[HN Gopher] Transport System Bogl: a new magnetic rail system
       ___________________________________________________________________
        
       Transport System Bogl: a new magnetic rail system
        
       Author : Tomte
       Score  : 37 points
       Date   : 2022-07-09 09:40 UTC (2 days ago)
        
 (HTM) web link (transportsystemboegl.com)
 (TXT) w3m dump (transportsystemboegl.com)
        
       | dzonga wrote:
       | seems it's another maglev train solution. maglev trains seemed
       | cool watching videos close to 2 decades ago. seems they're coming
       | to fruition finally something to get excited about
        
         | bluGill wrote:
         | Not something to get excited about because maglev doesn't solve
         | any of the real problems trains have in the real world.
        
       | ucosty wrote:
       | Another day, another gadgetbahn. It's hard to tell from their
       | website exactly what problems they're trying to solve. They seem
       | to have taken all of the worst aspects of monorail style
       | operations, the relative complexity of maglev, and the vendor
       | lock-in of a gadgetbahn and have just run with it.
       | 
       | Off the top of my head:
       | 
       | From their rolling (gliding?) stock concepts it looks like
       | they're targeting the automated metro system market, think London
       | DLR or Vancouver Skytrain. With these system top speed isn't
       | really the issue as you'll be constrained by acceleration and
       | stop spacing. Better gains can be had in this space by building
       | better signalling systems, allowing the trains to run at higher
       | frequencies.
       | 
       | All of their marketing materials show the trains going in perfect
       | straight lines. A lot of other monorail systems are constrained
       | by this, because building switches for monorails is hard. Throw
       | maglev into the mix and I can't imagine the problem gets any
       | easier.
       | 
       | They focus a bit on ease of construction with the elevated rail
       | segments being made of pre-cast concrete sections. I'm faily
       | certain any modern elevated train guideway is also made of pre-
       | made sections on a production line. They're trying to sell normal
       | as some kind of innovation.
       | 
       | All the usual gadgetbahn things seem to apply as well. TSB goes
       | bust? Good luck getting new rolling stock. Want to integrate this
       | service with existing stations and track? Nope, it's all bespoke.
       | Want to get rolling stock from a different supplier that can meet
       | your local needs better? Good luck with that one. Nobody else
       | buys this system, so it remains expensive forever? Sucks to be
       | you.
        
         | 0_____0 wrote:
         | _gesticulates wildly in the direction of Paris Line 14_
         | 
         | In the US, we're so far behind that we can just plain copy just
         | about any modern train system. It's not the tech that's the
         | issue, it's the land use, policy, and planning.
        
         | bluGill wrote:
         | Maglev has some advantages for high speed operation: less
         | rolling resistance at speed (but worse in slow sections - while
         | not rolling resistance, at low speed they are not as
         | efficient), and less track maintenance. Problem is until you
         | get to high speed those advantages are not worth it, and when
         | you do air resistance is very expensive and so you need a lot
         | more riders or a high ticket price.
         | 
         | In the end maglev isn't worth it. It is only marginally faster
         | than regular rail, and a lot slower than flying. You can bring
         | a few cities just outside of regular rail range into train
         | range, but if you just let those people fly you overall have a
         | cheaper system.
         | 
         | Sticking to standard rail means that you can share track with
         | other service. While this isn't easy (you need a lot of people
         | in the office ensuring the schedule works) the options make it
         | well worth it. Even if you only share rail overnight when you
         | are running less service, 24 hour service is something all
         | cities should have on all lines.
        
           | seanmcdirmid wrote:
           | Does anyone know how the new slower maglev in Changsha is
           | working out (between the HSR station and airport)? I'm not
           | sure why they went with maglev there, hopefully it just
           | wasn't just a prestige project and there was a real benefit
           | to it.
           | 
           | The maglev Japan is building between Tokyo and Nagoya (and
           | eventually Osaka) should be productive, but that is more of a
           | traditional high speed one and will have enough traffic to
           | support it.
        
         | usrusr wrote:
         | My sarcastic take: the problem they are trying to solve is that
         | they are earning a lot of money from contracts so large that so
         | few competitors remain that it becomes somewhat "taking candy
         | from a baby" and that makes them desperately look for something
         | to be proud of.
         | 
         | On the less sarcastic side: unlike the major partners in the
         | former Transrapid project (Siemens and whatever the current
         | incarnation of Thyssen was called at the time), they aren't a
         | public company but some kind of family estate foundation. That
         | type of organization has far more liberty to follow vanity
         | projects than anything pubic could ever dream of.
        
       | Shadonototra wrote:
       | Nice, but it looks ugly AF, it feels very "industrial"
       | 
       | I can't imagine this in the middle of EU architecture
       | 
       | Or in the middle of Asian temples, or in the middle of a
       | beautiful landscape
       | 
       | They really need better designers
       | 
       | Also the front doesn't look like aerodynamic
        
         | Someone wrote:
         | Trains are relatively long in proportion to their width. That
         | makes the sides of the trains become relatively more important
         | for aerodynamics than the fronts.
         | 
         | Possibly, making the front more aerodynamic has so many
         | disadvantages that it's not worth it. For example, a train with
         | a long nose means less space for passengers in a given length
         | of train. It also may be a bad choice aerodynamically if you
         | want to have the ability to combine multiple railroad cars into
         | a single train.
        
         | azalemeth wrote:
         | The website doesn't actually say how it works. I can imagine it
         | fitting with some (admittedly german) aesthetics.
        
         | schroeding wrote:
         | I think it looks quite fitting between boxy European[1] or
         | Asian[2] rail cars. :D
         | 
         | [1]
         | https://commons.wikimedia.org/wiki/File:1019_4-Gleisdreieck-...
         | [2]
         | https://commons.wikimedia.org/wiki/File:Model_1000_of_Odakyu...
        
           | Shadonototra wrote:
           | they are very ugly
           | 
           | an example of what's beautiful and modern design (imo) is the
           | Tram in Bordeaux, France
           | 
           | https://www.alstom.com/fr/press-releases-
           | news/2020/2/alstom-...
           | 
           | https://i.redd.it/fbl047w3qdpy.jpg
           | 
           | https://static.actu.fr/uploads/2020/07/tramway-
           | bordeaux-854x...
        
             | schroeding wrote:
             | I agree, but that's the boxy Euro-Asian reality, for years
             | to come. So it can't get much worse. :D
        
         | SideburnsOfDoom wrote:
         | If it's ugly AF and it takes 10K cars off the roads, then it's
         | not that ugly. Much like "if it's stupid but it works, then
         | it's not stupid".
         | 
         | "EU architecture" already juxtaposes ornate pre-1900 buildings
         | with brutalist concrete blocks and glass spires, so no change
         | there.
        
         | danw1979 wrote:
         | I mean, it looks a lot like the DLR in London which is a bit of
         | a raised concrete eyesore too. But it's not what you'd choose
         | to plonk down in Vienna or Bruges, I agree.
        
           | tgv wrote:
           | Did you ever see the Brugge train station? Anything looks
           | better.
        
       | cgeier wrote:
       | This is very similar to existing maglev trains (such as
       | transrapid) but has the advantage that a lot of the technology is
       | now in the trains, not in the track. That makes construction of
       | such tracks a lot cheaper (but separate and new tracks are needed
       | anyway).
       | 
       | Also, this new system is designed for cruising speeds of up to
       | 150 km/h (instead of 500 km/h).
       | 
       | But in addition to passenger transport, they seem to be able to
       | carry freight as well. Last year there was a demo track for
       | container transport in Hamburg's harbour [1], not sure, if it's
       | still there.
       | 
       | [1] https://www.youtube.com/watch?v=Tee6BjDY0N8
        
         | rob74 wrote:
         | The question in my mind is just: if not for higher speeds, why
         | should you build a maglev line instead of a conventional (high
         | speed / regular) train line? IMHO the other purported
         | advantages are not really convincing - it may be a little bit
         | quieter, but the "flexible track routing" sounds very
         | unconvincing: at ground level you would have to fence off the
         | track, so in an urban setting it would probably end up on
         | stilts most of the time. And if you consider that, phrases like
         | "Visually appealing track route for urban use without overhead
         | lines" sound a bit ridiculous - is a concrete guideway on
         | concrete stilts really more visually appealing than tram (or
         | train) rails with overhead line? (In case anyone is wondering:
         | Germany has the luxury problem of having all other cables -
         | power, telecom, etc. - 99% underground, so they can debate the
         | aesthetic impact of overhead lines of trams. Not an issue in
         | most other countries.)
        
       | vosper wrote:
       | I looked at the site, I can't tell what's new about it. Kinda
       | looks like less-grimy BART to me, and that's hardly modern. Does
       | anyone know more about what's innovative here?
        
         | bluGill wrote:
         | marketing, like most gadgetbahns. There is a reason transit
         | enthusiasts in general look down on this. Anyone who knows
         | something about how to run trains knows this at best done
         | nothing to solve the real problems facing transit, and most
         | likely if they get even one sale it makes things worse for
         | everyone.
        
       | abrudz wrote:
       | Why do they have a re-painted Transrapid 07 on their grounds?[1]
       | 
       | Trnasrapid seems like a much more mature and capable design than
       | their own. E.g. While Transrapid uses a T-shaped track, Bogl uses
       | a U-shaped track. That's not going to work well with snow or
       | falling leaves, not to mention people on platforms discarding
       | items into the tracks...
       | 
       | [1]
       | https://www.google.com/maps/place/Transport+System+B%C3%B6gl...
        
         | usr1106 wrote:
         | They bought it for 1 Euro from Deutsche Bahn.
         | 
         | Deutsche Bahn have given up the idea that it's something you
         | could advertise for a brighter future with so they must have
         | been happy to get rid of it without getting bad press for
         | destroying industrial heritage.
         | 
         | Max Bogl participated in the construction of the Shanghai line.
         | So I guess they thought it would be nice exhibit of being a
         | global player.
        
       | Transrapid wrote:
        
       | gbanfalvi wrote:
       | How is this better than a regular train/subway/tram?
        
         | uniqueuid wrote:
         | Magnetically levitated, meaning up to 500 km/h (~300 mph),
         | silent, and it's driverless.
         | 
         | Downsides are that you need to build completely new tracks with
         | limited curvature (and new stations).
        
           | Octoth0rpe wrote:
           | > meaning up to 500 km/h (~300 mph)
           | 
           | from the website: Cruising speed of up to 150 km/h
           | 
           | I'm guessing that the value proposition of this particular
           | system is that it's cut certain performance corners to
           | achieve a far lower cost while still providing more than
           | adequate speed for the intracity use case.
        
             | bluGill wrote:
             | Sure, but wheels work just fine at those speeds. the
             | advantages of maglev over steel wheels need much faster
             | speeds before they are realized. At least for all current
             | maglev systems, this is still vaporware, ask me after it
             | has been in use for 20 years and we have real world data on
             | how it works out. Don't be the person who pays for getting
             | that real world data though.
        
         | iggldiggl wrote:
         | Cynically speaking - it's based on a track made from pre-cast
         | concrete elements, which Max Bogl (a construction company and
         | concrete manufacturer at heart) will happily build for you.
         | 
         | It's also marketed as a fully turn-key system where everything
         | starting from the design and finishing with the vehicles and
         | operations control will be provided by Bogl, which conversely
         | also means that it's a fully proprietary system and you're
         | dependent on Bogl for continuing support or any future
         | expansions, too.
        
           | jeffbee wrote:
           | Aren't most elevated guideways built from sections pre-cast
           | and moved into place? How is that a specific advantage of
           | this thing?
        
       | rincewind wrote:
       | It's really hard to figure out how the system differs from
       | PeopleMover. Is this new tech, or just a new vendor for basically
       | the same design they have at Disney? Wait, is this a MagLev
       | peoplemover?
        
       | uniqueuid wrote:
       | This seems to be a magnetic levitation solution. You know,
       | floating on air cushions, (almost) no friction, but needs
       | specific new tracks.
       | 
       | A prototype was developed in Germany some 50 years ago [1] but
       | never caught on.
       | 
       | [1] https://en.wikipedia.org/wiki/Transrapid
        
         | thematrixturtle wrote:
         | Shanghai built a demonstration line out to the airport that's
         | still operational and the world's fastest rail line to boot:
         | https://en.wikipedia.org/wiki/Shanghai_maglev_train
         | 
         | But it looks like Japan will be the first with a proper
         | intercity line in 2027-ish:
         | https://en.wikipedia.org/wiki/Ch%C5%AB%C5%8D_Shinkansen
        
           | PinguTS wrote:
           | Shanghai IS the Transrapid. Siemens first build it and than
           | sold the whole technology to China, because the Transrapid is
           | basically dead end.
           | 
           | I think, they extended the original track later on. But no
           | new one will be ever build.
        
         | cgeier wrote:
         | While similar technology, a lot more of that technology went
         | into the train instead of the track which makes this new
         | solution much cheaper to produce.
        
       | moepstar wrote:
       | https://www.google.com/maps/place/Transport+System+B%C3%B6gl...
       | 
       | This is their test track, on the right-hand side of the road
       | (edit: click on the picture, there's also a 360deg panorama of
       | the track)
        
       | PinguTS wrote:
       | We should not forget the backstory of this company.
       | 
       | Max Bogel is the largest family-owned construction company in
       | Germany. They build mainly infrastructure like roads, but where
       | also involved in the Gigafactory in Grunheide in Germany.
       | 
       | So, for them its a new business unit to build more infrastructure
       | as a whole contractor. They can delivery everything, not like it
       | is today in infrastructure projects where you have many different
       | contractors providing different parts.
       | 
       | So, they want to sell more concrete.
        
         | usr1106 wrote:
         | Interesting, lived in Germany for 30 years (although decades
         | ago), but had never heard about them.
         | 
         | Just wanted to say if the Transrapid consortium with the
         | biggest German industry players and decades of public
         | investment backing could not make it, I would not try again.
         | This is not the SW business where any can start with some
         | resources rented in the cloud. Of course sometimes it's just
         | too early to be right, but wouldn't count on it.
         | 
         | On the anecdotal side my first presentation in school around
         | 1972 was about the German Maglev train project. It did not go
         | as predicted, they sold one minor line to Shanghai decades
         | later.
        
           | mschuster91 wrote:
           | Edmund Stoiber's infamous 10 minute speech killed the
           | Transrapid in Munich. One of the OG German memes.
        
             | schroeding wrote:
             | For the uninitiated:
             | https://www.youtube.com/watch?v=f7TboWvVERU
             | 
             | Context:
             | 
             | The old munich airport in Riem was closed in the 90s. The
             | new airport was very far away. Gadgetbahn Transrapid,
             | running through tunnels and above the remains of the old
             | olympia train line from '72, should save the day. MP
             | Stoiber tries to explain the advantages.
             | 
             | Translation:
             | 
             | If you start from the main station in Munich with 10
             | minutes, without having to check in at the airport yet,
             | then you basically start at the airport, at the main
             | station in Munich you start your flight. 10 minutes. Take a
             | look at the major airports. If you go to Heathrow in London
             | or anywhere else, Charles de Gaulle in France or in Rome,
             | if you look at the distances, if you look at Frankfurt, you
             | will find that 10 minutes is all you need to find your gate
             | in Frankfurt. If you start from the main station, you get
             | into the main station[1], you take the Transrapid to Franz
             | Josef Strauss[2] Airport in 10 minutes, then you
             | practically start here, at the main station in Munich. Of
             | course, this means that the main station basically grows
             | closer to Bavaria, to the Bavarian cities, because that is
             | obvious, because many lines from Bavaria converge at the
             | main station.
             | 
             | [1] "get into" like you would get into a bus, like if the
             | station actually transports you to your destination [2]
             | Bavarian MP and German Minister in the 60s/70s/80s, Munich
             | Airport is named after him
        
               | mschuster91 wrote:
               | Good lord, you actually managed to listen to and
               | translate it without falling apart laughing? _tips hat_
        
               | usr1106 wrote:
               | Munich has been considered one of the leading engineering
               | centers in Germany for a long time. (Maybe Berlin has
               | passed it now when you focus more on software startups.)
               | How the heck have they had the worst politicians In
               | Germany (well, probably only second worst in post fact
               | age) for decades?
        
         | bluGill wrote:
         | I wish they would sell standard systems. If it is just concrete
         | we need more competition bringing costs down.
         | 
         | Standard not only means you won't get an orphan system, but it
         | also means you as a city can order from anyone. If the company
         | you normally order from is busy with other orders you can buy
         | from someone else when you have need.
         | 
         | Standard means as a manufacture you can afford to invest in
         | more jigs. Jigs are very expensive to make, but they decrease
         | the cost of each whatever built with them. As such the more
         | customers of the same thing the more jigs are worth investing
         | in. Every change the jigs cannot handle is additional cost.
         | (some jigs are adjustable, so within limits you could do things
         | like non-standard wheel gauges - you still shouldn't but you
         | could)
        
         | iggldiggl wrote:
         | Looking at that page, it's also marketed as a fully turn-key
         | solution with really everything (design, track construction,
         | vehicles, signalling) provided by Bogl, so they presumably also
         | hope to get some sort of lock-in effect where buyers of their
         | system continue being dependent on them for any ongoing
         | maintenance or future expansions, too.
         | 
         | For how this can go wrong, look at the story of the Translohr
         | (some sort of guided bus touted as a cheaper alternative to a
         | conventional steel wheel tram), where the cities who bought
         | that system subsequently had difficulties in persuading Alstom
         | (who had bought up the tram part of the Translohr technology
         | and eventually decided to sort of discontinue that system) to
         | continue providing maintenance support or possibly even
         | additional vehicles for the exisiting Translohr installations.
        
       | wffurr wrote:
       | Quiet, fast elevated trains and commuter rail would be amazing,
       | but at this point in the US I'd settle for existing _at all_ or
       | in the few cities that have rail systems, equipment that 's not
       | >50 years old and can actually stay on the tracks, be on time,
       | and have reasonable levels of service.
       | 
       | But even that extremely low bar isn't achievable. Meanwhile,
       | local, state, and federal government can find $200 billion
       | dollars a year to spend on roads so we can all be stuck in
       | traffic on good quality pavement...
        
       ___________________________________________________________________
       (page generated 2022-07-11 23:02 UTC)