setting you might find that long term project might
| need you to rethink many more things like how do you keep people
| dedicated/motivated when it is hard to see the distant goal? How
| do you keep _yourself_ motivated? How to deal with people leaving
| the project? How to deal with more urgent /short term project
| preempting the long term goal?
| makeitdouble wrote:
| Setting aside if you're right, you're not addressing the third
| issue, which is as important, if not more, than the other two:
| "Assuming you know exactly what to build"
|
| Also, among any other analogy you could have taken, choosing
| diet is pretty ironic (or perhaps completely apt actually?)
| twawaaay wrote:
| I think long term projects typically correspond with
| appropriately larger challenges. That's why I used losing
| weight as an example.
|
| Even with losing weight, it is much easier to understand what
| you are getting into when you want to drop 3kg vs 30kg.
|
| In my case feeling cold all the time for about a year wasn't
| something I have predicted when I started it. Or how
| difficult it is going to be to manage clothing department. Or
| to learn new recipes.
|
| Now, none of the above would cause the project to fail, but
| one quarter into that year I figured out I need to find ways
| to keep me focused on the goal or I am going to fail. Just
| eating less wasn't doing it for me and I felt constantly
| hungry and miserable and I would soon drop out.
|
| So I had to pivot and be innovative to be able to finish the
| project.
| prerok wrote:
| But... that's just the thing. You had a goal, not a long-
| term plan.
|
| With that you would have set yourself with activities that
| stretched the span of your endeavors, say for half a year
| each week I lose 1 kg. I do that by eating this, exercising
| like that, etc. Then, things start falling apart with the
| hurdles you mentioned, and you adjust your plan by changing
| recipes, trying to find more fitting clothing, etc. So, you
| adjusted your long term plan to still reach your goal.
|
| The point this article is trying to make is that you
| shouldn't stick to your plan but rather keep in mind your
| goal and change the plan along the way.
| twawaaay wrote:
| It is just an example. Simplification is a useful
| didactic/communication tool.
|
| Project I normally work on span tens to thousands of
| people but they are usually very complex to give as
| examples without spending some more time thinking how to
| best explain it.
| Volrath89 wrote:
| [deleted]
| twawaaay wrote:
| I am sorry that I caused you enough discomfort to point it
| out. I will try to do better next time. In the meantime I am
| still learning English -- not my native language.
| daveguy wrote:
| A trick to remember that one is:
|
| Losing lost an "o".
|
| (Even a lot of native speakers mix up lose and loose.)
| tpoacher wrote:
| I think the quote by David Lloyd George is quite apt here:
|
| > "Don't be afraid to take a big step if one is indicated; you
| can't cross a chasm in two small jumps"
| ohthehugemanate wrote:
| The reason time planning doesn't work for most teams is not
| neatly broken down into two points as in TFA. There are way more
| than two points. Consider confounding factors like computer/power
| outages, windows updates, bugs in upstream, developers' personal
| lives, etc etc etc. One hung over developer day, poorly timed,
| can add weeks to your project. To accurately predict a team
| development process you would need Chaos Theory level of
| mathematics (and foreknowledge of variables). Asking developers
| to guess time values for tickets and adding them up does not cut
| it.
|
| OR you handle it the way casinos do, using the law of large
| numbers[1] to make extremely accurate predictions over many
| consistently-produced values. There's a good reason why _every
| single formal study on estimation_ , and _every single agile
| framework_ has come up with abstracted estimation units and the
| same velocity calculations. A mature estimation process, run for
| a month or two, will give you medium- and long-term estimates
| that are _at least_ within 5% of reality - that 's perfectly
| useful for long-range planning. So the first half of the article
| is simply showing off that the author has never learned about
| professional estimation processes. Fair enough, most developers
| haven't.
|
| Others have already pointed out in this thread that the purpose
| of long range planning is to indicate what we expect comes next.
| TFA acknowledges this as a good use of long-range planning.
|
| There is one good remark in there, however:
|
| > Instead of rewarding teams for delivering useful, profitable
| features, companies which worship conformance to plan reward
| developers for features on time and within budget; it doesn't
| matter how useless or broken those features are.
|
| As an organizational principle this is exactly correct. By all
| means use long-range plans, and adapt them as the situation
| changes. But don't build a rewards scheme around them!
|
| [1] https://en.wikipedia.org/wiki/Law_of_large_numbers
| t43562 wrote:
| To an extent I think it comes from looking at other companies out
| there that have achieved something and thinking that they planned
| everything about where they are now.
| simonh wrote:
| The reason we have deadlines and long term plans is financing.
| Nobody is going to give a development team a blank cheque to
| produce something they can't describe against no timeline.
| Furthermore there are often external constraints that impose
| deadlines and specific long term objectives. A hardware product
| launch for example. Even within companies, architectural or
| infrastructural constraints, or business commitments to partners,
| can add up to essentially the same situation as the agency
| exception.
|
| All the problems the article describes are real, and I found it
| thought provoking and useful, don't get me wrong.
| indymike wrote:
| > The reason we have deadlines and long term plans is
| financing. Nobody is going to give a development team a blank
| cheque to produce something they can't describe against no
| timeline.
|
| This is true, and the usual proposed timeline is usually wildly
| inaccurate.
| myth2018 wrote:
| Financing and, I'd add, feasibility assessments. A good plan
| may reveal that a given project is simply unachievable given
| the resources available, providing info for a wise manager to
| avoid making huge mistakes.
|
| Sometimes we technicians adopt such condescending tone, like
| this article's, out of ignorance. There are decisions whose
| underlying logic we won't fully comprehend while we don't
| consider factors outside tech and product design. This article
| seems to share the misbelief that plans are supposed to predict
| future. Granted, several managers also think like that, but
| many people who produce and consume long-term plans are
| relatively well connected to reality and understand their
| limits.
| kqr wrote:
| But feasibility assessment is basically about going to the
| engineers and saying, "we want to spend 6 months on product X
| -- can it be done to satisfaction in that time?" That's often
| a very easy question to answer reliably.
|
| Long-term planning approaches the problem from the ass end of
| things. It's going to the engineers and saying "design
| feature X on paper for us" and once they've spent a month
| doing that, management says, in the best case*, "well, this
| work cannot be done for real in the remaining five months, so
| never mind".
|
| The original question would have been answerable in a day
| without going into too much detail.
|
| ----
|
| * Best case. The more common case would be "well, now that
| we've spent a month planning this we better get the actual
| work done in the five remaining months, no matter what it
| takes!!"
| myth2018 wrote:
| I'm sorry but I couldn't disagree more.
|
| We engineers can be really fast at refusing unrealistic
| estimates imposed by other departments, especially when we
| take them for loosers. But we are not very good at
| estimating as well, and we are often overoptmistic. I don't
| track my times too fanatically, but I do it +/- regularly
| and, still, I err way more than I think it's reasonable
| considering the data I have.
|
| I don't think you are going to get much reliability on
| simply asking 1 question to an engineer, especially if you
| approach the matter with such overconfidence.
|
| You might argue that an engineer would be more conservative
| and would avoid many mistakes by replying "no, it isn't
| feasible" more often than not, but then they would be
| wasting a lot of opportunities by discarding feasible
| projects, ruining the company as well, only in a different
| way
| kqr wrote:
| I never suggested asking just one person, to be clear!
| myth2018 wrote:
| You're right, I correct myself:
|
| > asking 1 question to your engineers
| makeitdouble wrote:
| > Nobody is going to give a development team a blank cheque to
| produce something they can't describe against no timeline.
|
| You seem to be describing an issue of trust and risk
| assessment.
|
| For instance most companies won't micro-manage projects that
| probably last for a few days, as they trust their team and/or
| feel comfortable pulling the plug after a few days if it didn't
| pan out: the risk is low enough.
|
| Same way buying a new mouse probably requires less oversight
| than contracting thousand dollars of GCP for 3 years.
|
| In that respect, how long a project can be before needing a
| fleshed out plan, internal milestones with verifiable
| deliverables and a set timeline comes down to how much the team
| is trusted.
| qprofyeh wrote:
| You are probably right. Funny, it's product development that
| builds the product to begin with, the thing of value that
| generates revenue to pay the salaries of all these supporting
| roles like finance. Those roles are then planned for and
| filled. At some point a business silently becomes a financial
| instrument itself and product development in turn becomes just
| a resource or investment, that needs to be planned. While truth
| is, the product still is the business' reason d'etre. Does this
| phenomenon have a name?
| kqr wrote:
| Bureaucracy.
|
| It's the phenomenon where the actual work increasingly gets
| pushed aside to make room for recording information about the
| work.
|
| Jobs of higher and higher complexity get invented to measure
| and analyse this meta-work, ostensibly in the name of
| productivity. But I suspect a large portion of it is just the
| paper-pushing meta-workers making jobs up in order to fill
| their time.
| qprofyeh wrote:
| Bureaucracy? Sure. It's very visible, to everyone at all
| these companies.
|
| How about putting this in the context of a company &
| product like Coca-Cola though? It's not bad for them per
| se, to hand over the reins to finance/commerce/bureaucracy.
| Can we call it a "business cycle" perhaps?
| achenet wrote:
| https://en.wikipedia.org/wiki/Bullshit_Jobs
| auggierose wrote:
| Society?
| totetsu wrote:
| Financialization?
| noir_lord wrote:
| You make a plan not because you expect to follow it but because
| making a plan forces you to consider both the situation and the
| resources you have available, then when the plan falls apart as
| they nearly always do you at least know _what you have available
| to deal with it_.
| winReInstall wrote:
| Long term plans do not work out, because we have the wrong format
| for them.
|
| A long term plan should be not a linear chain of events. But a
| scenario-tree. You are always at root - the now. Now you gain a
| new a capabilitz or the world changes around you, and the tree
| adapts. Its branches thicken were they become more likely.
| Unlikely scenario branches wither away. The whole structure is
| recursive, one capability reached makes other capabilities more
| reachable, but might introduce risks, that shrink the whole tree
| down.
|
| This scenario tree is not focused on a single product, as a
| product is just one of many expression of a capability. But when
| the capability is reached, the whole thing has changed, including
| your view on risks and rewards while moving on. So pivoting might
| be in order. Meanwhile others move to similar trees, and change
| the world around you for the better and the worse.
|
| To compress this structure down into a "historylike" sequence of
| events, is the main fallacy. The past may be a linear graph, but
| none the less a ever changing root-recursive-tree was traversed
| by those moving within it.
| d0mine wrote:
| It reminds me the prime radiant from Foundation by Asimov.
| https://youtu.be/3KLYtvwVlrI
| dclowd9901 wrote:
| I think this is asking too much of people. Like what are you
| saying? We literally create a possibility tree as a plan? That
| has so little utility compared to just creating the next two
| possibilities and choosing between the one that is most likely.
|
| I think the problem with the long term plan is the destination.
| If your plan is based on being in a specific state ("I want us
| to have made this product in one year."), it's doomed because
| it's very hard to target something that accurately that far
| away with everything that comes along as the posted article
| elaborates.
|
| We should be shooting for an outcome. "I want us to have a way
| for our users to do X in a year." That way, you're less trying
| to wrestle a shoe onto a goose, and more coaxing something into
| shape based on where you want it to go. It also prescribes less
| so the path toward completion can always be optimal. For
| example, I know that for our users to be able to do X, we need
| to house the data in a certain way and expose these other
| services in a certain way. After those steps are achieved (or
| maybe they fail), we now know where we are in this moment and
| can take the next optimal path.
| kalupa wrote:
| I have nothing really useful to add to this thread, but I
| just wanted to declare "trying to wrestle a shoe onto a
| goose" is an incredible analogy.
| whatever1 wrote:
| You dont have to map out the entire probability space, but
| for each stage maybe you can have 3 scenarios the good, the
| bad, the nominal. Then you can start adding decisions to each
| stage and see how different decision strategies (decision
| sequences) have different outcomes (expected, worst case,
| best case, value at risk etc).
| kqr wrote:
| There are a lot of opinions in this discussion but I'd like to
| steer things toward the concrete.
|
| Could you people on HN share some numbers? If I get a lot of good
| responses I might present a summary later.
|
| 1. How long do you usually spend making your long-term plans?
|
| 2. How much time does one of these long-term plans cover?
|
| 3. How often do you make these long-term plans?
|
| 4. How often do you end up abandoning a long-term plan to do
| something more profitable as it comes up?
|
| 5. How often do you pass on doing something more profitable
| because you choose to stick to your long-term plan instead?
| kqr wrote:
| I can answer for the previous job I had. When I joined, we had
| a process where
|
| 1. A plan took roughly 40 person-hours to make.
|
| 2. The plans were meant to cover 6--18 months, although a bit
| unclear at times.
|
| 3. These plans were generally made 5--6 times per year.
|
| 4. 100 % of the plans were abandoned for something more
| profitable.
|
| 5. About 80 % of the time when something more profitable came
| up, we chose to pass it up to stick to the plan.
|
| Halfway through my time there, we had a change of process which
| moved emphasis much more toward short-term planning. The long-
| term plans became much more flexible. I would summarise the
| outcome as
|
| 1. The long-term plan is built in 4 hours.
|
| 2. It still covers roughly 12--18 months.
|
| 3. The plans are adjusted to agree with reality every 5 weeks
| or so.
|
| 4. The long-term plans are still abandoned around 100 % of the
| time.
|
| 5. We now pass up on around 50 % of the more profitable things.
| nickelcitymario wrote:
| Great questions. For me:
|
| 1. There's a few weeks every summer where planning is a major
| focus, but then evaluating and adapting that plan might take up
| to half a day a week on average throughout the year. Basically:
| What assumptions underlie the plan, and have those assumptions
| changed? Maybe we assumed wrong, or maybe facts changed. So I
| try to keep an eye out for things that require an adjustment in
| our direction.
|
| 2. I have 10 year goals, 3-5 year milestones, and 1 year plans.
| I'd like to push that to 18 month plans, but at the moment I
| only go into any detail for 12 months.
|
| 3. Once per year in terms of formally planning the subsequent
| year.
|
| 4. I can't think of a time where I completely abandoned a plan
| (as opposed to adapting it to changing data).
|
| 5. Interesting question. I would argue "never", because if
| there's a truly more profitable option on the table, then the
| plan needs to adapt and take that into account. But are we
| talking about short-term or long-term profitable? I very rarely
| change my plans in response to short-term opportunities,
| because that's a great way of killing long-term profitability.
| blamestross wrote:
| The problem with "long term plans" in this context is them being
| linear. Basically, most "plans" in practice are just fictions to
| lower anxiety.
|
| Real "Plans" are trees. What is being presented as "the plan" is
| just the most desired or likely path from root to leaf. The
| problem emerges when people stop considering the rest of the tree
| exists. The primary thing to focus on in planning is "decision
| points" and the branches they point off to.
|
| Then deal with all your workers/coworkers/bosses getting
| frustrated with your "too complicated" decision tree based plan
| and ask you to throw away 99% of it because they would rather
| ignore undesired/nonideal futures.
| Ensorceled wrote:
| > 1. Nothing will go wrong 2. Product developers know precisely
| what they must build 3. Product developers know exactly how long
| each task is going to take
|
| If your plan is built with these assumptions you are not very
| experienced at long term planning.
|
| The real reasons long term plans don't work well in real life is
| are:
|
| 1. People don't spend enough thought on strategy before putting
| the plan together [1]
|
| 2. The people assigned to make the long term plan often don't
| have buy in for the results
|
| 3. Most management teams have, at max, a 1-2 month attention span
|
| The most important result of a long term plan is that it produces
| a collection of important, documented, well understood projects
| and their relevant priorities and approximate costs.
|
| [1] See comments on "Why don't we have a strategy?"
| https://news.ycombinator.com/item?id=32094469
| ricardobeat wrote:
| Thats the exact opposite point to the author's. Both can be
| true depending on context, but I find his take more realistic
| for the majority of products in tech.
|
| You're suggesting that plans fail due to poor execution, he is
| saying long-term plans are pointless when you don't know where
| you're going in terms of market fit, design, feature set, which
| is usually the case (and arguably _should_ be the case if you
| want to build a competitive product).
| Ensorceled wrote:
| Right ... I disagree with the author. I presume that's why
| I'm getting down voted here.
|
| Proper long term planning EXPLICITLY includes:
|
| Risk Planning for "1. Nothing will go wrong"
|
| Provisions for Product marketing/Spikes/UX Design to address
| that fact that "2. Product developers [DON'T] know precisely
| what they must build"
|
| Padding and provisions in estimation errors to address "3.
| Product developers know exactly how long each task is going
| to take"
|
| It's like Long Term Planning 101 to address these things.
| ricardobeat wrote:
| Can you give us some context or background of the field
| you're in? Things differ quite a bit between a mobile app
| vs shipyard crane controller software.
|
| The point is that even "proper" long term planning doesn't
| work for the former. You never have enough information for
| the plans to actually materialize, it's not simply the
| planners fault.
| Ensorceled wrote:
| Well ... in my 30+ years I've done medical (imaging and
| diagnostics where design controls and planning are
| required by regulation), enterprise firewalls/anti-
| spam/anti-virus (again, design and planning critical),
| more than a few mobile apps, SaaS, VR. So pretty much the
| gamut.
|
| Long term planning "works" everywhere ... you just have
| different plans: sometimes less detail on the 3-12 month
| items, sometimes you need a detailed plan out for a full
| year or more.
| [deleted]
| Terretta wrote:
| Software project productivity guru Tom Demarco, after a long
| career, had a kind of eye-opening _mea culpa_ moment about
| project planning:
|
| _" I thought all late projects were the same in that they were
| really estimation failures, not performance failures. I still
| believe that all late projects are the same, but for an entirely
| different reason. All projects that finish late have this one
| thing in common: they started late."_ -- TD
| alfiedotwtf wrote:
| tl;dr: Long-term plans = Waterfall.
| ChrisMarshallNY wrote:
| I learned how to play the long game, from the Japanese.
|
| My company used to have ten-year major product cycles. They have
| since, shortened it, but it was still at least five years ahead.
|
| They would have a "long range" plan, that looked many years
| ahead. It would be strategic, and very "fuzzy," with tea-leaf
| reading and crystal ball-gazing. They would deliberately eschew
| details.
|
| It was like looking at a map, and saying "We should go West."
|
| They would have a "middle range" plan, usually, about a year
| ahead. Sometimes, eighteen months.
|
| It was like saying "We should follow one of these highways,
| West."
|
| Then, they would have detailed "project plans," that would be (in
| my opinion), way too detailed and mapped out. These were usually
| handled in six-to-nine-month milestones.
|
| It was like saying "We should follow this highway, and take this
| side road," etc.
|
| I follow a similar pattern, in my own work, these days, except
| that I keep my project plan flexible, and pivot as necessary;
| sometimes, on fairly short notice.
| tmp2343EU wrote:
| This is pretty much what I do as well. It seems so simple and
| obvious in the retrospect but it took me years to figure it
| out. Thanks for the write up
| nitwit005 wrote:
| Let's be real, the main reason these plans don't work out is
| because management changes their mind every couple of weeks.
|
| There are very few software shops with the management discipline
| to not change a plan for a full year, because the plan is
| working.
| nickelcitymario wrote:
| While the problems presented are real, the solution proposed is
| laughable. None of these are new problems. It's amazing how often
| we think we've discovered something new when it's really an age-
| old problem that has been debated forever.
|
| I like to sum it up as the tension between two contradictory yet
| true axioms:
|
| (1) Failure to plan is planning to fail.
|
| (2) No plan survives contact with the enemy.
|
| You can't just abandon long term thinking because it's hard. Grow
| up. You're an adult. Life is hard. You still need to have a
| destination in mind. The path to getting there probably won't
| look like the one you planned, but your odds of success are much
| better when you both have a plan and are ready to adapt and
| evolve that plan as you go.
| chrisweekly wrote:
| The adage "Plans are useless, but planning is essential." might
| solve the ~paradox of your (1) and (2).
| nickelcitymario wrote:
| That's another great way to put it, but I don't know that I'd
| say plans are "useless". It's a good adage all the same, as
| long as we don't take it too literally. (Which, ironically,
| is a good way to think of any plan, too.)
| makeitdouble wrote:
| Long term thinking and planning are different though.
|
| > Grow up. You're an adult.
|
| Being an adult is also about taking paths that you don't know
| where they go, but have enough resources, experience and
| confidence you'll make it work somehow. I think your point has
| merit, but it's not that solid to match such confidence in it.
| nickelcitymario wrote:
| I'm not sure we're disagreeing here.
|
| In virtually all initiatives, we don't know where we'll end
| up. Not really.
|
| But the best way forward, the best way to set yourself up for
| success, is to develop a plan based on what you do know. It's
| incumbent upon anyone responsible for keeping others employed
| that we don't dive into things blindly. We make informed
| bets, and hopefully we're right more often than we're wrong.
|
| I'd like to add that you were far more respectful of me than
| I was of the OP. I appreciate your respectfulness, and I'll
| strive to do better.
| imbnwa wrote:
| I find an uncanny correspondence between the recommendation given
| here, following as it does from an interpretation of the Agile
| manifesto, and Brian Will's procedural programming recommendation
| contra OOP in his classic 'Object-Oriented Programming is Bad'[1]
|
| [0]https://www.youtube.com/watch?v=QM1iUe6IofM
| civilized wrote:
| I agree with both the article and the commenters who are
| vehemently disagreeing. We need to understand how planning is
| used by different people for different goals:
|
| 1. Vision: setting long-term goals and speculating on the path
| that will best meet those goals.
|
| 2. Incentives and accountability: trying to make sure a team
| delivers X in Y time.
|
| Setting a long-term vision is of course extremely valuable - find
| me a great founder or leader who doesn't have a long-term vision!
| It's the trying to force X to happen in Y time that increasingly
| breaks down over longer timelines.
| friendzis wrote:
| I only skimmed the article yet it it is ridden with weird takes
| on management.
|
| Let me give you an example. You go on touristic vacation. Most
| people would plan the core sights to be seen and places to be
| visited, probably center all that around pre-booked places to
| crash for the night. This article sort of advocates shortening
| the plans to half a day plans, because you might to go a tad bit
| different route.
|
| Of course there are uncertainties and the longer the term, the
| more uncertainties. Knowing exactly how long a task takes is
| worthless if you do not know what and why you are building. Where
| does the itemized list with well-defined tasks for sprints come
| from? The longer term plan. Both are very relevant, but are tools
| used at different levels.
|
| Without long term plan Facebook could have ended up a dating app
| or blogging platform.
| konschubert wrote:
| OT:
|
| My best travels have been those where I only ever planned one
| or two days ahead. Backpacking is great!
| beckingz wrote:
| Facebook tried both of those things.
| kqr wrote:
| Do most people really vacation that way? I like to have
| something to fall back to, like a rough set of things to do in
| any type of weather, but I can't imagine making that fallback
| plan a priority. The priority is always what I feel like in the
| moment, having experienced what I have just before. Most of the
| moments I remember come out of spontaneously visiting a
| graveyard or bookshop locals talk about, or taking a trip to
| the outskirts of town because they looked interesting from
| afar. Things I would never have thought to plan!
| zihotki wrote:
| "Plans are useless but planning is indispensable" D. Eisenhower
| magicalhippo wrote:
| I think the article could be improved by defining or giving an
| example of a long term plan.
|
| At the start of each year we have a plan, but it's a rough plan.
| We know we have certain external constraints that need to be met,
| for example system A is moving from sending XML files via SFTP to
| a REST API in June. If we already know the scope, we'll have some
| rough dates for when we should be ready for testing and so on, if
| not we have some (much) earlier dates for studying documentation
| to determine scope and requirements.
|
| We also have some internal goals we would like to meet, for
| example making a new module for doing X. They also got some rough
| dates attached.
|
| This yearly plan is then used to ground our short-term planning.
|
| However, I didn't get the feeling that it was this sort of long
| term plan the article had in mind.
| moring wrote:
| This article assumes a very narrow definition of "long-term
| plan", yet doesn't give that definition to the reader. Here are
| some clues towards that definition:
|
| > Instead of rewarding teams for delivering useful, profitable
| features, companies which worship conformance to plan reward
| developers for features on time and within budget
|
| "The plan does not look at the usefulness of work done. The plan
| decides in advance on a time frame and budget for each feature."
|
| > Consequently, to make up for these delays, teams are pressured
| to deliver the next feature in less time than they originally
| estimated.
|
| "The plan must be rigid with respect to unforeseen bugs. Scope or
| time frame cannot be adjusted."
|
| > Consequently, long-term plans either force you to stick to
| useless features or pressure the team to accelerate the following
| features to compensate for the delay created by listening to
| feedback.
|
| "The plan does not allow adjustments based on feedback."
| lleb97a wrote:
| Long term outlooks work provided you scale the resolution,
| contrast etc... proportionally. This is how I identify the forest
| from the trees.
| teodorlu wrote:
| I get the impression that the author criticizes bad planning, or
| estimation.
|
| To me, a good plan is a map of dependencies in time.
| 28304283409234 wrote:
| "Assumptions are the mother of all f_ups." That is what I've
| always learned, and experienced. My entire dayjob consists of
| finding the assumptions people made, and exploiting them.
|
| Yet, here we are. In Agile Land. And _everyone_ treats
| assumptions as some proven datapoint. We now call them
| 'estimates'. But if it looks like a duck....
| harish_yadav wrote:
| Curiously, what is that day job?
| lbriner wrote:
| I agree with the sentiments but there are a number of things that
| make this hard, some already alluded to.
|
| The idea that something we "need" but maybe not in the top 5 and
| it seems weird to deal with it with "bring it back to each
| meeting until either you don't want it anymore or it becomes top
| 5", why not instead put it into the roadmap?
|
| Someone else has alluded to external investment driven by
| strategy and long-term plans. It is uncomfortable if there is no
| long-term plan even though we are told that investors invest in
| the people, not the product.
|
| Some tasks are long-term and might involve communication with
| customers, deadlines to deprecate something, other work needed to
| support something. If all of this will take 1 year in elapsed
| time, you can't simply forget the later bits since the earlier
| bits are only being done to support the later bits.
| kqr wrote:
| > why not instead put it into the roadmap?
|
| Because then there will be 100 things on the roadmap, 20 of
| which have a sponsor that have long since left the company.
|
| In an ideal world, yes, everything would go on the roadmap
| which would automatically take into account the market appetite
| and internal economy and sort things so the most important
| thing is first.
|
| In reality, trying to intelligently prioritise among hundreds
| of things takes a huge amount of work -- time we could instead
| spend on doing the real work of development. In other words,
| it's a trade-off: do you want to spend time shuffling Jira
| tickets around, or actually implementing them?
|
| Having people bring up their top priorities repeatedly ensures
| that the only tasks under consideration are ones that people
| think are important _right now_ , not ones that were important
| at some point some time ago. And we get that filtering for
| free!
| beckingz wrote:
| I just finished one of the books cited in this article: The
| Principles of Product Development Flow: Second Generation Lean
| Product Development. Strongly recommend it. Huge focus on the
| economics of product development.
| papito wrote:
| Don't plan - have a _goal_. Just like in war, your plan will have
| to change as you go along.
| benj111 wrote:
| But then you don't have an end date.
|
| Deadlines are useful. Yes it may need to be pushed back but
| saying it'll be ready when it's ready with no time frame is not,
| in most cases useful.
| doctor_eval wrote:
| Deadlines are not plans, and vice versa.
|
| It's fine to say "we need to ship a product by 2023". But the
| kind of long term plan the article is talking about would not
| only set a date but list the very specific features that will
| be delivered each month leading up to the date. This kind of
| planning happens really often. It's nuts, for the reasons they
| list.
| cuddlecake wrote:
| Deadlines feel like they are mainly useful to induce stress and
| urgency. The stress and urgency being useful (or important) is
| another matter.
|
| In a perfect world (for me, from my point of view), there are
| no deadlines, but rather short plans and enough understanding
| of the plan to decide whether doing something specific is
| useful or a hindrance (and to what degree) for executing that
| plan.
|
| But alas, deadlines are easier to decide on.
| fendy3002 wrote:
| A genuine deadline is good, an artificial one isn't.
| Sometimes budget limitation can be a genuine hard deadline. A
| fixed special days, such as new year or election date, can
| also make a hard deadline. That being said, you'll need to
| move the deadline some time ahead to provide buffer.
|
| Shorter, soft deadlines and milestones are also good, since
| they provide a measurement between long term planning and
| current progress. Without them larger projects will likely
| failed than success.
|
| However management loves short, hard deadlines with
| artificial reasons, which makes them stressful.
| laserlight wrote:
| Your comment made me realize my problem with deadlines.
| Whenever I hear about a deadline, it has always been the
| case that management would like to have a time constraint
| without giving in from any of the other constraints, e.g.,
| scope, budget, quality. It's like trying to find a solution
| to a set of equations when constraints guarantee that there
| is none.
| simiones wrote:
| Deadlines are great for keeping scope in check. Almost any
| feature can be developed with endless embellishments -
| without some kind of deadline it's not clear how you can
| decide how much of those embellishments you should add before
| moving on to the next feature.
| laserlight wrote:
| I would call them timeboxes rather than deadlines.
| Tade0 wrote:
| My experience is that the only thing that actually works is
| making the plan _simpler_. As in: implement the simplest version
| of whatever you 're building at the same time being mindful that
| you'll have to eventually include all the features.
|
| With such a solution:
|
| -You can start dogfooding early on.
|
| -There's less to go wrong.
|
| -There's less sunk cost in those of the features that don't make
| it to the final product.
|
| Integrate _one_ of all those payment processors that were
| required, _one_ external API and move on. Also don 't do fancy,
| handcrafted components on the frontend. Or component libraries
| for that matter. Have separate tickets for validation.
|
| Once you're finished with that you'll find that in the meantime
| the Nth payment processor went bankrupt, Nth external API was
| deprecated and UX finally managed to convince the stakeholders
| that a color picker the shape of a peacock following the mouse
| with its gaze is not the best solution in terms of user
| experience.
| chrisweekly wrote:
| "color picker the shape of a peacock following the mouse with
| its gaze"
|
| hahahahaha
| krageon wrote:
| This is extremely long, but the fact of the matter is that these
| long term plans don't matter anywhere. They're a way for a
| relatively work-free layer of managers to feel like they have a
| hand in real work. After the plans are made, they can be burned:
| Their use was purely emotional, solely for people that won't be
| executing the plans.
| doctor_eval wrote:
| In my experience long term plans are a way to ensure that there
| is a scapegoat when things go to shit. They live in the bottom
| of the cupboard and come out only when blame assignment begins.
|
| "The product didn't work because the developers didn't follow
| the plan". Doesn't matter that the plan was half baked and had
| no connection to reality.
|
| I think that things like GTM strategies are super important but
| long term plans are useless. Build the next thing, ship it,
| learn, repeat.
| krageon wrote:
| You are not hit with the plans because the plans exist, you
| are hit with the plans because you displeased someone and
| didn't cover yourself. Either your manager does this for you
| or if they are an asshole you do this by establishing a paper
| trail. The plans are and remain a vapid exercise that doesn't
| matter to anyone (no, not even the people punishing you with
| them).
| 3pt14159 wrote:
| Long term plans do work.
|
| The Marshall Plan worked.
|
| The James Webb Space Telescope took two and a half decades of
| effort, but the plan worked.
|
| I could list a thousand plans that worked.
|
| Now, why do we, as software developers, not think plans work?
| Because they're less well suited to our domain and the reason for
| that is that our domain is incredibly complicated, changes
| frequently, AND it's incredibly maneuverable.
|
| What this means is that its more efficient to rely on this
| inherent maneuverability and build fast feedback loops to code
| our way towards a vague goal than it is to start planning for
| something 20 years away.
|
| Is someone really going to game out whether webhooks or HTTP long
| polling are going to fit 2042's software landscape better? No. It
| doesn't matter. There will be transports for data. There will be
| instruction sets. The abstractions will change and morph over
| time, but it's not fruitful to ponder the explosion of
| possibilities. It's enough to pick a direction and step on the
| gas and figure out the rest as you go.
| jerf wrote:
| Your ability to plan into the future is polynomial; the future's
| ability to do things you didn't expect is exponential. Reasonably
| low factors on each, at least generally (sometimes reality goes
| through periods of a much larger factor making planning hard even
| in the short term), but they're still in different classes.
| Combined with the fact planning is not itself free and a lot of
| the rest of the analysis after this becomes pretty obvious.
| d3ckard wrote:
| Feels like obvious link: The tyranny of the plan [0]. As a bonus,
| you will learn interesting facts about construction of Empire
| State Building.
|
| [0] https://chrisgagne.com/1255/mary-poppendiecks-the-tyranny-
| of...
| revskill wrote:
| I'm sure long term plan is composed of short-term plans. You
| don't make the long term plan work throughout 1 week!
|
| So, the issue is, don't separate long vs short, but:
|
| - Have a long term plan
|
| - Decompose into short term plans
|
| - Fix short term plan instead of changing the long term plan.
|
| - Enjoy the ride.
| 1soved2tasked wrote:
| OT, but anecdotical: Just a month ago ago, it seemed, my
| girlfriend was 'multitasking'. Confused i asked her why she does
| something, left it and leave for a minute or two (in and out).
| She said: "This seem to be my way to get around 'oh-i-forgot-
| this-or-that'-surprises" ^^ (-kitchen-talk).
|
| Some moments later i remembered, i had made a comic about exactly
| that. Searched for, and 5 ( _um_ no! way more years ^^) years ago
| we both sat in the kitchen, when i was writing a note after she
| confronted me with: 'you seem to forget too much!', after i had
| forgotten something. So i was writing when she ask me: 'what do
| you wrote?', and i told her 'A to-do-list'.
|
| So she sayed: 'Show me...' i handed it to her, written on the
| sheet of paper was: 'What you can do in under two-minutes, do
| instantaneously !' (-;
|
| edited:typo
| quickthrower2 wrote:
| gpt3?
| geoelkh wrote:
| This is a great article.
|
| I once gave a version of this to a manager and he replied by
| telling me that nothing gets done without a deadline.
|
| He kinda made a point. Curious to see what people think about
| this?
| achenet wrote:
| I've seen similar things said by Duke Ellington and Kevin
| Kelly.
|
| I think the reasoning KK gave was the deadline will force you
| to drop all the unnecessary cruft to focus on delivering the
| essential as fast as possible.
| loriverkutya wrote:
| I recommend to tell that manager to learn about how people can
| be motivated, because yeah, deadlines are one kind of
| motivation, but there are a huge amount of people who responds
| much better to other kind of motivations.
| glesperance wrote:
| Interesting article about long term planing. It does bring
| forward some interesting thoughts about how one should execute on
| a plan, but mostly I find it interesting in how this article
| misses the point of a plan.
|
| I'd like to propose a slightly contrarian, if not, more nuanced
| view of what is the purpose of a plan.
|
| If one considers a plan as a map that must be followed in minute
| details, to travel the proverbial territory then, of course,
| you're much better with small, unplanned iteration that allow you
| to learn from each story you deliver.
|
| The image that the author proposes is a very powerful one: yes it
| is much better to play the lottery by buying one digit at a time,
| because overall, you'll cut your losses short in most cases.
|
| However, this only focuses the value of the plan in it's
| execution phase, absent from the planner, and the feedback he
| will get from the divergences from the plan, and the updates he
| will be able to bring to the mental model / explanation linked to
| the plan.
|
| Let me be clear: *plans are meant to fail*. Why? The value of the
| plan is in *HOW* the execution diverges from it, and in so help
| us to update how we think and reason about the world.
|
| Each plan, has as origin an explanation, theory, of how the
| world/market/customer works. Changing your explanation of how the
| world works is the goal of learning. To learn, you must make
| predictions. That is what the plan is, a simple prediction. Of
| course we should not expect those to line up with reality 100% of
| the time. It is quite the opposite: *expect your plan to fail*
| but most importantly *improve your understanding of the world /
| your market / your customer based on what you did not predict.*
| jillesvangurp wrote:
| A plan and a backlog are two very different things. A backlog is
| not a plan. But having a backlog is still a good idea. Especially
| if it is prioritized and you have a clear idea of what you need
| to do short term and why.
|
| That prioritization does not come out of nowhere, there need to
| be some business goals and a strategy. Those are longer term
| things that change less often. Often that is summarized in some
| kind of roadmap. A roadmap is also not a plan but more of a tool
| that you use to align short term planning with long term goals.
| Ours is adjusted on a quarterly level and we tend to try to
| figure out the two or three most important things that we need to
| make some progress on. And we set some targets based on that.
|
| But a list of items that you want without a clear idea of how you
| are going to do these things is not a plan. Simple reality:
| unless you do waterfall, you won't have such a plan. And if you
| do, it's likely a bad plan. Adjusting plans regularly and
| figuring out business goals is something that happens a lot in
| software engineering. A classic misunderstanding is that that is
| a problem that needs to be fixed. It's a feature, not a bug.
|
| Building software is simply not like manufacturing, architecture
| or other engineering disciplines where you work off blueprints on
| predictable schedules. Until those blueprints are done, planning
| an engineering project is not doable either.
|
| You are not going to start building say a nuclear power plant
| without a very detailed plan and some blueprints and lots of
| analysis having taken place already. Of course, creating such a
| plan typically takes years and represents a massive investment in
| itself. And of course a common complaint with nuclear plants is
| that the planning stage is expensive, runs too long, and seems
| hard to plan. Agile nuclear plant design seems to be not a thing
| but if you think about it, the process of coming up with detailed
| plans for a nuclear plant has some similarities to how software
| projects work. Lots of uncertainty, constantly changing rules,
| requirements, legislation, and other factors. Maybe they should
| be more agile?
|
| Anyway, in software, the blueprints are the main thing that you
| build. That's why it's called software. It's an executable
| specification of some sort. Building that specification is the
| whole work. Having a blueprint for the blueprint is not really a
| thing (though of course many have attempted this). You might
| sketch out bits of it on a whiteboard and do some mvps,
| prototypes, and what not. But that's not the same as a detailed
| plan either.
|
| What's interesting is that some engineering companies are
| actually applying agile practices. E.g. the way SpaceX rapidly
| iterates on their prototypes seems a lot like the chaos you see
| in software companies. It seems to work for them and is very
| different from the way some of their old competitors work. What
| has changed there is that a lot of the work has moved inside
| computers. They are iterating on software, cad designs, using
| simulations, etc. Modern engineering inherently involves a lot of
| software. And you need to plan accordingly.
| ComputerCat wrote:
| I think it's good to have a long-term plan and goals, as long as
| it's fluid and can be adjusted as new problems/solutions arise.
| nottorp wrote:
| Yeah, don't make long term plans, just try random directions
| until something sticks. I'm sure Google would like to hire him.
|
| Adjusting the long term plans constantly is an entirely different
| animal.
| slowmovintarget wrote:
| Vision informs mission. Mission provides context for strategy.
| Strategy constrains roadmaps. Roadmaps provide measuring guides
| for plans. Plans line up the day to day work.
|
| Vision is _why_ you do what you do. It is your North Star, the
| reason your company or your team exists. It should rarely, if
| ever, vary. Yet it should be revisited every 5 years, at a
| minimum.
|
| Mission is _what_ you intend to achieve. It outlines what is in
| your scope, and out of your scope. Revisit it at least every 2
| years.
|
| Strategy is _how_ you will achieve your mission, and how what you
| do will move you toward your vision. It brings market data and
| analysis to the party. Revisit it at least once a year.
|
| Roadmaps show _when_ milestones of the strategy _should_ be
| achieved. They are guides for expectations. Stakeholders
| typically begin consuming information at this level. Roadmaps are
| not plans, they are measuring devices for strategic progress.
| They must be adjusted quarterly, and will often change.
|
| Plans (sprint plans, projects, task lists) show _who_ is assigned
| to deliver small decomposed pieces of the overall work. They line
| up to roadmaps and strategy, but they are what is real. Adjust
| them at least each sprint.
|
| There are other structures, feedback loops, inflection points,
| and ways to measure and adjust these components, but they are all
| commonly spoken of together as a "long term plan" without laying
| hyper-technical baggage on the word plan.
|
| I thought this was product management 101.
| renarl wrote:
| Thank you for this decomposition. Do you have any book
| recommendations that explain it in more depth?
| Terretta wrote:
| This one:
|
| https://smile.amazon.com/Technology-Strategy-Patterns-
| Archit...
|
| As of this writing, you won't find anything better.
| KineticLensman wrote:
| An alternative definition of 'strategy' is that it integrates
| ends, ways and means. Ends = what you want to achieve. Means =
| resources, constraints, etc. Ways = processes, techniques, etc.
|
| Given an agreed strategy, you can then develop a plan, which is
| the specific sequence of steps to achieve the ends.
| brickbrd wrote:
| I am not a PM, so at least I found this definition and mental
| model useful. Why is no one commenting on this answer!
| Terretta wrote:
| Because the definitions and leveling are arbitrary and
| cultural within a given firm or context. Notice how "plan" is
| both at the bottom level, and also the highest level by being
| all encompassing if you call it "long term".
|
| That said, regardless of labels, this leveled model is
| reasonable and better than a model that isn't cascaded.
| chrisjarvis wrote:
| Echoing @brickbrd this was new to me too, thanks for
| explaining.
| [deleted]
| rammy1234 wrote:
| I was expecting to see splitting the long term plans into
| multiple shorter wins. This ensures we celebrate wins and have a
| leading and lagging indicators. Constantly measure and iterate.
| If anything, pivot. Is that not how long term plans work.
|
| In reality none of the long term plans have worked apart from
| long term habits and principles. Plans are there to fail.
|
| "War will not go according to the plan but no war was won without
| a plan " :)
| bob1029 wrote:
| There is a balance with all things, but I've started to default
| heavily to execution.
|
| The best way to figure out feasibility and timing is to just
| start doing whatever. Presumably, we are talking about software
| and computers so mistakes are cheaper.
|
| An estimate that comes out of 15 minutes of trying to do that
| actual thing is infinitely more informed than one that a
| committee deliberates for months.
| mr90210 wrote:
| Still better than no plan at all, which is the default way of
| people going about their lives in the TikTok era.
| cmm05089 wrote:
| I think the underlying reason long term plans don't work in most
| commercial software development is that accurately estimating
| software development effort or schedule is the same order of
| magnitude complexity (CS big O) as implementing that software. If
| people could efficiently generate accurate estimates (and
| therefore schedules and plans), they would. It turns out to be
| hard even in a static world, and impossible in an unpredictable
| dynamic one. The fundamental issue is that developing software is
| 'design all the way down', it rarely turns into 'mechanical
| assembly' - in general, each line of code written is designed.
| That was one of the insights of the agile movement - the
| implementation 'stage' required considerable 'design' (or re-
| design, as the case may be). The difference between the coders
| and the architects is simply the scope of the abstractions. A
| successful architecture can reduce the scope of abstractions
| necessary when implementing specific bits - but it can't
| eliminate them.
| cletus wrote:
| I agree with this but would state it differently.
|
| This most often comes up in rewrites (which are usually a
| mistake) and the problem is that time doesn't stop once you start
| you rewrite (or, more generally, your long term plan). Features
| get added to the original. Bug fixes are made. Software entropy
| happens. These need to somehow be folded into your new thing. Or
| worse, you halt new development on the old while you write the
| new.
|
| I've seen pointless rewrites with a 6 month estimate take 3.5
| years to deliver, all the while the once-leading old version
| languished.
|
| More generally a lot of this comes down to risk management. Your
| long term plan needs:
|
| 1. Shorter term milestones. Due to changing circumstances you may
| end up terminating your long term plan early. You should aim to
| have something to show for it if that happens. Ironically, having
| something to show for it makes this outcome less likely;
|
| 2. Reversibility: your migration (data, software, etc) needs to
| be reversible; and
|
| 3. Incrementality: you need to be able to gradually roll out your
| long term plan. It can't be all or nothing.
|
| This is a common pattern in data migrations:
|
| 1. Double-write to the old and new systems. Start doing this with
| a small percentage of users (<=1%). Identify problems, fix them,
| rinse and repeat. Do nothing with the new data;
|
| 2. Increase the rollout to 100% gradually;
|
| 3. Have the system be able to read from the old or new system and
| work fine;
|
| 4. Roll out a small number of users to read from the new system.
| If this goes badly, you just read from the old;
|
| 5. Identify and eliminate all the old call sites reading from the
| old;
|
| 6. Once old data traffic gets to zero you can switch it off.
|
| I've seen too many systems where the project plan is basically to
| shut down development for 18 months while you write the new
| (often leaving non-critical bugs in place), do a 3 day data
| migration where the system is down and hope everything works.
| fleddr wrote:
| Must be nice to live in such an alternative universe.
|
| In companies where I've worked, a few Fortune 500 ones included,
| there is this thing called "budgeting". More formally called AOP,
| Annual Operating Plan.
|
| Your team, IT department, whichever...gets a budget. For the
| year. And you're going to tell the owners/accountants what they
| get for that. And it isn't just going to be "we'll add dark
| mode", it's going to be tied to bottom-line business metrics like
| revenue, cost of non-quality, compliance, etc.
|
| Further, this budgeting exercise also reveals cross department
| dependencies, critical path issues, etc.
|
| Of course, this still doesn't mean that the plan will fully work
| out, but this idea "let's just not do it or wing it" doesn't
| really work. At least not in the companies described above, but
| things are likely much different in well-funded startups.
| mr_tristan wrote:
| I'm surprised how much time is spent thinking about planning and
| execution, and so little is really discussed about defining goals
| well. Because I've found that goals are often really vague, and
| frequently, they shift. And, shocker, if you change your goals
| you need to change your plans. Also, if you're not able to see
| progress against your goals, you probably need to change your
| plans.
|
| A basic framework like "SMART" can help. But it does require some
| careful management; people can get really, really conservative if
| you're not careful, i.e., "undercommit and overdeliver" becomes a
| mantra. Some engineers and their direct management will throw up
| a lot of roadblocks to avoid looking bad.
|
| This tension between trying to deliver consistently vs trying to
| take on bigger problems absolutely wrecks plans. If you want to
| deliver consistently, just focus on small problems. But not all
| problems are small, and some are even hard to break down because
| there's a lot you simply won't know. Periodically redefining and
| re-evaluating your goals is probably "step 1" in this process,
| and from there, the plans should flow.
| doctor_eval wrote:
| I've been thinking a lot about this exact problem lately. If we
| accept the concept of "better / faster / cheaper", but the
| velocity and cost of a team is fixed, then the only variable is
| "better".
|
| This means that we can either reduce the feature count or we can
| reduce the code quality. If we stick to the plan (which
| inevitably talks about features) then it's quality that will
| suffer, but reducing quality has a significant cascading effect
| on the entire project.
|
| So the only real option is to change the plan - change the
| deliverables timing. But if the value of the plan was
| predictability, this option suggests that long term planning
| isn't particularly valuable anyway.
| xorcist wrote:
| > If we accept the concept of "better / faster / cheaper"
|
| The idea that these are somehow constant is one of those things
| that looks superficially reasonable but really is not.
|
| I often hear people wanting to reduce quality to increase
| velocity. But that's not how any of this works.
|
| Code that is hard to read, issues with tooling and papercut-
| type bugs that aren't showstoppers are the velocity tarpit. And
| these are the first things people skimp on in order to move
| faster. It's not just a long- versus short term thinking
| either.
|
| Part of it is that nobody really knows what "quality" is in a
| software development context. Except for the people who
| specialize in software quality, but they mean something
| different than the rest of us.
| doctor_eval wrote:
| To be clear I'm not suggesting (and don't believe) that
| velocity can be improved by reducing quality - that's
| actually my point.
|
| To put it another way, the dimensions of software projects
| are mostly invariant; absent an unlimited budget and
| unlimited time, one of the few effective knobs to fiddle with
| is the number of features shipped by a given time.
|
| The problem is that long term plans and detailed road maps
| attempt to make feature delivery invariant as well, which -
| IMO - is why at least 30% of IT projects still fail [0] - and
| of those that are said to have succeeded, many of them seem
| to have redefined success post-hoc.
|
| When we start to believe that delivering features to some
| inflexible plan decided 12 months ago is why we're here,
| we're well on the path to building crap. What's important to
| me is to ship good software as quickly as possible, learn
| from the users, and be flexible and respectful about the
| future.
|
| [0] I'm sorry but it's late and I'm too tired to pull out the
| PMI stats URL, but a cursory search should find the latest
| stats.
| beckingz wrote:
| Long term planning is perishable. The applicability and value of
| any detailed task within a plan is likely to be low in 2-6
| months.
|
| Or in plain english: ~70% of detailed JIRA tickets written more
| than 6 months ago will need to be updated significantly or get
| closed as 'wont do'.
| d--b wrote:
| I very much disagree with the article.
|
| Long term plans do not work very well for sure. But they're not
| _meant_ to. Long term planning is meant to give people an idea of
| what's coming after.
|
| This is important because what's coming after may change the
| implementation of what you're doing now. Some people in the team
| may say: "hey if we did 3 before 1, then we'd have 2 for free".
|
| Estimating the time it will take to do things is also important
| cause you may think that you know what's coming after, but if you
| don't know how much time it may take (apply a 0.5-2 multiplier
| range), you may actually never have time to do it.
|
| Keep making plans. Keep selling them to stakeholders, and keep
| telling them that it's just a rough plan and that details will be
| very different.
|
| In any case, it'll cost you more pain to fight your CEO and tell
| them that you don't want to make a 1-year plan, than to actually
| making a 1-year plan...
| lucideer wrote:
| > _Long term planning is meant to give people an idea of what
| 's coming after._
|
| This is precisely the problem though. Your statement is
| contradictory because if (as you say) long term plans don't in
| fact work, that "having an idea of what's coming" is complete
| fiction.
|
| And trust me, confidently believing in fiction is much much
| worse for effective planning than proactively preparing your
| product for uncertain outcomes.
|
| If I am 100% sure our product will be doing X and not Y in 18
| months, I'm going to build that product with a strong bias
| toward X and zero consideration for Y. If I don't know what's
| coming, I'm going to build it with weak contracts toward both
| and a heavy emphasis on being refactor-/pivot-friendly. Which
| of those approaches will serve my company better when we
| unexpectedly end up switching to Y after a year?
| Retric wrote:
| The refactor question is not just about the next 18 months.
| How likely the project will be in active development in 5 or
| 15 years?
|
| That's something long term planning can give you a reasonable
| idea about. If your working on Madden 24 then the business
| model is about minor changes every year, while most games are
| one and done.
| d--b wrote:
| Well that's a different organization, I prefer moving towards
| something that's likely to happen rather than stepping in the
| unknown.
|
| I am pretty sure there are teams / projects for which one
| methodology is better than the other.
|
| Stating that there are no situations in which it is
| beneficial for some team to make long term plans is simply
| too strong a statement.
| lucideer wrote:
| That's fair. This isn't a binary, and the ideal is likely
| somewhere in the middle.
|
| Still, I do think there's quite a large portion of detail-
| planning that can be radically different dependent on the
| high-level expectations, even where the range of high-level
| outcomes is small.
|
| i.e. (random off-the-top-of-my-head example): I'm building
| a piece of software offering some kind of service to end-
| users. We're considering staff-curated -vs- user-generated
| & curated content & we opt for the user-gen approach as we
| don't think the first option will scale. As we get into the
| market, we quickly realise the demand for content is high,
| we're in a good position to adjust our pricing upward, but
| engagement in content-provision & curation activities is
| low. So we decide to pivot to staff-curation.
|
| The above pivot doesn't involve a radical product change
| (the offering remains similar overall), but does involve
| radical technical changes under the hood. A long-term-
| planning oriented company may have invested heavily in
| building robust (expensive & complex) community features
| that may be thrown out later. A short-term-planning
| oriented company would more likely hedge their technical
| decisions - leverage some 3rd-parties temporarily during
| user-testing, maybe test earlier, be more sensitive to
| priority changes.
| makeitdouble wrote:
| I think parent's point still stands: expecting that X and
| not Y will come in 18 months might be worse than not
| expecting anything, if X actually comes in 36 months.
|
| Even within the same organization, it's such a gamble when:
|
| - X might never come if the project takes too long or gets
| deprioritized. 18 months is a long time, perhaps half of an
| engineer's average time in the company. X's sponsor going
| away could mean the project stays in limbo for the rest of
| its life
|
| - X might become Z when you realize midway that X wasn't a
| good idea in the first place, or the assumptions behind X
| changed enough for the project to not make sense anymore.
| The org might not care for the cost to readjust now that X
| is gone, but you're still worse off than if you weren't
| waiting for X.
| Pokepokalypse wrote:
| >And trust me, confidently believing in fiction is much much
| worse for effective planning
|
| Absolutely TRUE - and this becomes a political problem in
| some organizations, depending on whether you're around people
| who can handle hearing the truth (whether they just don't
| want to hear bad news, or whether they don't understand
| complex webs of interdependencies that can cause time
| estimates to be wrong).
| mrwh wrote:
| Agreed. The alternative to long-term planning is often a
| feeling of aimlessness, chasing the next incremental
| improvement with no idea of what, if anything, will be
| achieved. Useful fictions can still be useful.
| snarf21 wrote:
| I feel this is a problem in our entire mindset. People so often
| get confused with the difference between a plan and a _goal_.
| One is the what and one is the how. What most people call plans
| are really just goals. Plans require sufficient data to make a
| how. Or they need a whole set of contingency plans that would
| be the plan if and when sufficient data becomes available. This
| is why "long term plans" are so vague in general because they
| are just a goal. As time progresses, the long term becomes the
| short and the data becomes available to turn goals into plans
| that can be executed.
| jeddy3 wrote:
| I feel like you are talking about something more like roadmap.
|
| Of course long term plans/road maps have their place when
| everybody agrees on that it is an "idea of what's coming"
|
| However most long term plans I have encountered at my last two
| companies have absolutely been treated as commitments to
| detailed plans two years ahead of time, before we have no idea
| what we really want.
|
| This is causing project members constantly stressing/hurting
| about not meeting plan still years after everyone knows that
| the plan does reflect real life anymore.
| specialist wrote:
| > _something more like roadmap_
|
| Yes and: Strategy & Tactics
|
| Beyond the inability to reason about stuff, not even asking
| Who What Why When Where and How, the inability to divide &
| conquer, the hostility to verifying assumptions (eg will any
| one buy our stuff?), etc. etc.
|
| I've met very few people, any where, in business or politics,
| that can war game scenarios. Much less reason about tactical
| decisions. Or even know the difference between strategy and
| tactics.
|
| My hunch, totally unvalidated, is a strategic thinker isn't
| especially smart or talented, so much as everyone else is
| fantastically, tragically inept.
|
| I always marveled about the rise of Microsoft. Sure, they did
| some good stuff, made some good moves. (And then later was
| simply criminal.) But OMG their competition was terrible.
| Ashton-Tate, WordPerfect, Novell, Lotus, and probably a
| zillion others. So many defeated themselves. Microsoft was
| like the Bolsheviks; they found power lying on the street,
| after every one else imploded.
| gadders wrote:
| >> However most long term plans I have encountered at my last
| two companies have absolutely been treated as commitments to
| detailed plans two years ahead of time, before we have no
| idea what we really want.
|
| That is an issue with your company, not plans themselves. I'd
| agree with avoiding long term plans in a disfunctional
| organisation.
| worldsayshi wrote:
| I think there's a lot of confusion in this area. A long term
| plan tends to become too rigid, making us unable to respond
| to change. If we are dealing with a complex problem where the
| outcome is hard to predict this is a death sentence to the
| project.
|
| On the other hand having only short term "agile" plans can on
| the extreme end turn us reactive and without any focus. If we
| are dealing with a "big" problem this is a death sentence for
| the project.
|
| If the project is big complex and hard to predict we have to
| be able to be agile on both the short term and the long term,
| and sometimes on the really really long term, all at the same
| time. Oh, and also for the group and the whole organisation
| at the same time.
| d--b wrote:
| No, in my team we've been doing 1y actual plans for the past
| twelve years, with time estimates and project breakdowns and
| who's going to do what and when.
|
| It just works very well for us.
| kqr wrote:
| What does work well mean? Compared to what, and is that a
| fair comparison?
|
| Long term plans "work", but by sticking to them you might
| be giving up opportunities to do something more profitable.
| They can also "work" in the sense that the culture
| encourages abandoning them if something more profitable
| comes up, but then you've spent time planning for something
| that doesn't happen.
|
| How often do you decide to abandon your long-term plan for
| something more profitable? And how often do you decide to
| pass up on something more profitable to stick to the plan?
| bongoman37 wrote: