Beginning near the intersection of Broadway and Park Row, one of the routes of the railroad extends under Park Row, Center Street, New Elm Street, Elm Street, Lafayette Place, Fourth Avenue (beginning at Astor Place), Park Avenue, 42d Street, and Broadway to 125th Street, where it passes over Broadway by viaduct to 133d Street, thence under Broadway again to and under Eleventh Avenue to Fort George, where it comes to the surface again at Dyckman Street and continues by viaduct over Naegle Avenue, Amsterdam Avenue, and Broadway to Bailey Avenue, at the Kingsbridge station of the New York & Putnam Railroad, crossing the Harlem Ship Canal on a double-deck drawbridge. The length of this route is 13.50 miles, of which about 2 miles are on viaduct.
Another route begins at Broadway near 103d Street and extends under
104th Street and the upper part of Central Park to and under Lenox
Avenue to 142d Street, thence curving to the east to and under the
Harlem River at about 145th Street, thence from the river to and
under East 149th Street to a point near Third Avenue, thence by
viaduct beginning at Brook Avenue over Westchester Avenue, the
Southern Boulevard and the Boston Road to Bronx Park. The length of
this route is about 6.97 miles, of which about 3 miles are on viaduct.
MAP SHOWING THE LINES OF THE INTERBOROUGH RAPID TRANSIT CO. 1904
MAP SHOWING THE LINES OF THE INTERBOROUGH RAPID TRANSIT CO. 1904
At the City Hall there is a loop under the Park. From 142d Street there is a spur north under Lenox Avenue to 148th Street. There is a spur at Westchester and Third Avenues connecting by viaduct the Manhattan Elevated Railway Division of Interborough Rapid Transit Company with the viaduct of the subway at or near St. Ann's Avenue.
The route of the Brooklyn Extension connects near Broadway and Park Row with the Manhattan Bronx Route and extends under Broadway, Bowling Green, State Street, Battery Park, Whitehall Street, and South Street to and under the East River to Brooklyn at the foot of Joralemon Street, thence under Joralemon Street, Fulton Street, and Flatbush Avenue to Atlantic Avenue, connecting with the Brooklyn tunnel of the Long Island Railroad at that point. There is a loop under Battery Park beginning at Bridge Street. The length of this route is about 3 miles.
The routes in Manhattan and The Bronx may therefore be said to roughly resemble the letter Y with the base at the southern extremity of Manhattan Island, the fork at 103d Street and Broadway, the terminus of the westerly or Fort George branch of the fork just beyond Spuyten Duyvil Creek, the terminus of the easterly or Bronx Park branch at Bronx Park.
The stations beginning at the base of the Y and following the route up to the fork are located at the following points:
South Ferry, Bowling Green and Battery Place, Rector Street and
Broadway, Fulton Street and Broadway, City Hall, Manhattan; Brooklyn
Bridge Entrance, Manhattan; Worth and Elm Streets, Canal and Elm
Streets, Spring and Elm Streets, Bleecker and Elm Streets, Astor Place
and Fourth Avenue, 14th Street and Fourth Avenue, 18th Street and
Fourth Avenue, 23d Street and Fourth Avenue, 28th Street and Fourth
Avenue, 33d Street and Fourth Avenue, 42d Street and Madison Avenue
(Grand Central Station), 42d Street and Broadway, 50th Street and
Broadway, 60th Street and Broadway (Columbus Circle), 66th Street and
Broadway, 72d Street and Broadway, 79th Street and Broadway, 86th
Street and Broadway, 91st Street and Broadway, 96th Street and
Broadway.
34TH STREET AND PARK AVENUE, LOOKING SOUTH
34TH STREET AND PARK AVENUE, LOOKING SOUTH
The stations of the Fort George or westerly branch are located at the following points:
One Hundred and Third Street and Broadway, 110th Street and Broadway (Cathedral Parkway), 116th Street and Broadway (Columbia University), Manhattan Street (near 128th Street) and Broadway, 137th Street and Broadway, 145th Street and Broadway, 157th Street and Broadway, the intersection of 168th Street, St. Nicholas Avenue and Broadway, 181st Street and Eleventh Avenue, Dyckman Street and Naegle Avenue (beyond Fort George), 207th Street and Amsterdam Avenue, 215th Street and Amsterdam Avenue, Muscoota Street and Broadway, Bailey Avenue, at Kingsbridge near the New York & Putnam Railroad station.
The stations on the Bronx Park or easterly branch are located at the following points:
One Hundred and Tenth Street and Lenox Avenue, 116th Street and Lenox
Avenue, 125th Street and Lenox Avenue, 135th Street and Lenox Avenue,
145th Street and Lenox Avenue (spur), Mott Avenue and 149th Street,
the intersection of 149th Street, Melrose and Third Avenues, Jackson
and Westchester Avenues, Prospect and Westchester Avenues, Westchester
Avenue near Southern Boulevard (Fox Street), Freeman Street and the
Southern Boulevard, intersection of 174th Street, Southern Boulevard
and Boston Road, 177th Street and Boston Road (near Bronx Park).
PROFILE OF RAPID TRANSIT RAILROAD MANHATTAN AND BRONX LINES.
PROFILE OF RAPID TRANSIT RAILROAD
MANHATTAN AND BRONX LINES.
The stations in the Borough of Brooklyn on the Brooklyn Extension are located as follows:
Joralemon Street near Court (Brooklyn Borough Hall), intersection of Fulton, Bridge, and Hoyt Streets; Flatbush Avenue near Nevins Street, Atlantic Avenue and Flatbush Avenue (Brooklyn terminal of the Long Island Railroad).
From the Borough Hall, Manhattan, to the 96th Street station, the line is four-track. On the Fort George branch (including 103d Street station) there are three tracks to 145th Street and then two tracks to Dyckman Street, then three tracks again to the terminus at Bailey Avenue. On the Bronx Park branch there are two tracks to Brook Avenue and from that point to Bronx Park there are three tracks. On the Lenox Avenue spur to 148th Street there are two tracks, on the City Hall loop one track, on the Battery Park loop two tracks. The Brooklyn Extension is a two-track line.
There is a storage yard under Broadway between 137th Street and 145th Street on the Fort George branch, another on the surface at the end of the Lenox Avenue spur, Lenox Avenue and 148th Street, and a third on an elevated structure at the Boston Road and 178th Street. There is a repair shop and inspection shed on the surface adjoining the Lenox Avenue spur at the Harlem River and 148-150th Streets, and an inspection shed at the storage yard at Boston Road and 178th Street.
The total length of the line from the City Hall to the Kingsbridge
terminal is 13.50 miles, with 47.11 miles of single track and sidings.
The eastern or Bronx Park branch is 6.97 miles long, with 17.50 miles
of single track.
PROFILE OF BROOKLYN EXTENSION.
PROFILE OF BROOKLYN EXTENSION.
The total length of the Brooklyn Extension is 3.1 miles, with about 8 miles of single track.
The grades and curvature along the main line may be summarized as follows:
The total curvature is equal in length to 23 per cent. of the straight line, and the least radius of curvature is 147 feet. The greatest grade is 3 per cent., and occurs on either side of the tunnel under the Harlem River. At each station there is a down grade of 2.1 per cent., to assist in the acceleration of the cars when they start. In order to make time on roads running trains at frequent intervals, it is necessary to bring the trains to their full speed very soon after starting. The electrical equipment of the Rapid Transit Railroad will enable this to be done in a better manner than is possible with steam locomotives, while these short acceleration grades at each station, on both up and down tracks, will be of material assistance in making the starts smooth.
Photograph on page 26 shows an interesting feature at a local station, where, in order to obtain the quick acceleration in grade for local trains, and at the same time maintain a level grade for the express service, the tracks are constructed at a different level. This occurs at many local stations.
On the Brooklyn Extension the maximum grade is 3.1 per cent.
descending from the ends to the center of the East River tunnel. The
minimum radius of curve is 1,200 feet.
STANDARD STEEL CONSTRUCTION IN TUNNEL—THIRD RAIL PROTECTION NOT SHOWN
STANDARD STEEL CONSTRUCTION IN TUNNEL—THIRD RAIL PROTECTION NOT SHOWN
PLAN OF BROOKLYN BRIDGE STATION AND CITY HALL LOOP
PLAN OF BROOKLYN BRIDGE STATION AND CITY HALL LOOP
The track is of the usual standard construction with broken stone ballast, timber cross ties, and 100-pound rails of the American Society of Civil Engineers' section. The cross ties are selected hard pine. All ties are fitted with tie plates. All curves are supplied with steel inside guard rails. The frogs and switches are of the best design and quality to be had, and a special design has been used on all curves. At the Battery loop, at Westchester Avenue, at 96th Street, and at City Hall loop, where it has been necessary for the regular passenger tracks to cross, grade crossings have been avoided; one track or set of tracks passing under the other at the intersecting points. (See plan on this page.)
The contract for the building of the road contains the following somewhat unusual provision: "The railway and its equipment as contemplated by the contract constitute a great public work. All parts of the structure where exposed to public sight shall therefore be designed, constructed, and maintained with a view to the beauty of their appearance, as well as to their efficiency."
It may be said with exact truthfulness that the builders have spared no effort or expense to live up to the spirit of this provision, and that all parts of the road and equipment display dignified and consistent artistic effects of the highest order. These are noticeable in the power house and the electrical sub-stations and particularly in the passenger stations. It might readily have been supposed that the limited space and comparative uniformity of the underground stations would afford but little opportunity for architectural and decorative effects. The result has shown the fallacy of such a supposition.
PLAN OF 28TH ST. & 4TH AVENUE STATION.
PLAN OF 28TH ST. & 4TH AVENUE STATION.
Of the forty-eight stations, thirty-three are underground, eleven are on the viaduct portions of the road, and three are partly on the surface and partly underground, and one is partly on the surface and partly on the viaduct.
The underground stations are at the street intersections, and, except in a few instances, occupy space under the cross streets. The station plans are necessarily varied to suit the conditions of the different locations, the most important factor in planning them having been the amount of available space. The platforms are from 200 to 350 feet in length, and about 16 feet in width, narrowing at the ends, while the center space is larger or smaller, according to local conditions. As a rule the body of the station extends back about 50 feet from the edge of the platform.
At all local stations (except at 110th Street and Lenox Avenue) platforms are outside of the tracks. (Plan and photograph on pages 30 and 31.) At Lenox Avenue and 110th Street there is a single island platform for uptown and downtown passengers.
At express stations there are two island platforms between the express
and local tracks, one for uptown and one for downtown traffic. In
addition, there are the usual local platforms at Brooklyn Bridge, 14th
Street (photograph on page 34) and 96th Street. At the remaining
express stations, 42d Street and Madison Avenue and 72d Street, there
are no local platforms outside of the tracks, local and through
traffic using the island platforms.
28TH STREET STATION
28TH STREET STATION
The island platforms at Brooklyn Bridge, 14th Street, and 42d Street and Madison Avenue are reached by mezzanine footways from the local platforms, it having been impossible to place entrances in the streets immediately over the platforms. At 96th Street there is an underground passage connecting the local and island platforms, and at 72d Street there are entrances to the island platforms directly from the street because there is a park area in the middle of the street. Local passengers can transfer from express trains and express passengers from local trains without payment of additional fare by stepping across the island platforms.
At 72d Street, at 103d Street, and at 116th Street and Broadway the station platforms are below the surface, but the ticket booths and toilet rooms are on the surface; this arrangement being possible also because of the park area available in the streets. At Manhattan Street the platforms are on the viaduct, but the ticket booths and toilet rooms are on the surface. The viaduct at this point is about 68 feet above the surface, and escalators are provided. At many of the stations entrances have been arranged from the adjacent buildings, in addition to the entrances originally planned from the street.
The entrances to the underground stations are enclosed at the street by kiosks of cast iron and wire glass (photograph on page 33), and vary in number from two to eight at a station. The stairways are of concrete, reinforced by twisted steel rods. At 168th Street, at 181st Street, and at Mott Avenue, where the platforms are from 90 to 100 feet below the surface, elevators are provided.
WEST SIDE OF 23D STREET STATION
WEST SIDE OF 23D STREET STATION
At twenty of the underground stations it has been possible to use vault lights to such an extent that very little artificial light is needed. (Photograph on page 35.) Such artificial light as is required is supplied by incandescent lamps sunk in the ceilings. Provision has been made for using the track circuit for lighting in emergency if the regular lighting circuit should temporarily fail.
KIOSKS AT COLUMBUS CIRCLE
KIOSKS AT COLUMBUS CIRCLE
The station floors are of concrete, marked off in squares. At the
junction of the floors and side walls a cement sanitary cove is
placed. The floors drain to catch-basins, and hose bibs are provided
for washing the floors.
BROOKLYN BRIDGE STATION
BROOKLYN BRIDGE STATION
Two types of ceiling are used, one flat, which covers the steel and
concrete of the roof, and the other arched between the roof beams and
girders, the lower flanges of which are exposed. Both types have an
air space between ceiling and roof, which, together with the air
space behind the inner side walls, permits air to circulate and
minimizes condensation on the surface of the ceiling and walls.
PLAQUE SHOWING BEAVER AT ASTOR PLACE STATION
PLAQUE SHOWING BEAVER AT ASTOR PLACE STATION
The ceilings are separated into panels by wide ornamental mouldings,
and the panels are decorated with narrower mouldings and rosettes. The
bases of the walls are buff Norman brick. Above this is glass tile or
glazed tile, and above the tile is a faience or terra-cotta cornice.
Ceramic mosaic is used for decorative panels, friezes, pilasters, and
name-tablets. A different decorative treatment is used at each
station, including a distinctive color scheme. At some stations the
number of the intersecting street or initial letter of the street name
is shown on conspicuous plaques, at other stations the number or
letter is in the panel. At some stations artistic emblems have been
used in the scheme of decoration, as at Astor Place, the beaver (see
photograph on this page); at Columbus Circle, the great
navigator's Caravel; at 116th Street, the seal of Columbia University.
The walls above the cornice and the ceilings are finished in white
Keene cement.
EXPRESS STATION AT 14TH STREET, SHOWING ISLAND AND MEZZANINE PLATFORMS AND STAIRS CONNECTING THEM
EXPRESS STATION AT 14TH STREET, SHOWING ISLAND AND
MEZZANINE PLATFORMS AND STAIRS CONNECTING THEM
WEST SIDE OF COLUMBUS CIRCLE STATION (60TH STREET)—ILLUMINATED BY DAYLIGHT COMING THROUGH VAULT LIGHTS
WEST SIDE OF COLUMBUS CIRCLE STATION (60TH
STREET)—ILLUMINATED BY DAYLIGHT COMING THROUGH VAULT LIGHTS
CARAVEL AND WALL DECORATION
CARAVEL AND WALL DECORATION
The ticket booths are of oak with bronze window grills and fittings. There are toilet rooms in every station, except at the City Hall loop. Each toilet room has a free closet or closets, and a pay closet which is furnished with a basin, mirror, soap dish, and towel rack. The fixtures are porcelain, finished in dull nickel. The soil, vent and water pipes are run in wall spaces, so as to be accessible. The rooms are ventilated through the hollow columns of the kiosks, and each is provided with an electric fan. They are heated by electric heaters. The woodwork of the rooms is oak; the walls are red slate wainscot and Keene cement.
Passengers may enter the body of the station without paying fare. The train platforms are separated from the body of the station by railings. At the more important stations, separate sets of entrances are provided for incoming and outgoing passengers, the stairs at the back of the station being used for entrances and those nearer the track being used for exits.
CITY HALL STATION CITY HALL STATION
An example of the care used to obtain artistic effects can be seen at the City Hall station. The road at this point is through an arched tunnel. In order to secure consistency in treatment the roof of the station is continued by a larger arch of special design. (See photograph on this page.) At 168th Street, and at 181st Street, and at Mott Avenue stations, where the road is far beneath the surface, it has been possible to build massive arches over the stations and tracks, with spans of 50 feet.
Five types of construction have been employed in building the road: (1) the typical subway near the surface with flat roof and "I" beams for the roof and sides, supported between tracks with steel bulb-angle columns used on about 10.6 miles or 52.2 per cent. of the road; (2) flat roof typical subway of reënforced concrete construction supported between the tracks by steel bulb-angle columns, used for a short distance on Lenox Avenue and on the Brooklyn portion of the Brooklyn Extension, also on the Battery Park loop; (3) concrete lined tunnel used on about 4.6 miles or 23 per cent. of the road, of which 4.2 per cent. was concrete lined open cut work, and the remainder was rock tunnel work; (4) elevated road on steel viaduct used on about 5 miles or 24.6 per cent. of the road; (5) cast-iron tubes used under the Harlem and East Rivers.
The general character of the flat roof "I" beam construction is shown
in photograph on page 28 and drawing on this page]. The bottom
is of concrete. The side walls have "I" beam columns five feet apart,
between which are vertical concrete arches, the steel acting as a
support for the masonry and allowing the thickness of the walls to be
materially reduced from that necessary were nothing but concrete used.
The tops of the wall columns are connected by roof beams which are
supported by rows of steel columns between the tracks, built on
concrete and cut stone bases forming part of the floor system.
Concrete arches between the roof beams complete the top of the subway.
Such a structure is not impervious, and hence, there has been laid
behind the side walls, under the floor and over the roof a course of
two to eight thicknesses of felt, each washed with hot asphalt as
laid. In addition to this precaution against dampness, in three
sections of the subway (viz.: on Elm Street between Pearl and Grand
Streets, and on the approaches to the Harlem River tunnel, and on the
Battery Park Loop) the felt waterproofing has been made more effective
by one or two courses of hard-burned brick laid in hot asphalt, after
the manner sometimes employed in constructing the linings of
reservoirs of waterworks.
TYPICAL SECTION OF FOUR TRACK SUBWAY
TYPICAL SECTION OF FOUR TRACK SUBWAY
FOUR-TRACK SUBWAY—SHOWING CROSS-OVER SOUTH OF 18TH STREET STATION FOUR-TRACK SUBWAY—SHOWING CROSS-OVER SOUTH OF 18TH STREET STATION
In front of the waterproofing, immediately behind the steel columns, are the systems of terra-cotta ducts in which the electric cables are placed. The cables can be reached by means of manholes every 200 to 450 feet, which open into the subway and also into the street. The number of these ducts ranges from 128 down to 32, and they are connected with the main power station at 58th and 59th Streets and the Hudson River by a 128-duct subway under the former street.
The reinforced concrete construction substitutes for the steel roof
beams, steel rods, approximating 1-1/4 inches square, laid in varying
distances according to the different roof loads, from six to ten
inches apart. Rods 1-1/8 inches in diameter tie the side walls,
passing through angle columns in the walls and the bulb-angle columns
in the center. Layers of concrete are laid over the roof rods to a
thickness of from eighteen to thirty inches, and carried two inches
below the rods, imbedding them. For the sides similar square rods and
concrete are used and angle columns five feet apart. The concrete of
the side walls is from fifteen to eighteen inches thick. This type is
shown by photographs on page 41. The rods used are of both square
and twisted form.
LAYING SHEET WATERPROOFING IN BOTTOM
LAYING SHEET WATERPROOFING IN BOTTOM
SPECIAL BRICK AND ASPHALT WATERPROOFING
SPECIAL BRICK AND ASPHALT WATERPROOFING
The construction of the typical subway has been carried on by a great variety of methods, partly adopted on account of the conditions under which the work had to be prosecuted and partly due to the personal views of the different sub-contractors. The work was all done by open excavation, the so-called "cut and cover" system, but the conditions varied widely along different parts of the line, and different means were adopted to overcome local difficulties. The distance of the rock surface below the street level had a marked influence on the manner in which the excavation of the open trenches could be made. In some places this rock rose nearly to the pavement, as between 14th and 18th Streets. At other places the subway is located in water-bearing loam and sand, as in the stretch between Pearl and Grand Streets, where it was necessary to employ a special design for the bottom, which is illustrated by drawing on page 42.
This part of the route includes the former site of the ancient Collect Pond, familiar in the early history of New York, and the excavation was through made ground, the pond having been filled in for building purposes after it was abandoned for supplying water to the city. The excavations through Canal Street, adjacent, were also through made ground, that street having been at one time, as its name implies, a canal.
From the City Hall to 9th Street was sand, presenting no particular difficulties except through the territory just described.
At Union Square rock was encountered on the west side of Fourth Avenue
from the surface down. On the east side of the street, however, at the
surface was sand, which extended 15 feet down to a sloping rock
surface. The tendency of the sand to a slide off into the rock
excavation required great care. The work was done, however, without
interference with the street traffic, which is particularly heavy at
that point.
DUCTS IN SIDE WALLS—EIGHT ONLY OF THE SIXTEEN LAYERS ARE SHOWN
DUCTS IN SIDE WALLS—EIGHT ONLY OF THE SIXTEEN LAYERS
ARE SHOWN
REINFORCED CONCRETE CONSTRUCTION
REINFORCED CONCRETE CONSTRUCTION
ROOF SHOWING CONCRETE-STEEL CONSTRUCTION—LENOX AVENUE AND 140TH-141ST STREETS
ROOF SHOWING CONCRETE-STEEL CONSTRUCTION—LENOX AVENUE
AND 140TH-141ST STREETS
SECTION OF SUBWAY AT PEARL STREET This construction was made necessary by encountering a layer of Peat resting on Clay
SECTION OF SUBWAY AT PEARL STREET
This construction was made necessary by encountering a layer of Peat
resting on Clay
SURFACE RAILWAY TRACKS SUPPORTED OVER EXCAVATION ON UPPER BROADWAY
SURFACE RAILWAY TRACKS SUPPORTED OVER EXCAVATION ON
UPPER BROADWAY
SUBDIVISION OF 36" AND 30" GAS MAINS OVER ROOF OF SUBWAY—66TH STREET AND BROADWAY
SUBDIVISION OF 36" AND 30" GAS MAINS OVER ROOF OF
SUBWAY—66TH STREET AND BROADWAY
The natural difficulties of the route were increased by the network of sewers, water and gas mains, steam pipes, pneumatic tubes, electric conduits and their accessories, which filled the streets; and by the surface railways and their conduits. In some places the columns of the elevated railway had to be shored up temporarily, and in other places the subway passes close to the foundations of lofty buildings, where the construction needed to insure the safety of both subway and buildings was quite intricate. As the subway is close to the surface along a considerable part of its route, its construction involved the reconstruction of all the underground pipes and ducts in many places, as well as the removal of projecting vaults and buildings, and, in some cases, the underpinning of their walls. A description in detail of the methods of construction followed all along the line would make an interesting book of itself. Space will only permit, however, an account of how some of the more serious difficulties were overcome.
On Fourth Avenue, north of Union Square to 33d Street, there were two
electric conduit railway tracks in the center of the roadway and a
horse car track near each curb part of the distance. The two electric
car tracks were used for traffic which could not be interrupted,
although the horse car tracks could be removed without inconvenience.
These conditions rendered it impracticable to disturb the center of
the roadway, while permitting excavation near the curb. Well-timbered
shafts about 8 x 10 feet, in plan, were sunk along one curb line and
tunnels driven from them toward the other side of the street, stopping
about 3-1/2 feet beyond its center line. A bed of concrete was laid on
the bottom of each tunnel, and, when it had set, a heavy vertical
trestle was built on it. In this way trestles were built half across
the street, strong enough to carry all the street cars and traffic on
that half of the roadway. Cableways to handle the dirt were erected
near the curb line, spanning a number of these trestles, and then the
earth between them was excavated from the curb to within a few feet of
the nearest electric car track. The horse car tracks were removed.
Between the electric tracks a trench was dug until its bottom was
level with the tops of the trestles, about three feet below the
surface as a rule. A pair of heavy steel beams was then laid in this
trench on the trestles. Between these beams and the curb line a second
pair of beams were placed. In this way the equivalent of a bridge was
put up, the trestles acting as piers and the beams as girders. The
central portion of the roadway was then undermined and supported by
timbering suspended from the steel beams. The various gas and water
pipes were hung from timbers at the surface of the ground. About four
sections, or 150 feet, of the subway were built at a time in this
manner. When the work was completed along one side of the street it
was repeated in the same manner on the other side. This method of
construction was subsequently modified so as to permit work on both
sides of the street simultaneously. The manner in which the central
part of the roadway was supported remained the same and all of the
traffic was diverted to this strip.
SUPPORT OF ELEVATED RAILWAY STATION AT 42D STREET AND SIXTH AVENUE
SUPPORT OF ELEVATED RAILWAY STATION AT 42D STREET AND
SIXTH AVENUE
Between 14th and 17th Streets, because of the proximity of the rock to
the surface, it was necessary to move the tracks of the electric
surface railway from the center of the street some twenty feet to the
east curb, without interrupting traffic, which was very heavy at all
times, the line being one of the main arteries of the Metropolitan
system. Four 12 x 12-inch timbers were laid upon the surface. Standard
cast-iron yokes were placed upon the timbers at the usual distance
apart. Upon this structure the regular track and slot rails were
placed. The space between the rails was floored over. Wooden boxes
were temporarily laid for the electric cables. The usual hand holes
and other accessories were built and the road operated on this timber
roadbed. The removal of the tracks was made necessary because the rock
beneath them and the concrete around the yokes was so closely united
as to be practically monolithic, precluding the use of explosives.
Attempts to remove the rock from under the track demonstrated that it
could not be done without destroying the yokes of the surface railway.
SUPPORTING ELEVATED RAILROAD BY EXTENSION GIRDER—64TH STREET AND BROADWAY
SUPPORTING ELEVATED RAILROAD BY EXTENSION GIRDER—64TH
STREET AND BROADWAY
The method of undermining the tracks on Broadway from 60th to 104th Streets was entirely different, for the conditions were not the same. The street is a wide one with a 22-foot parkway in the center, an electric conduit railway on either side, and outside each track a wide roadway. The subway excavation extended about 10 feet outside each track, leaving between it and the curb ample room for vehicles. The construction problem, therefore, was to care for the car tracks with a minimum interference with the excavation. This was accomplished by temporary bridges for each track, each bridge consisting of a pair of timber trusses about 55 feet long, braced together overhead high enough to let a car pass below the bracing. These trusses were set up on crib-work supports at each end, and the track hung from the lower chords. (See photograph on page 42.) The excavation then proceeded until the trench was finished and posts could be put into place between its bottom and the track. When the track was securely supported in this way, the trusses were lifted on flat cars and moved ahead 50 feet.
At 66th Street station the subway roof was about 2 feet from the
electric railway yokes and structures of the street surface line. In
order to build at this point it was necessary to remove two large gas
mains, one 30 inches and the other 36 inches in diameter, and
substitute for them, in troughs built between the roof beams of the
subway, five smaller gas mains, each 24 inches in diameter. This was
done without interrupting the use of the mains.
MOVING BRICK AND CONCRETE RETAINING WALL TO MAKE ROOM FOR THIRD TRACK—BROADWAY AND 134TH STREET
MOVING BRICK AND CONCRETE RETAINING WALL TO MAKE ROOM
FOR THIRD TRACK—BROADWAY AND 134TH STREET
At the station on 42d Street, between Park and Madison Avenues, where there are five subway tracks, and along 42d Street to Broadway, a special method of construction was employed which was not followed elsewhere. The excavation here was about 35 feet deep and extended 10 to 15 feet into rock. A trench 30 feet wide was first sunk on the south side of the street and the subway built in it for a width of two tracks. Then, at intervals of 50 feet, tunnels were driven toward the north side of the street. Their tops were about 4 feet above the roof of the subway and their bottoms were on the roof. When they had been driven just beyond the line of the fourth track, their ends were connected by a tunnel parallel with the axis of the subway. The rock in the bottom of all these tunnels was then excavated to its final depth. In the small tunnel parallel with the subway axis, a bed of concrete was placed and the third row of steel columns was erected ready to carry the steel and concrete roof. When this work was completed, the earth between the traverse tunnels was excavated, the material above being supported on poling boards and struts. The roof of the subway was then extended sidewise over the rock below from the second to the third row of columns, and it was not until the roof was finished that the rock beneath was excavated. In this way the subway was finished for a width of four tracks. For the fifth track the earth was removed by tunneling to the limits of the subway, and then the rock below was blasted out.
MOVING WEST SIDE WALL TO WIDEN SUBWAY FOR THIRD TRACK—135TH STREET AND BROADWAY
MOVING WEST SIDE WALL TO WIDEN SUBWAY FOR THIRD
TRACK—135TH STREET AND BROADWAY
SUBWAY THROUGH NEW "TIMES" BUILDING, SHOWING INDEPENDENT CONSTRUCTION—THE WORKMEN STAND ON FLOOR GIRDERS OF SUBWAY
SUBWAY THROUGH NEW "TIMES" BUILDING, SHOWING
INDEPENDENT CONSTRUCTION—THE WORKMEN STAND ON FLOOR GIRDERS OF
SUBWAY
COLUMNS OF HOTEL BELMONT, PASSING THROUGH SUBWAY AT 42D STREET AND PARK AVENUE
COLUMNS OF HOTEL BELMONT, PASSING THROUGH SUBWAY AT 42D
STREET AND PARK AVENUE
In a number of places it was necessary to underpin the columns of the elevated railways, and a variety of methods were adopted for the work. A typical example of the difficulties involved was afforded at the Manhattan Railway Elevated Station at Sixth Avenue and 42d Street. The stairways of this station were directly over the open excavation for the subway in the latter thoroughfare and were used by a large number of people. The work was done in the same manner at each of the four corners. Two narrow pits about 40 feet apart, were first sunk and their bottoms covered with concrete at the elevation of the floor of the subway. A trestle was built in each pit, and on these were placed a pair of 3-foot plate girders, one on each side of the elevated column, which was midway between the trestles. The column was then riveted to the girders and was thus held independent of its original foundations. Other pits were then sunk under the stairway and trestles built in them to support it. When this work was completed it was possible to carry out the remaining excavation without interfering with the elevated railway traffic.
At 64th Street and Broadway, also, the whole elevated railway had to be supported during construction. A temporary wooden bent was used to carry the elevated structure. The elevated columns were removed until the subway structure was completed at that point. (See photograph on page 45.)
SMALL WATER MAINS BETWEEN STREET SURFACE AND SUBWAY ROOF, SUBSTITUTED FOR ONE LARGE MAIN—125TH STREET AND LENOX AVE.
SMALL WATER MAINS BETWEEN STREET SURFACE AND SUBWAY
ROOF, SUBSTITUTED FOR ONE LARGE MAIN—125TH STREET AND LENOX AVE.
SPECIAL CONSTRUCTION OF 6-1/2-FOOT SEWER, UNDER CHATHAM SQUARE
SPECIAL CONSTRUCTION OF 6-1/2-FOOT SEWER, UNDER CHATHAM
SQUARE
A feature of the construction which attracted considerable public
attention while it was in progress, was the underpinning of a part of
the Columbus Monument near the southwest entrance to Central Park.
This handsome memorial column has a stone shaft rising about 75 feet
above the street level and weighs about 700 tons. The rubble masonry
foundation is 45 feet square and rests on a 2-foot course of concrete.
The subway passes under its east side within 3 feet of its center,
thus cutting out about three-tenths of the original support. At this
place the footing was on dry sand of considerable depth, but on the
other side of the monument rock rose within 3 feet of the surface. The
steep slope of the rock surface toward the subway necessitated
particular care in underpinning the footings. The work was done by
first driving a tunnel 6 feet wide and 7 feet high under the monument
just outside the wall line of the subway. The tunnel was given a
2-foot bottom of concrete as a support for a row of wood posts a foot
square, which were put in every 5 feet to carry the footing above.
When these posts were securely wedged in place the tunnel was filled
with rubble masonry. This wall was strong enough to carry the weight
of the portion of the monument over the subway, but the monument had
to be supported to prevent its breaking off when undermined. To
support it thus a small tunnel was driven through the rubble masonry
foundation just below the street level and a pair of plate girders run
through it. A trestle bent was then built under each end of the
girders in the finished excavation for the subway. The girders were
wedged up against the top of the tunnel in the masonry and the
excavation was carried out under the monument without any injury to
that structure.
THREE PIPES SUBSTITUTED FOR LARGE BRICK SEWER AT 110TH STREET AND LENOX AVENUE
THREE PIPES SUBSTITUTED FOR LARGE BRICK SEWER AT 110TH
STREET AND LENOX AVENUE
SEWER SIPHON AT 149TH STREET AND RAILROAD AVENUE
SEWER SIPHON AT 149TH STREET AND RAILROAD AVENUE
CONCRETE SEWER BACK OF ELECTRIC DUCT MANHOLE—BROADWAY AND 58TH STREET
CONCRETE SEWER BACK OF ELECTRIC DUCT MANHOLE—BROADWAY
AND 58TH STREET
At 134th Street and Broadway a two-track structure of the steel beam
type about 200 feet long was completed. Approaching it from the south,
leading from Manhattan Valley Viaduct, was an open cut with retaining
walls 300 feet long and from 3 to 13 feet in height. After all this
work was finished (and it happened to be the first finished on the
subway), it was decided to widen the road to three tracks, and a
unique piece of work was successfully accomplished. The retaining
walls were moved bodily on slides, by means of jacks, to a line 6-1/4
feet on each side, widening the roadbed 12-1/2 feet, without a break
in either wall. The method of widening the steel-beam typical subway
portion was equally novel. The west wall was moved bodily by jacks
the necessary distance to bring it in line with the new position of
the west retaining wall. The remainder of the structure was then moved
bodily, also by jacks, 6-1/4 feet to the east. The new roof of the
usual type was then added over 12-1/2 feet of additional opening. (See
photographs on pages 46 and 47.)
CONCRETE SEWER BACK OF SIDE WALL, BROADWAY AND 56TH STREET
CONCRETE SEWER BACK OF SIDE WALL, BROADWAY AND 56TH
STREET
LARGE GAS AND WATER PIPES, RELAID BEHIND EACH SIDE WALL ON ELM STREET
LARGE GAS AND WATER PIPES, RELAID BEHIND EACH SIDE WALL
ON ELM STREET
Provision had to be made, not only for buildings along the route that
towered far above the street surface, but also for some which
burrowed far below the subway. Photograph on page 47 shows an
interesting example at 42d Street and Broadway, where the pressroom of
the new building of the "New York Times" is beneath the subway, the
first floor is above it, and the first basement is alongside of it.
Incidentally it should be noted that the steel structure of the
building and the subway are independent, the columns of the building
passing through the subway station.
DIFFICULT PIPE WORK—BROADWAY AND 70TH STREET
DIFFICULT PIPE WORK—BROADWAY AND 70TH STREET
At 42d Street and Park Avenue the road passes under the Hotel Belmont, which necessitated the use of extra heavy steel girders and foundations for the support of the hotel and reinforced subway station. (See photograph on page 48.)
Along the east side of Park Row the ascending line of the "loop" was built through the pressroom of the "New York Times" (the older downtown building), and as the excavation was considerably below the bottom of the foundation of the building, great care was necessary to avoid any settlement. Instead of wood sheathing, steel channels were driven and thoroughly braced, and construction proceeded without disturbance of the building, which is very tall.
At 125th Street and Lenox Avenue one of the most complicated network
of subsurface structures was encountered. Street surface electric
lines with their conduits intersect. On the south side of 125th Street
were a 48-inch water main and a 6-inch water main, a 12-inch and two
10-inch gas pipes and a bank of electric light and power ducts. On the
north side were a 20-inch water main, one 6-inch, one 10-inch, and one
12-inch gas pipe and two banks of electric ducts. The headroom between
the subway roof and the surface of the street was 4.75 feet. It was
necessary to relocate the yokes of the street railway tracks on Lenox
Avenue so as to bring them directly over the tunnel roof-beams.
Between the lower flanges of the roof-beams, for four bents, were laid
heavy steel plates well stiffened, and in these troughs were laid four
20-inch pipes, which carried the water of the 48-inch main. (See
photograph on page 49.) Special castings were necessary to make
the connections at each end. The smaller pipes and ducts were
rearranged and carried over the roof or laid in troughs composed of
3-inch I-beams laid on the lower flanges of the roof-beams. In
addition to all the transverse pipes, there were numerous pipes and
duct lines to be relaid and rebuilt parallel to the subway and around
the station. The change was accomplished without stopping or delaying
the street cars. The water mains were shut off for only a few hours.
SPECIAL RIVETED RECTANGULAR WATER PIPE, OVER ROOF OF SUBWAY AT 126TH STREET AND LENOX AVENUE
SPECIAL RIVETED RECTANGULAR WATER PIPE, OVER ROOF OF
SUBWAY AT 126TH STREET AND LENOX AVENUE
As has been said, the typical subway near the surface was used for
about one-half of the road. Since the sewers were at such a depth as
to interfere with the construction of the subway, it meant that the
sewers along that half had to be reconstructed. This indicates but
very partially the magnitude of the sewer work, however, because
nearly as many main sewers had to be reconstructed off the route of
the subway as on the route; 7.21 miles of main sewers along the route
were reconstructed and 5.13 miles of main sewers off the route. The
reason why so many main sewers on streets away from the subway had to
be rebuilt, was that, from 42d Street, south, there is a natural
ridge, and before the construction of the subway sewers drained to the
East River and to the North River from the ridge. The route of the
subway was so near to the dividing line that the only way to care for
the sewers was, in many instances, to build entirely new outfall
sewers.
THREE-TRACK CONCRETE ARCH—117TH STREET AND BROADWAY
THREE-TRACK CONCRETE ARCH—117TH STREET AND BROADWAY
A notable example of sewer diversion was at Canal Street, where the
flow of the sewer was carried into the East River instead of into the
Hudson River, permitting the sewer to be bulkheaded on the west side
and continued in use. On the east side a new main sewer was
constructed to empty into the East River. The new east-side sewer was
built off the route of the subway for over a mile. An interesting
feature in the construction was the work at Chatham Square, where a
6-1/2-foot circular brick conduit was built. The conjunction at this
point of numerous electric surface car lines, elevated railroad
pillars, and enormous vehicular street traffic, made it imperative
that the surface of the street should not be disturbed, and the sewer
was built by tunneling. This tunneling was through very fine running
sand and the section to be excavated was small. To meet these
conditions a novel method of construction was used. Interlocked
poling boards were employed to support the roof and were driven by
lever jacks, somewhat as a shield is driven in the shield system of
tunneling. The forward ends of the poling boards were supported by a
cantilever beam. The sides and front of the excavation were supported
by lagging boards laid flat against and over strips of canvas, which
were rolled down as the excavation progressed. The sewer was completed
and lined in lengths of from 1 foot to 4-1/2 feet, and at the maximum
rate of work about 12 feet of sewer were finished per week.
CONSTRUCTION OF FORT GEORGE TUNNEL
CONSTRUCTION OF FORT GEORGE TUNNEL
At 110th Street and Lenox Avenue a 6-1/2-foot circular brick sewer intersected the line of the subway at a level which necessitated its removal or subdivision. The latter expedient was adopted, and three 42-inch cast-iron pipes were passed under the subway. (See photograph on page 50.) At 149th Street and Railroad Avenue a sewer had to be lowered below tide level in order to cross under the subway. To do this two permanent inverted siphons were built of 48-inch cast-iron pipe. Two were built in order that one might be used, while the other could be shut off for cleaning, and they have proved very satisfactory. This was the only instance where siphons were used. In this connection it is worthy of note that the general changes referred to gave to the city much better sewers as substitutes for the old ones.
A number of interesting methods of providing for subsurface structures
are shown in photographs pages 51 to 54. From the General
Post-office at Park Row to 28th Street, just below the surface, there
is a system of pneumatic mail tubes for postal delivery. Of course,
absolutely no change in alignment could be permitted while these tubes
were in use carrying mail. It was necessary, therefore, to support
them very carefully. The slightest deviation in alignment would have
stopped the service.
TWO COLUMN BENT VIADUCT
TWO COLUMN BENT VIADUCT
TRAVELER FOR ERECTING FORMS, CENTRAL PARK TUNNEL—(IN THIS TUNNEL DUCTS ARE BUILT IN THE SIDEWALLS)
TRAVELER FOR ERECTING FORMS, CENTRAL PARK TUNNEL—(IN
THIS TUNNEL DUCTS ARE BUILT IN THE SIDEWALLS)