| xyzzy123 wrote:
| I've seen more places burn to the ground because everyone good on
| n < 10 team got poached by someone who left, than actual systems
| level cascading failures.
|
| Person A leaves. Now it kinda sucks here. Person B leaves. It
| sucks more (and my workload got worse) etc. Guess what, A&B are
| hiring.
|
| I guess this says more about "places I've worked" than "cascading
| failure" but I wanted to point out that it definitely happens at
| an organisational level, not just as some abstract computer
| thing.
| crest wrote:
| What you just describte sounds like a cascading failure in meat
| space.
| steveBK123 wrote:
| I always tell people the hardest part of tech is the people,
| not the tech.
| francisofascii wrote:
| Curious, why does one or two people leaving make it suck? If
| this is often the case, maybe management should find ways to
| address. More money, more opportunities. etc.
| vinceguidry wrote:
| Generally speaking on most software teams, one or two devs do
| most of the work, bear most of the responsibility, and it's a
| huge game of catch-up for the rest of the team if they leave.
|
| The reason why this is is twofold. First, this is knowledge
| work, the main task you're doing is fitting stuff in your
| head. Once one person has something fit into their head, the
| benefits for the second person doing the work of fitting it
| also into their head is not nearly as much. So knowledge
| becomes siloed, and 'knowledge transfer' doesn't work because
| there's very little the person with the knowledge can do to
| speed along the process of another person cramming it into
| their head.
|
| Second, infrastructure become unavoidably, yet unnecessarily
| complex. Decisions about which software projects to use and
| depend on get handed down by decision-makers who never have
| to touch those projects themselves.
|
| An example from my current team is GitHub Actions. We had to
| throw away a working Cloud Build CI infra because they liked
| the pretty interface. But the rest of our infra is on GCP.
| This complicated the setup such that it was very difficult
| for other people on the team to build working pipelines. So
| the knowledge about how it all works gets further siloed into
| a few people, who find showing others how it works difficult,
| because of the complexity. In practice the people that know
| end up doing the hard complex parts for them, no knowledge
| gets shared, and piling on to the list of things the rest of
| the team has to learn once they leave.
|
| In larger companies, this is solved at the management level
| like you say. They'll pressure the devs to come up to speed
| faster as much as they can get away with, incentivize key
| resources to stick around. The root cause can't be solved at
| a management level because management can only manage, they
| have no insight into software complexity and team dynamics.
| In smaller companies, the resources for doing this are non-
| existent, it can only be solved through prevention. Not over-
| complicating the stack, avoiding endless churn. Proactively
| rotating devs onto other parts of the team to facilitate
| knowledge transfer. Doing it before someone leaves. Spotting
| silos and getting someone else in there to learn what's going
| on.
| steveBK123 wrote:
| Sometimes you get newer management with NIH syndrome. So
| existing "legacy" project teams (the ones that are actually
| in production) can get squeezed on both ends.
|
| First they get a lot of BAU pressure to not have outages /
| ship features faster / etc. Second they also get Change
| pressure to completely re-architect while doing the BAU and
| not increasing staffing. For some who play chess in the
| department head seat, it is win win.
|
| If the legacy team has more outages / doesn't speed up on
| features, he has his remit to build his new pet project
| replacement and 2-3 years before theres any accountability
| for the outcome.
|
| If the legacy team succeeds in re-architecting then he also
| gets a win.
| mym1990 wrote:
| The same reason that LeBron leaving the Lakers would put them
| at the bottom of the table overnight. While knowledge sharing
| and thorough documentation is a way to mitigate risk, I don't
| think it will ever address the loss of an impactful person's
| vision, knowledge, work ethic, etc...
|
| Sometimes other people will also lose morale or see it as a
| chance to leave themselves...
|
| It also takes considerable time to onboard a replacement,
| which can drastically affect timelines/budgets/etc...
| steveBK123 wrote:
| Rings true. I've seen more "cascading failure" type behavior in
| the human staffing side of the equation than on the software
| side, where I am in NYC bank/fund/fintech space..
|
| Less of a "move fast & break things" mentality in systems that
| touch money, with a bias for inaction over action. Systems tend
| to fall over in isolation more than go into epic retry loops of
| death. Better to be down than to be up in bad state spamming
| orders/money/etc. Knight being an exception that proves the
| rule maybe?
|
| On the people side though its totally different. Teams are very
| lean, most of my teams have been 5ish people, and not unusual
| to join a team and realize 50% of you have been in the seat
| less than a year. You lose a lot of institutional knowledge and
| momentum. I joined a team once that was such an attrition
| disaster they hadn't shipped code to PROD in 6 months.
|
| Been on too many teams where management was so busy trying to
| whack the 5-10% they want to cut that they don't notice the top
| 20% making their own way for the exits.
|
| I once had 6 managers in a year. One of those transitions of
| power involved a Bob being named new department head on Monday
| night, hosting a pizza lunch on Tuesday, and then us getting an
| "actually Bob isn't going to be the lead, Jim is" email on
| Wednesday morning. I was 23 and the new 22 year old college
| hires arrived with no one to report to so I told them what to
| do for a few months while I interviewed elsewhere and left.