| PLATE |
|
PAPER |
PAGE |
|
XXXIX.a
|
Fig. 1. View of Meeting of Shields; and
Lowering Segment into Tunnel Invert
|
1155
|
253
|
|
XXXIX.b
|
Fig. 2. View of Meeting of Shields; and
Lowering Segment into Tunnel Invert
|
1155
|
253
|
|
XL.
|
Sections of Tunnel During Construction,
Showing Shield, Air Locks, Platforms, Etc.
|
1155
|
255
|
|
XLI.a
|
Fig. 1. Placing Key Segment; and Method of
Grouting Outside Iron
|
1155
|
257
|
|
XLI.b
|
Fig. 2. Placing Key Segment; and Method of
Grouting Outside Iron
|
1155
|
257
|
|
XLII.
|
Duct Bench Concrete Form in River Tunnels
|
1155
|
283
|
|
XLIII.a
|
Fig. 1. End of Portable and Adjustable Forms
for Building Side Bench; and Steel Rod Reinforcement in
River Tunnels
|
1155
|
285
|
|
XLIII.b
|
Fig. 2. End of Portable and Adjustable Forms
for Building Side Bench; and Steel Rod Reinforcement in
River Tunnels
|
1155
|
285
|
|
XLIV.
|
Details of 20-Ft. Movable Form and Traveler
for Concrete Arches
|
1155
|
287
|
|
XLV.
|
Traveling Concrete Form for Face of Bench
Walls
|
1155
|
291
|
|
XLVI.
|
Mechanical Analysis of Sand Used in Mortar
and Concrete
|
1155
|
297
|
|
XLVII.a
|
Fig. 1. Views Showing Condition of Work at
Site of Terminal Station
|
1156
|
307
|
|
XLVII.b
|
Fig. 2. Views Showing Condition of Work at
Site of Terminal Station
|
1156
|
307
|
|
XLVII.c
|
Fig. 3. Views Showing Condition of Work at
Site of Terminal Station
|
1156
|
307
|
|
XLVII.d
|
Fig. 4. Views Showing Condition of Work at
Site of Terminal Station
|
1156
|
307
|
|
XLVIII.a
|
Fig. 1. Views Showing Excavation and
Supports for Ninth Avenue Structures
|
1156
|
317
|
|
XLVIII.b
|
Fig. 2. Views Showing Excavation and
Supports for Ninth Avenue Structures
|
1156
|
317
|
|
XLVIII.c
|
Fig. 3. Views Showing Excavation and
Supports for Ninth Avenue Structures
|
1156
|
317
|
|
XLVIII.d
|
Fig. 4. Views Showing Excavation and
Supports for Ninth Avenue Structures
|
1156
|
317
|
|
XLIX.a
|
Fig. 1. Views Showing Underpinning for Ninth
Avenue Elevated Railway
|
1156
|
321
|
|
XLIX.b
|
Fig. 2. Views Showing Underpinning for Ninth
Avenue Elevated Railway
|
1156
|
321
|
|
XLIX.c
|
Fig. 3. Views Showing Underpinning for Ninth
Avenue Elevated Railway
|
1156
|
321
|
|
XLIX.d
|
Fig. 4. Views Showing Underpinning for Ninth
Avenue Elevated Railway
|
1156
|
321
|
|
L.a
|
Fig. 1. Views Showing Condition of Work
Between Ninth and Tenth Avenues, and Progress on Concrete
Walls
|
1156
|
325
|
|
L.b
|
Fig. 2. Views Showing Condition of Work
Between Ninth and Tenth Avenues, and Progress on Concrete
Walls
|
1156
|
325
|
|
L.c
|
Fig. 3. Views Showing Condition of Work
Between Ninth and Tenth Avenues, and Progress on Concrete
Walls
|
1156
|
325
|
|
L.d
|
Fig. 4. Views Showing Condition of Work
Between Ninth and Tenth Avenues, and Progress on Concrete
Walls
|
1156
|
325
|
|
LI.a
|
Fig. 1. Views Showing Box Drains and
Tie-Rods in Walls; the Completed Tenth Avenue Portal; and
the Disposal Trestle
|
1156
|
333
|
|
LI.b
|
Fig. 2. Views Showing Box Drains and
Tie-Rods in Walls; the Completed Tenth Avenue Portal; and
the Disposal Trestle
|
1156
|
333
|
|
LI.c
|
Fig. 3. Views Showing Box Drains and
Tie-Rods in Walls; the Completed Tenth Avenue Portal; and
the Disposal Trestle
|
1156
|
333
|
|
LI.d
|
Fig. 4. Views Showing Box Drains and
Tie-Rods in Walls; the Completed Tenth Avenue Portal; and
the Disposal Trestle
|
1156
|
333
|
|
LII.a
|
Fig. 1. Girders Under the Ninth Avenue
Elevated Railroad; Method of Supporting Elevated Railway
Columns; and View of Inside of Form for Walls, Showing
Drains, Tie-Rods, Etc.
|
1156
|
335
|
|
LII.b
|
Fig. 2. Girders Under the Ninth Avenue
Elevated Railroad; Method of Supporting Elevated Railway
Columns; and View of Inside of Form for Walls, Showing
Drains, Tie-Rods, Etc.
|
1156
|
335
|
|
LII.c
|
Fig. 3. Girders Under the Ninth Avenue
Elevated Railroad; Method of Supporting Elevated Railway
Columns; and View of Inside of Form for Walls, Showing
Drains, Tie-Rods, Etc.
|
1156
|
335
|
|
LII.d
|
Fig. 4. Girders Under the Ninth Avenue
Elevated Railroad; Method of Supporting Elevated Railway
Columns; and View of Inside of Form for Walls, Showing
Drains, Tie-Rods, Etc.
|
1156
|
335
|
|
LIII.
|
Pennsylvania Station, New York City; Plan
Showing Area at Track Level
|
1157
|
341
|
|
LIV.
|
Diagram Showing Widths of Base of Retaining
Wall Required for Different Batters and Pressures,
Pennsylvania Station
|
1157
|
349
|
|
LV.a
|
Fig. 1. Material Trestle Over N. Y. C. &
H. R. R. R. Co.'s Tracks; and Construction of Pier No. 72,
North River
|
1157
|
361
|
|
LV.b
|
Fig. 2. Material Trestle Over N. Y. C. &
H. R. R. R. Co.'s Tracks; and Construction of Pier No. 72,
North River
|
1157
|
361
|
|
LV.c
|
Fig. 3. Material Trestle Over N. Y. C. &
H. R. R. R. Co.'s Tracks; and Construction of Pier No. 72,
North River
|
1157
|
361
|
|
LVI.a
|
Fig. 1. Material Trestle Showing First
Chutes in Operation; and Views of East and West Pits at
Terminal Site
|
1157
|
363
|
|
LVI.b
|
Fig. 2. Material Trestle Showing First
Chutes in Operation; and Views of East and West Pits at
Terminal Site
|
1157
|
363
|
|
LVI.c
|
Fig. 3. Material Trestle Showing First
Chutes in Operation; and Views of East and West Pits at
Terminal Site
|
1157
|
363
|
|
† LVII.
|
Methods of Excavation, Cross-Town Tunnels, Manhattan |
1158
|
393
|
|
LVIII.a
|
Fig. 1. Views of Parts of First Avenue Plant,
Cross-Town Tunnels
|
1158
|
395
|
|
LVIII.b
|
Fig. 2. Views of Parts of First Avenue Plant,
Cross-Town Tunnels
|
1158
|
395
|
|
LVIII.c
|
Fig. 3. Views of Parts of First Avenue Plant,
Cross-Town Tunnels
|
1158
|
395
|
|
LVIII.d
|
Fig. 4. Views of Parts of First Avenue Plant,
Cross-Town Tunnels
|
1158
|
395
|
|
LIX.a
|
Fig. 1. Methods of Tunneling, Timbering, and
Lining, Cross-Town Tunnels
|
1158
|
399
|
|
LIX.b
|
Fig. 2. Methods of Tunneling, Timbering, and
Lining, Cross-Town Tunnels
|
1158
|
399
|
|
LIX.c
|
Fig. 3. Methods of Tunneling, Timbering, and
Lining, Cross-Town Tunnels
|
1158
|
399
|
|
LIX.d
|
Fig. 4. Methods of Tunneling, Timbering, and
Lining, Cross-Town Tunnels
|
1158
|
399
|
|
LX.a
|
Fig. 1. Methods of Timbering and
Underpinning, Cross-Town Tunnels
|
1158
|
407
|
|
LX.b
|
Fig. 2. Methods of Timbering and
Underpinning, Cross-Town Tunnels
|
1158
|
407
|
|
LX.c
|
Fig. 3. Methods of Timbering and
Underpinning, Cross-Town Tunnels
|
1158
|
407
|
|
LX.d
|
Fig. 4. Methods of Timbering and
Underpinning, Cross-Town Tunnels
|
1158
|
407
|
|
LXI.
|
Sections Showing Method of Excavating and
Timbering in Heavy Ground, Three-Track Tunnel; and Carriage
Form for Side Walls, Cross-Town Twin Tunnels
|
1158
|
413
|
|
LXII.a
|
Fig. 1. Methods of Water-Proofing and
Concreting, Cross-Town Tunnels
|
1158
|
417
|
|
LXII.b
|
Fig. 2. Methods of Water-Proofing and
Concreting, Cross-Town Tunnels
|
1158
|
417
|
|
LXII.c
|
Fig. 3. Methods of Water-Proofing and
Concreting, Cross-Town Tunnels
|
1158
|
417
|
|
LXII.d
|
Fig. 4. Methods of Water-Proofing and
Concreting, Cross-Town Tunnels
|
1158
|
417
|
|
LXIII.
|
Methods of Excavation in All Rock, East
River Tunnels
|
1159
|
423
|
|
LXIV.a
|
Fig. 1. Tunneling in Compressed Air,
Air-Lock, Caisson, etc., East River Tunnels
|
1159
|
425
|
|
LXIV.b
|
Fig. 2. Tunneling in Compressed Air,
Air-Lock, Caisson, etc., East River Tunnels
|
1159
|
425
|
|
LXIV.c
|
Fig. 3. Tunneling in Compressed Air,
Air-Lock, Caisson, etc., East River Tunnels
|
1159
|
425
|
|
LXIV.d
|
Fig. 4. Tunneling in Compressed Air,
Air-Lock, Caisson, etc., East River Tunnels
|
1159
|
425
|
|
LXV.a
|
Fig. 1. Shields Fitted with Sectional
Sliding Hoods and Sliding Extensions and with Fixed Hoods
and Fixed Extensions to Floors, East River Tunnels
|
1159
|
433
|
|
LXV.b
|
Fig. 2. Shields Fitted with Sectional
Sliding Hoods and Sliding Extensions and with Fixed Hoods
and Fixed Extensions to Floors, East River Tunnels
|
1159
|
433
|
|
LXVI.a
|
Fig. 1. Rear of Shield Showing Complete
Fittings, and Shield with Lower Portion of Bulkhead Removed,
East River Tunnels
|
1159
|
435
|
|
LXVI.b
|
Fig. 2. Rear of Shield Showing Complete
Fittings, and Shield with Lower Portion of Bulkhead Removed,
East River Tunnels
|
1159
|
435
|
|
LXVII.
|
Methods of Tunneling in Rock, East River
Tunnels
|
1159
|
437
|
|
LXVIII.
|
Operation of Shields, East River Tunnels
|
1159
|
439
|
|
LXIX.
|
Operations in Shoving the Shield
Forward in Rock and Sand, East River Tunnels
|
1159
|
441
|
|
LXX.a
|
Fig. 1. Small Shaft, Breasting and
Poling, Shutters on Front of Shield, and Hydraulic
Erector, East River Tunnels
|
1159
|
443
|
|
LXX.b
|
Fig. 2. Small Shaft, Breasting and
Poling, Shutters on Front of Shield, and Hydraulic
Erector, East River Tunnels
|
1159
|
443
|
|
LXX.c
|
Fig. 3. Small Shaft, Breasting and
Poling, Shutters on Front of Shield, and Hydraulic
Erector, East River Tunnels
|
1159
|
443
|
|
LXX.d
|
Fig. 4. Small Shaft, Breasting and
Poling, Shutters on Front of Shield, and Hydraulic
Erector, East River Tunnels
|
1159
|
443
|
|
LXXI.
|
Operations in Shoving the Shield
Forward in Sand, and Final Breasting and Bulkheading,
East River Tunnels
|
1159
|
445
|
|
LXXII.
|
Method of Operating Shields in Soft
Ground, East River Tunnels
|
1159
|
453
|
|
LXXIII.a
|
Fig. 1. Reinforcement of Broken Plates,
and Inflow of Soft Clay Through Shield, East River
Tunnels
|
1159
|
455
|
|
LXXIII.b
|
Fig. 2. Reinforcement of Broken Plates,
and Inflow of Soft Clay Through Shield, East River
Tunnels
|
1159
|
455
|
|
LXXIII.c
|
Fig. 3. Reinforcement of Broken Plates,
and Inflow of Soft Clay Through Shield, East River
Tunnels
|
1159
|
455
|
|
LXXIII.d
|
Fig. 4. Reinforcement of Broken Plates,
and Inflow of Soft Clay Through Shield, East River
Tunnels
|
1159
|
455
|
|
LXXIV.
|
Methods of Placing Concrete Inside the
Iron Tube, East River Tunnels
|
1159
|
475
|