http://tecnetinc.com/Cadkey%20or%20Catia.html
---------------------------------------------------------------------
Home
[cadkey]
CADKEY or Catia?
Boeing's Billion-Dollar 3D CAD Mistake!
By Joe Brouwer - Boeing trained Design Draftsman and 3D CAD/CAM
Dealer
---------------------------------------------------------------------
"All problems start with a solution process, that leads to a better
process, that leads to a better process and on and on, with each
advancement providing a more productive solution. Unless something
gets in the way that stops the advancement of this process by putting
in a much less productive process based on politics or vested
interest. This is a story of how politics and vested interest made a
decision that caused Boeing to make a Billion-dollar 3D CAD mistake."
---------------------------------------------------------------------
Update 5-23-18
Boeing's move to MBE, using PMI as the engineering deliverable has
put them on a path they may not be able to recover. This idiotic
solution is still looking for the problem that caused it. But what is
worse, is Boeing has given this costly process, legitimacy in many
industries!
PMI vs AID
Update 9-13-17
As I ponder on this article I realize that this decision by Boeing
alone delayed the industry at least 12 years from effectively moving
3D CAD to the PC. This caused an untold amount of incompatibility in
the 3D CAD industry. This set the path for the dated and complex Pro/
e (Creo) design system to become the de facto system, creating more
incompatibility. Sadly, this system was adopted by the PLM gurus, who
thought they could digitalize a system based on engineering documents
causing a huge data management mess.
---------------------------------------------------------------------
Boeing 747 Flight Deck 1986
I already had 4 years of 3D CAD experience on Computervision CADDS 4
when I took a contract at Boeing Everett 747 flight deck in 1986. It
was a drafting job on the board, which bummed me out, but the Seattle
area was my home and it was great to get back. I just had a new son
and missed the family.
The 1980's - 3D CAD - The Beginning
The group had 3 seats of Catia 2. They mostly provided loft lines for
the board draftsman to use for reference. I don't think the Catia
users did any design. Like Computervision CADDS 4, Catia 2 was a 3D
wireframe system. The Catia 2 operators were prima donna draftsman.
They ran these systems, easily costing well over a $100,000 each, 8
hours a day. Cost effective??
On my other contracts we were actually designing on Computervision
CADDS 4. Most companies had at least two shifts and a few had 3 to
make these systems cost effective. These systems weren't cheap. You
had to buy a minimum of 3 seats for $750,000. It came with a
mainframe computer in a tempature controled room, three terminals, a
Versatec plotter, 250 meg removable hard drive, backup tape system
and a control counsel. As I think of this, only those with government
contracts had more than 3 seats.
Most of the companies moved all of their draftsman to CADDS 4. 3D CAD
was in the realm of the draftsman in those days because 3D CAD
engineering deliverable was still the blueprint. These were not
drawings. We designed in 3D and created our engineering documentation
from placing instances of the model in different views and detailing
them and adding other annotation to the industry drawing standards.
This was Computervision's claim to fame: CADDS (Computervision
Automated Design and Drafting System). Most 3D CAD users are
familiar with this process today. The days of the drawing were gone.
In truth, this was also Pro/e sales point when released, "Faster
Drawings". The effective use of the 3D models as a pattern didn't
show up for years and the PDF at the turn of the century.
The Death of the Drawing
These prints were copied and handled just like vellum or mylar
drawings, but more than likely released as microfiche for the larger
companies. The only thing different was when a change was necessary
it would be done on CADDS 4.
At Boeing there was no way a contractor was getting close to the
Catia 2 system. I would moan and groan about being on the board.
Suddenly a fellow said "There is a PC based 3D CAD system on those
two Compaqs in that room". I already was in the world of PCs. I even
had some experience on AutoCAD. It was on my Compaq luggable with a
tiny amber monitor. But I was already a 3D CAD mechanical designer
and was not interested in a badly designed architectural electronic
drafting package.
So, I headed toward the computers. The product was CADKEY. It was
very much like CADDS 4. It had an easy to use GUI, much better than
CADDS 4 with its "dig" (digitizer) pen, tablet and keyboard input.
CADKEY also had a colored monitor which was a $25,000 option on CADDS
4. After 2 weeks of lunch hours I talked management letting me take
on a project.
An engineer and I proceeded to design the 747 first observer's
workstation. We got the outer mold loft lines for the station lines
we were going to be mounting the station from Catia in IGES.
IGES worked very well between the products. It is quite surprising
that that level of compatibility was programed into the programs at
this level of introduction of 3D CAD. Later I had the same success
with Computervision CADDS 4.
The project went incredibly well and management was hugely impressed.
They started ordering seats of CADKEY by the dozens. We had a list of
those who were waiting anxiously to get the next seats. We had an
ongoing list of enhancement requests that we would send to CADKEY
that they would implement as soon as they could
The word started spreading. Other groups would stop by to coordinate
and we would give them a demonstration.
We would send HP formatted files to the print department. Nope, no
plotters in the drafting room. So, we had to wait a couple of days
for our prints to be reviewed for errors, maybe a better design and
to check. CADKEY at that time had no documentation module, but full
drafting capabilities in the 2D/3D model mode. We would copy the
different views and place them on the same level (which we had 256)
and detail them. We would put in a border. We always designed and
detailed in full size and request the print shop to scale the print.
This offered some very interesting problems.
I was not sure how Catia 2 worked. But by this time, we had 25 seats
of CADKEY and still only 3 seats of Catia, mostly being used for
structural frame and OML support delivered to support the CADKEY
users.
I was put in charge of training. It was easy, all were experienced
Boeing draftsman, contractors and board engineers that took to CADKEY
like fish to water. Soon all the engineering documentation was going
out of CADKEY. It was funny, we promoted the users to play games like
solitaire to familiarize themselves with this new world of the PC.
All you want to know about 3D CAD training!
But not all was good. Computers had been expanding in all industry
based on the mainframe computer. The computer groups were gaining
power. BCS (Boeing Computer Services) power soon surpassed
engineering. Mainframes and workstations were in the realm of BCS,
but not these newfangled PCs (Personal Computers). BCS soon found
that it could not control these PC's. They were not called Personal
for nothing. BCS hated CADKEY. We could load it, configure it,
licensed it (dongle), maintain it without any input from BCS, Ah, but
Catia 2 was totally under their control.
Boeing could have led the world into PC based 3D CAD.
Just a small point - Catia did not show up on the PC for another 12
years.
BCS allowed no programming outside BCS. CADKEY had CADL (CAD Advanced
Design Language) like LISP in AutoCAD would allow the user to do
simple programming steps. It could also be used to copy and import
models into different CADKEY files. BCS wanted to remove this
integrated function so no one could program. They were completely out
of touch with what was needed and required and quite insane.
They would walk into the group like the Gestapo ready to punish
anyone that would defy them. There were many battles that occurred.
The Boeing draftsmen are not the most congenial bunch. They knew
their stuff and knew when they being fed BS. It became a battle
ground. CADKEY was soon hated by BCS and I am sure they swore they
would get rid of it.
There were a couple of us who saw the light and decided to create a
business selling CADKEY. We all invested in a $3,000.00 286 computer,
who would trust a newfangled 386, CADKEY $3,500.00 and a $2,500.00 19
inch monitor. This was a huge investment for a couple of draftsman,
$9000.00. These were seasoned Boeing lead draftsmen and one engineer.
We saw the productivity increases. It truly was a no brainer. I found
out very soon Boeing employees make horrible businessmen. 40 hours
was their maximum work week. All had hobbies and getting into a
business just didn't fit their life style. More about this later.
I was performing well beyond my job title and decided to be paid for
it, after all I was a job shopper. They offered me a dollar. My rate:
$20.00. I took a $15.00 cut to get home. Well, out went my resume and
I got a job with Square D in Lincoln, NE. I will tell you the only
thing good about Lincoln was the people, because besides corn fields
there is nothing there.
They had Computervision CADDS 4 monochrome screens. I was already
spoiled by a contract at Solar Turbines in San Diego where they
converted to colored monitors. I quickly brought out my incredible
CADKEY system and showed them how I could easily outperform their
CADDS 4 using IGES, this was all 2D/3D wireframe. Remember the Boeing
fellows. Well they just didn't want to be part of the business. So, I
started my company TECH-NET and sold Square D three CADKEY systems, I
think it was the color monitors that sold them. The 3 full systems
were only $10,000 more than a single color monitor for CV. But this
sale put me in the PC and PC based 3D CAD business.
In 1988 I came back home to the Seattle area and established
TECH-NET. We were a CADKEY Dealer. This was also the beginning of
wide use of the PC. We were selling hardware and software like crazy.
Networking was not included with the MCDOS software so we had quite
an operation going.
Being well experienced with the interoperability between CADKEY and
Catia 2 at Boeing I started selling CADKEY to every Boeing supplier.
CADKEY was the only effective PC based 3D CAD system on the market. I
was not the Boeing CADKEY dealer. If I was things might have been
different.
Boeing had 1500 seats of CADKEY in the commercial division. How in
the world did they justify replacing them with Catia 2? This was
still pre-1990. Catia just moved to IBM Unix workstations. What was
the big benefit that was worth approximately $50,000 to $60,000 per
seat more?
To make this move stranger, all Boeing employees had a PC. All
communications were now on the PC. Why in the world would they add
the complexity of a Unix system?
All the CADKEY PCs were on the same network providing and receiving
the same information. By 1988 CADKEY had an integrated documentation
module called the layout mode and 1989 Fastsurf, an intermediate
surfacing package, that easily matched Catia 3 at the time. This was
also the time Windows was becoming widely accepted. Remember, if many
of you can, the PC started with the MS-DOS system. CADKEY ran on DOS
and I had to take CADKEY kicking and screaming into the Age of
Windows. I remember how we had dual releases for CADKEY 7. Windows or
DOS. I was an edlin (edit line) programming king. An inside joke for
very few people.
So, it is 1989, CADKEY and Catia 3 were equally capable. I am just
assuming this since I never even looked at Catia 3 user interface or
its basic 3D CAD system. Boeing Flight Deck had 45 CADKEY seats and I
am sure were all designing and creating prints. They even got rid of
one of the Catia 3 stations, I was in close contact with those folks.
Made many close friends. I will not even tell you about my going away
party. Whew!! I was still supporting many of them with CADKEY even
though I was not the dealer.
I was having monthly user group meetings. We had huge seminars
presented by CADKEY. We were flying. Many Boeing engineers, designers
and draftsman would be in attendance. The NW was in the 3D CAD world.
What would make Boeing opt to use Catia 3 over a more productive,
cost effective, easily maintained and PC Based 3D CAD system? It was
not over night. I was not in the know about the relationship with
CADKEY and Boeing. But there was a push for Catia. I really don't
even remember what happened. The standard engineering deliverable was
the print. It wasn't until free form surfacing showed up did the 3D
model become of value with PC based 3 axis CNC programs, like Smart
CAM, MasterCAM, SurfCAM and others when the IGES model become part of
the engineering deliverable.
Let's just use the 1500 number of CADKEY seats that had to be
replaced. I know this was a slow process that moved into the early
1990's.
Let's say a CADKEY station cost Boeing $7,000.00 with the software,
PC and 19-inch CRT monitor (perfect station). Like I said before, all
Boeing employees had PCs anyway. The CADKEY PC system offered much
more than just a 3D CAD system it offered a door to the PC world,
word processing, spread sheets, scheduling system software, what we
all have now was mostly all there then. Nope, no internet, but Boeing
had a great internal networking system.
Boeing opted to spend, let's make it cheap, and just charge 10 times
the price to $70,000 per seat. But remember these were Unix seats and
needed a staff of Unix experts to maintain them. We know they had a
minimum staff of PC experts to maintain them. Now they doubled the IT
staff required.
Ah, maybe that answers the CADKEY or Catia question.
Who benefited by this move? Surely not engineering. They were happy
with CADKEY and the PC. Remember I was one of them for a couple of
years. In fact, I still was doing consulting for Boeing and many of
my clients. My CADKEY training classes were full of Boeing draftsman
and design engineers.
The only group that would benefit by this move was BCS (Boeing
Computer Services) and, of course, Dassault. Trust me they were in
charge and hugely influential.
So, what did this move cost the company just using the 1500 seats.
Don't forget to include all of the logistics!
$94,500,000.00
But that was just the beginning of the huge costs of this decision.
---------------------------------------------------------------------
PTC - SOLID MODELING
I am sorry but I must do an aside here at this time and introduce Pro
/e. It plays a huge part later in this drama.
All of the high-end systems were playing with solids. Mostly Boolean
operations. Both Computervision and Catia has some sort of solid
model functionality.
But something showed up in the market place in 1988 that set 3D CAD
on a path that would not only increase the cost of engineering for
Boeing but the complete industry.
Can you guess?
PTC (Parametric Technology Corporation) came out with a solid
modeling package called Pro/Engineer.
31 Years of 3D CAD Incompatibility
Now, Pro/e was the first, as far as I know, 3D CAD system that had
solid modeling designed from the ground up. It was delivered on a
Unix workstation that were now available at a high, yet not out of
reach, price as compared to Computervision CADDS 4 and Catia 3.
It was a very convoluted system that used a strangely devised history
of features based on child/parent relationships. You could design and
all the design steps were available. You could also program features
and assemblies and create family of parts based on these programs.
Parametric Modeling Finally Defined
I have to say it was a miracle. It was very, very clever.
But while it was very innovative it was incredibly flawed. It had a
separate part, assembly and drawing formats. I am sure the thought
was to be able to relate parts to each other and create constraints
between parts. Change one thing and all affected parts change. Great
idea. Of course, none of these fellows were engineering types. I used
to laugh as I was explained this concept.
You have a control cable running down the keel of an airplane and the
cable moved and all clearance holes in each frame associated to that
cable would also move.
Was I the only one that ever met Mr. Murphy?
Of course, it took much more time to design anything. Many engineers
had to become programmers. You would design the parts then insert
them into the assembly. All parts were associated to the assembly.
100 parts, 100 associations to maintain. Hello is Mr. Murphy there?
So, of course, PDM became a nightmare. No, no PDM was not (Part
Document Management) this became (Product Data Management) hmm who
would come up with that term? Ah, enter the InfoTechs, yes, the IT
folks now were called in to maintain these associated "Pieces of
Data" The simple document control of the past was now in the hands of
the IT folks defining PDM systems for the 3D CAD users. Which of
course now had to understand data management. Mr. Murphy was having a
field day, laughing and thinking how could he make it worse.
Yes, he made it worse!!
Enter PLM (Product Lifecycle Management) this was an advanced PDM
system that was to handle complete projects. Was it designed by
engineers, draftsman and document control experts? Oh no, none of
those folks had the academic credentials or applicable Infotech
knowledge considered necessary to reinvent this new wheel.
The Death of PLM?
Have I missed something???
Oh, yes we still had the print to worry about. No, no they were not
drawings. But remember Pro/e engineering deliverable was still these
associated information documents, still called drawings? It would
continue to be so until the turn of the century. Yes, there was .dxf.
But it was not truly a standard. No program would import the .dxf
correctly, and of course, it would change with ever version of
AutoCAD.
As for using the model for manufacturing, it started with IGES which
first were in 3D wireframe, then in a surface format, of course,
moving to solids in the mid 1990's. IGES released a solid model
translation but soon was replaced with the new, more robust, STEP
translator.
Good God, even lowly CADKEY that was developed by engineers had IGES
and STEP. It was just too obvious. But the CADKEY developers were
much, much smarter, they actually included the documentation in the
same file as the 3D modeled part and assy.
The Integrated Drawing in 3D CAD
It is a bit confusing, you had to have documentation. CNC was in its
infancy at the time of the release of Pro/e. Oh, believe me, I will
get into that later.
Ah, the associated separate drawing was a misnomer for sure, since we
didn't draw anything anymore caused huge problems for PDM and PLM.
Now you had the 3D modeled part and an associated document to
maintain. Hmmm this is even more than a bit confusing. Do you know
even today the 3D modeled part doesn't include the information that
there may be an associated drawing? Impossible you say? Bring up your
favorite Solidworks part.
I will not go into the complex operation of Pro/e. It was incredibly
unique and there was nothing that could compete. I bet the demos were
incredible as compare to what?? Nothing. Computervision and Catia
were still struggling with Boolean solids. PTC promised to reduce
drawing time of 90% one fellow told me. Of course, designing in Pro/e
was and still is torturous.
The Pro/e salesman could walk in to these large companies, set up the
Unix system and give them a demonstration. Can you imagine how much
more simple as compared to the huge networked Computervision or Catia
systems that were only wireframe at the time?
Pro/e was a Miracle.
Okay, Okay... that is enough about Pro/e for now. I will leave you with
one horribly devastating fact. All PLM is based on the Pro/e paradigm
of separate parts, assemblies and documentation. Didn't anyone think
of making the CAD system more data friendly??? Nope, none were
engineers or draftsman who applied this mess of convoluted processes.
Back to CADKEY and Catia
We will now move to 1991 and CADKEY and Catia 3. Life was good,
engineering was getting done. A few new things showed up
stereolithography (STL) and CNC programming. We were now designing
with surfacing to provide both of those technologies with functional
formatted data.
I remember doing a job for Spacelabs. In CADKEY they wanted to get
one of these new stereolithography parts made. They gave me a 3D
wireframe plastic part with no draft. Designers rarely designed with
draft in those days. In 3D wireframe it was difficult. Imagine the
spherical shapes (blends or fillets). They wanted me to add the
draft, now that we had 3D parts and could surface the model for STL.
I told them 55 hours. They said it didn't take that long to design. I
said than you should have designed it with draft. I did the job.
Just a funny aside! A year later I got a similar job. Yes, they came
back to me. But this time CADKEY had solids. 15 hours. Yes, solids
were much, much more productive.
Solid Modeling shows up on the PC.
In 1995 solid modeling showed up everywhere. Both Parasolid (UGS) and
ACIS solid modeling kernels became available. Suddenly many PC based
3D CAD programs started popping up, Solidworks, Trispectives,
CorelCAD, TurboCAD and a few more.
The 1990's - 3D CAD/CAM Moves to the PC!!
CADKEY had a 3D solid modeling module called FastSolids from the
creator of Fastsurf, Robert White, show up. After one seminar, I was
getting orders for the beta release. All my customers were ready to
move to solid modeling.
FastSolid was a Boolean system based on ACIS, where you would add or
subtract shapes to do your design. This was nothing like the history
of Pro/e. While it was totally functional you could not really edit
the features.
I was also looking at many of the other new products coming out. One
being Trispectives. It was also an ACIS system that could pass solid
models back and forth to FastSolids. But it was a graphic design
package with rendering and animation and a unique drag and drop
shapes from a catalog. It was incredible combination. We did
presentations with transparent shapes, labels and animation that
would rival the systems of today.
The engineering world had changed. Solid modeling was instantly king.
Of course, we still used 2D/3D wireframe and surfacing to support it.
Catia 4 was released. It provided solid modeling. It was a Boolean
system like CADKEY. The Boeing suppliers were now getting solid model
from Boeing still in IGES and then in STEP. Every Boeing supplier
moved to CNC. We sold Surfcam at the time. We were right in the midst
of the action and transition.
Nothing changed with engineering documentation by adding Solids to
the process. Yes, solid modeling increases productivity across the
board. They still were creating full prints, now called by the Boeing
draftsman the "flat file", but now included was a usable 3D model.
All was good!!
I remember calling one of the groups at Boeing. I had about 85 active
seats still in the commercial division. I called to promote more
CADKEY. BCS was not quite as worried about CADKEY since it had all
official engineering in Catia. The fellow asked me: "Does it have
history based modeling?" I thought why is he asking that. I said "Why
would you want history modeling, Boolean is much faster and easier".
He answered "Oh, we have to have history base solid modeling".
I was selling CADKEY like crazy. Remember Trispectives? Well, they
were bought by a company that sold CoCreate (Now Creo Direct) and
they in the midst of creating IronCAD. CoCreate was a Boolean only
system like CADKEY and Catia. But IronCAD had history and they added
the Boolean operation. But at this time, they moved into direct
editing. Ah, the difference please.
Boolean Design
This system was based on adding and subtracting shapes. It was based
on sketches and had extrude, revolve, sweep and loft commands. You
could add fillets. But there was no recognition of these features.
You wanted to change a hole you deleted the old one and put in a new
one.
Direct Edit
Much like Boolean Design but adds feature recognition. You can
recognize and actually edit the hole or blend. Today the direct edit
functionality is very powerful. It is much, much more flexible than
history based only design.
I was shown Solidwork and offered a dealership. I looked at it,
chuckled and said "Who would use or buy this piece of crap". How was
I to know that Dassault was ready to buy Solidworks for $310,000,000
in stock. Why would they do such a thing? Solidworks was a horrible
Pro/e knock off and only had 6000 seat which most were academic. Oh,
yeah, Catia 5 was right around the corner. More on that later.
It was 1998 I was now selling both CADKEY and IronCAD.
These were not trivial programs.
CADKEY was moving right along. They added a parametric or history
based module. Called creatively "CADKEY Parametric". This was the
industry's first true hybrid 3D CAD modeler.
It had 2D/3D wireframe, full free form surfacing, direct edit solid
modeling and now history based parametric solid modeling "ALL IN ONE
INTEGRATED PACKAGE". Remember you could do your parts, assembly and
drawings in one file.
CADKEY became the world's first fully functional 3D Hybrid modeler.
We gave a presentation to Boeing commercial in Everett the Boeing
folks were drooling. So, what happened here? I will explain later.
Today, that mantle is held by ZW3D.
IronCAD has a single model environment and the only package with
truly integrated history and direct editing. I started selling both
packages. IronCAD is the fastest conceptual design program and I was
moving a few CADKEY users. But its lack of surfacing limited the
sales.
2000 - Catia 5
Remember I said that selecting Catia over CADKEY cost Boeing millions
of dollars. That did not stop over the next 12 or 13 years. If I
didn't come along and provide CADKEY to all the Boeing suppliers
would someone else had? I don't know. But I was in the middle
providing the interoperability with Boeing and their suppliers. Like
I said Catia 4 was not available to even the large suppliers. If it
wasn't for this CADKEY compatible solution, the use of Catia would
have cost much, much more. I am sure Boeing was oblivious to this
fact.
Danger, Will Robinson!!
One day I got a call from a Boeing Supplier. He said: "Joe, Boeing is
not supplying drawings anymore." Boeing had moved to Catia 5 without
any notice to the supplier. They were now delivering the information
in a bizarre inaccessible 3D format. They did not know what to do.
With Catia 5 now available on the PC many had to buy a seat. Dassault
also provided Enovia. An expensive and very convoluted Catia 5
viewer.
I really am not sure what they were delivering for an engineering
deliverable. The PMI (Product Manufacturing Information) was being
developed. This is basically a 3D drawing. All of the engineering
information was to be included in a single native file in 3D space.
You needed a Catia 5 or Enovia seat to view it.
PMI vs AID (Associated Information Document
[img544]
Back to Pro/e and the separate part, assembly and drawing.
Well, Catia 5 was basically a Pro/e clone. I always wondered why they
bought Solidworks and the complete development staff. PMI is nothing
more than a poor effort to aid with document control now call PDM
(Product Data Management). This was now being pushed by an effort to
make the model the engineering authority instead of the
documentation. This is called MBE (Model Based Enterprise) using MBD
(Model Based Design) using the native PMI as the engineering
deliverable.
The suppliers were up in arms. But Boeing decide that they would move
to this system and now Dassault Catia 5 PLM was the basis of their
engineering system. The engineering system is the basis of the
company operation. This move affected all corporate operations.
In this decision, I am not sure how it came down, but Boeing decided
they did not need the Drafting Group or Document Control Group and
now depended on Dassault's PLM system to manage the complete
engineering process. As for the draftsman, 3D CAD really doesn't have
a place for them (more on this later). An engineer can do it all. Now
they are, what I call, the 3D CAD engineer.
How CADKEY could have eliminated the need for PLM, MBE and PMI?
CADKEY is a true single model environment. You could easily design
your parts, assemblies and sub-assemblies in one file. Also you could
do your drawings in the same file.
With the drawing included with the part or assembly: would they have
needed to go to a complex convoluted PLM system that tried to use the
native system in the form of a PMI to simplify PDM?
Probably not. We would still be working with a much more manageable
3D model and the associated integrated documentation. It was funny as
Catia 5 and this PLM system was being released and they were trying
to solve the problem with maintaining the separate print, Adobe
released the PDF, easily solving the separate print problem and
leaving the engineering documentation in stone delivered outside the
native CAD system.
If Boeing would have chosen CADKEY the following situation would have
never occurred. With the support of Boeing, CADKEY could have reached
a level of productivity that Boeing does not see today or ever will
see in the future.
Catia 4 to Catia 5 Fiasco!
Now for the life of me, a Boeing trained draftsman, a person that was
trained by and worked for the most incredible engineering company on
the planet, with the most incredible engineering and manufacturing
standards, why would Boeing make this obviously not thought through
decision.
Boeing was not alone on this decision. Airbus also made this move,
but with no CADKEY option.
Why was this decision made in this fashion. It was being made by BCS
and the Infotechs that had no ability or applicable knowledge to
differentiate between the relative importance's! Yes, they are still
in charge!
Catia 4 and Catia 5 could not read the others files.
The 777 was designed in Catia 3, but now all airplanes were being
modified with Catia 4 with the introduction in 1994.
It was incredible. There were no translators provided by Dassault!!!
Catia 4 was bad enough. It could only import/export IGES and STEP.
Wait a minute, Catia 5 could only import/export IGES and STEP!
We all heard the story about the electronic cable bundles for the
Airbus 380 not fitting due to the attempted mixing of the two system.
I will not go into the cost of this horribly devastating not thought
through decision.
Can any of you PC based 3D CAD users imagine this. You would have
thought there would have been at least forward compatibility.
Why in the world would they call it Catia 5. I was not compatible at
all with Catia 4. Why not a completely new name. It is like a bunch
of amateurs are in charge at Dassault, Boeing, Airbus and any other
Catia 4 users that fell into this trap.
Sadly, this mess is still going on today.
Update 2-20-19
Catia 6 was released in 2009 and not adopted by any of the Catia 5
major users. Today, Dassault is pushing the 3DExperience, I cannot
imagine the cost involved with this move!
Back to CADKEY
At the turn of the century, the folks at CADKEY decided to duplicate
the package in a new programing language. I will not go into that
fiasco but what came out of it was KeyCreator. This is now a fully
functional hybrid modeler. Sadly, the incredible history based
parametric capabilities were never to be included.
I replaced many of the CADKEY in Boeing with KeyCreator. Due to the
bumpy introduction of KeyCreator I had lost quite a few seats of
CADKEY.
But KeyCreator still was the best support system for both Catia 4 and
Catia 5. Soon native translators to all of the popular packages
started showing up on the PC based products. Both KeyCreator and
IronCAD could import Pro/e, Solidwork, Inventor and UG native files.
But even better they could import and export native Catia 4 and Catia
5 files.
Again, Joe to the rescue. I convinced the commercial division to buy
a seat of KeyCreator to convert Catia 5, Solidworks, Pro/e, UG,
Inventor and all of the standard formats to Catia 4. The fellow in
charge looked like a one legged man in an ass kicking contest. He was
working hours and hours bringing in native files and converting them
to Catia 4. Why? Of course, you wouldn't ask.
Catia 4 could only handle a 34 meg file!!!
Yes, he would bring in the files, edit them in KeyCreator by reducing
the size and save them as Catia 4 files. He was hugely successful.
Next question??
Why didn't every group buy a seat of KeyCreator to do their own
translations?
Boeing had a translation group. Every request took a minimum of two
weeks. I showed the group manager directly importing a Solidworks and
a Catia 5 file into KeyCreator and IronCAD and create a Catia 4 file.
Catia 4.5 = The Catia incompatibility Solution
Again, politics won! This guy had a bit of power and was not going to
let it go. Can you imagine how many suppliers Boeing has that use
different CAD systems and had to supply 3D models? Galley, seats,
instrumentation, electronics, etc. Everything came through this guy.
His complete group would have been eliminated. I think Boeing is
still using this process.
Cost to Boeing? Unimaginable.
"I have worked with Boeing and Catia for over 30 years. Dassault is
responsible for keeping Boeing one of the most ignorant and isolated
manufacturing companies. Their lack of interoperability is beyond
belief."
The above was a quote from one of my other articles.
I continue to work with Boeing suppliers. To this day Boeing is still
having problems with communicating with the suppliers.
Back to PMI
In 2007 PMI was becoming a problem. Adobe released a package, Acrobat
3D. I was involved with this package. It would read a Catia 5 file
with PMI and let you view the PMI and import the part as a STEP.
It was getting huge support by Boeing. Suddenly Adobe discontinued
it. They sold it to another company that is still providing it today.
I never understood it. A cheap way to view the PMI. Today, you have
to search for it, virtually no marketing. After all of these years
there has no standards set for this PMI format. How could there be
one? They are based on the different CAD systems native file. Just
keeping up with the different releases would create chaos.
I can only assume that this would have cut into the control and
profits of Dassault. I am sure that they advised Boeing it would not
be in their best interest.
Boeing now demands that the supplier can read the native Catia file
and do a validation of the part to assure it is the same as the part
going into the CNC. This is an extremely expensive time consuming
convoluted process. But remember the 3D model is now the authority
and Catia 5 puts out some of the more corrupt parts in the industry.
Compare and Validation Programs?
Band-Aids for Self-Inflicted Wounds!
Corrupt 3D CAD Parts
I do sell ZW3D and it imports PMI from Creo, NX, Catia and
Solidworks. So, if you need to have access to PMI please feel free to
give me a call.
Free PMI Importer?
That about brings us up to the present. Nothing has changed at Boeing
and I suppose Airbus for years. But engineering costing them a
fortune. Why?
Is Catia 5 the Worst 3D CAD System in the World?
You be the judge!
The Worst to Best 3D CAD Systems Expanded!
I can tell you after 30 years of selling a variety of 3D CAD systems,
and competing against many others, that Catia 5 is the worst CAD
system in the world. It is devastating for Boeing, Airbus or any
large engineering company that has a large turnover of engineers.
Why, Joe?
Catia 5 is just one of today's popular programs that are nothing more
than Pro/e (Creo) clones. It is a history based only design package.
It is not conducive for effective fast design. Now a smaller company
with a stable staff may tolerate a history only based system, a large
engineering firm with a high turn over of 3D CAD engineers cannot
afford the horrible overhead with this type of system.
I have many opinions on history and direct edit. I promote IronCAD
and ZW3D that have integrated direct editing. While I love history
for conceptual design I will sometimes completely blow my history and
continue to work with a mixture of history and direct edit.
Very large engineering companies should have robust integrated direct
editing available. Even better have fully functional integrated
hybrid modeling, including 2D/3D wire frame, free form surfacing and
history/direct edit solid modeling.
The Ultimate 3D CAD System
The only constant in engineering is change!
Next Generation 3D CAD Technology Applied!
While there are a few features like helical shapes that cannot be
edited, I would say 95% of the parts could be directly edited with
today's direct edit only or those that have both history and
integrated direct edit programs. Imagine how much easier that would
be for an engineer not familiar with a part to be productive? Imagine
the time that is being taken by a new engineer now responsible to
change the model figuring out how the model was made and how to make
the changes. History only systems demand a high level of intelligence
and experience to be productive.
Is 3D CAD Productivity an Oxymoron?
I have an article where I introduce Streamline Sketching and Feature
Based Modeling that can increase modeling productivity even in the
most Solidwork-ish systems.
3D Modeling Techniques Defined
Dassault released a package called Solidworks Conceptual Design. It
was based on the Catia modeling kernel. It really is not completely
compatible with basic Solidworks any more than any other package.
This is a package that allows you to design in a single model
environment using both direct edit and history. No documentation
module.
Welcome aboard Solidworks Rewritten!
But for the life of me, I do not understand why they didn't release
this to the Catia 5 community and relieve some of the pain of the
history based only program. It is based on the Catia modeling
kernel!! How could this be overlooked?
One Boeing fellow told me a story of a Catia 5 operator that had to
learn Catia 4. His opinion: Catia 4 was a better design system.
What?? And CADKEY was much, much better than Catia 4.
Boeing today
Now the draftsmen are gone. The engineers are producing minimized
PMI. Murphy is running rampant through Boeing engineering on the
design side. They are making suppliers jump through hoop after hoop
making all the parts more expensive.
Dassault's PLM and Infotech gurus are now running the show!
The Boeing draftsman were worker bees. They kept everything in line.
They made sure the documentation was complete and correct. They
released and maintained the documentation. This was no easy feat as
the engineers are now are finding out.
The Death of the Draftsman or "Where has all the talent gone?"
Now, I really must agree that there is no need for the draftsman
anymore. But we have a new position. The 3D CAD engineer. In the
past, most of the grunt and sometimes sophisticated design was done
by the draftsman.
Educating the New 3D CAD Engineer - 2015
Was the move to Catia 5 the cause? Not totally, this is inevitable
with any 3D CAD system. CADKEY with the integrated drawings may have
put the draftsman in a different light. But PMI sort of took all the
emphasis off completely detailing the parts and resulted in short
cutting engineering with devastating results.
Engineering's only purpose is to make available concise, complete
and unambiguous documentation to manufacturing.
The engineers do not have a good design and documentation system in
place with good checking procedures. I have been told that Boeing has
set up a Produciblity Group to review the released engineering. I
don't know what happens if they find the part cannot be made or there
are errors. Yes, I have had more than one supplier tell me they had
to tell Boeing a part could not be made.
I always thought the PMI was created to have only one document. But
now I am told Boeing has a minimum of 2 more documents that travel
with it.
All just to replace the simple drawing, which today is not even a
drawing but an easily created associated information document made by
detailing placed instances of the part.
So, there you go. I can tell you that Boeing has spent billions and
is still spending millions trying to make Catia 5 and its PLM/MBE/PMI
system work.
Here is a comment by an experience 3D CAD engineer that is forced to
use this flawed MBE/MBD/PMI system.
"The big problem is, any failure will be blamed on the responsible
engineers and not an unworkable system. MBE is already being
backstopped by drawings in many organizations that are forced to use
MBE, but the drawings are frequently not in the release control
process because they are not the "primary" data driving fabrication.
A fine mess."
Why MBE/MBD/PMI Will Fail I
Why MBE/MBD/PMI Will Fail Part II
PLM/MBE/PMI Absurdity!!
Engineering Documentation Today!
---------------------------------------------------------------------
Solutions?
1. Document Control
Please read these articles. I wrote them purposely before writing
this article.
Standard Cloud Based
Engineering Document Control
Standard Cloud Based
Engineering Document Control Part II
We move back to creating completely detailed associated information
documents (drawings). No, we don't need to go to the standards of
yesteryear, since we now include the 3D model as a comparison. But
the second check provided by completely detailing the part quickly
exposes errors or a better design. It also provides a much quicker
and easier review of the document. The Onshape concept is basically a
bucket where you can upload and store any form of documentation
including a live 3D view of the model. This truly is the perfect
solution. No special software, just an OnShape like cloud based
document control program, a web browser and an Apple or PC.
Checking, Design Review, Manufacturing and Data Extraction!
We move Document Control out of engineering and into a group that is
responsible for making sure that the information it up to date and
readily available.
It is Impossible to Use the Native CAD File as the Engineering
Deliverable!
To use this concept, Boeing can easily continue using Catia 5. Just
start doing complete associated information documents (drawings) and
converting them to a PDF. Get the engineering deliverable out of
native Catia 5 system. Dassault also should work to create a stable
3D model that can guarantee the integrity of the part and can safely
be exported as a step and not be corrupt. Having so many different 3D
CAD systems available has limited the interoperability. Sadly, the
major CAD companies have a vested interest in this not working. If
they did we would move to the most cost effective standard solution.
The 3D model cannot be used as the part authority!
There can be huge problems with the 3D model.
Corrupt 3D CAD Parts
Can the 3D Model Be Used as the Design Authority?
2. More Cost Effective and Productive Software
There are very few programs that have the parts, assemblies and
drawings in one file.
Could Boeing move back to one of these systems?
The truth is that it would be better than continuing the path they
are on with Catia 5.
Yes, you would still have to work with Catia 4 and Catia 5 parts. But
these programs read and write both Catia 4 and 5 native files.
ZW3D is the solution that would fit this bill. It is history based
and would need a very short learning curve. I do have to mention
IronCad as a supporting design package. Its level of 3D solid
modeling productivity cannot be overlooked.
The Single model environment option
This is by far the most productive design environment. You design
your assemblies in one file. This is a must for conceptual design, no
need for PDM in the design stage. Allows all parts to be in one file
until the time for engineering release.
3D CAD Single Model Design Environment
[main]
The Integrated Drawing
This is where the door is closed on the data management problem. Your
drawing is part of your part or assembly file. You can do assemblies
and release all of your part out of a single file. Think of how that
would solve the internal PDM, The uniqueness of the associated
information document (drawing) is the only thing blocking complete
CAD interoperablity. It would be great if we could develop a standard
for the drawings as compared to the 3D model. Being able to export
both the model and the drawing in an associated format.
[assembly]
Integrated Direct Edit Functionality
Integrated direct edit functionality allows direct editing to be part
of the design process offering incredible flexibility. Now need for
extensive design intent when starting a part. Functional direct edit
opens the option to work with any other CAD systems solid models.
Hybrid 3D Modeling
This is where all 3D CAD systems are trying to go. Sadly, they have
to really be designed as hybrid modelers from the ground up. Clumsy
add-on modules will never provide the smooth integrated operation,
compared to programs like ZW3D Standard.
ZW3D CATIA 5 Replacement Advantage
ZW3D can import the PMI of the Catia 5 file. Then create a document
inside the file. It can also import/export Catia 4 and 5 files.
Free PMI Importer?
[img544]
I am a Boeing trained draftsman with 53 years of experience, and I
believe from what I have seen the minimized PMI is not sufficient as
a format for engineering documentation.
I still believe a completely detailed AID (drawing) is required. If
not for a complete unambiguous description to manufacturing, then a
second check by the designer for errors or a better design. A
completely defined associated information document (drawing) provided
in a PDF format is also good for easy review and checking. The lack
of these functions is adding to the cost of engineering in errors and
slipped schedules. In my own engineering, when I detail the parts, I
always find an error. That is with decades of form, fit and function
design and drafting experience.
Conclusion
It is time for a disruption not only with Boeing and its relationship
with Catia 5 but the complete industries relationship with any of
these Pro/e Clones that are stealing our precious engineering time.
Catia is not the only culprit in this crime.
As I said in the beginning we got here step by step as the problem
arose. But it is time to reevaluate today's 3D CAD solutions.
PTC with Pro/e (Creo) offered a promise of associated parametric
design. Sadly, that promise was never established. The efforts to
implement it has added hours to the engineering design and delivery
process. With PLM, they tried to increase the lost productivity with
some very costly Band-Aids.
Evan Yares describes the problem of parametric design very clearly in
this article which is first of a series focused on this problem.
The failed promise of parametric CAD
It is interesting that the smaller companies are very productive with
3D CAD including TECH-NET. Their engineering deliverable is the model
and a detailed drawing in the form of a PDF. I suppose not having an
Infotech staff keeps things relatively simple.
Engineering didn't need computers. We designed the 747 or 767 without
them and in less time than they did the 787.
3D CAD and the 757
We need to establish a standard, equal to what we had in the past.
It is time to put engineering back in charge of engineering!
I have to tell you all, designing parts and the maintenance of those
parts is a very simple process. You design the parts, deliver
complete and unambiguous documentation to manufacturing, take
delivery of the parts and assemble. Then archive the engineering
documentation hopefully never to be seen again.
It surely isn't rocket science!
Part Design Defined
The Assembly Defined
Shouldn't the results of the computerization of engineering be a more
simplified process and incredible productivity increases?
Go ahead!! Try to answer that question!!
---------------------------------------------------------------------
TECH-NET Engineering Services!
We sell and support IronCAD and ZW3D Products and
provide engineering services throughout the USA and Canada!
Why TECH-NET Sells IronCAD and ZW3D
For more information or to download IronCAD or ZW3D
---------------------------------------------------------------------
With 53 years of experience in engineering, 17 years in manual
board design as a contract engineer, 33 years in 3D CAD sales,
support, training and providing engineering services, we have a
high level of understanding of today's 3D CAD engineering world.
For many it is in chaos. If you are having problems or just
interested in this subject please feel free to call and we can
discuss them. There are so many simpler solutions available that
will save you time and money.
My First 17 Years or "How did we do it without 3D CAD!"
[viewpoints]
Please visit our Viewpoints
for more interesting articles.
See you online.
Joe Brouwer
206-842-0360
HOME | ABOUT | PRODUCTS | SEMINARS | TRAINING | TECH-NET NEWS
TECH-NET ASSOCIATES | RENDERING OF THE MONTH | CAD*CAM SERVICES
HARDWARE | TECH TIPS | EMPLOYMENT | CONTACT