http://www.paul-f.com/ibmove.html bg image(gray) Indiana Bell Building Move Click to go HOME Home 1930 Map (c)2006 paulf. All rights reserved. (What's this copyright notice?) +-------------------------------------------------------------------+ | From the Bell Telephone Quarterly, January 1931 -- "Moving the | | Indianapolis Telephone Building." | | | | After extensive study, it was determined that the best use of | | the site and existing assets would be to move the existing | | headquarters building to the back corner of the lot, and build a | | new building fronting on Meridian Street. | | | | The eight story steel-frame and brick building measured about 100 | | x 135 feet and weighed about 11,000 tons. | | | | The entire process took about a month. | | | | During the move, work continued in all areas above the basement. | | They had to install safety stops in the elevator shafts to make | | sure travel to the basement was no longer possible. Functions | | included administration, business offices and toll equipment. | | Local exchange equipment was in the building at the back left of | | the photos. | | | | All utility cables and pipes serving the building had to be | | lengthened and made flexible to provide continuous service during | | the move. (Electric, phone, gas, water, sewer and steam.) | | | | A moveable concrete and steel bridge connected the vestibule to a | | covered walkway. This permitted employees and the public to | | enter and leave at any time while the move was in progress. | | (Imagine trying to get permits to do that today!) | | | | The straight line move used manually operated jack screws. Each | | was operated by a team of men that turned handles through an arc | | of 90 degrees six times in about 30 seconds, and then they rested | | 30 seconds (!). Each operation moved the load about 3/8 of an | | inch. | | | | The pivoting operation was accomplished with the aid of cables | | attached to a stationary steam engine. | | | +-------------------------------------------------------------------+ Move part 1 Move part 2 +-------------------------------------------------------------------+ | | | The following photos show the evolution of the site after the | | move. | | | | First, a new building was completed at 240 N. Meridian in 1933. | | The old building can be seen in the back of the lot. | | | +-------------------------------------------------------------------+ New building 1933 +---------------------------------------------------------------+ | | | By 1968, the moved building had been demolished and replaced. | | The addition made the combined building 20 stories tall. | | | +---------------------------------------------------------------+ Expansion 1968 +-------------------------------------------------------------------+ | | | By 1975, the headquarters had moved to a new "modern" building at | | 220 N.Meridian, | | which was connected with 240 N. Meridian. | | | +-------------------------------------------------------------------+ New building 1975 Bottom 3 images courtesy of AT&T Archives and History Center, San Antonio, TX. ------------------------------------------------------- Please send comments or photos of your favorite phones to: Email address ------------------------------------------------------- Back to Home Page (c)2006 paulf. All rights reserved.