203 Ibid.
Sutter’s troops exacted a comparatively stiff price from the Reds in return, for it was estimated that 120 of the enemy were killed or wounded. Moreover, the Marines captured more than 30 prisoners, 70 rifles, 10 machine guns, and an ordnance dump loaded with small-arms ammunition.204
204 2/1 SAR, 4; and Carter ltr, 19 Apr 55.
Elsewhere on the 1st Marines front there was considerably more hiking than combat. The 3d Battalion completed its sweep of the Munhang Peninsula about 1600 and assembled at the southern tip of the O-3 Line to await relief by the Reconnaissance Company.205 In the course of rounding up NKPA prisoners and abandoned weapons, 3/1 had encountered a group of Korean villagers, headed by their schoolmaster, who called themselves the Young People’s Anti-Communist Resistance League. They had armed themselves with Russian rifles and light machine guns left behind by enemy troops fleeing inland.206
205 3/1 SAR, 6; Ridge ltr, 12 May 55; Simmons ltr 15 Apr 55.
206 Ibid.; Maj G. C. Westover ltr to authors, 1 Apr 55; and Capt J. R. Fisher ltr to authors, 18 Apr 55.
In the center of Puller’s zone, the 1st Battalion had moved rapidly to fill the gap between the 2d and 3d. Attacking into the vacuum left by the retreating enemy, Hawkins’ unit drove two mountainous miles beyond the O-3 Line, finally stopping for the night on high ground about 2,500 yards south of 2/1’s positions on Hill 186. The break in the regimental front was protected when 3/1 shifted northward and formed a reserve perimeter to the rear of the lines, after being relieved on the right at 1700 by Captain Kenneth J. Houghton’s Reconnaissance Company. Assuming responsibility for the Division’s southern flank, the Recon troops set up a night defense at the base of the Namdong Peninsula with their front linked to that of 1/1 on the left.207
207 Recon Co, HqBn, 1st MarDiv Unit Rpts, 9 Sep-11 Nov 50; and Ridge ltr, 12 May 55.
The establishment of a Division CP on shore was delayed by the necessity of utilizing every minute of the limited periods of high tide for the movement of troops, supplies, and equipment. General Smith decided on D-day that it would not be advisable to displace his CP ashore until General Craig and the ADC group (former headquarters of 1st ProvMarBrig) were able to set up adequate communications. With this object in mind, the ADC group landed on the evening high tide of D-day to locate an advance echelon on Wolmi-do.
Not much could be done that evening. And in the morning Craig informed CG 1st MarDiv that the island was too crowded. He reported that he and Lieutenant Colonel Stewart had discovered a likely spot on the southeast outskirts of Inchon and recommended that the CP be moved without delay.208 General Smith approved and the move started at once.
208 BGen E. W. Snedeker ltr to authors, 5 Apr 55.
Meanwhile, a good deal of military housekeeping had been accomplished in the Inchon port area. Lieutenant Colonel John H. Partridge’s 1st Engineer Battalion was given the task of making a survey of beach exit roads with a view to opening up an MSR between RED and BLUE Beaches.
After elements of Company A hit GREEN Beach, the remaining troops of the battalion had landed on the two beaches and assisted shore party units at unloading water, ammunition, and rations. This work was so well along by the morning of D-plus 1 that the engineers opened up the MSR between the two beaches and assigned personnel for improvement and maintenance. A Water point was established at the north end of RED Beach with 31 distillation units, and 125,000 gallons were issued during the next six days.209
209 1st MarDiv SAR, Annex Nan Nan.
The new Division CP on the outskirts of Inchon was ready by the afternoon of D-plus 1, and General Smith said goodbye to General MacArthur on the bridge of the Mount McKinley. The commander in chief wished him well and enjoined him to take Kimpo Airfield at the first opportunity.210
210 O. P. Smith, Notes, 188–189.
The Marine general landed at YELLOW Beach at 1730. Upon arrival at the CP, he sent a dispatch to Admiral Doyle, informing him that he was assuming responsibility for the conduct of operations ashore at 1800 on 16 September. Thus ended the amphibious assault phase, almost exactly 24 hours after the first wave of Marines set foot on RED Beach.