       | titzer wrote:
       | > The top two sources of failure in software development projects
       | are failing to discover what is actually needed and failure to
       | eliminate chaos in the software before delivering it to the
       | customer.
       | 
       | The first one is called _requirements gathering_ (the method,
       | _requirements engineering_ ). I was wondering how far I was going
       | to have to read to find someone mentioning that.
       | 
       | It can be as simple as writing down a list of things the software
       | has to do. It could be _one_ afternoon brainstorming meeting, to
       | start. But we don 't even bother. Why? Because this discipline is
       | not engineering, not science, not manufacturing. One my darker
       | days, I think we are just playing in the mud.
       | 
       | I am grateful to work on virtual machines and compilers. They at
       | least have functional requirements--an input specification--and a
       | well-specified target machine. The rest in the middle is a fun
       | design exercise, but there is a crucible at the end of the day.
       | If you can't run the programs without bugs, you have failed. That
       | makes it easy to put functional correctness first and performance
       | second, as it should be. We need to find more ways of translating
       | problems into requirements in order to reduce black art to
       | science to practice.
        
         | blacktriangle wrote:
         | I agree it's a bit like playing in the mud, but the more I work
         | the more I suspect that's just accepting reality.
         | 
         | Requirements gathering works wonderfully for internal projects
         | with a fixed set of stakeholders and a well defined problem
         | with measurable outcomes. Product development is a whole
         | different world whose outcome is the much more vague "generate
         | profit for the developers". Particularly in the realm of B2B
         | software.
         | 
         | You need to find some local minimum that will meet the needs of
         | thousands of organizations in order for development to be
         | worthwhile.
         | 
         | You need to get many busy people who don't know you to actually
         | talk to you.
         | 
         | You need to talk to multiple different stakeholders within the
         | organization.
         | 
         | And even after you group all your stakeholders into some kind
         | of user personas, you still haven't accounted for what the
         | larger organizational behavior will be, as B2B products
         | generally require large-scale buy-in.
         | 
         | And at the end of the day, no matter what people say they will
         | do, the true test is when a company actually opens their
         | coffers and pays your invoice.
         | 
         | We've arrived down here in the mud through years of experience
         | of doing requirements gathering, building to a spec, and then
         | finding out that we built the wrong thing and nobody will pay
         | us for all our hard work.
         | 
         | Sometimes you really do have to build it to see if they will
         | come. And the more formalized (ie expensive) you make the
         | requirements engineering process, the more compelling the
         | iterate and start getting paying customers asap plan becomes.
        
         | djmips wrote:
         | >"That makes it easy to put functional correctness first and
         | performance second, as it should be."
         | 
         | That only works when performance isn't a core deliverable. In
         | my area, that have to be co-developed as it is too expensive to
         | build merely functional and make it fast later.
        
           | titzer wrote:
           | Oh, believe me, performance of a Wasm engine is a core
           | deliverable.
        
           | Jtsummers wrote:
           | As I had to convince a former colleague, fast but wrong is
           | useless. I can make a very high performance program if
           | correctness is irrelevant. Correctness is _the_ requirement
           | (at least from my professional work), and performance is
           | necessarily secondary. That doesn 't remove it as a
           | requirement, but if I'm giving wrong results quickly then
           | planes aren't flying (worst case, they're burning up on the
           | ground and everyone is dead). Performance is obviously
           | important because I've mostly worked on real-time systems.
           | But I can take a _correct_ program and make it fast much more
           | easily than taking a fast but _incorrect_ program and make it
           | correct.
           | 
           | I guess if your work has no consequences correctness can be
           | discarded or rendered a secondary criteria for your programs.
        
       | eric4smith wrote:
       | My dad who was a quite successful artist back in the day said
       | something I'll never forget.
       | 
       | "Son, I'd like to work on that painting forever, because for me
       | it's never finished. But I have to stop and sell it because I
       | have to feed the 3 of you children".
       | 
       | His sole source of income was his art, and we grew up not wanting
       | anything, because he was pragmatic enough to understand at some
       | point he had to ship his art to survive - even if to him, it was
       | not completed.
       | 
       | That's why when I heard Steve Jobs say "real artists ship"... I
       | immediately understood at a visceral level what he meant. And
       | iPhones over the years have had countless bugs.
        
         | barbazoo wrote:
         | That's a great lesson your dad taught you there. I wish I had
         | been taught that early on in my career because it applies just
         | as well to an organization.
        
         | djmips wrote:
         | Hmmm, everything has bugs. The iPhone shipped as a great
         | product that customers loved. The point of the article is to
         | release something great that the customers will love.
         | Internally, yes, ship something early and iterate on feedback.
        
       | [deleted]
        
       | rcarmo wrote:
       | This reads a lot like a lean/MVP manifesto. I would say that
       | there is always a pressure to deliver working code, but that
       | "unfinished" should always be in terms of project scope and not
       | in terms of either functionality or reliability. "Code" is the
       | wrong terminology here.
       | 
       | It's OK to not have every feature implemented. But it's not OK to
       | ship half-baked, untested functionality, no matter what the
       | "code" looks like.
        
         | commandlinefan wrote:
         | > This reads a lot like a lean/MVP manifesto
         | 
         | It also reads like the Agile manifesto from 20 years ago, which
         | caused a huge splash when it was first published - before it
         | was misinterpreted by everybody who might have been able to
         | actually apply it to obtain results as "do exactly what you've
         | always been doing (especially in terms of fixing a delivery
         | date long before you describe what the software is supposed to
         | do), but use terminology like 'sprints' and 'standups' to do
         | it".
        
         | yakshaving_jgt wrote:
         | Conversely, half-assed is ok if you only need half an ass.
        
       | nine_zeros wrote:
       | A rational manager would scope projects with their technical
       | leaders AND senior engineers who will ultimately execute. This
       | scoping must happen before selling the project and also
       | constantly throughout the lifecycle of the project.
       | 
       | Then, the rational manager would also manage expectations with
       | other stakeholders, not committing to things they cannot see the
       | end to.
       | 
       | But most managers are not rational and do the complete opposite.
       | They want to "appear" amazing managers to other stakeholders
       | while simultaneously bringing their "ego" in discussions with
       | team leads and senior engineers.
       | 
       | Nobody is happy with such managers. I think a better org
       | structure would be managers reporting to senior engineers instead
       | of senior engineers reporting to managers.
       | 
       | Senior engineers are responsible for the implementation. Managers
       | merely act as assistants delivering messages everywhere.
        
       | keynesyoudigit wrote:
       | As a Dev this looks like such a wonderful approach to me, but how
       | do you get the customer on board with this? How do you get a
       | nervous customer that doesn't trust you yet to enthusiastically
       | work with you figure out what they want?
        
       | Guthur wrote:
       | One of the problems I have found is that we don't talk the same
       | language when communicating with the business, we use terms like
       | "Technical Debt", "Test Coverage", even "Minimal Viable Product".
       | 
       | In my opinion the universal variable across all these is risk,
       | and it's easy for all to grasp what we mean when we say the word
       | "Risk".
       | 
       | There is delivery risk, will be get this out in a timely fashion
       | for the market.
       | 
       | There is operational risk, will this fall over if we get 10x
       | users or if someone looks at it funny.
       | 
       | There is market fit risk, are we building the right thing for the
       | customer.
       | 
       | Framing these conversation with the business as functions of risk
       | analysis and management is a fundamental part of leadership in my
       | opinion.
        
         | danybittel wrote:
         | You forgot the most important one: the risk of running out of
         | money.
        
         | JPKab wrote:
         | I don't disagree, but at my last company, I was always very
         | explicit about these things in business terms.
         | 
         | The real enemy I ran into was the SVPs desire to please the CEO
         | who wanted to please the board who wanted to please the
         | investment PR racket and make sure we could tell Gartner that X
         | feature is ready by Y date to ensure we were included in their
         | Magic Quadrant. The answer to the bosses had to be "yes it will
         | be released by Y date". Saw that pattern repeated, realized
         | "Agile" was just a word for waterfall, quit for a startup.
        
           | pdkl95 wrote:
           | "How a plan becomes policy"
           | 
           | http://web.mnstate.edu/alm/humor/ThePlan.htm
           | 
           | This poem is my favorite description of this pattern, because
           | it focuses on the the _bad communication_ that creates the
           | problem. Regardless of the _intent_ of the people involved,
           | gradually filtering out important information at each level
           | as people try to please their superior guarantees a GIGO mess
           | for the that the people at the top. As the poem says,  "this
           | ... is how shit happens",
           | 
           | Adopting something like the airline industry's "no-blame"
           | culture that focuses on getting accurate reports by
           | explicitly not focusing on blame might help avoid the natural
           | tendency to eventually fall into this pattern.
        
             | 35fbe7d3d5b9 wrote:
             | http://www.art.net/~hopkins/Don/unix-
             | haters/tirix/embarrassi...
             | 
             | > I wrote a note in sgi.bad-attitude about the "optimist
             | effect", which I believe is mostly true. In condensed form:
             | 
             | > Optimists tend to be promoted, so the higher up in the
             | organization you are, the more optimistic you tend to be.
             | If one manager says "I can do that in 4 months", and
             | another only promises it in 6 months, the 4 month guy gets
             | the job. When the software is 4 months late, the overall
             | system complexity makes it easy to assign blame elsewhere,
             | so there's no way to judge mis-management when it's time
             | for promotions.
             | 
             | > To look good to their boss, most people tend to put a
             | positive spin on their reports. With many levels of
             | management and increasing optimism all the way up, the
             | information reaching the VPs is very filtered, and always
             | filtered positively.
        
         | nanis wrote:
         | If you are lucky enough to work with people who are willing to
         | explain this and take the information in objectively, that's
         | great. Sometimes, I have been that lucky person.
         | 
         | On the other hand, in not a trivial number of cases, you'll be
         | working with people who get all the upside when things go right
         | and the blame the tech side successfully when they don't. Their
         | interests do not align with the interests of the business
         | either but since the business side consists of their bros, they
         | all instinctively align on that.
         | 
         | So, you keep talking about "risk", that gets portrayed to
         | upstairs as "I am doing my best, but so and so here is throwing
         | technical minutiae at me which is slowing us down."
         | 
         | They are used to being graded on the curve where your position
         | gets better if everyone else does worse and taking advantage of
         | that system.
         | 
         | Among the many reasons I never graded on a curve, but you can't
         | do that with upper management in business.
         | 
         | I say this as a person who believes business cost/benefit
         | calculations trump everything else. However, decisions must be
         | made by people who understand the tradeoffs and are
         | accountable.
        
         | macawfish wrote:
         | I agree with you, and I think it's just as frustrating when the
         | decision makers don't document and communicate risk "down the
         | chain", instead packaging up tasks for the implementers and
         | expecting them to have the same sense of priorities, or to
         | rediscover all the nuances of their design decisions during
         | development, etc
        
         | herodoturtle wrote:
         | I'd like to second this line of thinking.
         | 
         | I've built a software business over the last 15 years using
         | this exact communications theme, and whilst my little business
         | is a sample size of 1, we've certainly found that framing
         | conversations with customers in terms of "risk" has kept us all
         | on the same page.
         | 
         | I'd also add that by adopting this communication style, one can
         | then look at _opportunities_ in a new light as well. On that
         | note, I was lucky to read a book called  "IT Risk" (by
         | Westerman & Hunter, HBS Press [0]) back when I first started
         | the company, and it gave me an interesting perspective on risk.
         | 
         | In a nutshell, once you identify and minimise/eliminate all the
         | usual risks (many of which you identified in your list), you
         | can then reorient your business in such as way so as to start
         | actively taking risks which stand to improve your overall
         | offering.
         | 
         | This in turn allows you to build a strategic moat of sorts,
         | because whilst your competitors are still scrambling to address
         | the usual risks, you're actively taking on opportunistic risks
         | which at times reap tremendous rewards.
         | 
         | [0] https://www.amazon.com/Risk-Turning-Business-Competitive-
         | Adv...
        
         | makeitdouble wrote:
         | I am not versed enough in car things, but it seems to me this
         | would be something maintenance shops nailed down decades ago.
         | How would they convey that your car is lacking maintenance even
         | if you can still drive it to work ?
         | 
         | Perhaps we should go with "needs repair" or something like that
         | ?
         | 
         | "Risk" feels like insurance territory (which goes along with
         | "there is always some risk"), and a lot of people beautify the
         | notion of taking risks to get higher gains.
        
           | giansegato wrote:
           | Risk-taking is very cultural dependent, in some contexts
           | people would _avoid_ taking risks as their default option.
           | 
           | That said, I feel that car shops just work because, well,
           | it's the law, especially in some countries.
           | 
           | In the end "needs repair" is the same as saying "mitigating
           | accident risk".
        
           | Cthulhu_ wrote:
           | The risk for a shoddy car is that you end up killing someone
           | or get written up and charged with a violation. The risk for
           | shoddy software (in most cases) is that you have an outage
           | and suffer some financial or reputation damage, but that
           | won't put you out of business.
           | 
           | There's laws against bad cars, there's no laws against bad
           | software.
        
             | squiggleblaz wrote:
             | > There's laws against bad cars, there's no laws against
             | bad software.
             | 
             | There's often privacy/data protection obligations, but they
             | seem to be impossibly difficult to get the courts to pay
             | attention to. If the average business owner would find
             | themselves in legal shit every time an external party got
             | access to their data (i.e. just being the victim of a
             | ransomware attack puts you at risk of losing your home),
             | they would probably pay more attention.
        
           | OJFord wrote:
           | And then we can scathingly label the most hated parts 'beyond
           | economical repair'!
        
         | pydry wrote:
         | This is a common theme but I don't believe it's true. It
         | mirrors all of those twee blog posts that come up with Yet
         | Another Metaphor for technical debt as if people with MBAs
         | would then just "get it".
         | 
         | It's not really about finding the right metaphor it's about
         | lacking a common, shared unit of account.
         | 
         | Risks can't really be factored into decision-making unless you
         | can measure them. Theyre not risks otherwise theyre just black
         | swans waiting to happen (or not).
         | 
         | Technical debt and code coverage "as risks" cant be factored in
         | either. Instead of trying to cargo cult the way "the business"
         | talks or coming up with yet another metaphor we should be
         | coming up with better ways to measure these things so that they
         | can be plugged into an excel spreadsheet.
         | 
         | This is done incredibly badly right now. Most measurable code
         | metrics which proxy things we care about are downright terrible
         | at proxying them (e.g. test coverage). In place of working
         | metrics most businesses (in my experience at least) rely on
         | guesswork and trust in high level executives.
        
           | majormajor wrote:
           | I've never really seen tech debt cause an immediate, hugely-
           | costly single event where you could say "see, that was the
           | risk we were taking."
           | 
           | I've seen it frequently slow feature development down,
           | though.
           | 
           | But... I've also seen a lot of rewrites _fail to improve
           | feature development speed_.
           | 
           | So until we, as a discipline, can quantify and predict
           | development speed w.r.t. shitty vs good code, it's going to
           | be a tough conversation that'll rely on persuasion and gut
           | estimates.
           | 
           | We normally can't even predict how expensive (time-consuming)
           | doing that rewrite that we want to do would be! Let alone the
           | benefit!
        
           | 35fbe7d3d5b9 wrote:
           | > Technical debt and code coverage "as risks" cant be
           | factored in either.
           | 
           | They can be _measured_. Lots of companies don 't, which is
           | mind-boggling.
           | 
           | When a release goes sideways and has to be rolled back, you
           | figure out why. Ah, you launched a feature that revealed an
           | intersection of edge cases in your testing? That's n
           | developers * m hours * p dollars of blended dev salary down
           | the drain.
           | 
           | When your feature delivery slows to a crawl over time, you
           | dig in - your programmers aren't getting worse over time...
           | are they? No, you find that a ticket that took your average
           | developer x hours to deliver at the beginning of your
           | development now takes 2x or 3x. Make a value stream map and
           | you'll find out that your test suite has become so sluggish
           | that your developers can't iterate quickly, that QA now
           | measures regression time in days not hours, and as a result
           | your developers are taking on less work to compensate. X dev
           | hours * Y blended rate in ongoing waste, plus factor in the
           | value of missed sales because of missed features if you want
           | to really put a point on it.
           | 
           | > It's not really about finding the right metaphor it's about
           | lacking a common, shared unit of account.
           | 
           | Name the local currency you get paid in - dollars, Euros,
           | pesos. _That_ is the shared unit of account. If you don 't
           | care about it, start walking up the org chart. You won't have
           | to go far before you realize that's what actually matters,
           | and that engineers who can translate technical risks and
           | inefficiencies in their world to dollar values are highly
           | valued.
        
             | pydry wrote:
             | >Name the local currency you get paid in - dollars, Euros,
             | pesos. That is the shared unit of account.
             | 
             | Good luck trying to accurately measure technical debt in
             | dollars.
        
               | 35fbe7d3d5b9 wrote:
               | Accurately is the hard part, but you don't have to be
               | perfect here - just as accurate as next year's sales
               | forecast is.
               | 
               | "I can't outrun a bear, I just have to outrun _you_ " ;)
        
               | SketchySeaBeast wrote:
               | To take the metaphor, mangle it, and run with it - The
               | problem is that technical debt isn't being chased by a
               | bear, it's walking through the woods in bear country. It
               | only becomes truly quantifiable when the bear charges
               | you. Until then it's a "could be a problem". We probably
               | don't even know the exact details of what sort of bear is
               | going to come maul us, so it's hard to say "if we don't
               | stop this a brown bear is going to come out and get us".
        
               | 35fbe7d3d5b9 wrote:
               | I don't disagree, which is why my original post talked
               | about pricing technical debt _retrospectively_. You don
               | 't know when the bear will charge tomorrow, but past bear
               | charges can be highly instructive if you learn from them.
               | 
               | My prod ETL process is an unloved mess, and we've had
               | enough maulings occur to learn from it:
               | 
               | * I learned the problem - data models drift in the
               | production app and changes aren't reflected / properly
               | tested in the ETL or the analytics environment. And we
               | don't have enough monitoring in place to catch the
               | problem when it happens in the wild.
               | 
               | * I learned the cost of inaction - my analytics
               | environment is responsible for $10mm of CARR, and I know
               | the impact to customers when it goes down. Heck, I know
               | how much customer credit has been given out due to SLA
               | breaches, so there's a quantifiable price today.
               | 
               | * I learned the price to fix it - we've estimated the
               | effort and run cost of the new solution.
               | 
               | Now I've got something that I can work with: customer
               | acquisition says they've got $4m in the near-term
               | pipeline? OK, great, but if we onboard them with a broken
               | system we risk spending $+x in customer credits and risk
               | damaging our reputation. And since it costs $y to fix it,
               | and $x > $y, let's fix it.
               | 
               | I have plenty of other unloved systems that are in bear
               | country but haven't mauled me (yet), but even then you
               | can start thinking about risks. One system is small but
               | critical for multiple products, so my exposure is "hey
               | every single customer is getting service credits" -
               | expensive enough to force the monitoring/refactoring work
               | that it always needed. One of them serves logins for ~7k
               | users but only for _one customer_ so my financial
               | exposure is bounded. We don 't worry about bear spray
               | when walking around there ;)
        
             | thrower123 wrote:
             | People get mad when you start counting up how much salary
             | the hours of meetings about why you aren't moving faster
             | chews up.
             | 
             | That daily status meeting that pulls in twelve people for
             | an hour to hem and haw about nothing? That costs $600 every
             | day. $30k a year.
        
               | SketchySeaBeast wrote:
               | Only $600 for a dozen people? That's only about three
               | people based upon the billable rates I'm familiar with.
        
         | Isamu wrote:
         | Middle and upper management are mostly concerned about risk,
         | because the environment they are in rewards being "done" more
         | than trying something that could have a bigger payoff.
         | 
         | That is, the downside of accepting risk tends to outweigh the
         | upside of achieving a goal at the cost of running over
         | schedule. In that environment.
        
           | b3morales wrote:
           | Very much this; not least because, having organizational
           | power, they can manipulate the situation to _evade_ the
           | downside. As discussed in the classic Gervais Principle
           | essay: https://www.ribbonfarm.com/2011/10/14/the-gervais-
           | principle-...
        
         | pjmlp wrote:
         | There is another thread on the front page about every engineer
         | having to try out consulting.
         | 
         | This is one of the ways to learn how to use language that
         | business gets the point across.
        
           | djmips wrote:
           | Didn't quite parse your second paragraph. Missing a few
           | words?
        
             | pjmlp wrote:
             | Rephrasing it, with consulting one is mostly on the
             | frontline and has to deal with all areas, so one grows into
             | using a language to express the technical issues in ways
             | that get the buy-in from business, specially if it is a one
             | person team size consulting gig.
        
       | nlitened wrote:
       | > Engineers are problem solvers, and a manager who applies
       | pressure becomes the problem the engineers decide they need to
       | solve. If it is really important to deliver Something(tm) by the
       | date, engineers will, if enough pressure is applied, deliver
       | unfinished code by that date. Unfinished code that is full of
       | race conditions, performance problems, outright bugs
       | 
       | This is wrong. You can and should deliver "by the date", but you
       | should also prioritize ruthlessly, and ship at least the top of
       | most-important-features list with reasonable quality when time
       | runs out.
       | 
       | Of course, this implies that both managers and engineers have to
       | understand deeply, what value each feature brings, and
       | communicate among themselves and with their client continuously.
        
       | archeantus wrote:
       | I loved the build up in this article, but the solution left me
       | wanting more. My org suffers from the disease of Date Driven
       | Development, but just telling my boss to let us work until it is
       | done simply means we will never ship because it will never be
       | done.
       | 
       | Literally the list of new feature requests from product is a mile
       | long. So where do you draw the line? And once you draw the line,
       | how can you justify pushing off on everything else that needs to
       | get done while you are hardening and making sure that what you
       | have decided to ship is actually ready to go?
       | 
       | The problem statement resonates with me, but I'd love more help
       | on the solution. What is a viable way to get out of date driven
       | development? Please help!
        
         | jbuhbjlnjbn wrote:
         | Simple: differentiate between basic feature maturity and
         | additional optional features. You release a working product,
         | then you add working functionality over time. This is what the
         | successful software companies do today anyways.
        
         | Jtsummers wrote:
         | Take an incremental approach.
         | 
         | Establish the core needs, what must be shipped as a basic
         | system, and ship it. Then extend over a series of iterations
         | where you incorporate more needs and wants. You won't totally
         | avoid the deadline, but you will mitigate one of the deadline
         | problems: All-or-nothing.
         | 
         | If you establish a deadline 1-3 years from now it is expected
         | the entire system will be finished on that date. Well what if
         | it's not? Establish quarterly releases (or more often,
         | especially if you can work with the team deploying the system
         | like if you're an internal dev shop) and aim for a first
         | release in a few months that hits the essentials. Everything
         | else is an extension, you may still take 1-3 years (or longer)
         | but you'll be releasing and getting value from the system right
         | away.
         | 
         | I've even done this with safety critical real-time systems in
         | my work. We built what was necessary for flight test, but not
         | desirable for operations (missed a few needs, a lot of wants).
         | By the time the plane was rolling off the factory floor for
         | release to airlines, we had all the needs covered and most of
         | the wants. The rest of the wants were covered in the next year
         | or so as well as some newly discovered needs. But if we'd
         | waited to have everything done, the plane wouldn't have been
         | delivered to customers for several more years (because flight
         | testing would have been delayed by about 3 years).
        
       | Havoc wrote:
       | Half finished work they would never do su
        
       | H8crilA wrote:
       | Here's a question: why do you, as an engineer, care? You're just
       | an employee, it is the upper management's role to make sure your
       | company moves forward, maintains the trust of clients, has
       | reliable enough solutions. If they decide to sacrifice quality
       | for speed that's their problem/decision. Really. You were hired
       | to provide technical solutions within specs, and if specs require
       | fast completion more than quality then that's probably what you
       | should deliver. Then watch it blow up, or maybe it will actually
       | be good enough.
        
         | 35fbe7d3d5b9 wrote:
         | The fastest way to cap your career growth is to think about
         | yourself as someone whose role is to take a spec and provide a
         | technical solution inside that box.
         | 
         | Upper management values - _and pays accordingly_ - people who
         | go beyond that. Learn some finance, learn to mentor others,
         | learn to talk with a customer and understand what they 're
         | really after. You'll gain trust and find that you're being
         | pulled into things far earlier in the development pipeline,
         | which often puts you in a place to build better products.
        
           | RobRivera wrote:
           | ive had issues with management paying me accordingly. lucky
           | me in obsessed with mentoring
        
           | H8crilA wrote:
           | Oh, playing the ladder can be rewarding. But you don't
           | achieve that by saying "our code will be piss if we ship too
           | quickly" if a decision has already been made without you.
           | Don't be clueless, you must get your seat at the table first.
        
           | trhway wrote:
           | It's the fastest way to learn to understand your career
           | limits, stop worrying and start to love what is possible to
           | love in that job
           | 
           | >Upper management values - and pays accordingly - people who
           | go beyond that
           | 
           | They love when many do that while they pay accordingly only
           | to the very few in order to entice the others.
        
           | majormajor wrote:
           | Upper management won't value you constantly disagreeing with
           | them on risk/reward tradeoffs like "how finished does the
           | code need to be" or "how many bugs are OK for now." Maybe
           | they say "yes, but if we don't get it done by the deadline,
           | we might lose $LARGE_NUMBER in business because..." After
           | that point, there's a difference between seen as usefully
           | raising a concern and being stubborn and annoying.
           | 
           | Or, possibly upper management is just clueless to the cost of
           | the bugs that are shipping. But you still probably won't get
           | far if you just say "this is too buggy" and can't show them
           | why they're wrong and you're right about it harming the
           | business. Maybe you can persuade them if you go get some
           | data. Maybe not.
           | 
           | Ultimately, if the kind of software they want doesn't line up
           | with the kind of software you want to build, don't expect to
           | get rewarded for constantly complaining about it. You're
           | probably better off finding a place where you align better in
           | terms of what type of software they want to ship.
        
         | hateful wrote:
         | If you're the kind of developer/programmer that cares about
         | their work, then your company probably doesn't know how lucky
         | they are.
        
         | dkdk8283 wrote:
         | You care if you work in security, and ops but perhaps to a
         | lesser extent.
        
         | 3pt14159 wrote:
         | I'm honest about delivery dates, but I do deeply care about
         | getting a project across the line on time. Not just because it
         | gets me cooler, more demanding projects with larger
         | compensation, also for its own sake. It's fun to win,
         | especially when the timeline isn't arbitrary and you can pull
         | it off.
        
         | astockwell wrote:
         | This _should_ be true, but isn't always, if you're at a company
         | (or just have a manager) who will let the mess/blame fall onto
         | your shoulders.
         | 
         | That being said, if you're at said company/have said manager,
         | you should get a new job. I hear the market is hot.
        
         | ep103 wrote:
         | https://en.wikipedia.org/wiki/Arete
        
         | macevilc wrote:
         | This advice is soo very wrong. As a programmer you need to
         | think first. The code you write is gonna affect your life
         | maintaining it. So it does affect you or some other developer
         | maintaining it. By actually caring you make things easier for
         | you and your peers and that helps you grow your career.
        
           | Jtsummers wrote:
           | Whenever someone writes a comment like GP's, it's safe to
           | assume they are not involved in long term maintenance of a
           | system. _Or_ they 're like my current team, reveling in the
           | paid OT their shoddy work lets them justify (which is now
           | unpaid for them, but paid for me, watch your contract terms
           | people!).
        
         | whateveracct wrote:
         | Because you eat shit later when it blows up or makes your life
         | more difficult.
         | 
         | Also, not having agency about how you spend your energy eats
         | away at the soul. That's more subjective, but I'll do a way
         | better job with way less effort if I am a primary decision
         | maker of what work I'm doing instead of an intake machine.
        
         | haolez wrote:
         | True, but the "be good enough" will probably be updated on what
         | "good enough" is after you deliver your first impossible
         | project. It'll eventually catch up, but that's just how bad
         | executives and bad companies manage.
        
         | r00fus wrote:
         | There's a saying when I was in the military: "If it affects
         | you, it's your problem".
         | 
         | If your code blows up, it will come back to haunt you. Now you
         | get to fix your code, except it involves a bunch of other
         | teams. Maybe that's what you want, but most likely not.
        
       | commandlinefan wrote:
       | As Dilbert says: "Our boss can't judge the quality of our work,
       | but he knows when it's late".
        
         | barbazoo wrote:
         | And just like Scott Adams is so wrong about many things he
         | says, Dilbert is wrong here or at least short sighted too.
         | While you notice immediately that something is on time, you'll
         | also notice really quickly that something is of bad quality,
         | unreliable, inconsistent, low performant, etc which translates
         | in whoever the customer is to be very unhappy very quickly.
         | There needs to be a well-informed balance.
         | 
         | I know you were just posting a funny Dilbert quote but I don't
         | respect Scott Adams anymore so I was triggered, please accept
         | my apologies.
        
           | vegetablepotpie wrote:
           | I can see that you have not been exposed to the magic of
           | bureaucratic indifference.
           | 
           | If you release a really shitty product, and your customer
           | doesn't have choice (has no competitor, made a large upfront
           | payment, has fallen into vendor lock-in, etc), you don't have
           | to respond.
           | 
           | You can translate an unhappy customer into a compliant one by
           | putting up barriers to the reporting and documentation of the
           | issue. Make automated resolutions that don't quite fit the
           | situation, put the issue into a ticketing system that never
           | addresses the issue, give employees roles that either overlap
           | with each other or don't intersect at all over the customers
           | issue, etc.
           | 
           | These are the situations that Scott Adams parodies with
           | Dilbert.
        
           | lnanek2 wrote:
           | > While you notice immediately that something is on time,
           | you'll also notice really quickly that something is of bad
           | quality, unreliable, inconsistent, low performant, etc
           | 
           | Not in my experience. Our team has a couple core perf metrics
           | that are alarmed, like page load and missed frames, but it's
           | easy to do really bad things that won't trigger the alarms.
           | Or do them such that the automated tests are using different
           | content for the pages they test than the real users who will
           | see the commits weeks later. E.g. someone commits a change to
           | feature x that locks up the screen, but the test user pool
           | never uses feature X, or never puts content into it and just
           | sees the empty state screen.
           | 
           | Quite common for developers here to write stuff that works
           | for 99% of users, but falls over otherwise as well. Like
           | today I fixed an issue where tapping a button on one screen
           | to go to another really fast, like under 1 second, crashes
           | because of a race condition. Testers aren't going to notice
           | that. It just shows up in the company's overall crash rate
           | which is spread across 4000 developers. Automatic UI tests
           | caught it, but the responsible team had just filed the crash
           | stack trace JIRA into their backlog and left it to sit for
           | months. Similarly, today, we had a production issue because
           | someone wrote some code that only works for certain users who
           | had already accepted a certain terms of service screen.
           | 
           | Shipping a feature is rewarded heavily. Not screwing up the
           | app for edge cases and perf and people who have to implement
           | the next feature after you? Good test coverage? Not at all.
           | If you dare to give an estimate that includes full test
           | coverage, PMs will just take you off the project and pick a
           | developer who doesn't do that.
        
         | DesiLurker wrote:
         | Dont take project management advice from Scott Adams. His
         | judgement is seriously questionable. he is okay for a few
         | laughs at the expense of old corporate culture but anything
         | more serious is useless.
        
       | jahnu wrote:
       | > Unfinished code that is full of race conditions, performance
       | problems, outright bugs and worst of all, poor to non-existent
       | product/market fit.
       | 
       | The last one is so different than the rest. Bugs shouldn't even
       | "ship" internally in that they shouldn't really be making it out
       | of feature branches often for some reasonable value of often.
       | 
       | But back to the last one, that's something that should be decided
       | with high confidence before the first line of code is written!
        
         | tonyedgecombe wrote:
         | The last one is the hardest to get right in my experience.
         | Sometimes you just won't know until you start asking people to
         | put their hand in their pocket.
        
           | Cthulhu_ wrote:
           | I mean there's been a few successful companies like Slack
           | that started off with something completely different before
           | they pivoted. Sometimes market fit takes some
           | experimentation.
        
       | brainwipe wrote:
       | This article raises some great points but is still trying to
       | close the stable door after the horse has bolted.
       | 
       | If your business is agile, it begins with the style of engagement
       | between you and the customer. Really agile businesses don't deal
       | with absolutes (such as fixed price contracts), instead they
       | accept change at the core.
       | 
       | Accounting hate that, so most businesses aren't agile.
        
       | javier10e6 wrote:
       | Not to be thrown into semantics but... Scope vs. Goal The goal
       | defines the scope. If the goal does not change, neither the
       | scope. When the goal includes a date...the scope has no way to
       | adjust because scope refers, simply put, to a to-do list. A
       | poorly conceived date does not change the scope, it cuts short
       | the to-do list. How long does it take to a Nascar Team to win the
       | Indy 500? 500 miles as fast as humanly possible.
        
       | phkahler wrote:
       | Deliver something the customer wants, make the product better, or
       | figure out why those 2 things are not the priorities. It's
       | usually money or politics.
        